Attachment F - SOW - 437-21-210 EHRM Tier 2 - 5-21-2025.docx

DOCX document 3 MB Posted

Attached to
Y1DA--VHA Construction Project - EHRM Tier Two Infrastructure Upgrades at Fargo VAMC - Project # 437-21-210 Fargo, ND
Solicitation number
36C77625B0014
Issued by

About this file

This document is a Statement of Work (SOW) for a VA Healthcare Infrastructure Upgrade project at the Fargo Veterans Affairs (VA) Health Care System, Project Number 437-21-210. The project involves comprehensive construction and infrastructure modifications, including renovating the library into a new Main Computer Room, replacing the emergency generator, installing a new Uninterrupted Power Supply (UPS), establishing a Source B fiber optic pathway across campus, and upgrading emergency power to Telecommunication Rooms. The project has a 546-day performance period from Notice to Proceed and requires extensive coordination with VA personnel, adherence to strict infection control protocols, and compliance with pandemic safety procedures.

Key technical requirements include reconfiguring existing UPS systems, installing additional battery cabinets, creating new electrical distribution panels, and implementing a redundant fiber optic cabling route. The contractor must navigate complex logistical challenges, such as managing utility shutdowns, conducting background checks for personnel access, and addressing infrastructure issues like flooded fiber optic manholes. Specific technical specifications include installing a 400A Distribution Panel, relocating UPS equipment, and coordinating with local telecommunications providers to establish new fiber optic infrastructure. The project involves multiple technical annexes detailing specific infrastructure modifications and requires meticulous planning to minimize disruption to the VA Medical Center's critical operations.

View the file

Other files

File Type Posted
Fargo EHRM Tier 2 Infra Upgrades - Am. 0007 - WD and Call-in Info - 36C77625B0014 0007.docx DOCX document
Amendment 0007 - Att 1 - DBA Wage Det - Cass County ND - 20250013 7-4-25.pdf PDF
Addendum 1 - Fargo EHRM Tier 2.pdf PDF
36C77625B0014 0006.pdf PDF
Fargo EHRM Tier 2 Infra Upgrades - Am. 0005 - Round 3 QA - 36C77625B0014 0005.docx DOCX document
Am. 0005 - Attachment 1 - RFP Fargo EHRM Tier 2 - Technical Q_A- Round 3 - 7-15-25.docx DOCX document
Fargo EHRM Tier 2 Infra Upgrades - Am. 0004 - Due date ext - 36C77625B0014 0004.docx DOCX document
Fargo EHRM Tier 2 Infrastructure Upgrades - Am. 0003 - Additional QA - 36C77625B0014 0003.docx DOCX document
Am. 0003 - Attachment 1 - RFP Fargo EHRM Tier 2 - Technical Q_A- Round 2 - 7-9-25.docx DOCX document
0002 - Attachment 3 - Fargo ND Volume 2 Revised Specifications 6_25_2025.pdf PDF
Fargo EHRM Tier 2 - Amendment 0002 - 36C77625B0014 0002.docx DOCX document
0002 - Attachment 4 - Site Assessment Report - Fargo VA USTs - P-0040293.pdf PDF
0002 - Attachment 2 - Fargo ND Volume 1 Revised Specifications 6_25_2025.pdf PDF
0002 - Attachment 5 - Fargo EHRM Tier 2 - Tech Questions and Responses - FINAL.docx DOCX document
0002 - Attachment 1 - Fargo EHRM Tier 2 Prebid Sign In_06042025.pdf PDF
Fargo EHRM - Amendment 0001 - 36C77625B0014 0001.docx DOCX document
Amendment 0001 - Attachment 2 - Pg 184 43721210_Fargo Tier 2.pdf PDF
Fargo EHRM - Amendment 0001 - 36C77625B0014 0001.docx DOCX document
Amendment 0001 - Attachment 1 - Pg 182 43721210_Fargo Tier 2.pdf PDF
36C77625B0014_1.docx DOCX document
Attachment G - Fargo VA Asbestos Inspection Report - IFB.pdf PDF
SOW Appendix 7 - Declaration for Federal Employment OF 306.pdf PDF
Attachment D - 437-21-210_Fargo Tier 2_IFB_Spec_Vol-1_250509.pdf PDF
Attachment C - Site Visit Instructions - EHRM Infrastructure Upgrades Tier 2 - Fargo VAMC.docx DOCX document
Attachment A - VA Notice of Limitations on Subcontracting-Cert of Compliance for Construction.docx DOCX document
SOW Appendix 5 - 16709 - Fargo Structural Calculations 2023-12-18.pdf PDF
Attachment B - Davis-Bacon Act Wage Rates - Cass County - Rev 02 - 4-4-25.pdf PDF
SOW Appendix 8 - Self Certification of Continuous Service_20200228.pdf PDF
SOW Appendix 6 - Contractor Background Investigation Request Form REV 02-04-2025.pdf PDF
SOW Appendix 1 - 43721210_Fargo Tier 2_IFB-BOD_240116_Final.pdf PDF
Attachment E - EHRM Infrastructure Upgrades Tier 2 - Fargo VAMC_Dwgs_240116.pdf PDF
SOW Appendix 2 - 43721210_Fargo Tier 2_IFB-BOD-Appendix-B_Blast_240116.pdf PDF
SOW Appendix 4 - 43721210_Fargo Tier 2_IFB-BOD-Appendix-D_Civil_240116.pdf PDF
SOW Appendix 9 - Reusable sleeve locations red-lines _ Main hospital.pdf PDF
SOW Appendix 3 - 43721210_Fargo Tier 2_IFB-BOD-Appendix-C_Structural_240116.pdf PDF
SOW Appendix 10 - Reusable sleeve locations red lines _ Outbuildings.pdf PDF
Attachment D - 437-21-210_Fargo Tier 2_IFB_Spec_Vol-2_250509.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Project Number: 437-21-210 Project Title: EHRM Infrastructure Upgrades – Tier 2 Description of Work:

