This document outlines the scope of work for an infrastructure upgrade project at the Omaha VA Medical Center. The project involves upgrading the structured cabling and backbone systems across multiple buildings on the medical center campus. Key aspects include installing new underground conduit, building out telecom rooms and the main computer room, installing intra-building and inter-building backbone cabling, and replacing all horizontal cabling with new Category 6A cabling. The work is broken into five phases: installing new pathways and infrastructure; installing backbone cabling; installing horizontal cabling; cutting over systems to the new cabling; and demolishing old cabling and equipment. The solicitation is for a construction contract through the Department of Veterans Affairs to complete this infrastructure upgrade work while keeping existing systems operational.

View the file

Other files

File Type Posted
Attachment 01 Question and Answer.docx DOCX document
36C77623B0036-1 0008.docx DOCX document
Attachment 01 Additional Questions and Answers.pdf PDF
Attachment 02 Spec 01 00 00 -2 POP Rev1.pdf PDF
Attachment 04 Additional Drawings.pdf PDF
36C77623B0036-1 0007.docx DOCX document
Attachment 03 Additional Drawing Sheet List.pdf PDF
ATTACHMENT 01 - SPECIFICATIONS SECTION 27 COMMUNICATIONS.zip ZIP file
36C77623B0036-1 0006.docx DOCX document
ATTACHMENT 02 - 09 65 19 19 STATIC DISSIPATIVE TILE.pdf PDF
Attachment 01 Omaha EHRM V21 - RFI Responses.pdf PDF
36C77623B0036-1 0005.docx DOCX document
Attachment 04 Omaha EHRM Addendum Mech Drawings.pdf PDF
Attachment 02 09 65 16 Resiliant Tile Flooring.pdf PDF
36C77623B0036-1 0004.docx DOCX document
Davis Bacon Wage Determinations.pdf PDF
36C77623B0036-1 0003.docx DOCX document
36C77623B0036-1 0002.docx DOCX document
Attachment 1 Site Visit Sign In EHRM Infrastructure Upgrades Construction.pdf PDF
36C77623B0036-1 0001.docx DOCX document
Attachment 09 VA-Omaha EHRM Civil_20230515 - Drawing.pdf PDF
Attachment 06 Omaha EHRM Structural_20230515 - Drawing.pdf PDF
Attachment 03 Specification vol 1 Rev1.pdf PDF
Attachment 07 OMAHA VA EHRM_BID SET_ELECTRICAL - Drawing.pdf PDF
Attachment 04 OMAHA VA EHRM_BID SET_ARCHITECTURAL - drawings.pdf PDF
Attachment 05 OMAHA VA EHRM_BID SET_MECHANICAL - Drawing (1).pdf PDF
Attachment 14 Specification Vol 2 Rev1.pdf PDF
Attachment 08 OMAHA VA EHRM_BID SET_TECHNOLOGY - Drawing.pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical (2).pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical.pdf PDF
Attachment 01 Omaha EHRM 100 Narrative Elec Revised.pdf PDF
Attachment 16 Service Contract Wage Determinations.gov.pdf PDF
Attachment 10 DBA Wage Determination 4.13.2023.gov.pdf PDF
Attachment 15 HEFP SEP SOP Process Flow Data Center Phase v1.0.pdf PDF
Attachment 13 - Site Visit EHRM Minor Construction Project- Omaha.docx DOCX document
Attachment 11 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 12 - Limitations on Subcontracting - Construction.docx DOCX document
36C77623B0036-1_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. THE EXISTING MAIN COMPUTER ROOM (MCR) AND TELECOM ROOMS (TR) TO REMAIN

OPERATIONAL DURING THE INSTALLATION OF THE NEW STRUCTURED CABLING AND

BACKBONE CABLING SYSTEMS. THE EXISTING SYSTEMS SHALL NOT BE DISRUPTED UNLESS

COORDINATED IN ADVANCE WITH OIT AND AT THEIR DISCRETION ON DATE AND TIME.

2. COORDINATE EACH TR CUTOVER WITH OIT AT THEIR DISCRETION ON DATE AND TIME.

PHASE 1 - PATHWAYS AND INFRASTRUCTURE

1. INSTALL NEW INTER-BUILDING UNDERGROUND DUCT BANK CONDUITS.

2. BUILD OUT NEW MCR LAYOUT.

A. COORDINATE BUILDOUT WITH OIT FOR EXISTING FIBER OPTIC INFRASTRUCTURE TO

EXISTING TR AND EXISTING MCR EQUIPMENT TO REMAIN FUNCTIONAL .

