Attachment 08 OMAHA VA EHRM_BID SET_TECHNOLOGY - Drawing.pdf
PDF 28 MB Posted
- Attached to
- Y1DA--Copy of EHRM Infrastructure Upgrades - Construction - Omaha VAMC DUPLICATE OF 36C776230036
- Solicitation number
- 36C77623B00361
About this file
This file attachment relates to a federal contract solicitation for infrastructure upgrades at the Omaha VA Medical Center. The solicitation number is 36C77623B00361 and is for construction services for the EHRM Infrastructure Upgrades project. The opportunity was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The solicitation seeks construction services to upgrade technology infrastructure at the Omaha VA Medical Center, including drawings of proposed construction work contained in the attached 28MB PDF file. Responses to the solicitation are due on an unspecified date. The award date and any pricing or set-aside terms are not included in the provided information.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNOLOGY SYMBOL LIST
SYMBOL: DESCRIPTION: NOTE:
EQUIPMENT
LIST ABBREV.:
#D
W
#D#V 1., 3.
WALL INFORMATION OUTLET, COMBINATION
TELEPHONE/DATA COMMUNICATION
SC-IO-W
1., 3.WALL INFORMATION OUTLET, WALL TELEPHONESC-IO-W
1., 3.
FLOOR INFORMATION OUTLET, DATA COMMUNICATION
ONLY
SC-IO-F
#D#V 1., 3.
FLOOR INFORMATION OUTLET, COMBINATION
TELEPHONE/DATA COMMUNICATION
SC-IO-F
#D 1., 3.
CEILING INFORMATION OUTLET, DATA
COMMUNICATION ONLY
SC-IO-C
#D 1., 3.
WALL INFORMATION OUTLET, DATA COMMUNICATION
ONLY
SC-IO-W
M 2.AC-CR2-W CARD ACCESS READER WITH KEYPAD; LETTER
INDICATES AS FOLLOWS:
M = MOUNT
C - CEILING D - DESK F- FLUSH H - HIDDEN M -
MULLION
P - PEDESTAL R - RACK S - SURFACE W - WALL
CSS 2.CONTROLLED SECURITY SCHEME SCHEDULE
IDENTIFIER
N/A
CCTV .
VIDEO SURVEILLANCE CAMERA WITH LENS, WALL
MOUNT OR CEILING MOUNTVS-CM1
TECHNOLOGY ABBREVIATION KEY
MAIN COMPUTER ROOMMCR-#
TELECOMMUNICATIONS ROOM (BUILDING NUMBER - FLOOR - SEQUENCE)TR-#-#-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
ABBR: DESCRIPTION:
UNLESS OTHERWISE NOTEDUON
FIELD OF VIEWFOV
DOUBLE POLE DOUBLE THROWDPDT
PAN TILT ZOOMPTZ
POWER OVER ETHERNETPOE
ABOVE FINISHED GRADEAFG
DELAYED EGRESSDE
TELEPHONE EQUIPMENT ROOMTER-#
OFFICE OF INFORMATION TECHNOLOGY (VA)OIT
TECHNOLOGY GENERAL NOTES:
1. ###-### INDICATES TECHNOLOGY EQUIPMENT SCHEDULE ITEM LABELED AS "EQUIPMENT
LIST ABBREVIATION"
2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE AND SPECIFICATIONS FOR FULL
DESCRIPTIONS AND MANUFACTURERS OF ALL DEVICES.
TECHNOLOGY MOUNTING SUBSCRIPT KEY:
A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH
H MOUNT ORIENTED HORIZONTALLY
L MOUNT IN CASEWORK
M MOUNT IN MODULAR FURNITURE
S MOUNT IN SURFACE RACEWAY
A SLASH IS USED BETWEEN TWO SUBSCRIPTS, E.G., A/H.
GENERAL NOTES:
1. ALL SYMBOLS AND ABBREVIATIONS LISTED MAY NOT BE APPLICABLE TO THIS PROJECT.
REFER TO THE TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE COMPLETE DESCRIPTION
AND ITEMS.
2. ALL SYMBOLS AND ABBREVIATIONS REFER TO TECHNOLOGY SHEETS ONLY AS DEFINED
ON THE SHEET INDEX. REFER TO THE GENERAL TECHNOLOGY NOTES FOR ADDITIONAL
INFORMATION.
3. ALL SYMBOLS LISTED ABOVE ARE FOR REFERENCE ONLY. REFER TO PLANS AND LINE
TYPE KEY FOR NEW, EXISTING TO REMAIN AND TO BE REMOVED ITEMS FOR ADDITIONAL
INFORMATION.
4. REFER TO RISERS ON SHEETS: TN500, TN501, TN502, TN503, TN504, TN505, TN506, TN507, TN508.
TECHNOLOGY SYMBOL NOTES:
1. "#" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION. REFER TO
INFORMATION OUTLET SCHEDULE ON TN600 FOR ADDITIONAL INFORMATION.
2. REFER TO CONTROLLED SECURITY SCHEME (CSS) TYPE SCHEDULE ON TN600 FOR
ADDITIONAL INFORMATION.
3. REFER TO LINE TYPE KEY FOR NEW, EXISTING TO REMAIN, OR DEMO LINE TYPE.
CABLE TRAY, CHANNEL TRAY, BASKET
TRAY
LADDER RACK
WIDTH X HEIGHT
WIDTH X HEIGHT
DIAMETERø C CONDUIT
CONDUIT DOWN
CONDUIT UP OR UP/DOWN
CONDUIT SLEEVE
CONTINUATION
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
SECURITY CONTRACTORS.C.
CIVIL CONTRACTORC.C.
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
SUGGESTED MATRIX OF RESPONSIBILITY
ITEM: SHOWN ON:
FURNISHED
BY:
INSTALLED
BY: NOTES:
TECHNOLOGY ROUGH-IN, REFER TO
TECHNOLOGY EQUIPMENT SCHEDULE
AND SPECIFICATIONS FOR DEFINITION
T-SERIES E.C. E.C. 3. 4.
INFORMATION OUTLET FACEPLATES,
JACKS, AND TERMINATIONS
T-SERIES T.C. T.C.
CONDUIT SLEEVES (WHEN SHOWN ON
DRAWINGS)
T-SERIES E.C. E.C.
CONDUIT SLEEVES (NOT SHOWN BUT
REQUIRED FOR PROPER INSTALLATION
OF SYSTEM)
N/A T.C. T.C. 2. 4.
TELECOMMUNICATION SYSTEMS
ROUGH-IN
T-SERIES E.C. E.C. 1.
TELECOMMUNICATION EQUIPMENT,
CABLING, AND TERMINATIONS
T-SERIES T.C. T.C.
CABLE TRAY (INCLUDING WIRE BASKET
TRAY) REFER TO SPECIFICATION
SECTION 27 05 36 FOR DEFINITION
T-SERIES E.C. E.C.
GROUNDING LUGS ON TECHNOLOGY
EQUIPMENT
T-SERIES T.C. E.C. 6.
BONDING SYSTEM FOR TECHNOLOGY
SYSTEM, REFER TO SPECIFICATION
SECTION 27 05 26 FOR DEFINITION
T-SERIES E.C. E.C. 7. 8.
CONNECTION OF TECHNOLOGY
BONDING SYSTEM TO THE ELECTRICAL
GROUND SYSTEM
T-SERIES E.C. E.C.
LINE VOLTAGE POWER (+120V OR
GREATER)
E-SERIES E.C. E.C.
