36E77618R0005-00001013.xlsx
XLSX spreadsheet 66 KB Posted
- Attached to
- VISN 8 Orlando Energy Savings Performance Contract (ESPC) (Previously posted under 36E77618Q0013)
- Solicitation number
- 36E77618R0005
About this file
This notice announces a Request for Proposal for an Energy Savings Performance Contract for four locations within the Department of Veterans Affairs Medical Center Orlando. The solicitation will seek proposals for identified energy conservation measures at the Lake Baldwin, Lake Nona, Lakemont, and Viera OPC campuses, including improvements to boiler plants, chiller plants, HVAC systems, lighting, electric motors and drives, renewable energy systems, water and sewer conservation, commissioning, and solar powered trash compactors. The solicitation will be issued on or about March 22, 2018 for approximately 60 calendar days. Responses must be submitted electronically via the VA Vendor Acquisition Portal. This is a set-aside for Service Disabled Veteran Owned Small Businesses. Offerors must be on the Department of Energy's Qualified List of Energy Service Companies by the closing date. The applicable NAICS code is 541330 with a size standard of $38.5 million. Questions must be submitted in writing to the specified email address.
36E77618R0005 00001 Q8 FY17 OVAMC Utility Spreadsheet.xlsx
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY17 UTILITY TRACKER for 1358's
| VENDOR | Campus | Description | FY16 PO # | Account # | FY17 PO # | FCP | Cost Center | BOC | Vendor Tax ID Code | Vista Vendor Number | Quarter 1 (1358 Requested) | OCTOBER | NOVEMBER | DECEMBER | Total Spent OCT/NOV/DEC | Quarter 2 (1358 Requested) | JANUARY | FEBRUARY | MARCH | Total Spent JAN/FEB/MAR | Quarter 3 (1358 Requested) | APRIL | MAY | JUNE | Total Spent APR/MAY/JUN | Quarter 4 (1358 Requested) | JULY | AUGUST | SEPTEMBER | Total Spent JUL/AUG/SEP | Annual Total | |
| OUC | Lake Nona | Electric Meter 1 | C65039 | 4149254960 | C75088 | 6511 | 851100 | 2391 | 596000397 | 16794 | $1,150,000.00 | $322,707.63 | $323,391.85 | $342,678.65 | $988,778.13 | $850,000.00 | $292,580.80 | $297,134.34 | $337,281.92 | $926,997.06 | $990,000.00 | $315,237.26 | $356,239.06 | $390,282.23 | $1,061,758.55 | $370,638.36 | $371,133.10 | $377,139.28 | $1,118,910.74 | $4,096,444.48 | ||
| OUC | Lake Nona | Water | C65040 | 4149254960 | C75089 | 6511 | 851100 | 2392 | 596000397 | 16794 | $55,000.00 | $16,055.96 | $16,561.40 | $16,451.99 | $49,069.35 | $50,000.00 | $14,469.81 | $14,158.99 | $16,791.01 | $45,419.81 | $49,000.00 | $15,123.65 | $18,268.83 | $30,954.23 | $64,346.71 | $21,585.70 | $18,043.45 | $15,001.79 | $54,630.94 | $213,466.81 | ||
| OUC | Lake Nona | Sewer/ Wastewater | C65041 | 4149254960 | C75090 | 6511 | 851100 | 2395 | 596000397 | 16794 | $216,000.00 | $68,740.29 | $70,940.22 | $71,065.07 | $210,745.58 | $211,000.00 | $66,342.11 | $65,687.87 | $73,660.88 | $205,690.86 | $210,000.00 | $68,762.75 | $78,413.24 | $52,186.94 | $199,362.93 | $96,598.22 | $80,057.64 | $65,854.59 | $242,510.45 | $858,309.82 | ||
| OUC | Lake Nona | Reclaimed Water | C65042 | 4149254960 | C75069 | 6511 | 851100 | 2390 | 596000397 | 16794 | $4,500.00 | $342.93 | $983.25 | $534.06 | $1,860.24 | $1,200.00 | $348.45 | $62.79 | $600.30 | $1,011.54 | $0.00 | $1,985.13 | $1,810.56 | $770.09 | $4,565.78 | $723.13 | $59.40 | $269.61 | $1,052.14 | $8,489.70 | ||
| OUC | Lake Nona | Solid Waste | C65044 | 4149254960 | C75065 | 6567 | 856700 | 2542 | 596000397 | 16794 | $6,000.00 | $993.89 | $993.89 | $993.89 | $2,981.67 | $200.00 | $993.89 | $993.89 | $993.89 | $2,981.67 | $2,981.67 | $993.89 | $993.89 | $993.89 | $2,981.67 | $993.89 | $993.89 | $993.89 | $2,981.67 | $11,926.68 | ||
| OUC | SIMLEARN | Electric Meter 2 | C65365 | 4149254960 | C75087 | 6511 | 851100 | 2391 | 596000397 | 16794 | $15,000.00 | $5,458.75 | $6,980.19 | $7,792.73 | $20,231.67 | $24,000.00 | $7,625.10 | $6,865.28 | $7,774.18 | $22,264.56 | $30,000.00 | $6,583.62 | $7,578.52 | $7,570.18 | $21,732.32 | $7,031.83 | $7,372.52 | $7,657.65 | $22,062.00 | $86,290.55 | ||
| TECO | Lake Nona | Gas | C65043 | 19245273 | C75070 | 6511 | 851100 | 2394 | 590475140 | 25674 | $405,000.00 | $110,705.63 | $119,312.77 | $146,131.54 | $376,149.94 | $375,000.00 | $133,228.76 | 130,636.96 | $124,435.45 | $388,301.17 | $400,000.00 | $137,171.94 | $126,144.62 | $109,478.58 | $372,795.14 | $117,195.00 | $116,010.98 | $140,857.60 | $374,063.58 | $1,511,309.83 | ||
