36E77618R0005-00001014.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
VISN 8 Orlando Energy Savings Performance Contract (ESPC) (Previously posted under 36E77618Q0013)
Solicitation number
36E77618R0005
Issued by

About this file

This document provides details for a federal energy savings performance contract solicitation. The Department of Veterans Affairs intends to solicit proposals and award a firm-fixed price contract to implement energy conservation measures at four locations within the Orlando VA Medical Center network. The identified energy conservation measures include improvements to boiler plants, chiller plants, HVAC systems, lighting, electric motors and drives, renewable energy installations, water and sewer conservation, and commissioning activities. Offerors must be on the Department of Energy's qualified list of energy service companies. The solicitation will be set aside for service-disabled veteran owned small businesses and issued on March 22, 2018 for approximately 60 days via the VA vendor portal. Questions must be submitted in writing by the stated deadline.

36E77618R0005 00001 Q8 FY18 OVAMC Utility Spreadsheet.xlsx

View the file

Other files

File Type Posted
36E77618R0005-00001005.pdf PDF
36E77618R0005-00001019.pdf PDF
36E77618R0005-00001015.xlsx XLSX spreadsheet
36E77618R0005-00001013.xlsx XLSX spreadsheet
36E77618R0005-00001011.pdf PDF
36E77618R0005-00001006.pdf PDF
36E77618R0005-00001001.docx DOCX document
36E77618R0005-00001000.docx DOCX document
36E77618R0005-00001017.docx DOCX document
36E77618R0005-00001004.pdf PDF
36E77618R0005-00001009.pdf PDF
36E77618R0005-00001008.pdf PDF
36E77618R0005-00001020.pdf PDF
36E77618R0005-00001002.pdf PDF
36E77618R0005-00001012.pdf PDF
36E77618R0005-00001018.xlsx XLSX spreadsheet
36E77618R0005-00001016.pdf PDF
36E77618R0005-00001021.xlsx XLSX spreadsheet
36E77618R0005-00001007.pdf PDF
36E77618R0005-00001003.pdf PDF
36E77618R0005-00001010.pdf PDF
36E77618R0005-030.pdf PDF
36E77618R0005-031.pdf PDF
36E77618R0005-034.pdf PDF
36E77618R0005-045.pdf PDF
36E77618R0005-037.pdf PDF
36E77618R0005-025.docx DOCX document
36E77618R0005-026.docx DOCX document
36E77618R0005-042.pdf PDF
36E77618R0005-048.pdf PDF
36E77618R0005-035.pdf PDF
36E77618R0005-029.pdf PDF
36E77618R0005-046.pdf PDF
36E77618R0005-047.pdf PDF
36E77618R0005-033.pdf PDF
36E77618R0005-038.pdf PDF
36E77618R0005-039.pdf PDF
36E77618R0005-032.pdf PDF
36E77618R0005-028.pdf PDF
36E77618R0005-049.pdf PDF
36E77618R0005-040.pdf PDF
36E77618R0005-027.docx DOCX document
36E77618R0005-044.pdf PDF
36E77618R0005-043.pdf PDF
36E77618R0005-041.pdf PDF
36E77618R0005-036.pdf PDF
36E77618R0005-024.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY18 UTILITY TRACKER for 1358's