LINE VOLTAGE POWER (NOT SHOWN
BUT REQUIRED FOR PROPER
INSTALLATION OF SYSTEM)
N/A T.C. E.C. 2. 4.
LINE VOLTAGE POWER FOR DOOR
HARDWARE POWER SUPPLIES
ARCH SPEC E.C. E.C.
LOW VOLTAGE CABLING FOR
TECHNOLOGY SYSTEMS
T-SERIES T.C. T.C.
CABLE HANGERS AND SUPPORTS OR
OTHER CABLE ROUTING METHODS
(OTHER THAN CONDUIT AND CABLE
TRAY)
T-SERIES T.C. T.C. 5.
TECHNOLOGY SERVICE ENTRANCE
CONDUITS, HANDHOLES, AND
MANHOLES
T-SERIES E.C. E.C.
SUGGESTED MATRIX OF RESPONSIBILITY NOTES
1. LOCATIONS OF TELECOMMUNICATIONS ROUGH-INS SHALL BE INDICATED BY THE INFORMATION
OUTLET SYMBOLS ON THE DRAWINGS. REFER TO THE TECHNOLOGY SYMBOL LIST FOR
ADDITIONAL INFORMATION.
2. BASED ON THE INHERENT DIFFERENCES IN PRODUCTS FROM VARIOUS MANUFACTURERS, ALL
REQUIRED EQUIPMENT MAY NOT BE SHOWN ON THE DRAWINGS FOR ALL ACCEPTABLE
MANUFACTURERS.
3. INCLUDES BACKBOXES AND CONDUIT REQUIRED FOR THE TECHNOLOGY SYSTEMS
INSTALLATION. THE E.C. SHALL BASE THE BID ON THE BASIS OF DESIGN SHOWN ON THE
CONTRACT DOCUMENTS.
4. ALL CHANGES TO THE SLEEVES, BACKBOXES, CONDUITS, AND POWER REQUIRED BECAUSE OF
THE T.C.'S SELECTION OF AN ALTERNATE ACCEPTABLE MANUFACTURER OR FROM SYSTEM
CONFIGURATIONS THAT ARE LEFT TO THE CHOICE OF THE CONTRACTOR SHALL BE INCLUDED
IN THE T.C.'S BID. THIS BID SHALL INCLUDE INSTALLATION BY A LICENSED ELECTRICIAN.
5. UNLESS TRADE RULES DICTATE OTHERWISE.
6. FURNISHED AS PART OF THE EQUIPMENT WHEN POSSIBLE, OR FURNISHED TO THE E.C. FOR
INSTALLATION IN THE FIELD.
7. INCLUDES ALL CONDUCTORS, GROUND BARS, AND TERMINATIONS FOR THE COMPLETE
BONDING SYSTEM REQUIRED BY THE SPECIFICATIONS.
8. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS OF PANELS AND SWITCHBOARDS SHOWN
IN THE TECHNOLOGY BONDING RISER DIAGRAM AND TYPICAL TELECOM ROOM BONDING FLOW
DIAGRAM.
TELECOM ROOM REFERENCES
TELECOM ROOM
DETAIL / SHEET
REFERENCE
FLOOR PLAN
REFERENCE ARCH ROOM NUMBER
MCR-01 2/01-TN100TR-A 01-TN100 B721
TER-01 4/01-TN100TR-D 01-TN100 B024C
TR-104 3/08-TN101 08-TN101 104
TR-109 1/06-TN101TR 06-TN101 109
TR-109D 3/D-TN101 D-TN101 109
TR-202 3/02-TN202 02-TN202 202
TR-1011 N/A ACC-TN101 1011
TR-1205B 4/01-TN101TR-B 01-TN101 1205B
TR-1433 N/A ACC-TN101 1433
TR-1510 3/01-TN101TR-A 01-TN101 1510
TR-1616 1/01-TN101TR-A 01-TN101 1616
TR-1656 1/01-TN101TR-B 01-TN101 1656
TR-2011 N/A ACC-TN102 2011
TR-2255A 4/01-TN102TR 01-TN102 2255A
TR-2433 N/A ACC-TN102 2433
TR-2448 1/01-TN102TR 01-TN102 2448
TR-3254B 1/01-TN103TR 01-TN103 3254B
TR-4374A 1/01-TN104TR 01-TN104 4374A
TR-5414 1/01-TN105TR 01-TN105 5414
TR-6414 1/01-TN106TR 01-TN106 6414
TR-7414 1/01-TN107TR 01-TN107 7414
TR-8414 1/01-TN108TR 01-TN108 8414
TR-9414 1/01-TN109TR 01-TN109 9414
TR-10414 1/01-TN110TR 01-TN110 10414
TR-11414 1/01-TN111TR 01-TN111 11414
TR-12018 1/01-TN112TR 01-TN112 12018
TR-14003 1/01-TN114TR 01-TN114 14003
TR-B12A 1/09-TN101TR 09-TN100 B12A
TR-B611 1/01-TN100TR-D 01-TN100 B611
TR-B818A 2/01-TN100TR-C 01-TN100 B818A
TR-G011 N/A ACC-TN100 G011
TR-G433 N/A ACC-TN100 G433
TR-G-1-1 2/G-TN101 G-TN101 1674
TR-R200A 2/15-TN102 15-TN102 R200A
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
OMAHA EHRM INFRASTRUCTURE
UPGRADE DESIGN
636-21-704
B
IM
/V
IS
N
O m a h a
E H
R M
/6
-7
.B
.T R
.r v t
/1
/2
:1
:3
A
M
TECHNOLOGY COVERSHEET
PDN DJJ
ISSUED FOR BID
FULLY SPRINKLERED
636 - OMAHA VA MEDICAL CENTER
MAY 15, 2023
Office of Construction and
Facilities Management 00-TN000
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com # 21005326.00
Revisions: Date:
1. THE EXISTING MAIN COMPUTER ROOM (MCR) AND TELECOM ROOMS (TR) TO REMAIN
OPERATIONAL DURING THE INSTALLATION OF THE NEW STRUCTURED CABLING AND
BACKBONE CABLING SYSTEMS. THE EXISTING SYSTEMS SHALL NOT BE DISRUPTED UNLESS
COORDINATED IN ADVANCE WITH OIT AND AT THEIR DISCRETION ON DATE AND TIME.
2. COORDINATE EACH TR CUTOVER WITH OIT AT THEIR DISCRETION ON DATE AND TIME.
PHASE 1 - PATHWAYS AND INFRASTRUCTURE
1. INSTALL NEW INTER-BUILDING UNDERGROUND DUCT BANK CONDUITS.
2. BUILD OUT NEW MCR LAYOUT.
A. COORDINATE BUILDOUT WITH OIT FOR EXISTING FIBER OPTIC INFRASTRUCTURE TO
EXISTING TR AND EXISTING MCR EQUIPMENT TO REMAIN FUNCTIONAL .
3. BUILD OUT NEW TR SPACES.
4. INSTALL NEW INTRA-BUILDING BACKBONE CABLING PATHWAYS.
PHASE 2 - BACKBONE CABLING
1. INSTALL INTER-BUILDING BACKBONE CABLING.
2. INSTALL INTRA-BUILDING BACKBONE CABLING.
3. TERMINATE AND TEST.
PHASE 3 - HORIZONTAL CABLING
1. INSTALL NEW CAT 6A CABLING.
A. TERMINATE CABLING IN NEW TR PATCH PANELS.
B. NEATLY COIL CABLING AT EXISTING OR EXPANDED TR LOCATIONS FOR CUTOVER TO
NEW RACKS AND PATCH PANELS.