3. BUILD OUT NEW TR SPACES.

4. INSTALL NEW INTRA-BUILDING BACKBONE CABLING PATHWAYS.

PHASE 2 - BACKBONE CABLING

1. INSTALL INTER-BUILDING BACKBONE CABLING.

2. INSTALL INTRA-BUILDING BACKBONE CABLING.

3. TERMINATE AND TEST.

PHASE 3 - HORIZONTAL CABLING

1. INSTALL NEW CAT 6A CABLING.

A. TERMINATE CABLING IN NEW TR PATCH PANELS.

B. NEATLY COIL CABLING AT EXISTING OR EXPANDED TR LOCATIONS FOR CUTOVER TO

NEW RACKS AND PATCH PANELS.

C. NEATLY COIL CABLING AT EXISTING OUTLET LOCATIONS.

PHASE 4 - CUTOVER

1. OIT INSTALLATION OF NETWORK SWITCHES AT EACH TR PLANNED FOR CUTOVER

2. REMOVE EXISTING OUTLET CABLING FROM OUTLET AND ROUTE NEW CAT 6A CABLING INTO

OUTLET.

A. NEATLY COIL EXISTING CABLING ABOVE CEILING.

3. REMOVE EXISTING EQUIPMENT RACKS AND INSTALL NEW EQUIPMENT RACKS EQUIPMENT IN

REMODELED OR EXPANDED TR.

4. TERMINATE AND TEST NEW CABLING.

5. OIT CUTOVER AND PATCHING TO NETWORK SWITCHES.

PHASE 5 - DEMOLITION

1. REMOVE OLD FIBER OPTIC BACKBONE CABLING FROM EACH OLD TR FOLLOWING

SUCCESSFUL CUTOVER TO NEW TR.

A. OTHER EXISTING SYSTEMS IN OLD TR TO REMAIN FUNCTIONAL.

2. REMOVE OLD HORIZONTAL CABLING FROM EACH OUTLET BACK TO ITS SOURCE FOLLOWING

SUCCESSFUL CUTOVER.

3. REMOVE ALL EQUIPMENT RACKS AND ASSOCIATED EQUIPMENT FROM EACH OLD TR

FOLLOWING SUCCESSFUL CUTOVER. COORDINATE WITH OIT PRIOR TO REMOVING EXISTING

EQUIPMENT RACKS FROM OLD TR AS ACTIVE CABLING AND EQUIPMENT MAY REMAIN.

TECHNOLOGY PHASING NOTES

1. THE LOCATION OF THE CONDUIT, HAND HOLES AND/OR MAINTENANCE HOLES SHOWN ARE

APPROXIMATE LOCATIONS. FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIVATE AND/OR

PUBLIC PRIOR TO THE INSTALLATION OF THE COMPONENT. FIELD COORDINATE THE FINAL

LOCATION WITH THE OWNER AND ENGINEER PRIOR TO INSTALLATION.

2. POTHOLING TO LOCATE EXISTING UNDERGROUND UTILITIES, IF APPLICABLE, SHALL BE

INCLUDED IN THE CONTRACTOR'S BID. CONTRACTOR IS RESPONSIBLE FOR FINAL

PLACEMENT OF HAND HOLES AND/OR MAINTENANCE HOLES AND SHALL NOTIFY THE

ENGINEER OF FINAL LOCATIONS PRIOR TO INSTALLATION.

3. HAND HOLES AND/OR MAINTENANCE HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF

THE FRAME WILL BE FLUSH WITH THE GROUND LINE.

4. REMOVAL AND REPLACEMENT OF THE EXISTING UNDERGROUND UTILITIES THAT ARE

REQUIRED TO COMPLETE THE INSTALLATION SHALL BE INCLUDED IN THE CONTRACTOR'S

BID.

5. CONTRACTOR SHALL INCLUDE IN THEIR BID ANY REMOVAL AND REPLACEMENT OF EXISTING

SIDEWALK, PAVEMENT, GRASS, SHRUBS, TREES, ETC. THAT WILL BE IMPACTED BY THE

INSTALLATION OF THE NEW CONDUITS SHOWN ON THE DRAWINGS. IF TREES ARE REQUIRED

TO BE REMOVED THE CONTRACTOR SHALL CONTACT THE OWNER AND DISCUSS OPTIONS

PRIOR TO CUTTING DOWN ANY TREE OR SHRUB OVER 5' IN HEIGHT.

6. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN

REQUIRED MINIMUM DEPTH TO AVOID EXISTING UNDERGROUND UTILITIES.

7. PROVIDE A MINIMUM OF 25'-0" SLACK LOOP WITHIN EACH HAND HOLES AND/OR

MAINTENANCE HOLES. SLACK LOOP SHALL BE SECURE SO COPPER AND FIBER IS NOT

RESTING ON EARTH AFTER FINAL INSTALLATION.

TECHNOLOGY OUTSIDE PLANT NOTES

1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE

INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY

BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR SHALL VISIT THE

SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS.