VENDORCampusDescriptionOCTOBERNOVEMBERDECEMBERTotal Spent OCT/NOV/DECJANUARYFEBRUARYMARCHTotal Spent JAN/FEB/MARAPRILMAYJUNETotal Spent APR/MAY/JUNJULYAUGUSTSEPTEMBERTotal Spent JUL/AUG/SEPAnnual Total
OUCLake NonaElectric Meter 1$351,031.98$317,820.99$327,460.83$996,313.80$301,348.37$315,563.22$328,695.49$945,607.08$0.00$1,941,920.88
OUCLake NonaWater$13,428.12$13,260.74$9,862.86$36,551.72$10,585.57$9,154.17$13,934.96$33,674.70$0.00$70,226.42
OUCLake NonaSewer/ Wastewater$58,506.35$57,724.74$41,858.33$158,089.42$43,456.22$37,938.05$57,713.15$139,107.42$0.00$297,196.84
OUCLake NonaReclaimed Water$438.66$343.45$1,083.08$1,865.19$488.05$877.01$376.89$1,741.95$0.00$3,607.14
OUCLake NonaSolid Waste$993.89$993.89$993.89$2,981.67$993.89$993.89$993.89$2,981.67$0.00$5,963.34
OUCSIMLEARNElectric Meter 2$6,993.17$7,167.49$7,584.10$21,744.76$7,308.80$6,818.84$7,556.53$21,684.17$0.00$43,428.93
TECOLake NonaGas$120,682.51$164,776.91$162,167.87$447,627.29$158,249.65139,735.75$165,044.25$463,029.65$0.00$910,656.94
OUCLake BaldwinElectric$56,653.81$59,471.70$48,005.14$164,130.65$53,977.1350,484.02$60,362.45$164,823.60$0.00$328,954.25
OUCLake BaldwinWater$2,650.98$2,697.43$2,060.64$7,409.05$2,039.45$2,280.98$2,452.35$6,772.78$0.00$14,181.83
OUCLake BaldwinSewer/ Wastewater$9,699.23$9,764.87$6,791.31$26,255.41$6,178.61$7,253.43$8,016.03$21,448.07$0.00$47,703.48
OUCLake BaldwinSolid Waste$1,013.88$1,013.88$1,013.88$3,041.64$1,013.88$1,013.88$1,013.88$3,041.64$0.00$6,083.28
TECOLake BaldwinGas$6,084.29$5,820.55$6,914.71$18,819.55$7,445.25$7,445.25$0.00$26,264.80
INFINITE ENERGYLake BaldwinGas Supplier$18,618.71$17,815.31$21,184.72$57,618.74$23,810.14$23,810.14$0.00$81,428.88
OUCLakemontElectric$32,795.42$34,519.16$32,200.91$99,515.49$34,458.28$31,427.19$30,812.37$96,697.84$0.00$196,213.33
OUCLakemontWater$3,535.63$2,342.50$2,192.12$8,070.25$3,351.51$2,290.18$2,663.77$8,305.46$0.00$16,375.71
OUCLakemontSewer/Wastewater$3,068.67$1,919.08$2,048.90$7,036.65$2,075.90$2,390.78$2,347.09$6,813.77$0.00$13,850.42
OUCLakemontSolid Waste$1,242.36$1,242.36$1,242.36$3,727.08$1,242.86$1,242.36$1,242.36$3,727.58$0.00$7,454.66
FPL (FLORIDA POWER & LIGHT )VieraElectric Meter 1$21,696.56$18,159.79$16,026.99$55,883.34$16,810.46$13,953.99$13,726.98$44,491.43$0.00$100,374.77
FPL (FLORIDA POWER & LIGHT )VieraElectric Meter 2$283.87$256.01$203.07$742.95$230.10$206.34$249.10$685.54$0.00$1,428.49
FPL (FLORIDA POWER & LIGHT )VieraElectric Meter 3$37,002.90$38,781.98$41,191.55$116,976.43$41,265.31$34,926.56$36,036.93$112,228.80$0.00$229,205.23
CITY OF COCOAVieraWater$1,421.40$1,250.90$1,332.74$4,005.04$1,397.53$1,305.59$1,329.33$4,032.45$0.00$8,037.49
CITY OF COCOAVieraSewer$2,176.93$1,795.01$2,076.32$6,048.26$2,228.63$2,052.27$2,068.30$6,349.20$0.00$12,397.46
CITY OF COCOAVieraFireline$110.12$110.12$110.12$330.36$110.12$110.12$110.12$330.36$0.00$660.72
Total$750,129.44$759,048.86$735,606.44$2,244,784.74$720,065.71$662,018.62$736,746.22$2,118,830.55$0.00$0.00$0.00$0.00$0.00$0.00$0.00$4,363,615.29Total