C. NEATLY COIL CABLING AT EXISTING OUTLET LOCATIONS.
PHASE 4 - CUTOVER
1. OIT INSTALLATION OF NETWORK SWITCHES AT EACH TR PLANNED FOR CUTOVER
2. REMOVE EXISTING OUTLET CABLING FROM OUTLET AND ROUTE NEW CAT 6A CABLING INTO
OUTLET.
A. NEATLY COIL EXISTING CABLING ABOVE CEILING.
3. REMOVE EXISTING EQUIPMENT RACKS AND INSTALL NEW EQUIPMENT RACKS EQUIPMENT IN
REMODELED OR EXPANDED TR.
4. TERMINATE AND TEST NEW CABLING.
5. OIT CUTOVER AND PATCHING TO NETWORK SWITCHES.
PHASE 5 - DEMOLITION
1. REMOVE OLD FIBER OPTIC BACKBONE CABLING FROM EACH OLD TR FOLLOWING
SUCCESSFUL CUTOVER TO NEW TR.
A. OTHER EXISTING SYSTEMS IN OLD TR TO REMAIN FUNCTIONAL.
2. REMOVE OLD HORIZONTAL CABLING FROM EACH OUTLET BACK TO ITS SOURCE FOLLOWING
SUCCESSFUL CUTOVER.
3. REMOVE ALL EQUIPMENT RACKS AND ASSOCIATED EQUIPMENT FROM EACH OLD TR
FOLLOWING SUCCESSFUL CUTOVER. COORDINATE WITH OIT PRIOR TO REMOVING EXISTING
EQUIPMENT RACKS FROM OLD TR AS ACTIVE CABLING AND EQUIPMENT MAY REMAIN.
TECHNOLOGY PHASING NOTES
1. THE LOCATION OF THE CONDUIT, HAND HOLES AND/OR MAINTENANCE HOLES SHOWN ARE
APPROXIMATE LOCATIONS. FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIVATE AND/OR
PUBLIC PRIOR TO THE INSTALLATION OF THE COMPONENT. FIELD COORDINATE THE FINAL
LOCATION WITH THE OWNER AND ENGINEER PRIOR TO INSTALLATION.
2. POTHOLING TO LOCATE EXISTING UNDERGROUND UTILITIES, IF APPLICABLE, SHALL BE
INCLUDED IN THE CONTRACTOR'S BID. CONTRACTOR IS RESPONSIBLE FOR FINAL
PLACEMENT OF HAND HOLES AND/OR MAINTENANCE HOLES AND SHALL NOTIFY THE
ENGINEER OF FINAL LOCATIONS PRIOR TO INSTALLATION.
3. HAND HOLES AND/OR MAINTENANCE HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF
THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
4. REMOVAL AND REPLACEMENT OF THE EXISTING UNDERGROUND UTILITIES THAT ARE
REQUIRED TO COMPLETE THE INSTALLATION SHALL BE INCLUDED IN THE CONTRACTOR'S
BID.
5. CONTRACTOR SHALL INCLUDE IN THEIR BID ANY REMOVAL AND REPLACEMENT OF EXISTING
SIDEWALK, PAVEMENT, GRASS, SHRUBS, TREES, ETC. THAT WILL BE IMPACTED BY THE
INSTALLATION OF THE NEW CONDUITS SHOWN ON THE DRAWINGS. IF TREES ARE REQUIRED
TO BE REMOVED THE CONTRACTOR SHALL CONTACT THE OWNER AND DISCUSS OPTIONS
PRIOR TO CUTTING DOWN ANY TREE OR SHRUB OVER 5' IN HEIGHT.
6. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN
REQUIRED MINIMUM DEPTH TO AVOID EXISTING UNDERGROUND UTILITIES.
7. PROVIDE A MINIMUM OF 25'-0" SLACK LOOP WITHIN EACH HAND HOLES AND/OR
MAINTENANCE HOLES. SLACK LOOP SHALL BE SECURE SO COPPER AND FIBER IS NOT
RESTING ON EARTH AFTER FINAL INSTALLATION.
TECHNOLOGY OUTSIDE PLANT NOTES
1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE
INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY
BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR SHALL VISIT THE
SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS.
2. ITEMS (i.e. EQUIPMENT RACKS, SWITCHES, ETC.) REMOVED AND NOT RELOCATED
REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN.
(i.e., FOR MAINTENANCE PURPOSES).
3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION
SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED
PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL
LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.
4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO
EQUIPMENT, SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER.
CONDUIT CONCEALED IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT
AFFECTED BY OTHER CONSTRUCTION.
5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE
CONDUIT IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG.
WHERE CONDUIT IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS,
ETC., SHALL ALSO BE REMOVED.
6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE
REMOVING EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.
7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING
EXISTING CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE
INSTALLED IN ALL REUSED CONDUIT TO ASSURE PROPER GROUND PATH.
8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A
JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND
CONDUIT AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.
9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE
SOURCE.
10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND
ALL ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE
RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.
TECHNOLOGY DEMOLITION NOTES
1. SCOPE OF WORK INCLUDES RE-USE OF EXISTING TELECOMMUNICATIONS OUTLET ROUGH-
IN FOR NEW CATEGORY 6A CABLING. NEW CATEGORY 6A CABLING AT EXISTING OUTLET
LOCATIONS SHALL BE AS FOLLOWS:
• EXISTING 3/4” CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF TWO (2) CAT
6A CABLES.
• EXISTING 1” CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF FOUR (4) CAT
6A CABLES.
• PROVIDE NEW CONDUIT AND BACKBOX AT LOCATIONS EXCEEDING THE REQUIREMENTS
LISTED ABOVE. NEW CONDUIT SIZE SHALL BE BASED ON 40% FILL, TAKING INTO
CONSIDERATION THE DERATING OF THE CONDUIT CAPACITY FOR EACH 90 DEGREE
BEND.
2. FOR EXISTING ROUGH-IN WITH SHALLOW BACK BOXES: PROVIDE A SURFACE MOUNT
BACKBOX INSTALLED OVER TOP OF EXISTING IN-WALL BACKBOX (LEVITON 42777 OR SIM),
WITH AN ANGLED FACEPLATE (LEVITON 42081 SERIES OR SIM) TO ALLOW FOR BEND RADIUS
OF NEW CAT 6A CABLING.
3. NEW OUTLET LOCATIONS REQUIRING NEW IN-WALL OR SURFACE MOUNT ROUGH-IN ARE
NOTED ON THE DRAWINGS. ALL OTHER OUTLETS ARE ASSUMED TO UTILIZE EXISTING
ROUGH-IN.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADDITIONAL CONDUIT SLEEVES
AS REQUIRED FOR NEW CABLING PATHWAYS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CABLE LOCATIONS WITHIN FURNITURE
AND WILL BE RESPONSIBLE FOR ALL FURNITURE MOVES TO COMPLETE THE INSTALLATION
OF CABLING IN OUTLETS.
6. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.
UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN
MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON
BUILDING STRUCTURE.
7. BOXES LOCATED ON OPPOSITE SIDES OF NON-RATED WALLS SHALL BE OFFSET A MINIMUM
OF 6" HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE
OFFSET A MINIMUM OF 24" HORIZONTALLY. "THRU-THE-WALL" BOXES SHALL NOT BE
ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.
8. VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH
ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING
THE ACTUAL TELECOMMUNICATIONS INSTALLATION, ADJUST OUTLETS OR CONNECTION
LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.
9. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO
ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION
DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN
ADVANCE BY THE OTHER CONTRACTOR.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL
OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE
EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR
SEALED INTO OPENINGS.
11. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL
BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF
THROUGH-PENETRATION FIRESTOPS. REFER TO DIVISION 7 FOR ADDITIONAL INFORMATION
AND REQUIREMENTS SPECIFIC TO FIRESTOPPING.
12. THE TECHNOLOGY CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
THE CEILINGS, CEILING TILES, AND CEILING GRID ASSOCIATED WITH THE AREAS OF WORK
BY ALL CONTRACTORS.
13. ALL CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 27 05 36 FOR INSTALLATION REQUIREMENTS.
14. FLUSH MOUNT ALL NEW TELECOMMUNICATION OUTLETS AT +18" FROM FLOOR
(CENTERLINE DIMENSION), EXCEPT WHERE OTHERWISE NOTED. OUTLETS MAY BE SURFACE
MOUNTED WHEN CONDUIT IS SPECIFIED EXPOSED.
15. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO THE
WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES
DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE
RATING, AND FINISH.
TECHNOLOGY INSTALLATION NOTES:
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
OMAHA EHRM INFRASTRUCTURE
UPGRADE DESIGN
636-21-704
B
IM
/V
IS
N
O m a h a
E H
R M
/6
-7
.B
.T R
.r v t
/1
/2
:1
:3
A
M
TECHNOLOGY NOTES AND SHEET INDEX
PDN DJJ
ISSUED FOR BID
FULLY SPRINKLERED
636 - OMAHA VA MEDICAL CENTER
MAY 15, 2023
Office of Construction and
Facilities Management 00-TN001
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com # 21005326.00
TECHNOLOGY SHEET INDEX
01-TN107D BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN107E BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN107TR BLDG. 01 - LEVEL 07 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN108 BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN108B BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN108C BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN108D BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN108E BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN108TR BLDG. 01 - LEVEL 08 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN109 BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN109B BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN109C BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN109D BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN109E BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN109TR BLDG. 01 - LEVEL 09 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN110 BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN110B BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN110C BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN110D BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN110E BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN110TR BLDG. 01 - LEVEL 10 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN111 BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN111B BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN111C BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN111D BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN111E BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN111TR BLDG. 01 - LEVEL 11 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN112 BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN112B BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN112E BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN112TR BLDG. 01 - LEVEL 12 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN113 BLDG. 01 - LEVEL 13 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN113E BLDG. 01 - LEVEL 13 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN114 BLDG. 01 - LEVEL 14 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN114E BLDG. 01 - LEVEL 14 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN114TR BLDG. 01 - LEVEL 14 - TECHNOLOGY ROOM ENLARGEMENTS
02-TN200 BLDG. 02- LEVEL 00 FLOOR PLAN - TECHNOLOGY
02-TN201 BLDG. 02- LEVEL 01 FLOOR PLAN - TECHNOLOGY
02-TN202 BLDG. 02- LEVEL 02 FLOOR PLAN - TECHNOLOGY
06-TD101 BLDG. 06 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY
06-TN101 BLDG. 06 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
06-TN101TR BLDG. 06 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS
08-TN201 BLDG. 08 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
09-TD100 BLDG. 09 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY
09-TD101 BLDG. 09 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY
09-TN100 BLDG. 09 - LEVEL 00 FLOOR PLAN - TECHNOLOGY
09-TN101 BLDG. 09 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
09-TN101TR BLDG. 09 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
15-TD100 BLDG. 15 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TD101 BLDG. 15 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TD102 BLDG. 15 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TD103 BLDG. 15 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TN100 BLDG. 15 - LEVEL 00 FLOOR PLAN - TECHNOLOGY
15-TN101 BLDG. 15 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
15-TN102 BLDG. 15 - LEVEL 02 FLOOR PLAN - TECHNOLOGY
15-TN103 BLDG. 15 - LEVEL 03 FLOOR PLAN - TECHNOLOGY
ACC-TN100 BLDG. ACC - LEVEL 00 - TECHNOLOGY
ACC-TN101 BLDG. ACC - LEVEL 01 - TECHNOLOGY
ACC-TN102 BLDG. ACC - LEVEL 02 - TECHNOLOGY
D-TN101 BLDG. D - LEVEL 01 FLOOR PLANS - TECHNOLOGY
G-TN101 GEN. BLDG. - LEVEL 01 FLOOR PLANS - TECHNOLOGY
TN400 TECHNOLOGY DETAILS
TN401 TECHNOLOGY DETAILS
TN402 TECHNOLOGY DETAILS
TN500 TECHNOLOGY DIAGRAMS
TN501 TECHNOLOGY DIAGRAMS
TN502 TECHNOLOGY DIAGRAMS
TN503 TECHNOLOGY DIAGRAMS
TN504 TECHNOLOGY DIAGRAMS
TN505 TECHNOLOGY DIAGRAMS
TN506 TECHNOLOGY DIAGRAMS
TN507 TECHNOLOGY DIAGRAMS
TN508 TECHNOLOGY DIAGRAMS
TN600 TECHNOLOGY SCHEDULES
TECHNOLOGY SHEET INDEX
00-TN000 TECHNOLOGY COVERSHEET
00-TN001 TECHNOLOGY NOTES AND SHEET INDEX
00-TN002 SITE PLAN - TECHNOLOGY
01-TD100 BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD100A BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT A
01-TD100B BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD100C BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD100D BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD100E BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD101 BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD101A BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT A
01-TD101B BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD101C BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD101D BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD101E BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD102 BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD102B BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD102C BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD102D BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD102E BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD103 BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD103B BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD103C BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD103D BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD103E BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD104 BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD104B BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD104C BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD104D BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD104E BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD105 BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD105B BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD105C BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD105D BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD105E BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD106 BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD106B BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD106C BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD106D BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD106E BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD107 BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD107B BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD107C BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD107D BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD107E BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD108 BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD108B BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD108C BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD108D BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD108E BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD109 BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD109B BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD109C BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD109D BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD109E BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD110 BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD110B BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD110C BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN- TECHNOLOGY - QUADRANT C
01-TD110D BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD110E BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD111 BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD111B BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD111C BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD111D BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD111E BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD112 BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD112B BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD112D BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD112E BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD113 BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD113B BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD113E BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD114 BLDG. 01 - LEVEL 14 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD114E BLDG. 01 - LEVEL 14 FLOOR DEMOLITION - TECHNOLOGY - QUADRANT E
01-TN100 BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN100A BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT A
01-TN100B BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN100C BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN100D BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN100E BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN100TR-A BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN100TR-B BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN100TR-C BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN100TR-D BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN101 BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN101A BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT A
01-TN101B BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN101C BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN101D BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN101E BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN101TR-A BLDG. 01 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN101TR-B BLDG. 01 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN102 BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN102B BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN102C BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN102D BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN102E BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN102TR BLDG. 01 - LEVEL 02 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN103 BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN103B BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN103C BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN103D BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN103E BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN103TR BLDG. 01 - LEVEL 03 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN104 BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN104B BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN104C BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN104D BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN104E BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN104TR BLDG. 01 - LEVEL 04 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN105 BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN105B BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN105C BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN105D BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN105E BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN105TR BLDG. 01 - LEVEL 05 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN106 BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN106B BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN106C BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN106D BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN106E BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN106TR BLDG. 01 - LEVEL 06 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN107 BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN107B BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN107C BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT C
D
D
D
D
D
D
D
D
D D
ONE
WAY
G
5'
5'
5'
5'
5'
4.9986
"LEG A"
(2) 4" CONDUITS
"LEG B"
(2) 4" CONDUITS
"LEG A"
(8) 4" CONDUITS
"LEG A"
(8) 4" CONDUITS
"LEG A"
(6) 4" CONDUITS
"LEG A"
(2) 4" CONDUITS
"LEG A"
(2) 4" CONDUITS
1 "LEG A"
(2) 4" CONDUITS
"LEG A"
(4) 4" CONDUITS
"LEG B"
(2) 4" CONDUITS
"LEG B"
(2) 4" CONDUITS
1"LEG B"
(4) 4" CONDUITS
"LEG B"
(2) 4" CONDUITS
"LEG B"
(8) 4" CONDUITS
"LEG B"
(2) 4" CONDUITS
"LEG B"
(2) 4" CONDUITS
"LEG B"
(6) 4" CONDUITS
"LEG B"
(2) 4" CONDUITS
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
"LEG A"
(2) 4" CONDUITS
TUNNEL
ENTRANCE
BUILDING 1
ACC
BUILDING 6
BUILDING 8
BUILDING 9
BUILDING 2
BUILDING D
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
OMAHA EHRM INFRASTRUCTURE
UPGRADE DESIGN
636-21-704
B
IM
/V
IS
N
O m a h a
E H
R M
/6
-7
.B
.T R
.r v t
/1
/2
:1
:3
A
M
SITE PLAN - TECHNOLOGY
PDN DJJ
ISSUED FOR BID
FULLY SPRINKLERED
OMAHA VA MEDICAL CENTER
MAY 15, 2023
Office of Construction and
Facilities Management 00-TN002
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com # 21005326.00
1" = 60'-0"
SITE PLAN - TECHNOLOGY
KEYNOTES:
1. ALL UNDERGROUND CONDUITS SHALL BE
INSTALLED IN CONCRETE ENCASED DUCT
BANK. REFER TO CIVIL DRAWINGS FOR DUCT
BANK AND HAND HOLE DETAILS.
