Attachment 03 Specification vol 1 Rev1.pdf

PDF 9 MB Posted

Attached to
Y1DA--Copy of EHRM Infrastructure Upgrades - Construction - Omaha VAMC DUPLICATE OF 36C776230036
Solicitation number
36C77623B00361
Issued by

About this file

This solicitation is for an infrastructure upgrade construction project at the Omaha VA Medical Center. The solicitation seeks a contractor to provide all labor, materials, and supervision necessary to complete the project, which includes a near-complete recabling of the main hospital building and associated campus buildings. The project involves replacing all telecommunications cable, outlets, and associated equipment across multiple campus buildings as delineated in the project plans. The period of performance is 1,095 calendar days. Interested offerors should review the detailed project plans and specifications included in the solicitation documentation.

View the file

Other files

File Type Posted
Attachment 01 Question and Answer.docx DOCX document
36C77623B0036-1 0008.docx DOCX document
Attachment 01 Additional Questions and Answers.pdf PDF
Attachment 02 Spec 01 00 00 -2 POP Rev1.pdf PDF
Attachment 04 Additional Drawings.pdf PDF
36C77623B0036-1 0007.docx DOCX document
Attachment 03 Additional Drawing Sheet List.pdf PDF
ATTACHMENT 01 - SPECIFICATIONS SECTION 27 COMMUNICATIONS.zip ZIP file
36C77623B0036-1 0006.docx DOCX document
ATTACHMENT 02 - 09 65 19 19 STATIC DISSIPATIVE TILE.pdf PDF
Attachment 01 Omaha EHRM V21 - RFI Responses.pdf PDF
36C77623B0036-1 0005.docx DOCX document
Attachment 03 Tech Notes 636 704.B01.00 TN001.T.20230726.pdf PDF
Attachment 04 Omaha EHRM Addendum Mech Drawings.pdf PDF
Attachment 02 09 65 16 Resiliant Tile Flooring.pdf PDF
36C77623B0036-1 0004.docx DOCX document
Davis Bacon Wage Determinations.pdf PDF
36C77623B0036-1 0003.docx DOCX document
36C77623B0036-1 0002.docx DOCX document
Attachment 1 Site Visit Sign In EHRM Infrastructure Upgrades Construction.pdf PDF
36C77623B0036-1 0001.docx DOCX document
Attachment 09 VA-Omaha EHRM Civil_20230515 - Drawing.pdf PDF
Attachment 06 Omaha EHRM Structural_20230515 - Drawing.pdf PDF
Attachment 07 OMAHA VA EHRM_BID SET_ELECTRICAL - Drawing.pdf PDF
Attachment 04 OMAHA VA EHRM_BID SET_ARCHITECTURAL - drawings.pdf PDF
Attachment 05 OMAHA VA EHRM_BID SET_MECHANICAL - Drawing (1).pdf PDF
Attachment 14 Specification Vol 2 Rev1.pdf PDF
Attachment 08 OMAHA VA EHRM_BID SET_TECHNOLOGY - Drawing.pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical (2).pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical.pdf PDF
Attachment 01 Omaha EHRM 100 Narrative Elec Revised.pdf PDF
Attachment 16 Service Contract Wage Determinations.gov.pdf PDF
Attachment 10 DBA Wage Determination 4.13.2023.gov.pdf PDF
Attachment 15 HEFP SEP SOP Process Flow Data Center Phase v1.0.pdf PDF
Attachment 13 - Site Visit EHRM Minor Construction Project- Omaha.docx DOCX document
Attachment 11 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 12 - Limitations on Subcontracting - Construction.docx DOCX document
36C77623B0036-1_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Romanyk Consulting Corp. Copyright © 2016

PRIVILEGED AND CONFIDENTIAL PROPRIETARY INFORMATION

OMAHA EHRM

INFRASTRUCTURE UPGRADE

DESIGN

OMAHA VA MEDICAL CENTER

Omaha, NE

100% CONSTRUCTION DOCUMENTS

SPECIFICATIONS VOLUME I

May 15, 2023

Project Number: 636‐21‐704

100% Construction Documents Omaha EHRM Infrastructure Upgrade Design

Project Number 636‐21‐704 May 15, 2023

00 00 01 ‐ 1

SECTION 00 00 01

SEAL CERTIFICATIONS

ROMANYK CONSULTING CORP.

Architecture:

00 01 15 List of Drawing Sheets

00 01 10 Table of Contents

01 00 00 General Requirements

01 32 16.15 Project Schedules

01 33 23 Shop Drawings, Product Data, and Samples

01 35 26 Safety Requirements

01 42 19 Reference Standards

01 45 00 Quality Control

01 57 19 Temporary Environmental Controls

01 74 19 Construction Waste Management

01 81 13 Sustainable Construction Requirements

01 91 00 General Commissioning Requirements

02 41 00 Demolition

04 05 13 Masonry Mortaring

04 05 16 Masonry Grouting

04 20 00 Unit Masonry

05 12 00 Structural Steel Framing

05 51 00 Metal Stairs

06 10 00 Rough Carpentry

07 22 00 Roof and Deck Insulation

07 40 00 Roofing and Siding Panels

07 54 23 Thermoplastic Polyolefin (TPO) Roofing

07 60 00 Flashing and Sheet Metal

07 61 16 Batten Seam Sheet Metal Roofing

07 71 00 Roof Specialties

07 72 00 Roof Accessories

07 84 00 Firestopping

Replace with Seal at 100% Final/

Construction set

Project Number 636‐21‐704 May 15, 2023

00 00 01 ‐ 2

07 92 00 Joint Sealants

08 11 13 Hollow Metal Doors and Frames

08 14 00 Interior Wood Doors

08 71 00 Door Hardware

08 90 00 Louvers and Vents

09 05 16 Subsurface Preparation for Floor Finishes

09 06 00 Schedule for Finishes

09 22 16 Non‐Structural Metal Framing

09 29 00 Gypsum Board

09 51 00 Acoustical Ceilings

09 65 13 Resilient Base and Accessories

09 65 16 Resilient Sheet Flooring

09 69 00 Access Flooring

09 91 00 Painting

10 14 00 Signage

13 05 41 Seismic Restraint Requirements for Non‐Structural Components

32 31 40 High Security Fences and Gates

Mechanical, Plumbing and Fire Protection:

21 13 13 Wet‐Pipe Sprinkler Systems

22 05 11 Common Work Results for Plumbing

22 05 12 General Motor Requirements for Plumbing Equipment

22 05 23 General‐Duty Valves for Plumbing Piping

22 07 11 Plumbing Insulation

22 11 00 Facility Water Distribution

22 13 00 Facility Sanitary and Vent Piping

22 15 00 General Service Compressed‐Air Systems

22 40 00 Plumbing Fixtures

23 05 11 Common Work Results for HVAC

23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 11 HVAC and Boiler Plant Insulation

Replace with Seal at 100% Final/

Construction set

STATE OF NEBRASKA

PR

O

FE

SS

IO

NAL MECHANICAL ENGIN

EER

ARLO G.