FY18 Energy Usage

VENDORCampusDescriptionOCTOBERNOVEMBERDECEMBERTotal Spent OCT/NOV/DECJANUARYFEBRUARYMARCHTotal Spent JAN/FEB/MARQuarter 3
(1358 Requested)APRILMAYJUNETotal Spent APR/MAY/JUNQuarter 4
(1358 Requested)JULYAUGUSTSEPTEMBERTotal Spent JUL/AUG/SEPAnnual Total
OUCSIMLEARNElectric Meter 2$6,993.17$7,167.49$7,584.10$21,744.76$7,308.80$6,818.84$7,556.53$21,684.17$0.00$0.00$43,428.93
OUCSIMLEARN (Utility)Electrical (kWh)86,40088,40094,600269,40089,60083,60094,400267,60000537,000
OUCSIMLEARN (Utility)Electrical Demand (kW)148.5153.5154.1456161.0149.9152.34630.00.0919
OUCLake NonaElectric Meter 1$351,031.98$317,820.99$327,460.83$996,313.80$301,348.37$315,563.22$328,695.49$945,607.08$0.00$0.00$1,941,920.88LN Electrical Rate$0.082
OUCLake Nona (Utility)Electrical (kWh)4,303,8003,945,6003,999,60012,249,0003,600,0003,758,4004,016,80011,375,2000023,624,200
OUCLake Nona (Utility)Electrical (kW)8,7667,5148,30524,5848,4118,8228,31125,5440050,128
OUCLake Nona (Utility)Demand Cost$66,931.65$57,580.02$63,517.59$188,029.26$64,367.07$67,364.37$63,552.27$195,283.71$0.00$0.00$383,312.97
OUCLake NonaWater$13,428.12$13,260.74$9,862.86$36,551.72$10,585.57$9,154.17$13,934.96$33,674.70$0.00$0.00$70,226.42LN Water Rate
OUCLake Nona (Utility)Pot.Water (kGal)8,1318,0226,08722,2406,0395,2728,02019,3320041,572$1.69
OUCLake NonaSewer/ Wastewater$58,506.35$57,724.74$41,858.33$158,089.42$43,456.22$37,938.05$57,713.15$139,107.42$0.00$0.00$297,196.84
OUCLake NonaReclaimed Water$438.66$343.45$1,083.08$1,865.19$488.05$877.01$376.89$1,741.95$0.00$0.00$3,607.14LN Rec Water Rate
OUCLake Nona (Utility)Rec Water (kGal)6364981,5702,7037071,2715462,525005,228$0.69
OUCLake NonaSolid Waste$993.89$993.89$993.89$2,981.67$993.89$993.89$993.89$2,981.67$0.00$0.00$5,963.34Total LN Water Rate
TECOLake NonaGas (Total Cost w/ taxes)$120,682.51$164,776.91$162,735.62$448,195.04$158,249.65$139,735.75$165,044.25$463,029.65$0.00$0.00$911,224.69$1.58
TECOLake NonaGas Supply Cost (PGA)$96,647.19$132,065.72$131,289.10$360,002.01$127,662.88$112,113.18$132,468.24$372,244.30$0.00$0.00$732,246.31
TECOLake NonaGas Delivery Cost (Dist)$13,702.30$18,723.81$17,870.93$50,297.04$17,377.33$15,829.37$18,703.32$51,910.02$0.00$0.00$102,207.06
TECOLake Nona (Utility)Gas (Therms)107,631.7147,130.4135,683.9390,446.0131,936.3120,183.5142,003.8394,123.60.00784,569.6$1.16per therm
OUCLake BaldwinElectric$56,653.81$59,471.70$48,005.14$164,130.65$53,977.13$50,484.02$60,362.45$164,823.60$0.00$0.00$328,954.25
OUCLake Baldwin (Utility)Electrical (kWh)784,055749,511652,6282,186,194670,213657,416698,9742,026,603004,212,797$0.078
OUCLake Baldwin (Utility)Electrical Demand (kW)3,2703,7372,5609,5663,1482,5702,5338,2510017,817
Lake Baldwin (Utility)Demand Cost$12,612$15,772$9,599$37,982.69$12,804$9,698$9,557$32,058.66$0.00$0.00$70,041.35$3.931per KW
OUCLake BaldwinWater$2,650.98$2,697.43$2,060.64$7,409.05$1,912.28$2,153.81$2,452.35$6,518.44$0.00$0.00$13,927.49
OUCLake Baldwin (Utility)Pot.Water (kGal)1,3481,3579443,6498591,0081,1142,981006,629$2.10
OUCLake BaldwinSewer/ Wastewater$9,699.23$9,764.87$6,791.31$26,255.41$6,178.61$7,253.43$8,016.03$21,448.07$0.00$0.00$47,703.48