| OUC | Lake Baldwin | Electric | C65059 | 5185800001 | C75091 | 6511 | 851100 | 2391 | 596000397 | 16794 | $249,000.00 | $61,346.44 | $57,242.15 | $54,753.68 | $173,342.27 | $105,000.00 | $50,289.65 | 48,067.13 | $64,553.37 | $162,910.15 | $190,000.00 | $60,104.51 | $70,624.85 | $82,962.14 | $213,691.50 | $84,594.92 | $78,027.56 | $68,768.55 | $231,391.03 | $781,334.95 | ||
| OUC | Lake Baldwin | Water | C65060 | 5185800001 | C75071 | 6511 | 851100 | 2392 | 596000397 | 16794 | $10,500.00 | $2,765.53 | $2,822.55 | $2,585.24 | $8,173.32 | $8,000.00 | $2,491.23 | $2,321.72 | $2,851.83 | $7,664.78 | $7,000.00 | $2,419.00 | $3,532.78 | $3,443.27 | $9,395.05 | $3,214.16 | $4,082.60 | $2,944.87 | $10,241.63 | $35,474.78 | ||
| OUC | Lake Baldwin | Sewer/ Wastewater | C65061 | 5185800001 | C75072 | 6511 | 851100 | 2395 | 596000397 | 16794 | $39,000.00 | $10,247.90 | $10,216.60 | $9,481.18 | $29,945.68 | $25,000.00 | $9,094.96 | $8,648.33 | $10,220.06 | $27,963.35 | $25,000.00 | $9,051.34 | $10,764.05 | $13,542.63 | $33,358.02 | $11,790.01 | $16,346.72 | $10,768.61 | $38,905.34 | $130,172.39 | ||
| OUC | Lake Baldwin | Solid Waste | C65062 | 5185800001 | C75066 | 6567 | 856700 | 2542 | 596000397 | 16794 | $3,041.64 | $1,013.88 | $1,013.88 | $1,013.88 | $3,041.64 | $3,041.64 | $1,013.88 | $1,013.88 | $1,090.92 | $3,118.68 | $3,373.00 | $1,013.88 | $1,013.88 | $1,013.88 | $3,041.64 | $1,013.88 | $1,013.88 | $1,013.88 | $3,041.64 | $12,243.60 | ||
| TECO | Lake Baldwin | Gas | C65063 | 06451447 | C75073 | 6511 | 851100 | 2394 | 590475140 | 25674 | $15,000.00 | $2,571.49 | $4,400.62 | $4,566.69 | $11,538.80 | $10,000.00 | $5,551.06 | 5,560.73 | $5,498.58 | $16,610.37 | $20,000.00 | $4,941.80 | $4,693.86 | $5,064.65 | $14,700.31 | $6,201.34 | $6,145.36 | $6,712.28 | $19,058.98 | $61,908.46 | ||
| INFINITE ENERGY | Lake Baldwin | Gas Supplier | C65064 | 64082222431512 | C75074 | 6511 | 851100 | 2394 | 593244997 | 20181 | $49,500.00 | $13,321.08 | $14,040.69 | $14,391.59 | $41,753.36 | $37,000.00 | $17,718.05 | $18,725.32 | $18,781.90 | $55,225.27 | $70,000.00 | $16,809.88 | $15,657.64 | $16,746.45 | $49,213.97 | $16,656.78 | $17,333.16 | $22,836.75 | $56,826.69 | $203,019.29 | ||
| OUC | Lakemont | Electric | C65065 | 871800001 | C75075 | 6511 | 851100 | 2391 | 596000397 | 16794 | $117,000.00 | $35,115.43 | $36,152.52 | $29,521.73 | $100,789.68 | $95,000.00 | $32,090.06 | 30,588.60 | $36,148.62 | $98,827.28 | $100,000.00 | $30,661.14 | $34,940.15 | $33,710.68 | $99,311.97 | $35,516.67 | $32,791.26 | $30,663.71 | $98,971.64 | $397,900.57 | ||
| OUC | Lakemont | Water | C65066 | 871800001 | C75076 | 6511 | 851100 | 2392 | 596000397 | 16794 | $10,800.00 | $1,636.97 | $1,888.80 | $1,905.19 | $5,430.96 | $500.00 | $1,662.49 | $1,497.30 | $1,785.30 | $4,945.09 | $5,000.00 | $1,786.55 | $4,141.13 | $1,509.34 | $7,437.02 | $1,862.14 | $3,117.32 | $2,869.95 | $7,849.41 | $25,662.48 | ||
| OUC | Lakemont | Sewer/Wastewater | C65067 | 871800001 | C75077 | 6511 | 851100 | 2395 | 596000397 | 16794 | $21,000.00 | $3,854.00 | $4,072.35 | $4,021.54 | $11,947.89 | $5,000.00 | $3,721.51 | $3,294.11 | $3,421.69 | $10,437.31 | $10,000.00 | $2,837.64 | $3,159.90 | $4,056.49 | $10,054.03 | $3,239.12 | $3,049.52 | $2,493.09 | $8,781.73 | $41,220.96 | ||
| OUC | Lakemont | Solid Waste | C65068 | 871800001 | C75067 | 6567 | 856700 | 2542 | 596000397 | 16794 | $3,727.08 | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $3,727.08 | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $3,727.08 | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $14,908.32 | ||
| FPL (FLORIDA POWER & LIGHT ) | Viera | Electric Meter 1 | C65069 | 2282788393 | C75078 | 6511 | 851100 | 2391 | 590247775 | 26125 | $63,000.00 | $40,494.08 | $0.00 | $15,726.49 | $56,220.57 | $55,000.00 | $15,782.51 | $14,116.12 | $12,260.54 | $42,159.17 | $48,000.00 | $14,220.57 | $21,565.50 | $26,135.49 | $61,921.56 | $29,155.18 | $26,153.02 | $27,338.01 | $82,646.21 | $242,947.51 | ||
| FPL (FLORIDA POWER & LIGHT ) | Viera | Electric Meter 2 | C65069 | 4410471314 | C75078 | 6511 | 851100 | 2391 | 590247775 | 26125 | $1,158.00 | $596.36 | $528.29 | $0.00 | $1,124.65 | $1,500.00 | $0.00 | $178.81 | $270.02 | $448.83 | $1,000.00 | $278.44 | $351.37 | $303.35 | $933.16 | $330.11 | $326.12 | $315.37 | $971.60 | $3,478.24 | ||