WIECZOREK

E-17213

05/15/23

Project Number 636‐21‐704 May 15, 2023

00 00 01 ‐ 3

23 09 23 Direct‐Digital Control System for HVAC

23 10 00 Facility Fuel Systems

23 23 00 Refrigerant Piping

23 31 00 HVAC Ducts and Casings

23 37 00 Air Outlets and Inlets

23 81 23 Computer‐Room Air‐Conditioners

23 82 00 Convection Heating and Cooling Units

Electrical and Fire Alarm:

26 05 11 Requirements for Electrical Installations

26 05 13 Medium‐Voltage Cables

26 05 19 Low‐Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 33 Raceway and Boxes for Electrical Systems

26 05 41 Underground Electrical Construction

26 05 73 Overcurrent Protective Coordination Study

26 09 23 Lighting Controls

26 11 16 Secondary Unit Substations

26 24 16 Panelboards

26 25 11 Busways

26 26 00 Power Distribution Units for Static Uninterruptible Power Systems

26 27 26 Wiring Devices

26 29 21 Enclosed Switches and Circuit Breakers

26 33 53 Static Uninterruptible Power Supply

26 36 23 Automatic Transfer Switches

26 43 13 Surge Protective Devices

26 51 00 Interior Lighting

IMEG GROUP

Technology:

27 05 11 Requirements for Communications Installations

Replace with Seal at 100% Final/

Construction set

Replace with Seal at

Project Number 636‐21‐704 May 15, 2023

00 00 01 ‐ 4

27 05 26 Grounding and Bonding for Communication Systems

27 05 33 Conduits and Backboxes for Communication Systems

27 05 36 Cable Trays for Communications Systems

27 05 53 Identification for Communications Systems

27 10 00 Structured Cabling

27 11 16 Communication Cabinets, Racks, Frames and Enclosures

27 11 19 Communications Termination Blocks and Patch Panels

27 11 26 Communications Rack Mounted Power Protection and Power Strips

27 13 13 Communications Copper Backbone Cabling

27 13 13.13 Communications Copper Cable Splicing and Terminations

27 13 23 Communications Optical Fiber Backbone Cabling

27 15 13 Communications Copper Horizontal Cabling

27 15 13.13 Communications Optical Fiber Cable Splicing and Terminations

27 16 19 Communications Patch Cords, Station Cords, and Cross Connect Wire

28 05 00 Common Work Results for Electronic Safety and Security

28 05 13 Conductors and Cables for Electronic Safety and Security

28 05 26 Grounding and Bonding for Electronic Safety and Security

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

28 08 00 Commissioning of Electronic Safety and Security Systems

28 13 00 Physical Access Control System

28 23 00 Video Surveillance

28 31 00 Fire Detection and Alarm

Project Number 636‐21‐704 May 15, 2023

00 00 01 ‐ 5

LEO A. DALY

Structural and Civil Specifications:

03 30 00 Cast‐in‐Place Concrete

05 12 00 Structural Steel Framing

05 31 00 Steel Decking

05 36 00 Composite Metal Decking

05 50 00 Metal Fabrications

31 20 00 Earthwork

SPECIFICATION DIVISIONS NOT USED:

11 Equipment

12 Furnishings

14 Conveying Equipment

25 Integrated Automation

33 Utilities

34 Transportation

48 Electrical Power Generation

Replace with Seal at

100% Construc on Documents

Omaha EHRM Infrastructure Upgrade Design

Project Number 636-21-704

May 15, 2023

VA 09-01-21

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS VHA

MASTER SPECIFICATIONS

TABLE OF CONTENTS

Sec�on 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 00 01 Seal Cer fica ons

00 01 15 List of Drawing Sheets 05-20

00 01 10 Table of Contents 09-21

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 05-21

01 32 16.01 Architectural and Engineering CPM Schedules 03-20

01 32 16.15 Project Schedules 11-21

01 33 23 Shop Drawings, Product Data, and Samples 06-21

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 57 19 Temporary Environmental Controls 01-21

01 74 19 Construc on Waste Management 01-21

01 81 13 Sustainable Construc on Requirements 10-17

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demoli on 08-17

Omaha EHRM Infrastructure Upgrade Design

Project Number 636-21-704

May 15, 2023

VA 09-01-21

00 01 10-2

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grou ng 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 01-21

05 36 00 Composite Metal Decking 01-21

05 50 00 Metal Fabrica ons 08-18

05 51 00 Metal Stairs 01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Omaha EHRM Infrastructure Upgrade Design

Project Number 636-21-704

May 15, 2023

VA 09-01-21

00 01 10-3

07 22 00 Roof and Deck Insula on 01-21

07 54 23 Thermoplas c Polyolefin (TPO) Roofing 01-21

07 60 00 Flashing and Sheet Metal 01-21

07 61 16 BaAen Seam Sheet Metal Roofing 01-21

07 71 00 Roof Special es 01-21

07 72 00 Roof Accessories 01-21

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 71 00 Door Hardware 05-22

08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Prepara on for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 51 00 Acous cal Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 06-22

09 69 00 Access Flooring 01-21

09 91 00 Pain ng 01-21

DIVISION 10 – SPECIALTIES

Omaha EHRM Infrastructure Upgrade Design

Project Number 636-21-704

May 15, 2023

VA 09-01-21

00 01 10-4

10 14 00 Signage 01-21

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS – NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21

DIVISION 14– CONVEYING EQUIPEMENT – NOT USED

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI100 GENERAL INFORMATION

GI101 SHEET INDEX

GI102 SHEET INDEX

GI103 ABBREVIATIONS & SYMBOLS

GI103.1 ICRA DETAILS FOR OR ROOMS

GI103.2 ICRA DETAILS FOR TELECOM

GI103.3 ICRA DETAILS CLASS 1 & 2

GI103.4 ICRA DETAILS CLASS 3

GI103.5 CLASS IV ICRA DETAILS

GI103.6 CLASS IV ALT ICRA DETAILS

GI104 SITE & STAGING PLAN

GI104B ENLARGED SITE PLAN

GI105 CODE SUMMARY

GENERAL

01‐GI106 LEVEL 00 LIFE SAFETY/ PHASING PLAN

01‐GI107 LEVEL 01 LIFE SAFETY/ PHASING PLAN

01‐GI108 LEVEL 02 LIFE SAFETY/ PHASING PLAN

01‐GI109 LEVEL 03 LIFE SAFETY/ PHASING PLAN

01‐GI110 LEVEL 04 LIFE SAFETY/ PHASING PLAN

01‐GI111 LEVEL 05 LIFE SAFETY/ PHASING PLAN

01‐GI112 LEVEL 06 LIFE SAFETY/ PHASING PLAN

01‐GI113 LEVEL 07 LIFE SAFETY/ PHASING PLAN

01‐GI114 LEVEL 08 LIFE SAFETY/ PHASING PLAN

01‐GI115 LEVEL 09 LIFE SAFETY/ PHASING PLAN

01‐GI116 LEVEL 10 LIFE SAFETY/ PHASING PLAN

01‐GI117 LEVEL 11 LIFE SAFETY/ PHASING PLAN

01‐GI118 LEVEL 12 LIFE SAFETY/PHASING PLAN

01‐GI119 LEVEL 14 LIFE SAFETY/PHASING PLAN

02‐GI118 BLDG. 02 ‐ LIFE SAFETY/ PHASING PLAN

06‐GI119 BLDG. 06 LIFE SAFETY/ PHASING PLAN

08‐GI120 BLDG. 08 ‐ LIFE SAFETY/ PHASING PLAN

09‐GI121 BLDG. 09 ‐ LIFE SAFETY/ PHASING PLAN

15‐GI122 BLDG. 15 ‐ LIFE SAFETY/ PHASING PLAN

ACC‐GI123 BLDG. ACC ‐ LEVEL 00 LIFE SAFETY/ PHASING PLAN

ACC‐GI124 BLDG. ACC ‐ LEVEL 01 LIFE SAFETY/ PHASING PLAN

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 2

ACC‐GI125 BLDG. ACC ‐ LEVEL 02 LIFE SAFETY/ PHASING PLAN

D‐GI126 BLDG. D ‐ LEVEL 01 LIFE SAFETY/ PHASING PLAN

G‐ GI101 GENERATOR BUILDING ‐ LIFE SAFETY PLAN/CODE REVIEW

CIVIL

CD201 SITE DEMOLITION

CD202 DEMOLITION ‐ PARKING STALL REMIDIATION

CG201 SITE GRADING

CG202 SITE GRADING ‐ PARKING STALL REMEDIATION

CS101 OVERALL SITE

CS102 SITE LAYOUT A1

CS103 SITE LAYOUT A2

CS104 SITE LAYOUT A3

CS105 SITE LAYOUT A4

CS201 SITE LAYOUT

CS202 SITE LAYOUT ‐ PARKING STALL REMEDIATION

CS501 SITE DETAILS

CS901 SITE PHOTOS

CU201 SITE UTILITIES

CIVIL

C510 DETAILS

C511 DETAILS

STRUCTURAL

01‐S001 STRUCTURAL GENERAL NOTES & DETAILS

01‐SB101 PLANS & DETAILS

01‐SF501 FRAMING PLAN

G‐SB201 PLANS AND DETAILS

G‐SB202 FOUNDATION AND FRAMING DETAILS

G‐SB203 FRAMING DETAILS

ARCHITECTURAL

01‐AD101 BLDG. 01 ‐ LEVEL 00 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD102 BLDG. 01 ‐ LEVEL 00 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS ‐

