Technical Questions SF330 Request.docx

Standard Form DOCX document 39 KB Posted

Attached to
C1DA--(660-809) Construct Sterile Processing Service Design - Salt Lake City (VA-23-00006737)
Solicitation number
36C77623R0132
Issued by

About this file

This document contains a pre-solicitation notice for architect-engineering services. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking statements of qualifications from service-disabled veteran-owned small businesses for design and construction period services related to a new sterile processing services facility at the George E. Wahlen VA Medical Center in Salt Lake City, Utah. The anticipated contract value is between $10-20 million. Statements of qualifications are due by February 23, 2024 and must not exceed 50 pages. Evaluation criteria include specialized experience in healthcare facility design, professional qualifications of the project team, past performance history, knowledge of the project locality, and capacity for the work. The anticipated period of performance for design completion is 220 calendar days from notice to proceed.

View the file

Other versions and copies of SF 330

File Revision Posted Attached to
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
1-Standard Form 330 Part II.pdf.pdf Revision not stated Waters Avenue Force Main Replacement CEI Services
Standard_Form_330-21b_-_Architect-Engineering_Qualifications.pdf Revision not stated Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
SF330-21b.pdf Revision not stated PARAMARIBO: A&E Services, MSGR
15. Exhibit M - SF330 - Architect-Engineer Qualifications_VA-GP.pdf Revision not stated Request for Lease Proposals (RLP) for Olympia, WA CBOC
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Subsurface Investigation & Testing
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Construction Engineering and Inspection (CEI) Services - CDBG-DR
1-Standard Form 330 Part II.pdf.pdf Revision not stated Misc. Professional Stormwater Services
SF-330 AE Qualifications.pdf Revision not stated IDIQ For Architect Engineer (A/E) Services for Central Office
Appendix-4-AE-Qualifications-SF-330-Forms.pdf Revision not stated Construction Management for the 30th Street WestCatenary Replacement Project – Phase 1A
HR001126RE008 Public Announcement Attachment 2 - SF 330.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF 330 Instructions.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF330 21AE FILLABLE.pdf Revision not stated DOC Architect and Engineering IDIQ
Attachment 1b - ArchitectEngineerQualifications (SF330-FAA 4400-37).docx Revision not stated Architecture and Engineering Services - MMAC
EXHIBIT M_SF330 - Architect-Engineer Qualifications.pdf Revision not stated Request for Lease Proposal (RLP): Las Vegas, NV Medical Facility
Attachment 5 - Standard Form 330 (SF330) - Architect-Engineer Qualifications.pdf Revision not stated FY 27 A-E IDIQ Solicitation
SF330-21a.pdf Revision not stated Architect & Engineering Services CFAC FY26 QA1
SF330-21a.pdf Revision not stated CC-623-250-001 BCCC Nursing Building Renovation and Addition
12-EXHIBIT L SF 330 Architect Engineer Qualifications.pdf Revision not stated Oklahoma City OK Fiscal Building Superseding Lease
Show all 20

Who attaches SF 330

State Files
Florida 97
Maryland 41
Pennsylvania 23
Washington 21
Texas 19

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION # 36C77623R0132

PROJECT NAME: Salt Lake City Sterile Processing Services

TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

ITEM

NO.

DATE QUESTION RECEIVED
DATE QUESTION ANSWERED
QUESTION
GOVERNMENT RESPONSE
1.
2/6/2024
2/14/2024
Section 4.2 Professional Qualifications states that the lead designer in each discipline must be registered in the State of Utah. Does the licensure have to be completed before submitting a proposal, or can it be in process until the project is awarded?
The license must be completed before submitting a proposal.
2.
2/13/2024
2/14/2024
Please advise if the A/E need to include planning and design of the Temporary space to relocate existing Sterile Processing Services function to a different part of this Hospital while the renovation the existing Sterile Processing Services Project area takes place as part of this project scope of work. Would you please confirm?

There is no renovation in this project with the exception of renovation for the elevator lobbies.

The Sterile Processing Services space will be all new square footage. Sterile Processing Services will operate out of their current space until the new square footage is done and then we will transfer them over. No trailers and no temporary spaces.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

44.

45.

46.

47.

48.

49.

50.

51.

52.

53.

54.

55.

56.

57.

58.

59.

60.

61.

62.

63.

64.

65.

66.

67.

68.

69.

70.

71.

72.

73.

74.

75.

76.

77.

78.

79.

80.

81.

82.

83.

84.

85.

86.

87.

88.

89.

90.

91.

92.

93.

94.

95.

96.

97.

98.

File details come from the government source that posted it. Updated .