This document provides details for an energy savings performance contract opportunity within the Department of Veterans Affairs. The solicitation will be issued for energy conservation measures across four VA locations in Orlando, Florida, including boiler plant improvements, chiller upgrades, HVAC retrofits, lighting replacements, and renewable energy systems. Offerors must be service-disabled veteran-owned small businesses listed on the Department of Energy's qualified energy service provider list. Proposals will be accepted electronically through the VA vendor portal from March 22nd to approximately May 21st, 2018. The applicable NAICS code is 541330 with a size standard of $38.5 million.
36E77618R0005 S02 RFP ATTACHMENT J-3 - ESPC Technology Categories and Associated ECMs.pdf
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-3
ENERGY SAVINGS PERFORMANCE CONTRACT TECHNOLOGY CATEGORIES
AND ASSOCIATED ENERGY CONSERVATION MEASURES
This attachment lists the technology categories (TCs) authorized under this contract, and provides energy conservation measure (ECM) examples for each TC. This list is not intended to be inclusive of all potential ECMs authorized under each TC.
TC.1 Boiler Plant Improvements - ECMs such as, but not limited to:
• Boiler control, including new controls and retrofits to existing controls
• Replacement of existing boilers with high efficiency boilers
• Boiler decentralization
TC.2 Chiller Plant Improvements - ECMs such as, but not limited to:
• Chiller retrofits or replacements
• Chiller plant pumping, piping, and controls retrofits and replacements
TC.3 Building Automation Systems (BAS)/Energy Management Control Systems (EMCS) - ECMs such as, but not limited to:
• Heating, Ventilating, and Air Conditioning (HVAC) upgrade from pneumatics to Direct
Digital Control
• Upgrade or replacement of existing EMCS systems
TC.4 Heating, Ventilating, and Air Conditioning (HVAC, not including boilers, chillers, and Building Automation System/Energy Monitoring/Management Control System (EMCS)) - ECMs such as, but not limited to:
• Packaged air conditioning unit replacements
• HVAC damper and controller repair or replacement
• Window air conditioning replacement with high efficiency units
• Cooling tower retrofits or replacements
• Economizer installation
• Fans and pump replacement or impeller trimming
• Thermal energy storage
• Variable air volume retrofit
TC.5 Lighting Improvements - ECMs such as, but not limited to:
• Interior and exterior lighting retrofits and replacements
• Intelligent lighting controls
• Occupancy sensors
• Light Emitting Diode technologies
• Daylighting
• Spectrally enhanced lighting
• Fiber optic lighting technologies
TC.6 Building Envelope Modifications - ECMs such as, but not limited to:
• Insulation installation
• Weatherization
• Window replacement
• Reflective solar window tinting
TC.7 Chilled Water, Hot Water, and Steam Distribution Systems - ECMs such as, but not limited to:
• Piping insulation installation
• Hot water heater repair and replacement
• Steam trap repair and replacement
• Repair or replacement of existing condensate return systems and installation of new condensate return systems
TC.8 Electric Motors and Drives - ECMs such as, but not limited to:
• Motor replacement with high efficiency motors
• Variable speed motors or drives
TC.9 Refrigeration - ECMs such as, but not limited to:
• Replacement of ice/refrigeration equipment with high efficiency units
TC.10 Distributed Generation - ECMs such as, but not limited to:
• Cogeneration systems installation
• Micro-turbines installation
• Fuel cells installation
TC.11 Renewable Energy Systems - ECMs such as, but not limited to:
• Photovoltaic system installation
• Solar hot water system installation
• Solar ventilation preheating system installation
• Wind energy system installation
• Passive solar heating installation
• Landfill gas, waste water treatment plant digester gas, and coalbed methane power plant installation
• Wood waste and other organic waste stream heating or power plant installation
• Replacement of air conditioning and heating units with ground coupled heat pump systems
TC.12 Energy/Utility Distribution Systems - ECMs such as, but not limited to:
• Transformers installation
• Power quality upgrades
• Power factor correction
• Gas distribution systems installation
TC.13 Water and Sewer Conservation Systems - ECMs such as, but not limited to:
• Low-flow faucets and showerheads
• Low-flow plumbing equipment
• Water efficient irrigation
• On-site sewer treatment systems
TC.14 Electrical Peak Shaving/Load Shifting - ECMs such as, but not limited to:
• Thermal energy storage
• Gas cooling
TC.15 Energy Cost Reduction Through Rate Adjustments - ECMs such as, but not limited to:
• Change to more favorable rate schedule
• Lower energy cost supplier(s) (where applicable)
• Energy service billing and meter auditing recommendations
TC.16 Energy Related Process Improvements - ECMs such as, but not limited to:
• Production and/or manufacturing improvements
• Recycling and other waste stream reductions
• Industrial process improvement
TC.17 Commissioning - ECMs such as but not limited to:
• Retro-commissioning services
• Continuous commissioning services
TC.18 Advanced Metering Systems
TC.19 Appliance/Plug-load reductions - ECMs such as but not limited to:
• Replace air-cooled ice/refrigeration equipment
• Replace refrigerators
• De-lamp vending machines
• Plug timers
• Energy Star® products
TC.20 Future ECMs - (not currently authorized):
• Non-Building Applications
| ATTACHMENT J-3 |
| TC.4 Heating, Ventilating, and Air Conditioning (HVAC, not including boilers, chillers, and Building Automation System/Energy Monitoring/Management Control System (EMCS)) - ECMs such as, but not limited to: |
| TC.18 Advanced Metering Systems |
File details come from the government source that posted it. Updated .