1. Construction work shall include, but shall not be limited to providing all labor, materials, equipment, etc. necessary to complete Fargo Veterans Affairs (VA) Health Care System construction project 437-21-210, EHRM Tier 2 in accordance with the Statement of Work (SOW), the contract documents, National Fire Protection Agency (NFPA), local building codes, VA and American Society of Healthcare Engineering (ASHE) facility standards, and other applicable requirements.

2. The project shall include, but shall not be limited to: renovating the current library to become the new Main Computer Room (MCR), replacement of the building emergency generator and all of its associated components, renovation of the previous MCR site, installation of a new Uninterrupted Power Supply (UPS), Source B fiber optic pathway across all of campus, and new emergency power to Telecommunication Rooms (TR).

3. Construction barriers will be hard walled. Infection Control Risk Assessment (ICRA) is shown on the construction documents. The contractor is expected to make every reasonable effort to control dust in all areas at all times. The ICRA may be adjusted in coordination with the contractor after award if the contractor can propose alternative means and methods.

4. Contractor will be responsible for coordination of shut downing down any utilities. This may mean the contractor will attend weekly coordinating meetings with VA personnel. Shut down of critical infrastructure, such as emergency generations systems, will likely be required to be done on week day evenings or, for longer shut downs, weekend work may be required. This is a hospital and only means and methods which limit shut down times of critical systems will be considered.

5. Asbestos is known to exist within the construction limits.

6. Construction activities which impact Life Safety planning will require an Interim Life Safety Measure (ILSM) and the contractor will be solely responsible for performing these measures. This may include placing signage, notifying or educating affected tenants, fire watch, temporary fire suppression measures, modifying construction sites to ensure egress paths are maintained.

7. Period of Performance will be 546 days from receipt the Notice to Proceed (NTP).

8. Anyone requiring access to Telecommunications locations will be escorted and will be subject to availability of VA personnel. Unrestricted access will require the contractor to submit for background checks and finger printing in order to obtain Personal Identification Verification (PIV) cards.

9. As of January 1st, 2024, pandemic safety precautions are minimal at the Fargo VA Medical Center but, depending on infections rates within the local community, are subject to change. The contractor is expected to comply with all pandemic procedures at all time in order to ensure the safety of VA patients. Failure to comply may result in the contractor being escorted off the property.