| FPL (FLORIDA POWER & LIGHT ) | Viera | Electric Meter 3 | C65069 | 6164816362 | C75078 | 6511 | 851100 | 2391 | 590247775 | 26125 | $114,000.00 | $69,919.65 | $69,271.40 | $0.00 | $139,191.05 | $210,000.00 | $6,280.77 | $38,442.20 | $37,226.26 | $81,949.23 | $71,000.00 | $36,878.97 | $37,696.64 | $36,483.12 | $111,058.73 | $37,151.01 | $36,435.89 | $37,135.98 | $110,722.88 | $442,921.89 | ||
| CITY OF COCOA | Viera | Water | C65070 | 194369129612 | C75079 | 6511 | 851100 | 2392 | 59600029201 | 21166 | $5,000.00 | $1,518.50 | $1,780.90 | $1,685.78 | $4,985.18 | $6,000.00 | $1,406.98 | $1,689.06 | $1,841.82 | $4,937.86 | $4,000.00 | $1,630.02 | $1,495.11 | $1,108.07 | $4,233.20 | $1,183.94 | $1,518.50 | $1,029.25 | $3,731.69 | $17,887.93 | ||
| CITY OF COCOA | Viera | Sewer | C65071 | 194369129612 | C75080 | 6511 | 851100 | 2395 | 59600029201 | 21166 | $8,700.00 | $2,409.13 | $2,991.40 | $2,917.84 | $8,318.37 | $8,700.00 | $2,268.59 | $2,925.48 | $3,246.29 | $8,440.36 | $8,700.00 | $2,787.99 | $2,513.01 | $1,611.69 | $6,912.69 | $1,749.18 | $2,528.29 | $1,298.52 | $5,575.99 | $29,247.41 | ||
| CITY OF COCOA | Viera | Fireline | C65072 | 194369141254 | C75081 | 6511 | 851100 | 2390 | 59600029201 | 21166 | $302.52 | $105.88 | $105.88 | $105.88 | $317.64 | $317.64 | $105.88 | $105.88 | $105.88 | $317.64 | $375.00 | $105.88 | $105.88 | $105.88 | $317.64 | $105.88 | $105.88 | $110.12 | $321.88 | $1,274.80 | ||
| DUKE ENERGY | Crossroads | Suite 112B | C65085 | 9386053273 | C75082 | 6511 | 851100 | 2391 | 592865986 | 15764 | $1,800.00 | $446.02 | $419.36 | $421.58 | $1,286.96 | $1,000.00 | $448.40 | $399.84 | $415.27 | $1,263.51 | $1,300.00 | $501.97 | $501.97 | $547.26 | $553.66 | $531.08 | $1,632.00 | $4,684.44 | ||||
| DUKE ENERGY | Crossroads | Suite 114 | C65085 | 4423684140 | C75082 | 6511 | 851100 | 2391 | 592865986 | 15764 | $2,730.00 | $682.98 | $613.65 | $604.63 | $1,901.26 | $1,500.00 | $615.97 | $611.23 | $650.65 | $1,877.85 | $2,000.00 | $794.22 | $794.22 | $925.87 | $882.17 | $856.29 | $2,664.33 | $7,237.66 | ||||
| DUKE ENERGY | Crossroads | Suite 120 | C65085 | 5147646049 | C75082 | 6511 | 851100 | 2391 | 592865986 | 15764 | $1,000.00 | $225.39 | $202.46 | $208.25 | $636.10 | $500.00 | $211.49 | $185.19 | $188.05 | $584.73 | $700.00 | $236.06 | $236.06 | $280.85 | $257.55 | $253.65 | $792.05 | $2,248.94 | ||||
| DUKE ENERGY | Clermont | Electric | C65086 | 6845729424 | C75092 | 6511 | 851100 | 2391 | 592865986 | 15764 | $5,000.00 | $1,117.86 | $1,046.60 | $1,133.56 | $3,298.02 | $1,700.00 | $12,786.13 | $1,032.27 | $1,045.62 | $14,864.02 | $16,000.00 | $60,104.51 | $70,624.85 | $82,962.14 | $213,691.50 | $1,374.98 | $1,374.98 | $233,228.52 | ||||
| FPL (FLORIDA POWER & LIGHT ) | Daytona OPC | Electric | C65073 | 3385335488 | C75083 | 6511 | 851100 | 2391 | 590247775 | 26125 | $50,100.00 | $27,913.06 | $0.00 | $14,779.50 | $42,692.56 | $40,000.00 | $12,786.13 | $14,005.67 | $15,262.02 | $42,053.82 | $45,000.00 | $17,089.25 | $16,727.96 | $16,469.27 | $50,286.48 | $16,857.75 | $16,715.00 | $16,103.71 | $49,676.46 | $184,709.32 | ||
| CITY OF DAYTONA BEACH | Daytona OPC | Water | C65074 | 00051754-01 | C75084 | 6511 | 851100 | 2392 | 596000304 | 25239 | $1,050.00 | $276.85 | $271.63 | $365.59 | $914.07 | $1,000.00 | $302.95 | $396.91 | $297.73 | $997.59 | $1,500.00 | $292.51 | $276.85 | $334.27 | $903.63 | $329.05 | $287.29 | $248.14 | $864.48 | $3,679.77 | ||
| CITY OF DAYTONA BEACH | Daytona OPC | Sewer | C65075 | 00051754-01 | C75085 | 6511 | 851100 | 2395 | 596000304 | 25239 | $5,100.00 | $1,612.66 | $1,603.68 | $1,765.32 | $4,981.66 | $5,100.00 | $1,657.56 | $1,819.20 | $1,648.58 | $5,125.34 | $6,200.00 | $1,639.60 | $1,612.66 | $1,711.44 | $4,963.70 | $1,702.46 | $1,338.12 | $1,600.45 | $4,641.03 | $19,711.73 | ||
| CITY OF DAYTONA BEACH | Daytona OPC | Solid Waste | C65076 | 00051754-01 | C75068 | 6567 | 856700 | 2542 | 596000304 | 25239 | $162.00 | $56.08 | $56.08 | $56.08 | $168.24 | $175.00 | $56.08 | $56.08 | $56.08 | $168.24 | $168.24 | $56.08 | $56.08 | $56.08 | $168.24 | $56.08 | $56.08 | $57.80 | $169.96 | $674.68 | ||