2. CONDUITS INSTALLED IN EXISTING TUNNEL.
INSTALL CONDUITS ON SOUTH WALL IN
GROUPS OF (2) FOR EACH BUILDING SERVED
WITH PULL BOX EVERY 100'. LABEL PULL
BOXES WITH BUILDING DESTINATION.
CONDUITS LEAVING EXISTING TUNNEL TO
UNDERGROUND PATHWAY SHALL BE
INSTALLED IN CONCRETE ENCASED DUCT
BANK.
SHEET NOTES:
1. THIS DRAWING IS SHOWN FOR INTENT OF
CONDUIT AND FIBER OPTIC CABLE ROUTING.
REFER TO CIVIL DRAWINGS FOR EXACT DUCT
BANK AND PATHWAY INFORMATION.
2. REFER TO TN402 FOR EXTERIOR PATHWAY
DETAILS.
3. PROVIDE (3) 3-CELL TEXTILE INNERDUCTS IN
EACH CONDUIT. REFER TO 2/TN402 FOR
ADDITIONAL INFORMATION.
B501
B502
B721
B818A
B723
OFFICE
SERVER RM
SERVER RM
B590
B577
B556B
B556
B556A B551A
B551 B545
B514
B542
B540
B537
B533AA
B533A
B533
B522
B504 B500
A101
#1
#2
BLDG. 19
B589 B024
B505 B505A
B503
B024A
B024AA
B024E
B024C
B024D B024F
B025
B009A
B009
B003
B005
B119 B119A
B111
B094
B090
B079
B070
B030
B036
B039
B040
B030A
B069A
B046B049B051
B064
B054
B069B
B069 B075
#3
#4
#5
B508 B506
B556D
B556C
B103
#7 #8
B514A
B535
B540A
B535A
B522A
B629B B629A
B629C B629D
B612 B610
B702
B617 B615 B613 B607 B605
B601
B632
B700
B630
B624
B714
B802
B710
B717
B712
B719 B804
B834 B836
B833 B835
B818
B816
B716
B726
B724
B821 B821A
B821B
B821D B821C
B808
B806
B813
B803
B805
B805A
B705
B805B
B703
B701
B830
B832
B609
B818B
B802A
B801
B614
B601A
B611
B702B
B629
B702
B702C
B626
B628
B837
B556E
B556F
B113
B001
B700A
B002
B020
B080B530
B579
B700B
B815
B728
B622
B007
B707B708
B095
B588A
B580 B581
B582
B582B
B582C
B583
B584
B584A
B585
B586
B587
B582A
B588
B807
B801
B702G B702F B702E B702D
B069C
B618
B833A
B618A
B805C
B632B
B632A
B618C
B618B
B005A
B102
B079A
B526
B526A
B524A
B524A
B503A
10 9
BLDG. 17
AIR CONDITIONING
LAB
COLD ROOM G.C. LAB
STORAGE
LAB
STORAGE
TLT
LOCKERS
RESEARCH
LAB
PLMONARY STORRESEARCH
LAB
OFFICE
BIOMED
BIO MED SHOP/OFFICE
STORAGE
LINEN CHUTE
PLUMBING
SHOP
EMS
EQUIPMENT
STORAGE
WELDING
SHOP
MECHANICAL
HVAC
ELECTRICAL
STORAGE
TELEPHONE
SWITCH
ROOM
OFFICE
PHARMACY STORAGE
STORAGE
WATER
METER
MORGUE
STOR
MORGUE
MECHTLT
COMPRESSED GAS
LINEN CHUTE
JAN
RECEIVING
AREA
OFFICE
WAREHOUSE
STORAGE
STORAGE
PLUMBING
STORAGE
PAINT
ELEVATOR
PIT
MENS TOILET
WOMENS TOILET
MECHANICAL
STORAGE
TRAINING ROOM
CARPENTER SHOP
STOR
OFFICE
EMS OFFICE
OFFICE
STORAGE
HVAC
ELECT
MECHANICAL
OFFICES OFFICE
OFFICE
OFFICE OFFICE
TELECOM
OFFICE D
ELECTRIC
JAN
LOCKER
CLOTHING
ROOM
LINEN
SUPPLY
PHARMACY
OFFICE
STOR
BREAK
IT
VAULT
OFFICE
ELEC
OFFICE
OFFICEOFFICE
OFFICE
OFFICE OFFICE OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICES
OFFICE
OFFICE
CANTEEN
STORAGE
OFFICES
STOR
STORAGE
OFFICE
OFFICE
A/C OPERATORS
EMS
STORAGE
OFFICE
MAIL RM/ COPY
CENTER
MECHANICAL
SPACE
STOR
STOR
BIO HAZZARD/ INFECT
WASTE
MENS
CANTEEN
STORAGELOCK
SHOPREFRESHMENT SHOP
PULMONARY
RESEARCH
OFFICE
STOR
BIOMED SHRED
ROOM
PULMONARY
RESEARCH
LAB
PULMONARY
RESEARCH
LAB
PULMONARY
RESEARCH
LAB
OFFICE
BREAK RM
OFFICE
POLICE SUITE
HOLDING
TRAINING RM
DISPATCH
LOCKERS
ARMORY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE/CUBICLES
STORAGE
RADIO
ACTIVE
MATERIALS
OFFICE
OFFICE
OFFICES
OFFICEOFFICE
OFFICE
VOLUNTEER
SERVICES
OFFICE
OFFICE
PIV
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
STORAGE
EMS SHOP
OFFICE
CONF RM
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
STAIR
STAIR
STAIR
OPC STAIR
STAIR
STAIR
STAIR
STAIR STAIR
STAIR
OFFICE
STOR
OFFICE
OFFICE
IV RMIV RMIV RM BREAK RM
JANITOR
OFFICE
OFFICE
O.R. CHARGING
STATION
EMS
ELECTRICAL
ANTEROOM
STOR
STOR
ELECTRICAL
SUPPLY RM
WOMENS
OFFICE
DECONTAMINATION
SCOPE
PROCESSING
SCOPE
SCOPEPROCESSING
ANTEROOM
OXIDE
NITROUS
STOR
STOR
ELEVATOR LOBBY
ELEVATOR LOBBY
ELEVATOR
LOBBY
AUTOVALET
UP
UP
UP
UP
UP
UP
UP
DN
UP
UP
UP
BLOCKED
DOOR
BLOCKED
DOOR
8' OVERHEAD DOOR
8' OVERHEAD DOOR 8' OVERHEAD DOOR 8' OVERHEAD DOOR