DEMO

01‐AD103 BLDG. 01 ‐ LEVEL 00 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS ‐

DEMO

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 3

01‐AD104 BLDG. 01 ‐ LEVEL 00 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS ‐

DEMO

01‐AD105 BLDG. 01 ‐ LEVEL 01 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD106 BLDG. 01 ‐ LEVEL 01 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS ‐

DEMO

01‐AD107 BLDG. 01 ‐ LEVEL 01 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS ‐

DEMO

01‐AD108 BLDG. 01 ‐ LEVEL 01 RM. 1205B ENLARGED FLOOR PLANS, REFLECTED CEILING PLANS, & BUILDING SECTION ‐ DEMO

01‐AD109 BLDG. 01 ‐ LEVEL 01 RM. 1205B ENLARGED ROOF PLAN & BUILDING SECTION ‐ DEMO

01‐AD110 BLDG. 01 ‐ LEVEL 02 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD111 BLDG. 01 ‐ LEVEL 03 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD112 BLDG. 01 ‐ LEVEL 02 & 03 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS

‐ DEMO

01‐AD113 BLDG. 01 ‐ LEVEL 02 & 03 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS

‐ DEMO

01‐AD114 BLDG. 01 ‐ LEVEL 04 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD115 BLDG. 01 ‐ LEVEL 05 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD116 BLDG. 01 ‐ LEVEL 04 & 05 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS

‐ DEMO

01‐AD117 BLDG. 01 ‐ LEVEL 06 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD118 BLDG. 01 ‐ LEVEL 07 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD119 BLDG. 01 ‐ LEVEL 06 & 07 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS

‐ DEMO

01‐AD120 BLDG. 01 ‐ LEVEL 08 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD121 BLDG. 01 ‐ LEVEL 09 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD122 BLDG. 01 ‐ LEVEL 08 & 09 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS

‐ DEMO

01‐AD123 BLDG. 01 ‐ LEVEL 10 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD124 BLDG. 01 ‐ LEVEL 11 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD125 BLDG. 01 ‐ LEVEL 10 & 11 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS

‐ DEMO

01‐AD126 BLDG. 01 ‐ LEVEL 12 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD127 BLDG. 01 ‐ LEVEL 13 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD128 BLDG. 01 ‐ LEVEL 14 OVERALL DEMO REFLECTED CEILING PLAN

01‐AD129 BLDG. 01 ‐ LEVEL 12 & 14 ENLARGED DEMOLITION PLANS & REFLECTED CEILING PLANS

‐ DEMO

01‐AD130 BLDG. 01 ‐ LEVEL 13 OVERALL DEMO FLOOR PLAN

01‐AD131 BLDG. 01 ‐ LEVEL 14 OVERALL DEMO FLOOR PLAN

01‐AE101 BLDG. 01 ‐ LEVEL 00 OVERALL REFLECTED CEILING PLAN

01‐AE102 BLDG. 01 ‐ LEVEL 00 FLOOR PLAN ‐ QUADRANT A

01‐AE103 BLDG. 01 ‐ LEVEL 00 FLOOR PLAN ‐ QUADRANT B

01‐AE104 BLDG. 01 ‐ LEVEL 00 FLOOR PLAN ‐ QUADRANT C

01‐AE105 BLDG. 01 ‐ LEVEL 00 FLOOR PLAN ‐ QUADRANT D

01‐AE106 BLDG. 01 ‐ LEVEL 00 FLOOR PLAN ‐ QUADRANT E

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 4

01‐AE107 BLDG. 01 ‐ LEVEL 00 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE108 BLDG. 01 ‐ LEVEL 00 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE109 BLDG. 01 ‐ LEVEL 00 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE110 BLDG. 01 ‐ LEVEL 01 OVERALL REFLECTED CEILING PLAN

01‐AE111 BLDG. 01 ‐ LEVEL 01 FLOOR PLAN ‐ QUADRANT A

01‐AE112 BLDG. 01 ‐ LEVEL 01 FLOOR PLAN ‐ QUADRANT B

01‐AE113 BLDG. 01 ‐ LEVEL 01 FLOOR PLAN ‐ QUADRANT C

01‐AE114 BLDG. 01 ‐ LEVEL 01 FLOOR PLAN ‐ QUADRANT D

01‐AE115 BLDG. 01 ‐ LEVEL 01 FLOOR PLAN ‐ QUADRANT E

01‐AE116 BLDG. 01 ‐ LEVEL 01 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE117 BLDG. 01 ‐ LEVEL 01 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE118 BLDG. 01 ‐ LEVEL 01 RM. 1205B ENLARGED FLOOR PLAN & REFLECTED CEILING PLAN

01‐AE119 BLDG. 01 ‐ LEVEL 01 RM. 1205B ENLARGED ROOF PLAN

01‐AE120 BLDG. 01 ‐ LEVEL 01 RM. 1205B BUILDING SECTIONS

01‐AE121 BLDG. 01 ‐ LEVEL 01 RM. 1205B WALL DETAILS

01‐AE122 BLDG. 01 ‐ LEVEL 02 OVERALL REFLECTED CEILING PLAN

01‐AE123 BLDG. 01 ‐ LEVEL 02 FLOOR PLAN ‐ QUADRANT B

01‐AE124 BLDG. 01 ‐ LEVEL 02 FLOOR PLAN ‐ QUADRANT C

01‐AE125 BLDG. 01 ‐ LEVEL 02 FLOOR PLAN ‐ QUADRANT D

01‐AE126 BLDG. 01 ‐ LEVEL 02 FLOOR PLAN ‐ QUADRANT E

01‐AE127 BLDG. 01 ‐ LEVEL 03 OVERALL REFLECTED CEILING PLAN

01‐AE128 BLDG. 01 ‐ LEVEL 03 FLOOR PLAN ‐ QUADRANT B

01‐AE129 BLDG. 01 ‐ LEVEL 03 FLOOR PLAN ‐ QUADRANT C

01‐AE130 BLDG. 01 ‐ LEVEL 03 FLOOR PLAN ‐ QUADRANT D

01‐AE131 BLDG. 01 ‐ LEVEL 03 FLOOR PLAN ‐ QUADRANT E

01‐AE132 BLDG. 01 ‐ LEVEL 02 & 03 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE133 BLDG. 01 ‐ LEVEL 03 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE134 BLDG. 01 ‐ LEVEL 04 OVERALL REFLECTED CEILING PLAN

01‐AE135 BLDG. 01 ‐ LEVEL 04 FLOOR PLAN ‐ QUADRANT B

01‐AE136 BLDG. 01 ‐ LEVEL 04 FLOOR PLAN ‐ QUADRANT C

01‐AE137 BLDG. 01 ‐ LEVEL 04 FLOOR PLAN ‐ QUADRANT D

01‐AE138 BLDG. 01 ‐ LEVEL 04 FLOOR PLAN ‐ QUADRANT E

01‐AE139 BLDG. 01 ‐ LEVEL 05 OVERALL REFLECTED CEILING PLAN

01‐AE140 BLDG. 01 ‐ LEVEL 05 FLOOR PLAN ‐ QUADRANT B

01‐AE141 BLDG. 01 ‐ LEVEL 05 FLOOR PLAN ‐ QUADRANT C

01‐AE142 BLDG. 01 ‐ LEVEL 05 FLOOR PLAN ‐ QUADRANT D

01‐AE143 BLDG. 01 ‐ LEVEL 05 FLOOR PLAN ‐ QUADRANT E

01‐AE144 BLDG. 01 ‐ LEVEL 04 & 05 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE145 BLDG. 01 ‐ LEVEL 06 OVERALL REFLECTED CEILING PLAN