OUCLake BaldwinSolid Waste$1,013.88$1,013.88$1,013.88$3,041.64$1,013.88$1,013.88$1,013.88$3,041.64$0.00$0.00$6,083.28
TECOLake BaldwinGas$6,084.29$5,820.55$6,914.71$18,819.55$7,445.25$6,844.59$7,351.21$21,641.05$0.00$0.00$40,460.60
TECOLake BaldwinGas Delivery Cost (Dist)$4,542.13$4,356.82$5,197.98$14,096.93$5,659.73$5,192.21$5,953.01$16,804.95$0.00$0.00$30,901.88
TECOLake Baldwin (Utility)Gas (Therms)20,919.919,703.423,507.564,130.824,248.022,245.025,504.571,997.50.00136,128.3$1.07per therm
INFINITE ENERGYLake BaldwinGas Supplier$18,618.71$17,815.31$21,184.72$57,618.74$23,496.31$23,719.19$47,215.50$0.00$0.00$104,834.24
OUCLakemontElectric$32,795.42$34,519.16$32,200.91$99,515.49$34,458.28$31,427.19$30,812.37$96,697.84$0.00$0.00$196,213.33$0.082
OUCLakemont (Utility)Electrical (kWh)401,400423,300398,9001,223,600431,400349,300386,6001,167,300002,390,900
OUCLakemont (Utility)Electrical Demand (kW)740.91773.55688.712,2037017476192,067004,270
OUCLakemontDemand Cost$5,927.28$6,188.40$5,509.68$17,625.36$5,604.00$5,979.12$4,953.12$16,536.24$0.00$0.00$34,161.60
OUCLakemontWater$3,535.63$2,342.50$2,192.12$8,070.25$3,351.51$2,290.18$2,663.77$8,305.46$0.00$0.00$16,375.71
OUCLakemont (Utility)Pot.Water (kGal)4262673281,0212883323262,41700.0003,438$1.24
OUCLakemont (Utility)Irrigation (kGal)6414634291,5335984034698,28400.0009,817
OUCLakemontSewer/Wastewater$3,068.67$1,919.08$2,048.90$7,036.65$2,075.90$2,390.78$2,347.09$6,813.77$0.00$0.00$13,850.42
OUCLakemontSolid Waste$1,242.36$1,242.36$1,242.36$3,727.08$1,242.86$1,242.36$1,242.36$3,727.58$0.00$0.00$7,454.66
FPL (FLORIDA POWER & LIGHT )VieraElectric Meter 1$21,696.56$18,159.79$16,026.99$55,883.34$16,810.46$13,953.99$13,726.98$44,491.43$0.00$0.00$100,374.77
FPL (FLORIDA POWER & LIGHT )VieraMeter 1 taxes$1,995.44$1,661.63$1,500.98$5,158.05$1,556.63$1,266.92$1,249.24$4,072.79
FPL (FLORIDA POWER & LIGHT )VieraElectric Meter 2$283.87$256.01$203.07$742.95$230.10$206.34$249.10$685.54$0.00$0.00$1,428.49
FPL (FLORIDA POWER & LIGHT )VieraMeter 2 taxes$25.69$23.15$18.40$67.24$20.87$18.83$22.71$62.41
FPL (FLORIDA POWER & LIGHT )VieraElectric Meter 3$37,002.90$38,781.98$41,191.55$116,976.43$41,265.31$34,926.56$36,036.93$112,228.80$0.00$0.00$229,205.23$331,008.49
FPL (FLORIDA POWER & LIGHT )VieraMeter 3 taxes$3,397.97$3,567.39$3,875.97$10,841.33$3,886.18$3,218.62$3,322.91$10,427.71
FPL (FLORIDA POWER & LIGHT )Viera (Utility)Electrical (kWh)732,375700,660698,8512,131,886696,477565,989596,9851,859,451003,991,3370.0829317319
FPL (FLORIDA POWER & LIGHT )Viera (Utility)Electrical (kW)1,5051,5221,5424,5691,5821,4731,4854,540009,109
CITY OF COCOAVieraWater$1,421.40$1,250.90$1,332.74$4,005.04$1,397.53$1,305.59$1,312.41$4,015.53$0.00$0.00$8,020.57
CITY OF COCOAViera (Utility)Pot.Water (kGal)285235259779278256258792001,571$5.11
CITY OF COCOAVieraSewer$2,176.93$1,795.01$2,076.32$6,048.26$2,228.63$2,052.27$2,068.30$6,349.20$0.00$0.00$12,397.46
CITY OF COCOAVieraFireline$110.12$110.12$110.12$330.36$110.12$110.12$110.12$330.36$0.00$0.00$660.72
DUKE ENERGYCrossroadsSuite 112B$446.02$419.36$865.38$0.00$12,786.13$14,005.67$0.00$26,791.80$0.00$27,657.18
DUKE ENERGYCrossroadsSuite 114$682.98$613.65$1,296.63$0.00$0.00$0.00$1,296.63