8' OVERHEAD DOOR8' OVERHEAD DOOR
O V E R H E A D
D O O R
4'8" OVERHEAD DOOR
B501
B502
B721
B818A
B723
OFFICE
SERVER RM
SERVER RM
B590
B577
B556B
B556
B556A B551A
B551 B545
B514
B542
B540
B537
B533AA
B533A
B533
B522
B504 B500
A101
#1
#2
BLDG. 19
B589 B024
B505 B505A
B503
B024A
B024AA
B024E
B024C
B024D B024F
B025
B009A
B009
B003
B005
B119 B119A
B111
B094
B090
B079
B070
B030
B036
B039
B040
B030A
B069A
B046B049B051
B064
B054
B069B
B069 B075
#3
#4
#5
B508 B506
B556D
B556C
B103
#7 #8
B514A
B535
B540A
B535A
B522A
B629B B629A
B629C B629D
B612 B610
B702
B617 B615 B613 B607 B605
B601
B632
B700
B630
B624
B714
B802
B710
B717
B712
B719 B804
B834 B836
B833 B835
B818
B816
B716
B726
B724
B821 B821A
B821B
B821D B821C
B808
B806
B813
B803
B805
B805A
B705
B805B
B703
B701
B830
B832
B609
B818B
B802A
B801
B614
B601A
B611
B702B
B629
B702
B702C
B626
B628
B837
B556E
B556F
B113
B001
B700A
B002
B020
B080B530
B579
B700B
B815
B728
B622
B007
B707B708
B095
B588A
B580 B581
B582
B582B
B582C
B583
B584
B584A
B585
B586
B587
B582A
B588
B807
B801
B702G B702F B702E B702D
B069C
B618
B833A
B618A
B805C
B632B
B632A
B618C
B618B
B005A
B102
B079A
B526
B526A
B524A
B524A
B503A
10 9
BLDG. 17
AIR CONDITIONING
LAB
COLD ROOM G.C. LAB
STORAGE
LAB
STORAGE
TLT
LOCKERS
RESEARCH
LAB
PLMONARY STORRESEARCH
LAB
OFFICE
BIOMED
BIO MED SHOP/OFFICE
STORAGE
LINEN CHUTE
PLUMBING
SHOP
EMS
EQUIPMENT
STORAGE
WELDING
SHOP
MECHANICAL
HVAC
ELECTRICAL
STORAGE
TELEPHONE
SWITCH
ROOM
OFFICE
PHARMACY STORAGE
STORAGE
WATER
METER
MORGUE
STOR
MORGUE
MECHTLT
COMPRESSED GAS
LINEN CHUTE
JAN
RECEIVING
AREA
OFFICE
WAREHOUSE
STORAGE
STORAGE
PLUMBING
STORAGE
PAINT
ELEVATOR
PIT
MENS TOILET
WOMENS TOILET
MECHANICAL
STORAGE
TRAINING ROOM
CARPENTER SHOP
STOR
OFFICE
EMS OFFICE
OFFICE
STORAGE
HVAC
ELECT
MECHANICAL
OFFICES OFFICE
OFFICE
OFFICE OFFICE
TELECOM
OFFICE D
ELECTRIC
JAN
LOCKER
CLOTHING
ROOM
LINEN
SUPPLY
PHARMACY
OFFICE
STOR
BREAK
IT
VAULT
OFFICE
ELEC
OFFICE
OFFICEOFFICE
OFFICE
OFFICE OFFICE OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICES
OFFICE
OFFICE
CANTEEN
STORAGE
OFFICES
STOR
STORAGE
OFFICE
OFFICE
A/C OPERATORS
EMS
STORAGE
OFFICE
MAIL RM/ COPY
CENTER
MECHANICAL
SPACE
STOR
STOR
BIO HAZZARD/ INFECT
WASTE
MENS
CANTEEN
STORAGELOCK
SHOPREFRESHMENT SHOP
PULMONARY
RESEARCH
OFFICE
STOR
BIOMED SHRED
ROOM
PULMONARY
RESEARCH
LAB
PULMONARY
RESEARCH
LAB
PULMONARY
RESEARCH
LAB
OFFICE
BREAK RM
OFFICE
POLICE SUITE
HOLDING
TRAINING RM
DISPATCH
LOCKERS
ARMORY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE/CUBICLES
STORAGE
RADIO
ACTIVE
MATERIALS
OFFICE
OFFICE
OFFICES
OFFICEOFFICE
OFFICE
VOLUNTEER
SERVICES
OFFICE
OFFICE
PIV
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
STORAGE
EMS SHOP
OFFICE
CONF RM
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
STAIR
STAIR
STAIR
OPC STAIR
STAIR
STAIR
STAIR
STAIR STAIR
STAIR
OFFICE
STOR
OFFICE
OFFICE
IV RMIV RMIV RM BREAK RM
JANITOR
OFFICE
OFFICE
O.R. CHARGING
STATION
EMS
ELECTRICAL
ANTEROOM
STOR
STOR
ELECTRICAL
SUPPLY RM
WOMENS
OFFICE
DECONTAMINATION
SCOPE
PROCESSING
SCOPE
SCOPEPROCESSING
ANTEROOM
OXIDE
NITROUS
STOR
STOR
ELEVATOR LOBBY
ELEVATOR LOBBY
ELEVATOR
LOBBY
AUTOVALET
UP
UP
UP
UP
UP
UP
UP
DN
UP
UP
UP
BLOCKED
DOOR
BLOCKED
DOOR
8' OVERHEAD DOOR
8' OVERHEAD DOOR 8' OVERHEAD DOOR 8' OVERHEAD DOOR
8' OVERHEAD DOOR8' OVERHEAD DOOR
O V E R H E A D
D O O R
4'8" OVERHEAD DOOR
B501
B502
B721
B818A
B723
OFFICE
SERVER RM
SERVER RM
B590
B577
B556B
B556
B556A B551A
B551 B545
B514
B542
B540
B537
B533AA
B533A
B533
B522
B504 B500
A101
#1
#2
BLDG. 19
B589 B024
B505 B505A
B503
B024A
B024AA
B024E
B024C
B024D B024F
B025
B009A
B009
B003
B005
B119 B119A
B111
B094
B090
B079
B070
B030
B036
B039
B040
B030A
B069A
B046B049B051
B064
B054
B069B
B069 B075
#3
#4
#5
B508 B506
B556D
B556C
B103