01‐AE146 BLDG. 01 ‐ LEVEL 06 FLOOR PLAN ‐ QUADRANT B

01‐AE147 BLDG. 01 ‐ LEVEL 06 FLOOR PLAN ‐ QUADRANT C

01‐AE148 BLDG. 01 ‐ LEVEL 06 FLOOR PLAN ‐ QUADRANT D

01‐AE149 BLDG. 01 ‐ LEVEL 06 FLOOR PLAN ‐ QUADRANT E

01‐AE150 BLDG. 01 ‐ LEVEL 07 OVERALL REFLECTED CEILING PLAN

01‐AE151 BLDG. 01 ‐ LEVEL 07 FLOOR PLAN ‐ QUADRANT B

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 5

01‐AE152 BLDG. 01 ‐ LEVEL 07 FLOOR PLAN ‐ QUADRANT C

01‐AE153 BLDG. 01 ‐ LEVEL 07 FLOOR PLAN ‐ QUADRANT D

01‐AE154 BLDG. 01 ‐ LEVEL 07 FLOOR PLAN ‐ QUADRANT E

01‐AE155 BLDG. 01 ‐ LEVEL 06 & 07 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE156 BLDG. 01 ‐ LEVEL 08 OVERALL REFLECTED CEILING PLAN

01‐AE157 BLDG. 01 ‐ LEVEL 08 FLOOR PLAN ‐ QUADRANT B

01‐AE158 BLDG. 01 ‐ LEVEL 08 FLOOR PLAN ‐ QUADRANT C

01‐AE159 BLDG. 01 ‐ LEVEL 08 FLOOR PLAN ‐ QUADRANT D

01‐AE160 BLDG. 01 ‐ LEVEL 08 FLOOR PLAN ‐ QUADRANT E

01‐AE161 BLDG. 01 ‐ LEVEL 09 OVERALL REFLECTED CEILING PLAN

01‐AE162 BLDG. 01 ‐ LEVEL 09 FLOOR PLAN ‐ QUADRANT B

01‐AE163 BLDG. 01 ‐ LEVEL 09 FLOOR PLAN ‐ QUADRANT C

01‐AE164 BLDG. 01 ‐ LEVEL 09 FLOOR PLAN ‐ QUADRANT D

01‐AE165 BLDG. 01 ‐ LEVEL 09 FLOOR PLAN ‐ QUADRANT E

01‐AE166 BLDG. 01 ‐ LEVEL 08 & 09 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE167 BLDG. 01 ‐ LEVEL 10 OVERALL REFLECTED CEILING PLAN

01‐AE168 BLDG. 01 ‐ LEVEL 10 FLOOR PLAN ‐ QUADRANT B

01‐AE169 BLDG. 01 ‐ LEVEL 10 FLOOR PLAN ‐ QUADRANT C

01‐AE170 BLDG. 01 ‐ LEVEL 10 FLOOR PLAN ‐ QUADRANT D

01‐AE171 BLDG. 01 ‐ LEVEL 10 FLOOR PLAN ‐ QUADRANT E

01‐AE172 BLDG. 01 ‐ LEVEL 11 OVERALL REFLECTED CEILING PLAN

01‐AE173 BLDG. 01 ‐ LEVEL 11 FLOOR PLAN ‐ QUADRANT B

01‐AE174 BLDG. 01 ‐ LEVEL 11 FLOOR PLAN ‐ QUADRANT C

01‐AE175 BLDG. 01 ‐ LEVEL 11 FLOOR PLAN ‐ QUADRANT D

01‐AE176 BLDG. 01 ‐ LEVEL 11 FLOOR PLAN ‐ QUADRANT E

01‐AE177 BLDG. 01 ‐ LEVEL 10 & 11 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

01‐AE178 BLDG. 01 ‐ LEVEL 12 OVERALL REFLECTED CEILING PLAN

01‐AE179 BLDG. 01 ‐ LEVEL 12 FLOOR PLAN ‐ QUADRANT B

01‐AE180 BLDG. 01 ‐ LEVEL 12 FLOOR PLAN ‐ QUADRANT D

01‐AE181 BLDG. 01 ‐ LEVEL 12 FLOOR PLAN ‐ QUADRANT E

01‐AE182 BLDG. 01 ‐ LEVEL 13 OVERALL FLOOR PLAN

01‐AE183 BLDG. 01 ‐ LEVEL 14 OVERALL REFLECTED CEILING PLAN

01‐AE184 BLDG. 01 ‐ LEVEL 12 & 14 ENLARGED FLOOR PLANS & REFLECTED CEILING PLANS

02‐AD101 BLDG. 02 ‐ LEVEL 02 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

02‐AE101 BLDG. 02 ‐ LEVEL 02 FLOOR PLAN & REFLECTED CEILING PLAN

06‐AD101 BLDG. 06 ‐ LEVEL 01 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

06‐AE101 BLDG. 06 ‐ LEVEL 01 FLOOR PLAN & REFLECTED CEILING PLAN

08‐AD101 BLDG. 08 ‐ LEVEL 01 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

08‐AE101 BLDG. 08 ‐ LEVEL 01 FLOOR PLAN & REFLECTED CEILING PLAN

09‐AD101 BLDG. 09 ‐ LEVEL 00 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

09‐AE101 BLDG. 09 ‐ LEVEL 00 FLOOR PLAN & REFLECTED CEILING PLAN

15‐AD101 BLDG. 15 ‐ LEVEL 02 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

15‐AE101 BLDG. 15 ‐ LEVEL 02 FLOOR PLAN & REFLECTED CEILING PLAN

ACC‐AD101 BLDG. ACC ‐ LEVEL 00 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

ACC‐AD102 BLDG. ACC ‐ LEVEL 01 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 6

ACC‐AD103 BLDG. ACC ‐ LEVEL 02 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

ACC‐AE101 BLDG. ACC ‐ LEVEL 00 QUADRANT A

ACC‐AE102 BLDG. ACC ‐ LEVEL 00 QUADRANT B

ACC‐AE103 BLDG. ACC ‐ LEVEL 00 QUADRANT C

ACC‐AE104 BLDG. ACC ‐ LEVEL 00 FLOOR PLAN & REFLECTED CEILING PLAN

ACC‐AE105 BLDG. ACC ‐ LEVEL 01 QUADRANT A

ACC‐AE106 BLDG. ACC ‐ LEVEL 01 QUADRANT B

ACC‐AE107 BLDG. ACC ‐ LEVEL 01 QUADRANT C

ACC‐AE108 BLDG. ACC ‐ LEVEL 01 QUADRANT D

ACC‐AE109 BLDG. ACC ‐ LEVEL 01 FLOOR PLAN & REFLECTED CEILING PLAN

ACC‐AE110 BLDG. ACC ‐ LEVEL 02 QUADRANT A

ACC‐AE111 BLDG. ACC ‐ LEVEL 02 QUADRANT B

ACC‐AE112 BLDG. ACC ‐ LEVEL 02 QUADRANT C

ACC‐AE113 BLDG. ACC ‐ LEVEL 02 FLOOR PLAN & REFLECTED CEILING PLAN

D‐AD101 BLDG. D ‐ LEVEL 01 DEMOLITION PLAN & REFLECTED CEILING PLAN ‐ DEMO

D‐AE101 BLDG. D ‐ LEVEL 01 FLOOR PLAN & REFLECTED CEILING PLAN

G‐ AE101 GENERATOR BUILDING ‐ LEVEL 01 FLOOR PLAN & REFLECTED CEILING PLAN

G‐ AE104 GENERATOR BUILDING ‐ ROOF PLAN

G‐ AE201 GENERATOR BUILDING ‐ ELEVATIONS

G‐ AE202 GENERATOR BUILDING ‐ BUILDING SECTIONS

G‐ AI101 GENERATOR BUILDING ‐ WALL SECTIONS

G‐AI102 GENERATOR BUILDING ‐ WALL DETAILS

ARCHITECTURAL

AE500 WALL TYPES

AE501 TYPICAL PARTITION DETAILS

AE502 CEILING DETAILS

AE503 ROOF DETAILS

AE504 MISCELLANEOUS DETAILS

AE601 DOOR SCHEDULE/DETAILS

AF101 ROOM/SIGNAGE SCHEDULE

FIRE PROTECTION

F‐100 FIRE PROTECTION LEGEND, NOTES, AND ABBREVIATIONS

FIRE PROTECTION

01‐FA101 BLDG. 01 ‐ LEVEL 00 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT A

01‐FA102 BLDG. 01 ‐ LEVEL 00 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA103 BLDG. 01 ‐ LEVEL 00 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA104 BLDG. 01 ‐ LEVEL 00 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA105 BLDG. 01 ‐ LEVEL 00 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA111 BLDG. 01 ‐ LEVEL 01 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT A