| CITY OF DAYTONA BEACH | Daytona OPC | Fireline | C65077 | 00051755-01 | C75086 | 6511 | 851100 | 2390 | 596000304 | 25239 | $479.22 | $84.96 | $85.03 | $84.96 | $254.95 | $50.00 | $84.96 | $84.96 | $84.96 | $254.88 | $300.00 | $84.96 | $84.96 | $84.96 | $254.88 | $85.18 | $84.96 | $87.76 | $257.90 | $1,022.61 | ||
| Total | $2,629,650.46 | $805,579.62 | $751,232.45 | $748,986.47 | $2,305,798.54 | $2,136,211.36 | $695,258.57 | $712,548.50 | $781,732.03 | $2,189,539.10 | $813,427.37 | $892,330.19 | $922,893.79 | $2,628,651.35 | $870,557.31 | $845,438.23 | $845,054.59 | $2,561,050.13 | $9,685,039.12 | Total | ||||||||||||
| 6511 | $2,616,719.74 | $802,273.41 | $747,926.24 | $745,680.26 | $2,295,879.91 | $2,129,067.64 | $691,952.36 | $709,242.29 | $778,348.78 | $2,179,543.43 | $810,121.16 | $889,023.98 | $919,587.58 | $2,618,732.72 | $867,251.10 | $842,132.02 | $841,746.66 | $2,551,129.78 | $9,645,285.84 | 6511 | ||||||||||||
| 6567 | $12,930.72 | $3,306.21 | $3,306.21 | $3,306.21 | $9,918.63 | $7,143.72 | $3,306.21 | $3,306.21 | $3,383.25 | $9,995.67 | $3,306.21 | $3,306.21 | $3,306.21 | $9,918.63 | $3,306.21 | $3,306.21 | $3,307.93 | $9,920.35 | $39,753.28 | 6567 |
FY17 Energy Usage
| VENDOR | Campus | Description | OCTOBER | NOVEMBER | DECEMBER | Total Spent OCT/NOV/DEC | JANUARY | FEBRUARY | MARCH | Total Spent JAN/FEB/MAR | APRIL | MAY | JUNE | Total Spent APR/MAY/JUN | JULY | AUGUST | SEPTEMBER | Total Spent JUL/AUG/SEP | Annual Total | |||
| OUC | SIMLEARN | Electric Meter 2 | $5,458.75 | $6,980.19 | $7,792.73 | $20,231.67 | $7,625.10 | $6,865.28 | $7,774.18 | $22,264.56 | $6,583.62 | $7,578.52 | $7,570.18 | $21,732.32 | $7,031.83 | $7,372.52 | $7,657.65 | $22,062.00 | $86,290.55 | |||
| OUC | SIMLEARN (Utility) | Electrical (kWh) | 65,800 | 85,600 | 97,600 | 249,000 | 93,400 | 83,600 | 97,000 | 274,000 | 80,400 | 94,600 | 94,820 | 269,820 | 86,900 | 90,640 | 95,240 | 272,780 | 1,065,600 | |||
| OUC | SIMLEARN (Utility) | Electrical Demand (kW) | 128.4 | 153.4 | 155.2 | 437 | 168.8 | 155.6 | 157.8 | 482 | 147.2 | 153.4 | 150.6 | 451.2 | 149.6 | 160.4 | 157.9 | 467.8 | 1,838 | |||
| OUC | Lake Nona | Electric Meter 1 | $322,707.63 | $323,391.85 | $342,678.65 | $988,778.13 | $292,580.80 | $297,134.34 | $337,281.92 | $926,997.06 | $315,237.26 | $356,239.06 | $390,282.23 | $1,061,758.55 | $370,638.36 | $371,133.10 | $377,139.28 | $1,118,910.74 | $4,096,444.48 | LN Electrical Rate | $0.082 | |
| OUC | Lake Nona (Utility) | Electrical (kWh) | 3,965,400 | 3,812,400 | 4,228,200 | 12,006,000 | 3,555,000 | 3,526,600 | 4,125,600 | 11,207,200 | 3,760,200 | 4,381,200 | 4,906,080 | 13,047,480 | 4,545,180 | 4,486,680 | 4,663,440 | 13,695,300 | 49,955,980 | |||
| OUC | Lake Nona (Utility) | Electrical (kW) | 7,979 | 8,325 | 8,327 | 24,631 | 8,627 | 12,716 | 8,503 | 29,847 | 8,764.2 | 8,780.4 | 8,714.5 | 26,259 | 9,249 | 9,816 | 9,082 | 28,147 | 108,884 | 3.3387080048 | ||
| OUC | Lake Nona (Utility) | Demand Cost | $60,872.70 | $63,664.70 | $63,692.60 | $188,230.00 | $66,055.90 | $96,616.30 | $65,036.40 | $ 227,708.60 | $66,909.10 | $67,080.20 | $66,563.70 | $200,553.00 | $70,565.20 | $74,899.89 | $69,379.83 | $214,844.92 | $831,336.52 | |||
| OUC | Lake Nona | Water | $16,055.96 | $16,561.40 | $16,451.99 | $49,069.35 | $14,469.81 | $14,158.99 | $16,791.01 | $45,419.81 | $15,123.65 | $18,268.83 | $30,954.23 | $64,346.71 | $21,585.70 | $18,043.45 | $15,001.79 | $54,630.94 | $213,466.81 | LN Water Rate | ||
| OUC | Lake Nona (Utility) | Pot.Water (kGal) | 9,836 | 10,164 | 10,093 | 30,093 | 8,930 | 8,605 | 10,313 | 27,848 | 9,231 | 11,272 | 19,504 | 40,007 | 13,424 | 11,126 | 9,152 | 33,702 | 131,650 | $1.62 | ||
| OUC | Lake Nona | Sewer/ Wastewater | $68,740.29 | $70,940.22 | $71,065.07 | $210,745.58 | $66,342.11 | $65,687.87 | $73,660.88 | $205,690.86 | $68,762.75 | $78,413.24 | $52,186.94 | $199,362.93 | $96,598.22 | $80,057.64 | $65,854.59 | $242,510.45 | $858,309.82 | |||
| OUC | Lake Nona | Reclaimed Water | $342.93 | $983.25 | $534.06 | $1,860.24 | $348.45 | $62.79 | $600.30 | $1,011.54 | $1,985.13 | $1,810.56 | $770.09 | $4,565.78 | $723.13 | $59.40 | $269.61 | $1,052.14 | $8,489.70 | LN Rec Water Rate | ||
| OUC | Lake Nona (Utility) | Rec Water (kGal) | 497 | 1,425 | 774 | 2,696 | 505 | 91 | 870 | 1,466 | 2,877 | 2,624 | 1,116 | 6,617 | 1,048 | 86 | 391 | 1,525 | 12,304 | $0.69 | ||
| OUC | Lake Nona | Solid Waste | $993.89 | $993.89 | $993.89 | $2,981.67 | $993.89 | $993.89 | $993.89 | $2,981.67 | $993.89 | $993.89 | $993.89 | $2,981.67 | $993.89 | $993.89 | $993.89 | $2,981.67 | $11,926.68 | Total LN Water Rate | ||