10. In general, any work that will be obstructed from view will need to be inspected prior to being covered up.

11. Equipment that is difficult to ship or requires special packaging shall be inspected by the VA at the manufacturer prior to shipment. Contractor shall notify the COR as soon as they identify any such situation.

12. Conduit routing should be resolved during the pre-bid walk through.

13. Contractor shall submit to VA badging processes. This may include but not be limited to, back ground checks, finger printing, and interviews. All contractors shall be badged through a federal agency. Contractors that can not be badged will be barred from entry onto VA grounds.

14. Activities that cause excessive noise or vibration may be required to be completed after normal working hours.

See the attached Appendices and Annexes below for additional information.

SOW Appendix 1 - 43721210_Fargo Tier 2_IFB-BOD_240116_Final SOW Appendix 2 - 43721210_Fargo Tier 2_100-BOD-Appendix-B_Blast_231218 SOW Appendix 3 - 43721210_Fargo Tier 2_100-BOD-Appendix-C_Structural_231218 SOW Appendix 4 - 43721210_Fargo Tier 2_100-BOD-Appendix-D_Civil_231218 SOW Appendix 5 - 16709 - Fargo Structural Calculations 2023-12-18 SOW Appendix 6 - Contractor Background Investigation Request Form REV 02-04-2025 SOW Appendix 7 - Declaration for Federal Employment, OF 306 SOW Appendix 8 - Self Certification of Continuous Service_20200228 SOW Appendix 9 - Reusable sleeve locations red-lines – Main hospital SOW Appendix 10 - Reusable sleeve locations red lines – Outbuildings

Annex A - Changes to the UPS Problem The new UPS A was delivered to the Fargo VA Site on Oct. 21, 2024. It includes the Control Module, one Battery Module, and one Connection Cabinet Module. The Eaton Packing List states that it shipped to Dakota Electric (Warehouse) on Dec. 12, 2023.

The 90kW Storage batteries must be charged on a regular schedule to prevent degradation. The Battery Module lists an Install or recharge date of July 10, 2024, and a note that batteries must be in service, or recharged every 6 months after that.

The UPS system is too large to fit the Main Computer Room (existing) as was originally planned. The access is too narrow to get the cabinets past existing chillers and other equipment to the planned area.

The final Tier 2 location has not been constructed yet and is currently in use as a loading dock storage staging area for recycling. This currently is not a suitable environment for electronic equipment.

Proposed Solution There is space being used by IT in the MRI UPS room (BB-35), which is a controlled environment. The primary space use is assigned for the MRI UPS and associated CRAC unit. The remainder of the space is used by IT for temporary storage of incoming equipment awaiting placement within the hospital. The new EHRM UPS can be commissioned in this area and remain powered on with no load or maintenance schedule for the desired temporary period. (The UPS will maintain the batteries automatically).

Details Eaton said that even to just charge the batteries, a 100A 208 3-phase circuit is needed. This circuit does NOT need to be generator backed, as there is no load on the UPS. There is power available in BB-34 (a 30’ cable run).

The footprint of the three cabinets standing side by side is 44” deep x 126” wide. An additional 36” is needed in front of the cabinets for working clearance. This brings the total depth to 80”.

437-21-210

The Doorway into BB-35 is too narrow for the cabinets to fit through, so it would need to be replaced with a wider one. Interfering with this is the Fire alarm inside the room on the wall next to the door frame. A possible solution is to temporarily dismount this door and frame during the move-in stage.

Reintegration with the Facility The Tier 2 plan includes installing additional batteries, and a second UPS. With minor changes to the Tier 2 scope, Eaton can add the additional task to their standard UPS Commissioning to recommission the UPS A in its final location, with the new UPS B. No special skills or procedure will be needed by the VA to unplug (turn off at breaker) unwire and move the subject UPS 1 from the temporary location (BB-35) to the new UPS Room (Loading Dock 1) after construction. Only caveat is the physical move must be done and recommissioning UPS 1 (Power ON) within 6 months.