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 7

01‐FA112 BLDG. 01 ‐ LEVEL 01 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA113 BLDG. 01 ‐ LEVEL 01 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA114 BLDG. 01 ‐ LEVEL 01 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA115 BLDG. 01 ‐ LEVEL 01 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA122 BLDG. 01 ‐ LEVEL 02 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA123 BLDG. 01 ‐ LEVEL 02 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA124 BLDG. 01 ‐ LEVEL 02 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA125 BLDG. 01 ‐ LEVEL 02 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA132 BLDG. 01 ‐ LEVEL 03 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA133 BLDG. 01 ‐ LEVEL 03 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA134 BLDG. 01 ‐ LEVEL 03 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA135 BLDG. 01 ‐ LEVEL 03 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA142 BLDG. 01 ‐ LEVEL 04 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA143 BLDG. 01 ‐ LEVEL 04 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA144 BLDG. 01 ‐ LEVEL 04 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA145 BLDG. 01 ‐ LEVEL 04 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA152 BLDG. 01 ‐ LEVEL 05 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA153 BLDG. 01 ‐ LEVEL 05 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA154 BLDG. 01 ‐ LEVEL 05 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA155 BLDG. 01 ‐ LEVEL 05 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA162 BLDG. 01 ‐ LEVEL 06 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA163 BLDG. 01 ‐ LEVEL 06 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA164 BLDG. 01 ‐ LEVEL 06 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA165 BLDG. 01 ‐ LEVEL 06 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA172 BLDG. 01 ‐ LEVEL 07 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA173 BLDG. 01 ‐ LEVEL 07 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA174 BLDG. 01 ‐ LEVEL 07 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA175 BLDG. 01 ‐ LEVEL 07 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA182 BLDG. 01 ‐ LEVEL 08 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA183 BLDG. 01 ‐ LEVEL 08 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA184 BLDG. 01 ‐ LEVEL 08 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA185 BLDG. 01 ‐ LEVEL 08 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA192 BLDG. 01 ‐ LEVEL 09 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA193 BLDG. 01 ‐ LEVEL 09 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA194 BLDG. 01 ‐ LEVEL 09 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA195 BLDG. 01 ‐ LEVEL 09 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA202 BLDG. 01 ‐ LEVEL 10 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA203 BLDG. 01 ‐ LEVEL 10 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA204 BLDG. 01 ‐ LEVEL 10 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA205 BLDG. 01 ‐ LEVEL 10 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA212 BLDG. 01 ‐ LEVEL 11 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

01‐FA213 BLDG. 01 ‐ LEVEL 11 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT C

01‐FA214 BLDG. 01 ‐ LEVEL 11 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT D

01‐FA215 BLDG. 01 ‐ LEVEL 11 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA222 BLDG. 01 ‐ LEVEL 12 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT B

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 8

01‐FA225 BLDG. 01 ‐ LEVEL 12 FIRE PROTECTION FLOOR PLAN ‐ QUADRANT E

01‐FA231 BLDG. 01 ‐ LEVELS 13 & 14 FIRE PROTECTION FLOOR PLAN ‐ QUADRANTS B & E

01‐FE101 BLDG. 01 ‐ LEVEL 00 FIRE PROTECTION ENLARGED PLANS

01‐FE102 BLDG. 01 ‐ LEVELS 00 & 01 FIRE PROTECTION ENLARGED PLANS

01‐FE103 BLDG. 01 ‐ LEVEL 01 FIRE PROTECTION ENLARGED PLANS

01‐FE104 BLDG. 01 ‐ LEVELS 02‐04 FIRE PROTECTION ENLARGED PLANS

01‐FE105 BLDG. 01 ‐ LEVELS 05‐08 FIRE PROTECTION ENLARGED PLANS

01‐FE106 BLDG. 01 ‐ LEVELS 09‐12 & 14 FIRE PROTECTION ENLARGED PLANS

06‐FE101 BLDG. 06 ‐ LEVEL 01 FIRE PROTECTION FLOOR PLAN

09‐FE101 BLDG. 09 ‐ LEVEL 00 FIRE PROTECTION FLOOR PLAN

15‐FE101 BLDG. 15 ‐ LEVEL 02 FIRE PROTECTION FLOOR PLAN

G‐FE101 BLDG. G ‐ LEVEL 01 FIRE PROTECTION FLOOR PLAN

MECHANICAL

M‐100 MECHANICAL LEGEND, NOTES, AND ABBREVIATIONS

M‐101 MECHANICAL DETAILS

M‐102 MECHANICAL DETAILS

M‐103 MECHANICAL SCHEDULES

M‐104 MECHANICAL CONTROLS

MECHANICAL

01‐MA101 BLDG. 01 ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT A

01‐MA102 BLDG. 01 ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA103 BLDG. 01 ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA104 BLDG. 01 ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA105 BLDG. 01 ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA111 BLDG. 01 ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT A

01‐MA112 BLDG. 01 ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA113 BLDG. 01 ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA114 BLDG. 01 ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA115 BLDG. 01 ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA121 BLDG. 01 ‐ LEVEL 02 MECHANICAL ROOF PLAN ‐ QUADRANT A

01‐MA122 BLDG. 01 ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA123 BLDG. 01 ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA124 BLDG. 01 ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA125 BLDG. 01 ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA132 BLDG. 01 ‐ LEVEL 03 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA133 BLDG. 01 ‐ LEVEL 03 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA134 BLDG. 01 ‐ LEVEL 03 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA135 BLDG. 01 ‐ LEVEL 03 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA142 BLDG. 01 ‐ LEVEL 04 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA143 BLDG. 01 ‐ LEVEL 04 MECHANICAL FLOOR PLAN ‐ QUADRANT C

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 9

01‐MA144 BLDG. 01 ‐ LEVEL 04 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA145 BLDG. 01 ‐ LEVEL 04 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA152 BLDG. 01 ‐ LEVEL 05 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA153 BLDG. 01 ‐ LEVEL 05 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA154 BLDG. 01 ‐ LEVEL 05 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA155 BLDG. 01 ‐ LEVEL 05 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA162 BLDG. 01 ‐ LEVEL 06 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA163 BLDG. 01 ‐ LEVEL 06 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA164 BLDG. 01 ‐ LEVEL 06 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA165 BLDG. 01 ‐ LEVEL 06 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA172 BLDG. 01 ‐ LEVEL 07 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA173 BLDG. 01 ‐ LEVEL 07 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA174 BLDG. 01 ‐ LEVEL 07 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA175 BLDG. 01 ‐ LEVEL 07 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA182 BLDG. 01 ‐ LEVEL 08 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA183 BLDG. 01 ‐ LEVEL 08 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA184 BLDG. 01 ‐ LEVEL 08 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA185 BLDG. 01 ‐ LEVEL 08 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA192 BLDG. 01 ‐ LEVEL 09 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA193 BLDG. 01 ‐ LEVEL 09 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA194 BLDG. 01 ‐ LEVEL 09 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA195 BLDG. 01 ‐ LEVEL 09 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA202 BLDG. 01 ‐ LEVEL 10 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA203 BLDG. 01 ‐ LEVEL 10 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA204 BLDG. 01 ‐ LEVEL 10 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA205 BLDG. 01 ‐ LEVEL 10 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA212 BLDG. 01 ‐ LEVEL 11 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA213 BLDG. 01 ‐ LEVEL 11 MECHANICAL FLOOR PLAN ‐ QUADRANT C

01‐MA214 BLDG. 01 ‐ LEVEL 11 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA215 BLDG. 01 ‐ LEVEL 11 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA222 BLDG. 01 ‐ LEVEL 12 MECHANICAL FLOOR PLAN ‐ QUADRANT B