| TECO | Lake Nona | Gas (Total Cost w/ taxes) | $110,705.63 | $119,312.77 | $146,131.54 | $376,149.94 | $133,228.76 | $130,636.96 | $124,435.45 | $388,301.17 | $137,171.94 | $126,144.62 | $109,478.58 | $372,795.14 | $117,195.00 | $116,010.98 | $140,857.60 | $374,063.58 | $1,511,309.83 | $1.54 | ||
| TECO | Lake Nona | Gas Supply Cost (PGA) | $82,007.53 | $88,391.80 | $108,347.88 | $278,747.21 | $99,932.17 | $97,839.98 | $93,185.91 | $290,958.06 | $102,746.93 | $93,970.74 | $81,993.59 | $278,711.26 | $92,678.85 | $92,913.68 | $113,278.38 | $298,870.91 | $1,147,287.44 | |||
| TECO | Lake Nona | Gas Delivery Cost (Dist) | $18,917.33 | $20,390.04 | $24,942.37 | $64,249.74 | $21,878.69 | $21,420.64 | $20,401.70 | $63,701.03 | $22,494.94 | $21,114.77 | $17,951.30 | $61,561.01 | $14,284.90 | $13,162.62 | $15,555.41 | $43,002.93 | $232,514.71 | |||
| TECO | Lake Nona (Utility) | Gas (Therms) | 110,517.8 | 119,121.6 | 146,015.5 | 375,654.9 | 128,080.4 | 125,398.9 | 119,433.9 | 372,913.2 | 131,688.0 | 123,608.3 | 105,089.0 | 360,385.3 | 112,338 | 103,512 | 126,200 | 342,050 | 1,451,003.4 | $1.04 | per therm | |
| OUC | Lake Baldwin | Electric | $61,346.44 | $57,242.15 | $54,753.68 | $173,342.27 | $50,289.65 | $48,067.13 | $64,553.37 | $162,910.15 | $60,104.51 | $70,624.85 | $82,962.14 | $213,691.50 | $84,594.92 | $78,027.56 | $68,768.55 | $231,391.03 | $781,334.95 | $9.51 | $/MMBtu | |
| OUC | Lake Baldwin (Utility) | Electrical (kWh) | 768,132 | 756,343 | 740,993 | 2,265,468 | 626,989 | 632,851 | 750,521 | 2,010,361 | 691,947 | 849,529 | 949,410 | 2,490,886 | 1,004,392 | 940,005 | 808,463 | 2,752,860 | 9,519,575 | $0.082 | ||
| OUC | Lake Baldwin (Utility) | Electrical Demand (kW) | 4,201 | 3,229 | 2,954 | 10,384 | 3,127 | 2,732 | 2,730 | 8,589 | 3,000 | 2,946 | 3,937 | 9,882 | 3,677 | 3,232 | 3,154 | 10,063 | 38,918 | |||
| Lake Baldwin (Utility) | Demand Cost | $17,889 | $12,861 | $11,087 | $41,836.17 | $12,733 | $10,266 | $10,261 | $33,260.07 | $11,303 | $11,160 | $16,126 | $38,589.21 | $14,255 | $12,134 | $11,925 | $38,313.98 | $151,999.43 | $3.906 | per KW | ||
| OUC | Lake Baldwin | Water | $2,765.53 | $2,822.55 | $2,585.24 | $8,173.32 | $2,491.23 | $2,321.72 | $2,851.83 | $7,664.78 | $2,419.00 | $3,532.78 | $3,443.27 | $9,395.05 | $3,214.16 | $4,082.60 | $2,944.87 | $10,241.63 | $35,474.78 | |||
| OUC | Lake Baldwin (Utility) | Pot.Water (kGal) | 1,373 | 1,410 | 1,256 | 4,039 | 1,195 | 1,085 | 1,429 | 3,709 | 1,158 | 1,885 | 1,826 | 4,869 | 1,689 | 2,209 | 1,560 | 5,457 | 18,074 | $1.96 | ||
| OUC | Lake Baldwin | Sewer/ Wastewater | $10,247.90 | $10,216.60 | $9,481.18 | $29,945.68 | $9,094.96 | $8,648.33 | $10,220.06 | $27,963.35 | $9,051.34 | $10,764.05 | $13,542.63 | $33,358.02 | $11,790.01 | $16,346.72 | $10,768.61 | $38,905.34 | $130,172.39 | |||
| OUC | Lake Baldwin | Solid Waste | $1,013.88 | $1,013.88 | $1,013.88 | $3,041.64 | $1,013.88 | $1,013.88 | $1,090.92 | $3,118.68 | $1,013.88 | $1,013.88 | $1,013.88 | $3,041.64 | $1,013.88 | $1,013.88 | $1,013.88 | $3,041.64 | $12,243.60 | |||
| TECO | Lake Baldwin | Gas | $2,571.49 | $4,400.62 | $4,566.69 | $11,538.80 | $5,551.06 | $5,560.73 | $5,498.58 | $16,610.37 | $4,941.80 | $4,693.86 | $5,064.65 | $14,700.31 | $6,201.34 | $6,145.36 | $6,712.28 | $19,058.98 | $61,908.46 | |||
| TECO | Lake Baldwin | Gas Delivery Cost (Dist) | $2,893.79 | $3,245.40 | $3,374.53 | $9,513.72 | $4,146.02 | $4,154.10 | $4,104.34 | $12,404.46 | $3,667.61 | $3,473.56 | $3,763.98 | $10,905.15 | $4,648.67 | $4,605.59 | $5,041.80 | $14,296.06 | $47,119.39 | |||
| TECO | Lake Baldwin (Utility) | Gas (Therms) | 17,300.1 | 18,960.1 | 19,714.5 | 55,974.7 | 24,271.3 | 24,318.6 | 24,027.3 | 72,617.2 | 21,470.6 | 20,334.6 | 22,034.8 | 63,840.0 | 21,033 | 20,838 | 22,812 | 64,682 | 257,114.1 | $1.03 | per therm | |
| INFINITE ENERGY | Lake Baldwin | Gas Supplier | $13,321.08 | $14,040.69 | $14,391.59 | $41,753.36 | $17,718.05 | $18,725.32 | $18,781.90 | $55,225.27 | $16,809.88 | $15,657.64 | $16,746.45 | $49,213.97 | $16,656.78 | $17,333.16 | $22,836.75 | $56,826.69 | $203,019.29 | |||
| OUC | Lakemont | Electric | $35,115.43 | $36,152.52 | $29,521.73 | $100,789.68 | $32,090.06 | $30,588.60 | $36,148.62 | $98,827.28 | $30,661.14 | $34,940.15 | $33,710.68 | $99,311.97 | $35,516.67 | $32,791.26 | $30,663.71 | $98,971.64 | $397,900.57 | $0.081 | ||