DUKE ENERGYCrossroadsSuite 120$225.39$202.46$427.85$0.00$0.00$0.00$427.85
DUKE ENERGYClermontElectric$1,117.86$1,046.60$2,164.46$0.00$0.00$0.00$2,164.46
Electric
Gas
WaterOctoberNovemberDecember1st Qtr TotalJanuaryFebruaryMarch2nd Qtr TotalAprilMayJune3rd Qtr TotalJulyAugustSeptember4th Qtr TotalTotals
kWh5,575,6555,206,8115,145,72815,928,1944,791,2134,848,7165,196,77414,836,703kWh0000kWh000030,764,897
Elec Costs ($)$435,515.35$407,744.72$404,103.27$1,247,363.34$386,558.72$393,959.96$415,516.93$1,196,035.61-$775.00-$775.00-$775.00-$2,325.00-$775.00-$775.00-$775.00-$2,325.00$ 2,438,748.95
Viera Elec Costs ($)$53,564.23$51,945.61$53,545.64$159,055.48$54,419.69$53,591.26$51,284.96$159,295.91$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$ 318,351.39
Total kGal11,18210,6069,35731,1468,4928,28710,47627,255kGal0000kGal000058,400
Recl. kGal6364981,5702,7037071,2715462,525000000005,228
Recl Water ($)$438.66$343.45$1,083.08$1,865.19$488.05$877.01$376.891,742$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$3,607.15
Non-pot Costs$3,212.58$2,170.43$2,665.45$8,048.46$3,290.46$2,550.65$2,433.48$8,274.59-$104.54-$104.54-$104.54-$313.62-$104.54-$104.54-$104.54-$313.62$15,695.81
Irrig. Consump6414634291,5335984034691,47000002873641868373,840
Irrigation Costs$2,773.92$1,826.98$1,582.376,183$2,802.40$1,673.64$2,056.596,533-$104.54-$104.54-$104.54-314-$104.54-$104.54-$104.54-$313.62$12,088.66
Pot Water kGal9,9059,6467,35926,9107,1866,6139,46123,2600000-287-364-186-837$49,332.27
Pot Water ($)$14,760.29$14,520.78$9,840.71$39,121.78$10,949.44$9,438.05$15,008.14$35,395.63-$1,504.92-$1,504.92-$1,504.92-$4,514.76-$1,504.92-$1,504.92-$1,504.92-$4,514.76$65,487.89
Water Costs ($)$18,005.27$16,691.21$12,506.16$47,202.64$14,239.90$11,988.70$17,441.62$43,670.22-$1,609.46-$1,609.46-$1,609.46-$4,828.38-$1,609.46-$1,609.46-$1,609.46-$4,828.38$ 81,216.10
Waste Water ($)$71,274.25$69,408.69$50,698.54$191,381.48$51,710.73$47,582.26$68,076.27$167,369.26$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$ 358,750.74
Gas (MBTUs)12,855,16016,683,38015,919,14045,457,68015,618,43014,242,85016,750,83046,612,110MBTU0000MBTU000092,069,790
Gas Supply Costs$115,265.90$149,881.03$152,473.82$ 417,620.75$151,159.19$112,113.18$156,187.43$419,459.80$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$ 837,080.55
Gas Deliver Costs$18,244.43$23,080.63$23,068.91$ 64,393.97$23,037.06$21,021.58$24,656.33$68,714.97$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$ 133,108.94
Gas Costs$133,510.33$172,961.66$175,542.73$ 482,014.72$174,196.25$133,134.76$180,843.76$488,174.77$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$ 970,189.49
Gas Taxes$11,875.18$15,451.11$15,292.32$ 42,618.61$14,994.96$13,445.58$15,270.89$43,711.43$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$ 86,330.04
Gas w/ taxes ($)$145,385.51$188,412.77$190,835.05$ 524,633.33$189,191.21$146,580.34$196,114.65$531,886.20$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$ 1,056,519.53
Electrical Service Charges
$775.00
Water Service Charges (Potable Water)
$898.68--> Lake Nona
$606.24--> Lake Baldwin
$82.79--> Lakemont
$1,587.71
Water Service Charges (Irrigation Water)
$21.75--> Lakemont