#7 #8
B514A
B535
B540A
B535A
B522A
B629B B629A
B629C B629D
B612 B610
B702
B617 B615 B613 B607 B605
B601
B632
B700
B630
B624
B714
B802
B710
B717
B712
B719 B804
B834 B836
B833 B835
B818
B816
B716
B726
B724
B821 B821A
B821B
B821D B821C
B808
B806
B813
B803
B805
B805A
B705
B805B
B703
B701
B830
B832
B609
B818B
B802A
B801
B614
B601A
B611
B702B
B629
B702
B702C
B626
B628
B837
B556E
B556F
B113
B001
B700A
B002
B020
B080B530
B579
B700B
B815
B728
B622
B007
B707B708
B095
B588A
B580 B581
B582
B582B
B582C
B583
B584
B584A
B585
B586
B587
B582A
B588
B807
B801
B702G B702F B702E B702D
B069C
B618
B833A
B618A
B805C
B632B
B632A
B618C
B618B
B005A
B102
B079A
B526
B526A
B524A
B524A
B503A
10 9
BLDG. 17
AIR CONDITIONING
LAB
COLD ROOM G.C. LAB
STORAGE
LAB
STORAGE
TLT
LOCKERS
RESEARCH
LAB
PLMONARY STORRESEARCH
LAB
OFFICE
BIOMED
BIO MED SHOP/OFFICE
STORAGE
LINEN CHUTE
PLUMBING
SHOP
EMS
EQUIPMENT
STORAGE
WELDING
SHOP
MECHANICAL
HVAC
ELECTRICAL
STORAGE
TELEPHONE
SWITCH
ROOM
OFFICE
PHARMACY STORAGE
STORAGE
WATER
METER
MORGUE
STOR
MORGUE
MECHTLT
COMPRESSED GAS
LINEN CHUTE
JAN
RECEIVING
AREA
OFFICE
WAREHOUSE
STORAGE
STORAGE
PLUMBING
STORAGE
PAINT
ELEVATOR
PIT
MENS TOILET
WOMENS TOILET
MECHANICAL
STORAGE
TRAINING ROOM
CARPENTER SHOP
STOR
OFFICE
EMS OFFICE
OFFICE
STORAGE
HVAC
ELECT
MECHANICAL
OFFICES OFFICE
OFFICE
OFFICE OFFICE
TELECOM
OFFICE D
ELECTRIC
JAN
LOCKER
CLOTHING
ROOM
LINEN
SUPPLY
PHARMACY
OFFICE
STOR
BREAK
IT
VAULT
OFFICE
ELEC
OFFICE
OFFICEOFFICE
OFFICE
OFFICE OFFICE OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICES
OFFICE
OFFICE
CANTEEN
STORAGE
OFFICES
STOR
STORAGE
OFFICE
OFFICE
A/C OPERATORS
EMS
STORAGE
OFFICE
MAIL RM/ COPY
CENTER
MECHANICAL
SPACE
STOR
STOR
BIO HAZZARD/ INFECT
WASTE
MENS
CANTEEN
STORAGELOCK
SHOPREFRESHMENT SHOP
PULMONARY
RESEARCH
OFFICE
STOR
BIOMED SHRED
ROOM
PULMONARY
RESEARCH
LAB
PULMONARY
RESEARCH
LAB
PULMONARY
RESEARCH
LAB
OFFICE
BREAK RM
OFFICE
POLICE SUITE
HOLDING
TRAINING RM
DISPATCH
LOCKERS
ARMORY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE/CUBICLES
STORAGE
RADIO
ACTIVE
MATERIALS
OFFICE
OFFICE
OFFICES
OFFICEOFFICE
OFFICE
VOLUNTEER
SERVICES
OFFICE
OFFICE
PIV
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
STORAGE
EMS SHOP
OFFICE
CONF RM
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
STAIR
STAIR
STAIR
OPC STAIR
STAIR
STAIR
STAIR
STAIR STAIR
STAIR
OFFICE
STOR
OFFICE
OFFICE
IV RMIV RMIV RM BREAK RM
JANITOR
OFFICE
OFFICE
O.R. CHARGING
STATION
EMS
ELECTRICAL
ANTEROOM
STOR
STOR
ELECTRICAL
SUPPLY RM
WOMENS
OFFICE
DECONTAMINATION
SCOPE
PROCESSING
SCOPE
SCOPEPROCESSING
ANTEROOM
OXIDE
NITROUS
STOR
STOR
ELEVATOR LOBBY
ELEVATOR LOBBY
ELEVATOR
LOBBY
AUTOVALET
UP
UP
UP
UP
UP
UP
UP
DN
UP
UP
UP
BLOCKED
DOOR
BLOCKED
DOOR
8' OVERHEAD DOOR
8' OVERHEAD DOOR 8' OVERHEAD DOOR 8' OVERHEAD DOOR
8' OVERHEAD DOOR8' OVERHEAD DOOR
O V E R H E A D
D O O R
4'8" OVERHEAD DOOR
1 2 3 3.1 4 4.15 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
A
B
C
D
E
F
G
H
J
K
L
M
N
O
P Q
R
S
T
U
V
W
01-TN100TR-A
EXISTING MCR-01
EXISTING TR
EXISTING TR
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
OMAHA EHRM INFRASTRUCTURE
UPGRADE DESIGN
636-21-704
B
IM
/V
IS
N
O m a h a
E H
R M
/6
-7
.B
.T R
.r v t
/1
/2
:1
:3
A
M
BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN -
TECHNOLOGY - OVERALL
PDN DJJ
ISSUED FOR BID
FULLY SPRINKLERED
OMAHA VA MEDICAL CENTER
MAY 15, 2023
Office of Construction and
Facilities Management 01-TD100
1" = 20'-0"
BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com # 21005326.00
A
B
D E
C
A
B
D E
C
KEY PLAN NORTHNORTH
KEYNOTES:
1. REMOVE EXISTING COPPER BACKBONE
CABLING, FIBER OPTIC BACKBONE CABLING,
DATA CABLING, VOICE CABLING AND 2-POST
RACKS AFTER COMPLETED SUCCESSFUL
CUTOVER TO NEW TR. EXISTING SECURITY
PANELS SHALL REMAIN IN PLACE.