| OUC | Lakemont (Utility) | Electrical (kWh) | 421,900 | 443,000 | 426,300 | 1,291,200 | 391,100 | 373,600 | 456,900 | 1,221,600 | 370,100 | 426,800 | 417,600 | 1,214,500 | 430,070 | 401,330 | 363,000 | 1,194,400 | 4,921,700 | |||
| OUC | Lakemont (Utility) | Electrical Demand (kW) | 748 | 813 | 796 | 2,357 | 738 | 697 | 700 | 2,136 | 734 | 797 | 721 | 2,252 | 840 | 741 | 792 | 2,373 | 9,118 | |||
| OUC | Lakemont | Demand Cost | $5,983.20 | $6,504.00 | $6,366.40 | $18,853.60 | $5,907.20 | $5,577.60 | $5,599.20 | $17,084.00 | $5,875.20 | $6,372.00 | $5,769.60 | $18,016.80 | $6,722.16 | $5,927.76 | $6,337.92 | $18,987.84 | $72,942.24 | |||
| OUC | Lakemont | Water | $1,636.97 | $1,888.80 | $1,905.19 | $5,430.96 | $1,662.49 | $1,497.30 | $1,785.30 | $4,945.09 | $1,786.55 | $4,141.13 | $1,509.34 | $7,437.02 | $1,862.14 | $3,117.32 | $2,869.95 | $7,849.41 | $25,662.48 | |||
| OUC | Lakemont (Utility) | Pot.Water (kGal) | 488 | 562 | 552 | 1,602 | 508 | 418 | 457 | 2,208 | 334 | 414 | 391 | 1,139 | 450.146 | 423.796 | 346.469 | 1,220.411 | 6,169 | $1.22 | ||
| OUC | Lakemont (Utility) | Irrigation (kGal) | 265 | 291 | 297 | 853 | 264 | 259 | 302 | 11,262 | 338 | 759 | 269 | 1,366 | 318.492 | 562.979 | 538.789 | 1,420.260 | 14,902 | |||
| OUC | Lakemont | Sewer/Wastewater | $3,854.00 | $4,072.35 | $4,021.54 | $11,947.89 | $3,721.51 | $3,294.11 | $3,421.69 | $10,437.31 | $2,837.64 | $3,159.90 | $4,056.49 | $10,054.03 | $3,239.12 | $3,049.52 | $2,493.09 | $8,781.73 | $41,220.96 | |||
| OUC | Lakemont | Solid Waste | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $1,242.36 | $1,242.36 | $1,242.36 | $3,727.08 | $14,908.32 | |||
| FPL (FLORIDA POWER & LIGHT ) | Viera | Electric Meter 1 | $18,060.54 | $17,191.32 | $17,540.50 | $52,792.36 | $15,782.51 | $14,116.12 | $12,260.54 | $42,159.17 | $14,220.57 | $21,565.50 | $26,135.49 | $61,921.56 | $29,155.18 | $26,153.02 | $27,338.01 | $82,646.21 | $239,519.30 | |||
| FPL (FLORIDA POWER & LIGHT ) | Viera | Electric Meter 2 | $247.18 | $233.23 | $249.33 | $729.74 | $0.00 | $178.81 | $270.02 | $448.83 | $278.44 | $351.37 | $303.35 | $933.16 | $330.11 | $326.12 | $315.37 | $971.60 | $3,083.33 | |||
| FPL (FLORIDA POWER & LIGHT ) | Viera | Electric Meter 3 | $31,395.86 | $31,577.90 | $35,708.33 | $98,682.09 | $6,280.77 | $38,442.20 | $37,226.26 | $81,949.23 | $36,878.97 | $37,696.64 | $36,483.12 | $111,058.73 | $37,151.01 | $36,435.89 | $37,135.98 | $110,722.88 | $402,412.93 | $645,015.56 | ||
| FPL (FLORIDA POWER & LIGHT ) | Viera (Utility) | Electrical (kWh) | 783,447 | 778,008 | 766,047 | 2,327,502 | 657,956 | 632,129 | 545,679 | 1,835,764 | 596,516 | 755,166 | 788,066 | 2,139,748 | 841,230 | 797,752 | 831,566 | 2,470,548 | 8,773,562 | 0.0735180945 | ||
| FPL (FLORIDA POWER & LIGHT ) | Viera (Utility) | Electrical (kW) | 1,581 | 889 | 930 | 3,400 | 1,480 | 1,404 | 1,504 | 4,388 | 1,514 | 1,512 | 1,619 | 4,645 | 1,666 | 1,541 | 1,543 | 4,750 | 17,183 | |||
| CITY OF COCOA | Viera | Water | $1,501.67 | $1,764.07 | $1,668.95 | $4,934.69 | $1,390.15 | $1,672.23 | $1,824.99 | $4,887.37 | $1,613.19 | $1,495.11 | $1,108.07 | $4,216.37 | $1,183.94 | $1,518.50 | $1,029.25 | $3,731.69 | $17,770.12 | |||
| CITY OF COCOA | Viera (Utility) | Pot.Water (kGal) | 331 | 411 | 382 | 1,124 | 297 | 383 | 425 | 1,105 | 365 | 329 | 211 | 905 | 229 | 331 | 170 | 730 | 3,864 | $4.60 | ||
| CITY OF COCOA | Viera | Sewer | $2,409.13 | $2,991.40 | $2,917.84 | $8,318.37 | $2,268.59 | $2,925.48 | $3,246.29 | $8,440.36 | $2,787.99 | $2,513.01 | $1,611.69 | $6,912.69 | $1,749.18 | $2,528.29 | $1,298.52 | $5,575.99 | $29,247.41 | |||
| CITY OF COCOA | Viera | Fireline | $105.88 | $105.88 | $105.88 | $317.64 | $105.88 | $105.88 | $105.88 | $317.64 | $105.88 | $105.88 | $105.88 | $317.64 | $105.88 | $105.88 | $110.12 | $321.88 | $1,274.80 | |||
| DUKE ENERGY | Crossroads | Suite 112B | $446.02 | $419.36 | $865.38 | $0.00 | $12,786.13 | $14,005.67 | $0.00 | $26,791.80 | $0.00 | $27,657.18 | ||||||||||
| DUKE ENERGY | Crossroads | Suite 114 | $682.98 | $613.65 | $1,296.63 | $0.00 | $0.00 | $0.00 | $1,296.63 | |||||||||||||
| DUKE ENERGY | Crossroads | Suite 120 | $225.39 | $202.46 | $427.85 | $0.00 | $0.00 | $0.00 | $427.85 | |||||||||||||