Permanent Changes to Space BB-35

1. Addition of 100A 3-phase 208V circuit (non-generator, street power buss).

2. Possibly relocate fire detection and alarm.

3. Permanently or temporarily widen entrance door to a minimum of 46” clear opening (48” or larger door)

Temporary Changes to Space BB-35

1. Provisions for UPS equipment footprint and layout (71 sq feet – 10’-6” x 6’-9”).

2. Possible temporarily removing entrance door and frame for equipment move-in.

Temporary UPS Service to TR’s A new 400A Distribution Panel (labeled EBUPSN90-0) was added to BC-50. This panel will be inserted between the existing 3 UPS Units and the existing Distribution Panel EBUPSN90-1. This panel will feed the existing EBUPSN90-1 and the 8 new TR distribution panel feeds already run to BC-50 but not yet connected to anything.

Changes To BC-50 and UPS Wiring

1. Addition of 400A distribution panel.

2. Move feed to EBUPS90N-1 from existing UPS to be fed from the new 400A panel.

3. Feed the new panel from the existing UPS. (Note: this UPS is backed up by GEN 46)

4. Install wiring to TR distribution sub-panels from new 400A distribution panel (8x).

This work can be mostly undone during Tier 2 when the existing UPS is replaced with the two new UPS’s in the new Electrical Equipment Room.

Changes to BB-35 UPS Contractor shall re-configure existing 90KW (9GK618A029A00R0) battery cabinet to 200KW.

Contractor shall provide additional 200KW battery cabinets equivalent to 9GK618A029A00R0. Battery cabinets must be compatible with existing system.

Contractor shall be disconnecting and moving UPS equipment out of BB-35 as opposed to BB-50 which is shown on the drawings.

Figure 1: Changes to BB-35 Layout

Figure 2: Changes to BC-50 Layout

Annex B

Construction contractor shall be responsible for coordinating with the local telecommunications provider (Lumen) for the installation of a redundant fiberoptic cabling route. The contractor shall be responsible for installing a new fiberoptic manhole at the limit of the property line for the service provider to pull their new fiberoptic line through. The contractor shall also be responsible for providing a concrete encased fiberoptic duct bank which will terminate within building 40, room 102B. Refer to revised drawing TT-202 (revised 5/2/25). This revised drawing page shall supersede previous versions. The manhole shown is for reference and any equivalency should be submitted for approval.

Figure 3: Fiberoptic Vault (for reference of basis of design)

Annex C The fiberoptic duct bank was installed under a previous project (EHRM Tier 1). The Water table is high enough throughout most of the area that the fiberoptic manholes have a substantial amount of water in them, typically 4 feet but some are completely full. A manhole by building 11 is draining water back into building 13 through the fiberoptic conduits. A manhole by building 3 is full to the brim, will refill within 24 hours of full draining and floods the sub-basement of the hospital.

The contractor shall install a PVC drain line from these two manholes to a near by storm sewer manhole. Work will include full removal and replacement of pavements and soils, traffic control and marking, trench safety, and confined space entry. Back fill with native materials is allowed so long as the native materials does not have any notable debris in it. Manholes do not need to be entirely drained so a possible means and method would be to use existing plugs within the fiberoptic manhole and core a hole into the storm sewer manhole.

The general contractor should be aware, that in general, all the fiberoptic manholes are flooded and will require pumping during any work. Fiberoptic cabling should be kept out of the water when ever possible to avoid damage related to ice formation.

Figure 4: Additional drainline for Fiberoptic manhole near BLDG 11

Figure 5: Additional drainline for Fiberoptic manhole near BLDG 3

W

LIEBERT

PDX

EATON

93PM

UPS

93PM 300

UPS

BATTERY

CABINET

UPS

CONTROL

CABINET

UPS

CONNECT

CABINET SQUARE D

LGA

SQUARE

D

WBS #1 & #2

LB #1

LB #2

LB #3

NEW

EXISTING

Drop-in ceiling at

94" AFF

Existing bottom of precast concrete ceiling at 10' AFF

Existing bottom of concrete deck pan at 10'-9" AFF

Ex ist ing bo tto m of co nc re te be am at

' A

FF

5 6 4

7 8

1 2 3

AutoCAD SHX Text

BB-35 Imaging UPS

BB-35 Imaging UPS

BB-34 Mechanical

BB-34 Mechanical

Sheets and Views

Model image2.emf

EB-90N1

EBUPS-90N2

EBUPS-90N1

DDC-PANEL

DDC TXFR SW (30A)