01‐MA224 BLDG. 01 ‐ LEVEL 12 MECHANICAL FLOOR PLAN ‐ QUADRANT D

01‐MA225 BLDG. 01 ‐ LEVEL 12 MECHANICAL FLOOR PLAN ‐ QUADRANT E

01‐MA231 BLDG. 01 ‐ LEVELS 13 & 14 MECHANICAL FLOOR PLAN ‐ QUADRANTS B & E

01‐ME101 BLDG. 01 ‐ LEVEL 00 MECHANICAL ENLARGED PLANS

01‐ME102 BLDG. 01 ‐ LEVELS 00 & 01 MECHANICAL ENLARGED PLANS

01‐ME103 BLDG. 01 ‐ LEVEL 01 MECHANICAL ENLARGED PLANS

01‐ME104 BLDG. 01 ‐ LEVELS 02‐04 MECHANICAL ENLARGED PLANS

01‐ME105 BLDG. 01 ‐ LEVELS 05‐07 MECHANICAL ENLARGED PLANS

01‐ME106 BLDG. 01 ‐ LEVELS 08‐11 MECHANICAL ENLARGED PLANS

01‐ME107 BLDG. 01 ‐ LEVELS 12‐14 MECHANICAL ENLARGED PLANS

02‐ME101 BLDG. 02 ‐ LEVEL 02 MECHANICAL FLOOR PLAN

06‐ME101 BLDG. 06 ‐ LEVEL 01 MECHANICAL FLOOR PLAN

08‐ME101 BLDG. 08 ‐ LEVEL 01 MECHANICAL FLOOR PLAN

09‐ME101 BLDG. 09 ‐ LEVEL 00 MECHANICAL FLOOR PLAN

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 10

15‐ME101 BLDG. 15 ‐ LEVEL 02 MECHANICAL FLOOR PLAN

ACC‐MA101 BLDG. ACC ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT A

ACC‐MA102 BLDG. ACC ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT B

ACC‐MA103 BLDG. ACC ‐ LEVEL 00 MECHANICAL FLOOR PLAN ‐ QUADRANT C

ACC‐MA111 BLDG. ACC ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT A

ACC‐MA112 BLDG. ACC ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT B

ACC‐MA113 BLDG. ACC ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT C

ACC‐MA114 BLDG. ACC ‐ LEVEL 01 MECHANICAL FLOOR PLAN ‐ QUADRANT D

ACC‐MA121 BLDG. ACC ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT A

ACC‐MA122 BLDG. ACC ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT B

ACC‐MA123 BLDG. ACC ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT C

ACC‐MA124 BLDG. ACC ‐ LEVEL 02 MECHANICAL FLOOR PLAN ‐ QUADRANT D

ACC‐ME101 BLDG. ACC ‐ LEVEL 00 MECHANICAL ENLARGED PLANS

ACC‐ME102 BLDG. ACC ‐ LEVEL 01 MECHANICAL ENLARGED PLANS

ACC‐ME103 BLDG. ACC ‐ LEVEL 02 MECHANICAL ENLARGED PLANS

D‐ME101 BLDG. D ‐ LEVEL 01 MECHANICAL FLOOR PLAN

G‐ME101 BLDG. G ‐ LEVEL 01 MECHANICAL FLOOR PLAN

PLUMBING

P‐100 PLUMBING LEGEND, NOTES, SCHEDULES, AND ABBREVIATIONS

P‐101 DRY FOG HUMIDIFICATION SCHEMATIC AND COMPRESSED AIR RISER

P‐102 PLUMBING DETAILS

PLUMBING

01‐PA101 BLDG. 01 ‐ LEVEL 00 PLUMBING FLOOR PLAN ‐ QUADRANT A

01‐PA102 BLDG. 01 ‐ LEVEL 00 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA103 BLDG. 01 ‐ LEVEL 00 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA104 BLDG. 01 ‐ LEVEL 00 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA105 BLDG. 01 ‐ LEVEL 00 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA111 BLDG. 01 ‐ LEVEL 01 PLUMBING FLOOR PLAN ‐ QUADRANT A

01‐PA112 BLDG. 01 ‐ LEVEL 01 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA113 BLDG. 01 ‐ LEVEL 01 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA114 BLDG. 01 ‐ LEVEL 01 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA115 BLDG. 01 ‐ LEVEL 01 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA122 BLDG. 01 ‐ LEVEL 02 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA123 BLDG. 01 ‐ LEVEL 02 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA124 BLDG. 01 ‐ LEVEL 02 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA125 BLDG. 01 ‐ LEVEL 02 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA132 BLDG. 01 ‐ LEVEL 03 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA133 BLDG. 01 ‐ LEVEL 03 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA134 BLDG. 01 ‐ LEVEL 03 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA135 BLDG. 01 ‐ LEVEL 03 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA142 BLDG. 01 ‐ LEVEL 04 PLUMBING FLOOR PLAN ‐ QUADRANT B

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 11

01‐PA143 BLDG. 01 ‐ LEVEL 04 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA144 BLDG. 01 ‐ LEVEL 04 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA145 BLDG. 01 ‐ LEVEL 04 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA152 BLDG. 01 ‐ LEVEL 05 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA153 BLDG. 01 ‐ LEVEL 05 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA154 BLDG. 01 ‐ LEVEL 05 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA155 BLDG. 01 ‐ LEVEL 05 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA162 BLDG. 01 ‐ LEVEL 06 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA163 BLDG. 01 ‐ LEVEL 06 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA164 BLDG. 01 ‐ LEVEL 06 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA165 BLDG. 01 ‐ LEVEL 06 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA172 BLDG. 01 ‐ LEVEL 07 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA173 BLDG. 01 ‐ LEVEL 07 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA174 BLDG. 01 ‐ LEVEL 07 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA175 BLDG. 01 ‐ LEVEL 07 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA182 BLDG. 01 ‐ LEVEL 08 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA183 BLDG. 01 ‐ LEVEL 08 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA184 BLDG. 01 ‐ LEVEL 08 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA185 BLDG. 01 ‐ LEVEL 08 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA192 BLDG. 01 ‐ LEVEL 09 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA193 BLDG. 01 ‐ LEVEL 09 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA194 BLDG. 01 ‐ LEVEL 09 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA195 BLDG. 01 ‐ LEVEL 09 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA202 BLDG. 01 ‐ LEVEL 10 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA203 BLDG. 01 ‐ LEVEL 10 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA204 BLDG. 01 ‐ LEVEL 10 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA205 BLDG. 01 ‐ LEVEL 10 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA212 BLDG. 01 ‐ LEVEL 11 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA213 BLDG. 01 ‐ LEVEL 11 PLUMBING FLOOR PLAN ‐ QUADRANT C

01‐PA214 BLDG. 01 ‐ LEVEL 11 PLUMBING FLOOR PLAN ‐ QUADRANT D

01‐PA215 BLDG. 01 ‐ LEVEL 11 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA222 BLDG. 01 ‐ LEVEL 12 PLUMBING FLOOR PLAN ‐ QUADRANT B