| DUKE ENERGY | Clermont | Electric | $1,117.86 | $1,046.60 | $2,164.46 | $0.00 | $0.00 | $0.00 | $2,164.46 | |||||||||||||
| $2.0142 | $2.0018 | $2.0583 | ||||||||||||||||||||
| Electric | ||||||||||||||||||||||
| Gas | ||||||||||||||||||||||
| Water | October | November | December | 1st Qtr Total | January | February | March | 2nd Qtr Total | April | May | June | 3rd Qtr Total | July | August | September | 4th Qtr Total | Totals | |||||
| kWh | 5,221,232 | 5,097,343 | 5,493,093 | 15,811,668 | 4,666,489 | 4,616,651 | 5,430,021 | 14,713,161 | 4,902,647 | 5,752,129 | 6,367,910 | 17,022,686 | 6,066,542 | 5,918,655 | 5,930,143 | 17,915,340 | 65,462,855 | |||||
| Elec Costs ($) | $412,398.94 | $412,638.54 | $428,387.01 | $1,253,424.49 | $372,081.75 | $372,352.04 | $433,878.18 | $1,178,311.97 | $411,841.53 | $468,637.58 | $513,780.23 | $1,394,259.34 | $497,036.78 | $488,579.44 | $483,484.19 | $1,469,100.41 | $ 5,295,096.21 | |||||
| Viera Elec Costs ($) | $49,703.58 | $49,002.45 | $53,498.16 | $152,204.19 | $22,063.28 | $52,737.13 | $49,756.82 | $124,557.23 | $51,377.98 | $59,613.51 | $62,921.96 | $173,913.45 | $66,636.30 | $62,915.03 | $64,789.36 | $194,340.69 | $ 645,015.56 | |||||
| Total kGal | 12,459 | 13,852 | 12,972 | 39,283 | 11,402 | 10,458 | 13,371 | 35,231 | 13,938 | 16,954 | 23,106 | 53,998 | 16,930 | 14,407 | 11,988 | 43,324 | 171,837 | |||||
| Recl. kGal | 497 | 1,425 | 774 | 2,696 | 505 | 91 | 870 | 1,466 | 2,877 | 2,624 | 1,116 | 6,617 | 1,048 | 86 | 391 | 1,525 | 12,304 | |||||
| Recl Water ($) | $342.93 | $983.25 | $534.06 | $1,860.24 | $348.45 | $62.79 | $600.30 | 1,012 | $1,985.13 | $1,810.56 | $770.09 | $4,565.78 | $723.13 | $59.40 | $269.61 | $1,052.14 | $8,489.70 | |||||
| Non-pot Costs | $1,123.35 | $1,901.47 | $1,484.08 | $4,508.90 | $1,123.57 | $811.41 | $1,576.82 | $3,511.81 | $3,152.45 | $5,209.18 | $1,572.36 | $9,933.98 | $1,787.06 | $2,419.11 | $2,501.11 | $6,707.28 | $24,661.96 | |||||
| Irrig. Consump | 265 | 291 | 297 | 853 | 264 | 259 | 302 | 825 | 338 | 759 | 269 | 1,366 | 287 | 364 | 186 | 837 | 3,881 | |||||
| Irrigation Costs | $780.42 | $918.22 | $950.02 | 2,649 | $775.12 | $748.62 | $976.52 | 2,500 | $1,167.32 | $3,398.62 | $802.27 | 5,368 | $1,063.93 | $2,359.71 | $2,231.50 | $5,655.14 | $16,172.26 | |||||
| Pot Water kGal | 11,697 | 12,136 | 11,901 | 35,734 | 10,633 | 10,108 | 12,199 | 32,940 | 10,723 | 13,571 | 21,721 | 46,015 | 15,595 | 13,957 | 11,411 | 40,963 | $155,651.76 | |||||
| Pot Water ($) | $17,682.15 | $17,718.32 | $17,805.38 | $53,205.85 | $15,847.00 | $15,513.64 | $18,198.36 | $49,558.99 | $14,523.79 | $19,080.60 | $32,681.52 | $66,285.92 | $23,221.98 | $21,171.30 | $16,662.54 | $61,055.82 | $230,106.59 | |||||
| Water Costs ($) | $18,805.50 | $19,619.79 | $19,289.46 | $57,714.75 | $16,970.57 | $16,325.05 | $19,775.18 | $53,070.80 | $17,676.24 | $24,289.78 | $34,253.88 | $76,219.90 | $25,009.04 | $23,590.41 | $19,163.65 | $67,763.10 | $ 254,768.55 | |||||
| Waste Water ($) | $82,842.19 | $85,229.17 | $84,567.79 | $252,639.15 | $79,158.58 | $77,630.31 | $87,302.63 | $244,091.52 | $80,651.73 | $92,337.19 | $69,786.06 | $242,774.98 | $109,630.59 | $97,646.72 | $77,865.56 | $285,142.87 | $ 1,024,648.52 | |||||
| Gas (MBTUs) | 12,781,790 | 13,808,170 | 16,573,000 | 43,162,960 | 15,235,170 | 14,971,750 | 14,346,120 | 44,553,040 | 15,315,860 | 14,394,290 | 12,712,380 | 42,422,530 | 13,337,080 | 12,434,990 | 14,901,150 | 40,673,220 | 170,811,750 | |||||
| Gas Supply Costs | $95,328.61 | $102,432.49 | $122,739.47 | $ 320,500.57 | $117,650.22 | $116,565.30 | $111,967.81 | $346,183.33 | $119,556.81 | $109,628.38 | $98,740.04 | $327,925.23 | $109,335.63 | $110,246.84 | $136,115.13 | $355,697.60 | $ 1,350,306.73 | |||||
| Gas Deliver Costs | $21,811.12 | $23,635.44 | $28,316.90 | $ 73,763.46 | $26,024.71 | $25,574.74 | $24,506.04 | $76,105.49 | $26,162.55 | $24,588.33 | $21,715.28 | $72,466.16 | $18,933.57 | $17,768.21 | $20,597.21 | $57,298.99 | $ 279,634.10 | |||||
| Gas Costs | $117,139.73 | $126,067.93 | $151,056.37 | $ 394,264.03 | $143,674.93 | $142,140.04 | $136,473.85 | $422,288.82 | $145,719.36 | $134,216.71 | $120,455.32 | $400,391.39 | $128,269.20 | $128,015.05 | $156,712.34 | $412,996.59 | $ 1,629,940.83 | |||||
| Gas Taxes | $9,458.47 | $11,686.15 | $14,033.45 | $ 35,178.07 | $12,822.94 | $12,782.97 | $12,242.08 | $37,847.99 | $13,204.26 | $12,279.41 | $10,834.36 | $36,318.03 | $11,783.92 | $11,474.45 | $13,694.29 | $36,952.66 | $ 146,296.75 | |||||