MDAC 15

UPS-1

EB 90N1

#1,3,&5

46-DACU-6

EB

U

PS

N5

EB90N3

-BYPASS

UPS-2

#7,9,&11

UPS-3

#13,15,&17 EB

PS

N3

EB

N3

EBPUS

#17-19, 21-23, 25-27, &29-31

R1 22-1-17-1-32

46-DACU-5

TE BOX

EB UPS-90N4

NEW 400A, 3PH,

60 SLOT (MIN)

SERVICE PANEL,

EBUPS-90N0

EXISTING

2X2

J-BOX

2X2

1X1

1X1

BC-50 Computer

Sheets and Views

Model image3.emf

TT-202 revised 5_2_25.pdf

W6X15

R

MAIN HOSPITAL

BUILDING

1-9-46

(1) 12-STRAND OS1 OPTICAL FIBER

TO EXTEND SERVICE PROVIDER #1

TO NEW MCR ON 4TH FLOOR.

ROUTE "A" OPTICAL FIBER EXTENDED

(1) 12-STRAND OS1 OPTICAL FIBER

TO EXTEND SERVICE PROVIDER #1

LOCATION OF EXISTING

ENTRANCE CONDUIT FROM

INTRABUILDING DUCK BANK.

INSTALL NEW FIBEROPTIC

VAULT AT PROPERTY LINE

(1) 12-STRAND OS1 OPTICAL FIBER TO EXTEND SERVICE

PROVIDER #2 TO NEW MCR ON 4TH FLOOR

TT-B01-401

(1) 24-STRAND OS2 OPTICAL

FIBER AND (1) 25-PAIR CAT 5e

CABLE TO EACH TR/TE SHOWN

ON DESIGN DOCUMENTS.

LOCATION OF EXISTING SERVICE

PROVIDER #1 ENTRANCE CONDUIT.

ICT CONTRUCTION SEQUENCE OF WORK -

BASEMENT

CC JG

TT- 202

1-9-46, 40

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P

O

JE

TS

\2

2\

-1

_4

-2 1-

0_

Fa rg o, N

_E

H

M T ie r 2

(V

IS

TO

)\4

- D es oc s\

2-ra w in gs

\W

KI

\C

AD

\T T-

EN

ER

AL

ST

TI

S

EQ

E

F W

K

- B

AS

EM

T.

dw g

/1

8/

:3 8:

M

ISSUE FOR BID

BUILDING FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

B

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES - TIER 2

FARGO VA HEALTH CARE SYSTEM

437-21-210

Project Director

Revisions: Date:5-2-25 www. bancroft-ae.com

3300 Dundee RD.

Northbrook, IL 60062

T: 847.952.9362

01/16/2024Bancroft Project No: 22-113

ISSUE FOR BID 01-16-24

RATED PARTITION LEGEND

1 HR FIRE BARRIER

CONTRACTOR IS REQUIRED TO

MAINTAIN ALL RATED PARTITIONS.

2 HR FIRE BARRIER

SMOKE BARRIER

ISSUE FOR BID - 01/16/2024

Chris Carter

BICSI ID # 136803

EXPIRES 12-31-24

CONTRACTOR TO COORDINATE

NEW FIBEROPTIC UTILITY WITH

SERVICE PROVIDER AND

TERMINATE IN BLDG 40

NEW FIBEROPTIC DUCT BANK

2 FIBEROPTIC MANHOLE BASIS OF DESIGN

3 FIBEROPTIC DUCT BANK

TRENCH 3

2 X 2 DUCTBANK WITH 4" CONDUIT TRENCH

LOCATION OF SERVICE PROVIDER

#2 ENTRANCE CONDUITS

VHAFARHalvoC

Polygonal Line

Line

Rectangle image4.emf image5.PNG image6.PNG image1.emf

File details come from the government source that posted it. Updated .