01‐PA225 BLDG. 01 ‐ LEVEL 12 PLUMBING FLOOR PLAN ‐ QUADRANT E

01‐PA231 BLDG. 01 ‐ LEVELS 13 & 14 PLUMBING FLOOR PLAN ‐ QUADRANTS B & E

01‐PE101 BLDG. 01 ‐ LEVEL 00 PLUMBING ENLARGED PLANS

01‐PE102 BLDG. 01 ‐ LEVEL 00 PLUMBING ENLARGED PLANS

01‐PE103 BLDG. 01 ‐ LEVELS 00 & 01 PLUMBING ENLARGED PLANS

01‐PE104 BLDG. 01 ‐ LEVEL 01 PLUMBING ENLARGED PLANS

01‐PE105 BLDG. 01 ‐ LEVELS 02‐04 PLUMBING ENLARGED PLANS

01‐PE106 BLDG. 01 ‐ LEVELS 05‐08 PLUMBING ENLARGED PLANS

01‐PE107 BLDG. 01 ‐ LEVELS 09‐12 & 14 PLUMBING ENLARGED PLANS

02‐PE101 BLDG. 02 ‐ LEVEL 02 PLUMBING FLOOR PLAN

06‐PE101 BLDG. 06 ‐ LEVEL 01 PLUMBING FLOOR PLAN

08‐PE101 BLDG. 08 ‐ LEVEL 01 PLUMBING FLOOR PLAN

09‐PE101 BLDG. 09 ‐ LEVEL 00 PLUMBING FLOOR PLAN

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 12

15‐PE101 BLDG. 15 ‐ LEVEL 02 PLUMBING FLOOR PLAN

D‐PE101 BLDG. D ‐ LEVEL 01 PLUMBING FLOOR PLAN

G‐PE101 BLDG. G ‐ LEVEL 01 PLUMBING FLOOR PLAN

ELECTRICAL

E‐001 ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS

ES‐100 ELECTRICAL SITE PLAN

ES‐101 ELECTRICAL SITE PLAN

ELECTRICAL

01‐ED100 BUILDING 01 ‐ LEVEL 00 ELECTRICAL DEMOLITION PLAN

01‐ED101 BUILDING 01 ‐ LEVEL 01 ELECTRICAL DEMOLITION PLAN

01‐ED102 BUILDING 01 ‐ LEVEL 02 ELECTRICAL DEMOLITION PLAN

01‐ED103 BUILDING 01 ‐ LEVEL 03 & 04 ELECTRICAL DEMOLITION PLAN

01‐ED104 BUILDING 01 ‐ LEVEL 05 & 06 ELECTRICAL DEMOLITION PLAN

01‐ED105 BUILDING 01 ‐ LEVEL 07 & 08 ELECTRICAL DEMOLITION PLAN

01‐ED106 BUILDING 01 ‐ LEVEL 09 & 10 ELECTRICAL DEMOLITION PLAN

01‐ED107 BUILDING 01 ‐ LEVEL 11, 12, & 14 ELECTRICAL DEMOLITION PLAN

01‐EP100 BUILDING 01 ‐ LEVEL 00 ELECTRICAL FLOOR PLAN

01‐EP101 BUILDING 01 ‐ LEVEL 00 ELECTRICAL FLOOR PLAN

01‐EP102 BUILDING 01 ‐ LEVEL 01 ELECTRICAL FLOOR PLAN

01‐EP103 BUILDING 01 ‐ LEVEL 02 ELECTRICAL FLOOR PLAN

01‐EP104 BUILDING 01 ‐ LEVEL 03 & 04 ELECTRICAL FLOOR PLAN

01‐EP105 BUILDING 01 ‐ LEVEL 05 & 06 ELECTRICAL FLOOR PLAN

01‐EP106 BUILDING 01 ‐ LEVEL 07 & 08 ELECTRICAL FLOOR PLAN

01‐EP107 BUILDING 01 ‐ LEVEL 09 & 10 ELECTRICAL FLOOR PLAN

01‐EP108 BUILDING 01 ‐ LEVEL 11 & 12 ELECTRICAL FLOOR PLAN

01‐EP109 BUILDING 01 ‐ LEVEL 13 & 14 ELECTRICAL ROOF PLAN

01‐EP110 BUILDING 01 ‐ ELECTRICAL RISER DIAGRAM

02‐ED100 BUILDING 02 ‐ LEVEL 02 ELECTRICAL DEMOLITION PLAN

02‐EP100 BUILDING 02 ‐ LEVEL 02 ELECTRICAL FLOOR PLAN

06‐ED100 BUILDING 06 ‐ LEVEL 01 ELECTRICAL DEMOLITION PLAN

06‐EP100 BUILDING 06 ‐ LEVEL 01 ELECTRICAL FLOOR PLAN

08‐ED100 BUILDING 08 ‐ LEVEL 01 ELECTRICAL DEMOLITION PLAN

08‐EP100 BUILDING 08 ‐ LEVEL 01 ELECTRICAL FLOOR PLAN

09‐ED100 BUILDING 09 ‐ LEVEL 00 ELECTRICAL DEMOLITION PLAN

09‐EP100 BUILDING 09 ‐ LEVEL 00 ELECTRICAL FLOOR PLAN

15‐ED100 BUILDING 15 ‐ LEVEL 01 ELECTRICAL DEMOLITION PLAN

15‐ED101 BUILDING 15 ‐ LEVEL 02 ELECTRICAL DEMOLITION PLAN

15‐EP100 BUILDING 15 ‐ LEVEL 01 ELECTRICAL FLOOR PLAN

15‐EP101 BUILDING 15 ‐ LEVEL 02 ELECTRICAL FLOOR PLAN

ACC‐ED100 BUILDING ACC ‐ LEVEL 00 ELECTRICAL DEMOLITION PLAN

ACC‐ED101 BUILDING ACC ‐ LEVEL 01 ELECTRICAL DEMOLITION PLAN

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 13

ACC‐ED102 BUILDING ACC ‐ LEVEL 02 ELECTRICAL DEMOLITION PLAN

ACC‐EP100 BUILDING ACC ‐ LEVEL 00 ELECTRICAL FLOOR PLAN

ACC‐EP101 BUILDING ACC ‐ LEVEL 01 ELECTRICAL FLOOR PLAN

ACC‐EP102 BUILDING ACC ‐ LEVEL 02 ELECTRICAL FLOOR PLAN

D‐ED100 BUILDING D ‐ LEVEL 01 ELECTRICAL DEMOLITION PLAN

D‐EP100 BUILDING D ‐ LEVEL 01 ELECTRICAL FLOOR PLAN

G‐EP100 BUILDING G ‐ LEVEL 01 ELECTRICAL FLOOR PLAN

ELECTRICAL

E‐400 ELECTRICAL DETAILS

E‐401 ELECTRICAL DETAILS

E‐500 ELECTRICAL SCHEDULES

E‐501 ELECTRICAL SCHEDULES

E‐502 ELECTRICAL SCHEDULES

E‐503 ELECTRICAL SCHEDULES

E‐504 ELECTRICAL SCHEDULES

E‐505 ELECTRICAL SCHEDULES

E‐506 ELECTRICAL SCHEDULES

E‐507 ELECTRICAL SCHEDULES

E‐508 ELECTRICAL SCHEDULES

TECHNOLOGY

00‐TN000 TECHNOLOGY COVERSHEET

00‐TN001 TECHNOLOGY NOTES AND SHEET INDEX

00‐TN002 SITE PLAN ‐ TECHNOLOGY

01‐TD100 LEVEL 00 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD100A LEVEL 00 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD100B LEVEL 00 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD100C LEVEL 00 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD100D LEVEL 00 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD100E LEVEL 00 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD101 LEVEL 01 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD101A LEVEL 01 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT A

01‐TD101B LEVEL 01 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD101C LEVEL 01 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD101D LEVEL 01 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD101E LEVEL 01 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD102 LEVEL 02 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD102B LEVEL 02 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 14

01‐TD102C LEVEL 02 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD102D LEVEL 02 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD102E LEVEL 02 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD103 LEVEL 03 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD103B LEVEL 03 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD103C LEVEL 03 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD103D LEVEL 03 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD103E LEVEL 03 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD104 LEVEL 04 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD104B LEVEL 04 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD104C LEVEL 04 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD104D LEVEL 04 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD104E LEVEL 04 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD105 LEVEL 05 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD105B LEVEL 05 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD105C LEVEL 05 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD105D LEVEL 05 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD105E LEVEL 05 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD106 LEVEL 06 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐106B LEVEL 06 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD‐106C LEVEL 06 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD‐106D LEVEL 06 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD‐106E LEVEL 06 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐107 LEVEL 07 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐107B LEVEL 07 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD‐107C LEVEL 07 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD‐107D LEVEL 07 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD‐107E LEVEL 07 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐108 LEVEL 08 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐108B LEVEL 08 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD‐108C LEVEL 08 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD‐108D LEVEL 08 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD‐108E LEVEL 08 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐109 LEVEL 09 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐109B LEVEL 09 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD‐109C LEVEL 09 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD‐109D LEVEL 09 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD‐109E LEVEL 09 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐110 LEVEL 10 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐110B LEVEL 10 FLOOR DEMOLITION PLAN‐ TECHNOLOGY ‐ QUADRANT B

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 15

01‐TD‐110C LEVEL 10 FLOOR DEMOLITION PLAN‐ TECHNOLOGY ‐ QUADRANT C

01‐TD‐110D LEVEL 10 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD‐110E LEVEL 10 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐111 LEVEL 11 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐111B LEVEL 11 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD‐111C LEVEL 11 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TD‐111D LEVEL 11 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD‐111E LEVEL 11 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐112 LEVEL 12 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐112B LEVEL 12 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD‐112D LEVEL 12 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TD‐112E LEVEL 12 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐113 LEVEL 13 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐113B LEVEL 13 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TD‐113E LEVEL 13 FLOOR DEMOLITION PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TD‐114 LEVEL 14 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