| Gas w/ taxes ($) | $126,598.20 | $137,754.08 | $165,089.82 | $ 429,442.10 | $156,497.87 | $154,923.01 | $148,715.93 | $460,136.81 | $158,923.62 | $146,496.12 | $131,289.68 | $436,709.42 | $140,053.12 | $139,489.50 | $170,406.63 | $449,949.25 | $ 1,776,237.58 | |||||
| Electrical Service Charges | ||||||||||||||||||||||
| $745.00 | ||||||||||||||||||||||
| Water Service Charges (Potable Water) | ||||||||||||||||||||||
| $898.68 | --> Lake Nona | |||||||||||||||||||||
| $649.74 | --> Lake Baldwin | |||||||||||||||||||||
| $82.79 | --> Lakemont | |||||||||||||||||||||
| $1,631.21 | ||||||||||||||||||||||
| Water Service Charges (Irrigation Water) | ||||||||||||||||||||||
| $21.75 | --> Lakemont |
FY17 Energy Trends
| FY17 Utility Usage & Costs | |||||||||||||||||||||||||
| kWh | Total Electric Costs | Electrical Demand Cost | Total kGal | Irrigation (kGal) | Water Costs | Irrigation Costs | Potable Water Costs | Gas (MBTUs) | Gas Costs | Total MBTUs | Site EUI (kBTU/SF) | ||||||||||||||
| October | 5,221,232 | $412,398.94 | $60,872.70 | 12,459 | 265 | $18,805.50 | $780.42 | $17,682.15 | 12,781,790 | $117,139.73 | 30,601,855 | 18.29 | Cost per kWh | Cost per kGal | ORLANDO CAMPUSES ONLY | ||||||||||
| November | 5,097,343 | $412,638.54 | $63,664.70 | 13,852 | 291 | $19,619.79 | $918.22 | $17,718.32 | 13,808,170 | $126,067.93 | 31,205,402 | 18.65 | $0.08 | $1.48 | Total Energy Consumption (kWh) | Total CDD | kWh/CDD | Normalized kWH | |||||||
| December | 5,493,093 | $428,387.01 | $63,692.60 | 12,972 | 297 | $19,289.46 | $950.02 | $17,805.38 | 16,573,000 | $151,056.37 | 35,320,926 | 21.11 | Cost per Therm | FY16 | 64,405,056 | 3,752 | 17,166 | 61,611,367 | |||||||
| January | 4,666,489 | $372,081.75 | $66,055.90 | 11,402 | 264 | $16,970.57 | $775.12 | $15,847.00 | 15,235,170 | $143,674.93 | 31,161,897 | 18.63 | $0.95 | FY17 | 65,462,855 | 3,501 | 18,698 | 67,112,983 | 8.93% | increase | |||||
| February | 4,616,651 | $372,352.04 | $96,616.30 | 10,458 | 259 | $16,325.05 | $748.62 | $15,513.64 | 14,971,750 | $142,140.04 | 30,728,380 | 18.37 | Total Energy Consumption (MMBtu) | Total CDD | MMBtu/CDD | Normalized MMBtu | |||||||||
| March | 5,430,021 | $433,878.18 | $65,036.40 | 13,371 | 302 | $19,775.18 | $976.52 | $18,198.36 | 14,346,120 | $136,473.85 | 32,878,782 | 19.65 | Total SF | FY16 | 376,444 | 3,752 | 100.3315474755 | 360,115 | 4.73% | ||||||
| April | 4,902,647 | $411,841.53 | $66,909.10 | 13,938 | 338 | $17,676.24 | $1,167.32 | $14,523.79 | 15,315,860 | $145,719.36 | 32,048,594 | 19.16 | Orlando | 1,672,852 | FY17 | 394,236 | 3,501 | 112.6068192274 | 404,174 | ||||||
| May | 5,752,129 | $468,637.58 | $67,080.20 | 16,954 | 759 | $24,289.78 | $3,398.62 | $19,080.60 | 14,394,290 | $134,216.71 | 34,026,306 | 20.34 | Viera | 140,528 | |||||||||||
| June | 6,367,910 | $513,780.23 | $66,563.70 | 23,106 | 269 | $34,253.88 | $802.27 | $32,681.52 | 12,712,380 | $120,455.32 | 34,446,057 | 20.59 | Lakemont | 148,559 | 12.23% | ||||||||||
| July | 6,066,542 | $497,036.78 | $70,565.20 | 16,930 | 287 | $25,009.04 | $1,063.93 | $23,221.98 | 13,337,080 | $128,269.20 | 34,042,188 | 20.35 | Daytona | 64,000 | Viera OPC | ||||||||||
| August | 5,918,655 | $488,579.44 | $74,899.89 | 14,407 | 364 | $23,590.41 | $2,359.71 | $21,171.30 | 12,434,990 | $128,015.05 | 32,635,360 | 19.51 | 2,025,939 | SF | Total Energy Consumption (kWh) | Total CDD | kWh/CDD | Normalized kWH | |||||||
| September | 5,930,143 | $483,484.19 | $69,379.83 | 11,988 | 186 | $19,163.65 | $2,231.50 | $16,662.54 | 14,901,150 | $156,712.34 | 35,140,728 | 21.01 | FY16 | 8,529,533 | 4,056 | 2,103 | 8,224,081 | ||||||||
| Source EUI | FY17 | 8,773,562 | 4,381 | 2,003 | 7,831,821 | -4.77% | decrease | ||||||||||||||||||
| Orlando | Totals | 65,462,855 | $5,295,096 | $831,337 | 171,837 | 3,881 | $254,768.55 | $16,172.26 | $230,106.59 | 170,811,750 | $1,629,941 | 394,236,474 | 236 | ||||||||||||
| Viera | Totals | 8,773,562 | $ 645,015.56 | N/A | $18,010.00 | N/A | $18,010.00 | N/A | N/A | 29,944,167 | 213.1 | ||||||||||||||
| Overall | Total | 74,236,417 | $5,940,112 | 171,837 | 3,881 | $272,778.55 | $16,172.26 | $248,116.59 | 170,811,750 | $1,629,941 | 424,180,641 | 209.4 | kBtu/SF | ||||||||||||
| $0.79 | |||||||||||||||||||||||||
| $0.79 |