FY18 Energy Trends

FY18 Utility Usage & Costs
kWhTotal Electric CostsElectrical Demand CostTotal kGalIrrigation (kGal)Water CostsIrrigation CostsPotable Water CostsGas (MBTUs)Gas CostsTotal MBTUsSite EUI (kBTU/SF)
October5,575,655$435,515.35$66,931.6511,182641$18,005.27$2,773.92$14,760.2912,855,160$133,510.3331,884,87119.06Cost per kWhCost per kGal
November5,206,811$407,744.72$57,580.0210,606463$16,691.21$1,826.98$14,520.7816,683,380$172,961.6634,454,22620.60$0.08$1.39
December5,145,728$404,103.27$63,517.599,357429$12,506.16$1,582.37$9,840.7115,919,140$175,542.7333,481,51020.01Cost per Therm
January4,791,213$386,558.72$64,367.078,492598$14,239.90$2,802.40$10,949.4415,618,430$174,196.2531,970,84019.11$1.05
February4,848,716$393,959.96$67,364.378,287403$11,988.70$1,673.64$9,438.0514,242,850$133,134.7630,791,51818.41
March5,196,774$415,516.93$63,552.2710,476469$17,441.62$2,056.59$15,008.1416,750,830$180,843.7634,487,42020.62Total SF
April0-$775.00$0.0000-$1,609.46-$104.54-$1,504.920$0.0000.00Orlando1,672,852
May0-$775.00$0.0000-$1,609.46-$104.54-$1,504.920$0.0000.00Viera140,528
June0-$775.00$0.0000-$1,609.46-$104.54-$1,504.920$0.0000.00Lakemont148,559
July0-$775.00$0.000287-$1,609.46-$104.54-$1,504.920$0.0000.00Daytona64,000
August0-$775.00$0.000364-$1,609.46-$104.54-$1,504.920$0.0000.002,025,939SF
September0-$775.00$0.000186-$1,609.46-$104.54-$1,504.920$0.0000.00
Source EUIBlended RateElectrical $/SF
OrlandoTotals30,764,897$2,438,749$383,31358,4003,840$81,216.10$12,088.66$65,487.8992,069,790$970,189197,070,383118
VieraTotals3,991,337$ 318,351.39N/A$18,010.00N/A$18,010.00N/AN/A13,622,43396.9
OverallTotal34,756,234$2,757,10058,4003,840$99,226.10$12,088.66$83,497.8992,069,790$970,189210,692,817104.0kBtu/SF
per Sq Ft for utilitiesLake Nona Gas Supply Cost per therm$0.93
Lake Baldwin Gas Supply Cost per therm$0.77