01‐TD‐114E LEVEL 14 FLOOR DEMOLITION ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN100 LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY

01‐TN100A LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT A

01‐TN100B LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN100C LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN100D LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN100E LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01TN100TR LEVEL 00 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01TN100TR LEVEL 00 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01TN100TR LEVEL 00 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01TN100TR BLDG. 01 ‐ LEVEL 00 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN101 LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY

01‐TN101A LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT A

01‐TN101B LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN101C LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN101D LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN101E LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01TN101TR LEVEL 01 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01TN101TR LEVEL 01 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN102 LEVEL 02 FLOOR PLAN ‐ TECHNOLOGY

01‐TN102B LEVEL 02 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN102C LEVEL 02 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN102D LEVEL 02 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN102E LEVEL 02 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 16

01‐TN102TR LEVEL 02 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN103 LEVEL 03 FLOOR PLAN ‐ TECHNOLOGY

01‐TN103B LEVEL 03 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN103C LEVEL 03 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN103D LEVEL 03 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN103E LEVEL 03 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN103TR LEVEL 03 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN104 LEVEL 04 FLOOR PLAN ‐ TECHNOLOGY

01‐TN104B LEVEL 04 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN104C LEVEL 04 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN104D LEVEL 04 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN104E LEVEL 04 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN104TR LEVEL 04 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN105 LEVEL 05 FLOOR PLAN ‐ TECHNOLOGY

01‐TN105B LEVEL 05 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN105C LEVEL 05 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN105D LEVEL 05 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN105E LEVEL 05 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN105TR LEVEL 05 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN106 LEVEL 06 FLOOR PLAN ‐ TECHNOLOGY

01‐TN106B LEVEL 06 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN106C LEVEL 06 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN106D LEVEL 06 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN106E LEVEL 06 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN106TR LEVEL 06 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN107 LEVEL 07 FLOOR PLAN ‐ TECHNOLOGY

01‐TN107B LEVEL 07 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN107C LEVEL 07 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN107D LEVEL 07 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN107E LEVEL 07 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN107TR LEVEL 07 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN108 LEVEL 08 FLOOR PLAN ‐ TECHNOLOGY

01‐TN108B LEVEL 08 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN108C LEVEL 08 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN108D LEVEL 08 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN108E LEVEL 08 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN108TR LEVEL 08 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN109 LEVEL 09 FLOOR PLAN ‐ TECHNOLOGY

01‐TN109B LEVEL 09 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN109C LEVEL 09 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 17

01‐TN109D LEVEL 09 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN109E LEVEL 09 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN109TR LEVEL 09 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN110 LEVEL 10 FLOOR PLAN ‐ TECHNOLOGY

01‐TN110B LEVEL 10 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN110C LEVEL 10 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN110D LEVEL 10 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN110E LEVEL 10 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN110TR LEVEL 10 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN111 LEVEL 11 FLOOR PLAN ‐ TECHNOLOGY

01‐TN111B LEVEL 11 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN111C LEVEL 11 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT C

01‐TN111D LEVEL 11 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT D

01‐TN111E LEVEL 11 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN111TR LEVEL 11 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN112 LEVEL 12 FLOOR PLAN ‐ TECHNOLOGY

01‐TN112B LEVEL 12 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT B

01‐TN112E LEVEL 12 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN112TR LEVEL 12 ‐ TECHNOLOGY ROOM ENLARGEMENTS

01‐TN113 LEVEL 13 FLOOR PLAN ‐ TECHNOLOGY

01‐TN113E LEVEL 13 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN114 LEVEL 14 FLOOR PLAN ‐ TECHNOLOGY

01‐TN114E LEVEL 14 FLOOR PLAN ‐ TECHNOLOGY ‐ QUADRANT E

01‐TN114TR LEVEL 14 ‐ TECHNOLOGY ROOM ENLARGEMENTS

02‐TN200 LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY

02‐TN201 LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY

02‐TN202 LEVEL 02 FLOOR PLAN ‐ TECHNOLOGY

06‐TD101 LEVEL 01 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

06‐TN101 LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY

06‐TN101TR LEVEL 01 TECHNOLOGY ROOM ENLARGEMENTS

08‐TN201 LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY

09‐T‐201TR LEVEL 00 ‐ TECHNOLOGY ROOM ENLARGEMENTS

09‐TD100 LEVEL 00 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

09‐TD101 LEVEL 01 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

09‐TN100 LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY

09‐TN101 LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY

09‐TN101TR LEVEL 00 ‐ TECHNOLOGY ROOM ENLARGEMENTS

15‐TD100 LEVEL 00 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

15‐TD101 LEVEL 01 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

15‐TD102 LEVEL 02 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

Project Number 636‐21‐704 May 15, 2023

VA 05‐20

00 01 15 ‐ 18

15‐TD103 LEVEL 03 FLOOR DEMOLITION PLAN ‐TECHNOLOGY

15‐TN100 LEVEL 00 FLOOR PLAN ‐ TECHNOLOGY

15‐TN101 LEVEL 01 FLOOR PLAN ‐ TECHNOLOGY

15‐TN102 LEVEL 02 FLOOR PLAN ‐ TECHNOLOGY

15‐TN103 LEVEL 03 FLOOR PLAN ‐ TECHNOLOGY

ACC‐TN100 LEVEL 00 ‐ TECHNOLOGY

ACC‐TN101 LEVEL 01 ‐ TECHNOLOGY

ACC‐TN102 LEVEL 02 ‐ TECHNOLOGY

D‐TN101 LEVEL 01 FLOOR PLANS ‐ TECHNOLOGY

G‐TN101 LEVEL 01 FLOOR PLANS ‐ TECHNOLOGY

TN400 TECHNOLOGY DETAILS

TN401 TECHNOLOGY DETAILS

TN500 TECHNOLOGY DIAGRAMS

TN501 TECHNOLOGY DIAGRAMS

TN502 TECHNOLOGY DIAGRAMS

TN503 TECHNOLOGY DIAGRAMS

TN504 TECHNOLOGY DIAGRAMS

TN505 TECHNOLOGY DIAGRAMS

TN506 TECHNOLOGY DIAGRAMS

TN507 TECHNOLOGY DIAGRAMS

TN508 TECHNOLOGY DIAGRAMS

TN600 TECHNOLOGY SCHEDULES

100% Construc on Documents

Project Number 636‐21‐704

May 15, 2023

VA 05‐01‐21

01 00 00 ‐1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

a. Refer to sec on 01 35 26, SAFETY REQUIREMENTS for safety and infec on control requirements.

1.2 GENERAL INTENTION

a. Contractor shall completely prepare site for building opera ons, including demoli on and removal of exis ng structures, and furnish labor and materials and perform work for Project

Number 636‐21‐704 Project tle Omaha EHRM Infrastructure Upgrade Design as required by drawings and specifica ons.

b. Visits to the site by Bidders may be made in accordance with what is listed in the solicita on and at the discre on of the Contrac ng Officer. Only one site visit will be scheduled prior to the bid date. A endance is recommended.

c. Offices of Romanyk Consul ng Corpora on , as Architect Engineers, will render certain technical services during construc on. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirma ons by Contrac ng Officer or his duly authorized representa ve. A/E informa on as follows:

Company Romanyk Consul ng Corpora on

Address 3308 Preston Road, Suite 350‐164

Plano, Texas 75093

Phone 1‐855‐424‐3838 ext 315

Email jim.booher@romanykconsul ng.com

Email Yumei Wang <Yumei.Wang@romanykconsul ng.com>

d. Before placement and installa on of work subject to tests by tes ng laboratory retained by

Department of Veterans Affairs, the Contractor shall no fy the COR in sufficient me to enable

Project Number 636‐21‐704

May 15, 2023

VA 05‐01‐21

01 00 00 ‐2 tes ng laboratory personnel to be present at the site in me for proper taking and tes ng of specimens and field inspec on. Such prior no ce shall be not less than three workdays unless otherwise designated by the COR.

e. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be iden fied by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

f. ITEM I, GENERAL CONSTRUCTION: BASE BID: Contractor to provide all labor, equipment, materials and supervision…