B721
B818A
B723
OFFICE
SERVER RM
SERVER RM
B802
B717
B719 B804
B834 B836
B833 B835
B818
B816
B716
B726
B724
B821 B821A
B821B
B821D B821C
B808
B806
B813
B805
B805A
B830
B832
B818B
B802A
B801
B837
B815
B728
B807
B833A
B805C
MECHANICAL
STORAGE
TRAINING ROOM
CARPENTER SHOP
STOR
OFFICE
EMS OFFICE
OFFICE
STORAGE
HVAC
ELECT
MECHANICAL
OFFICES OFFICE
OFFICE
OFFICE OFFICE
TELECOM
OFFICE D
ELECTRIC
JAN
LOCKER
CLOTHING
ROOM
OFFICE
OFFICE
OFFICE
PIV
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
EMS SHOP
OFFICE
STAIR
OPC STAIR
OFFICE
STOR
AUTOVALET
UP
UP
UP
UP
B721
B818A
B723
OFFICE
SERVER RM
SERVER RM
B802
B717
B719 B804
B834 B836
B833 B835
B818
B816
B716
B726
B724
B821 B821A
B821B
B821D B821C
B808
B806
B813
B805
B805A
B830
B832
B818B
B802A
B801
B837
B815
B728
B807
B833A
B805C
MECHANICAL
STORAGE
TRAINING ROOM
CARPENTER SHOP
STOR
OFFICE
EMS OFFICE
OFFICE
STORAGE
HVAC
ELECT
MECHANICAL
OFFICES OFFICE
OFFICE
OFFICE OFFICE
TELECOM
OFFICE D
ELECTRIC
JAN
LOCKER
CLOTHING
ROOM
OFFICE
OFFICE
OFFICE
PIV
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
EMS SHOP
OFFICE
STAIR
OPC STAIR
OFFICE
STOR
AUTOVALET
UP
UP
UP
UP
B721
B818A
B723
OFFICE
SERVER RM
SERVER RM
B802
B717
B719 B804
B834 B836
B833 B835
B818
B816
B716
B726
B724
B821 B821A
B821B
B821D B821C
B808
B806
B813
B805
B805A
B830
B832
B818B
B802A
B801
B837
B815
B728
B807
B833A
B805C
MECHANICAL
STORAGE
TRAINING ROOM
CARPENTER SHOP
STOR
OFFICE
EMS OFFICE
OFFICE
STORAGE
HVAC
ELECT
MECHANICAL
OFFICES OFFICE
OFFICE
OFFICE OFFICE
TELECOM
OFFICE D
ELECTRIC
JAN
LOCKER
CLOTHING
ROOM
OFFICE
OFFICE
OFFICE
PIV
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
EMS SHOP
OFFICE
STAIR
OPC STAIR
OFFICE
STOR
AUTOVALET
UP
UP
UP
UP
D
D
1D-WAP
1D-WAP 1D-WAP1D-WAP
1D-CAM
4D4D
V
1D-WAP
2D2V2D
D
D
V
2D 2V 2D 2V
D
V
D
V
D
V
D
V
D
V
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D2D 2V
4D4D
D
V
D 2D 2V
V
D
V
2D 2V
D
V
D
V
D
1V
1D-CAM
1D-WAP
1D-WAP
D
V
1D 1V 1D 1V 1D 1V 1D 1V
D
V
D
V
D
V
1D1V 1D1V
1D1V 1D1V
1D1V
1D-WAP
1D-WAP
1D-WAP
V
2D2V 2D2V
D
V
2D 2V
2D2V
D
V
D
V
D
V
V
D
V
2D 2V
D
2D 2V
V
D
V
2D2V 3D
D
D
V
D
V
D
V
D
V
2D2V
2D 2V
D
V
D
V
1D-WAP
2D2V D
V
D
V
D
V
D
V
2D 2V 2D 2V
1D-WAP 2D2V
2D 2V
4D 4D
D
D
1 2 3 3.1 4 4.1 5 6 7 8 9 10
A
B
C
D
E
F
OUTLETS IN MODULAR FURNITURE
FED FROM POWER POLE
POWER POLE
CABLING IN THIS ROOM SERVED
FROM WALL MOUNTED RACK
POWER POLE
01-TN100TR-A
EXISTING
SECURITY
PANEL
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
OMAHA EHRM INFRASTRUCTURE
UPGRADE DESIGN
636-21-704
B
IM
/V
IS
N
O m a h a
E H
R M
/6
-7
.B
.T R
.r v t
/1
/2
:1
:3
A
M
BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN -
TECHNOLOGY - QUADRANT A
PDN DJJ
ISSUED FOR BID
FULLY SPRINKLERED
OMAHA VA MEDICAL CENTER
MAY 15, 2023
Office of Construction and
Facilities Management 01-TD100A
1/8" = 1'-0"
BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT A
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com # 21005326.00
A
B
D E
C
A
KEY PLAN NORTH
0 8' 16'4'
SHEET NOTES:
1. REMOVE ALL CABLING AS SHOWN ON THE
FLOOR PLANS. EXISTING ROUGH-IN TO
REMAIN. REFER TO TECHNOLOGY
INSTALLATION NOTES ON 00-TN001.
B590
BLDG. 19
B589
B629B B629A
B629C B629D
B612 B610
B702
B617 B615 B613 B607 B605
B601
B632
B700
B630
B624
B714
B802
B710
B717
B712
B803
B805A
B705
B805B
B703
B701
B609
B614
B601A
B611
B702B
B629
B702
B702C
B626
B628 B700A
B700B
B622
B707B708
B588A B582B
B582C
B583
B584
B584A
B585
B586
B587 B588
B801
B702G B702F B702E B702D
B618
B632B
B632A
10 9
PLUMBING
SHOP
EMS
EQUIPMENT
STORAGE
WELDING
SHOP
MENS TOILET
WOMENS TOILET
CLOTHING
ROOM
LINEN
SUPPLY
PHARMACY
OFFICE
STOR
BREAK
IT
VAULT
OFFICE
ELEC
OFFICE
OFFICEOFFICE
OFFICE
OFFICE OFFICE OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICES
OFFICE
LOCKERS
ARMORY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE/CUBICLES
STORAGE
RADIO
ACTIVE
MATERIALS
OFFICE
OFFICE
OFFICES
OFFICEOFFICE
OFFICE
VOLUNTEER
SERVICES
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
ELEVATOR ELEVATOR
ELEVATOR
STAIR
STAIR
OFFICE
OFFICE
IV RMIV RMIV RM BREAK RM
JANITOR
O.R. CHARGING
STATION
EMS
ELEVATOR
LOBBY
UP
UP
DN
UP
UP
UP
BLOCKED
DOOR
4'8" OVERHEAD DOOR
B590
BLDG. 19
B589
B629B B629A
B629C B629D
B612 B610
B702
B617 B615 B613 B607 B605
B601
B632
B700
B630
B624
B714
B802
B710
B717
B712
B803
B805A
B705
B805B
B703
B701
B609
B614
B601A
B611
B702B
B629
B702
B702C
B626
B628 B700A
B700B
B622
B707B708
B588A B582B
B582C
B583
B584
B584A
B585
B586
B587 B588
B801
B702G B702F B702E B702D
B618
B632B
B632A
10 9
PLUMBING
SHOP
EMS
EQUIPMENT
STORAGE
WELDING
SHOP
MENS TOILET
WOMENS TOILET
CLOTHING
ROOM
LINEN
SUPPLY
PHARMACY
OFFICE
STOR
BREAK
IT
VAULT
OFFICE
ELEC
OFFICE
OFFICEOFFICE
OFFICE
OFFICE OFFICE OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICES
OFFICE
LOCKERS
ARMORY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE/CUBICLES
STORAGE
RADIO
ACTIVE
MATERIALS
OFFICE
OFFICE
OFFICES
OFFICEOFFICE
OFFICE
VOLUNTEER
SERVICES
OFFICE
OFFICE
VOLUNTEER
ESCORT
RM
STORAGE
ELEVATOR ELEVATOR
ELEVATOR
STAIR
STAIR
OFFICE
OFFICE
IV RMIV RMIV RM BREAK RM
JANITOR
O.R. CHARGING
STATION
EMS
ELEVATOR
LOBBY
UP
UP
DN
UP
UP
UP
BLOCKED
DOOR
4'8" OVERHEAD DOOR
B590
BLDG. 19
B589
B629B B629A
B629C B629D
B612 B610
B702
B617 B615 B613 B607 B605
B601
B632
B700
B630
B624
B714
B802
B710
B717
B712
B803
B805A
B705
B805B
B703
B701
B609
B614
B601A
B611
B702B
B629
B702
B702C
B626
B628 B700A
B700B
B622
B707B708
B588A B582B
B582C
B583
B584
B584A
B585
B586
B587 B588
B801
B702G B702F B702E B702D
B618
B632B
B632A
10 9
PLUMBING
SHOP
EMS
EQUIPMENT
STORAGE
WELDING
SHOP
MENS TOILET
WOMENS TOILET
C…