2. ITEMS (i.e. EQUIPMENT RACKS, SWITCHES, ETC.) REMOVED AND NOT RELOCATED

REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR THE DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN.

(i.e., FOR MAINTENANCE PURPOSES).

3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION

SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED

PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL

LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.

4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO

EQUIPMENT, SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER.

CONDUIT CONCEALED IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT

AFFECTED BY OTHER CONSTRUCTION.

5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE

CONDUIT IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG.

WHERE CONDUIT IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS,

ETC., SHALL ALSO BE REMOVED.

6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE

REMOVING EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.

7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING

EXISTING CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE

INSTALLED IN ALL REUSED CONDUIT TO ASSURE PROPER GROUND PATH.

8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A

JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND

CONDUIT AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.

9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE

SOURCE.

10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND

ALL ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE

RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.

TECHNOLOGY DEMOLITION NOTES

1. SCOPE OF WORK INCLUDES RE-USE OF EXISTING TELECOMMUNICATIONS OUTLET ROUGH-

IN FOR NEW CATEGORY 6A CABLING. NEW CATEGORY 6A CABLING AT EXISTING OUTLET

LOCATIONS SHALL BE AS FOLLOWSBASED ON 0.230" O.D. REDUCED DIAMETER CAT 6A

CABLE:

• EXISTING 1/2" CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF TWO (2) CAT

6A CABLES.

• EXISTING 3/4” CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF FOUR (4) CAT

6A CABLES.

• EXISTING 1” CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF SEVEN (7) CAT

6A CABLES.

• PROVIDE NEW CONDUIT AND BACKBOX AT LOCATIONS EXCEEDING THE REQUIREMENTS

LISTED ABOVE. NEW CONDUIT SIZE SHALL BE BASED ON 40% FILL, TAKING INTO

CONSIDERATION THE DERATING OF THE CONDUIT CAPACITY FOR EACH 90 DEGREE

BEND.

• FOR BIDDING PURPOSES AT ALL LOCATIONS WITH THREE (3) OR MORE CABLES AS

INDICATED ON PLAN THE CONTRACTOR SHALL ASSUME 1/2" EXISTING CONDUIT AND

WILL BE REQUIRED TO PROVIDE NEW 3/4" OR LARGER RACEWAY.

2. FOR EXISTING ROUGH-IN WITH SHALLOW BACK BOXES: PROVIDE A SURFACE MOUNT

BACKBOX INSTALLED OVER TOP OF EXISTING IN-WALL BACKBOX (LEVITON 42777 OR SIM),

WITH AN ANGLED FACEPLATE (LEVITON 42081 SERIES OR SIM) TO ALLOW FOR BEND RADIUS

OF NEW CAT 6A CABLING.

3. NEW OUTLET LOCATIONS REQUIRING NEW IN-WALL OR SURFACE MOUNT ROUGH-IN ARE

NOTED ON THE DRAWINGS. ALL OTHER OUTLETS ARE ASSUMED TO UTILIZE EXISTING

ROUGH-IN.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADDITIONAL CONDUIT SLEEVES

AS REQUIRED FOR NEW CABLING PATHWAYS.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CABLE LOCATIONS WITHIN FURNITURE

AND WILL BE RESPONSIBLE FOR ALL FURNITURE MOVES TO COMPLETE THE INSTALLATION

OF CABLING IN OUTLETS.

6. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.

UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN

MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON

BUILDING STRUCTURE.

7. BOXES LOCATED ON OPPOSITE SIDES OF NON-RATED WALLS SHALL BE OFFSET A MINIMUM

OF 6" HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE

OFFSET A MINIMUM OF 24" HORIZONTALLY. "THRU-THE-WALL" BOXES SHALL NOT BE

ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.

8. VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH

ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING

THE ACTUAL TELECOMMUNICATIONS INSTALLATION, ADJUST OUTLETS OR CONNECTION

LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.

9. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO

ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION

DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN

ADVANCE BY THE OTHER CONTRACTOR.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL

OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE

EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR

SEALED INTO OPENINGS.

11. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL

BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF

THROUGH-PENETRATION FIRESTOPS. REFER TO DIVISION 7 FOR ADDITIONAL INFORMATION

AND REQUIREMENTS SPECIFIC TO FIRESTOPPING.

12. THE TECHNOLOGY CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

THE CEILINGS, CEILING TILES, AND CEILING GRID ASSOCIATED WITH THE AREAS OF WORK

BY ALL CONTRACTORS.

13. ALL CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 27 05 36 FOR INSTALLATION REQUIREMENTS.

14. FLUSH MOUNT ALL NEW TELECOMMUNICATION OUTLETS AT +18" FROM FLOOR

(CENTERLINE DIMENSION), EXCEPT WHERE OTHERWISE NOTED. OUTLETS MAY BE SURFACE

MOUNTED WHEN CONDUIT IS SPECIFIED EXPOSED.

15. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO THE

WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES

DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE

RATING, AND FINISH.

16. CONTRACTOR TO PROVIDE A FULL TIME RCDD SUPERVISOR FOR ALL DIVISION 27 WORK.

TECHNOLOGY INSTALLATION NOTES:

NOTES:

1. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION

OUTLETS IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS

WILL BE DETERMINED BY THE VA AT A LATER DATE.

2. CONTRACTOR TO FIELD VERIFY CONDUIT.

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

Sprinklered

OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

636-21-704

B

IM

/V

IS

N

O m a h a

E H

R M

/6

-7

.B

.T R

.r v t

/2

/2

:0

:1

P

M

TECHNOLOGY NOTES AND SHEET INDEX

PDN DJJ

ISSUED FOR BID

FULLY SPRINKLERED

636 - OMAHA VA MEDICAL CENTER

MAY 15, 2023

Office of Construction and

Facilities Management 00-TN001

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com # 21005326.00

TECHNOLOGY SHEET INDEX

01-TN107D * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN107E * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN107TR BLDG. 01 - LEVEL 07 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN108 BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN108B * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN108C * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN108D * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN108E * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN108TR BLDG. 01 - LEVEL 08 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN109 BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN109B * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN109C * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN109D * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN109E * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN109TR BLDG. 01 - LEVEL 09 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN110 BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN110B * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN110C * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN110D * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN110E * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN110TR BLDG. 01 - LEVEL 10 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN111 BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN111B * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN111C * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN111D * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN111E * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN111TR BLDG. 01 - LEVEL 11 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN112 BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN112B * BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN112E * BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN112TR BLDG. 01 - LEVEL 12 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN113 BLDG. 01 - LEVEL 13 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN113E * BLDG. 01 - LEVEL 13 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN114 BLDG. 01 - LEVEL 14 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN114E * BLDG. 01 - LEVEL 14 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN114TR BLDG. 01 - LEVEL 14 - TECHNOLOGY ROOM ENLARGEMENTS

02-TN200 BLDG. 02- LEVEL 00 FLOOR PLAN - TECHNOLOGY

02-TN201 BLDG. 02- LEVEL 01 FLOOR PLAN - TECHNOLOGY

02-TN202 BLDG. 02- LEVEL 02 FLOOR PLAN - TECHNOLOGY

06-TD101 BLDG. 06 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY

06-TN101 BLDG. 06 - LEVEL 01 FLOOR PLAN - TECHNOLOGY

06-TN101TR BLDG. 06 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS

08-TN201 BLDG. 08 - LEVEL 01 FLOOR PLAN - TECHNOLOGY

09-TD100 BLDG. 09 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY

09-TD101 BLDG. 09 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY

09-TN100 BLDG. 09 - LEVEL 00 FLOOR PLAN - TECHNOLOGY

09-TN101 BLDG. 09 - LEVEL 01 FLOOR PLAN - TECHNOLOGY

09-TN101TR BLDG. 09 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS

15-TD100 BLDG. 15 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY

15-TD101 BLDG. 15 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY

15-TD102 BLDG. 15 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY

15-TD103 BLDG. 15 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY

15-TN100 BLDG. 15 - LEVEL 00 FLOOR PLAN - TECHNOLOGY

15-TN101 BLDG. 15 - LEVEL 01 FLOOR PLAN - TECHNOLOGY

15-TN102 BLDG. 15 - LEVEL 02 FLOOR PLAN - TECHNOLOGY

15-TN103 BLDG. 15 - LEVEL 03 FLOOR PLAN - TECHNOLOGY

ACC-TN100 BLDG. ACC - LEVEL 00 - TECHNOLOGY

ACC-TN101 BLDG. ACC - LEVEL 01 - TECHNOLOGY

ACC-TN102 BLDG. ACC - LEVEL 02 - TECHNOLOGY

D-TN101 BLDG. D - LEVEL 01 FLOOR PLANS - TECHNOLOGY

G-TN101 GEN. BLDG. - LEVEL 01 FLOOR PLANS - TECHNOLOGY

TN400 TECHNOLOGY DETAILS

TN401 TECHNOLOGY DETAILS

TN402 TECHNOLOGY DETAILS

TN500 TECHNOLOGY DIAGRAMS

TN501 TECHNOLOGY DIAGRAMS

TN502 TECHNOLOGY DIAGRAMS

TN503 TECHNOLOGY DIAGRAMS

TN504 TECHNOLOGY DIAGRAMS

TN505 TECHNOLOGY DIAGRAMS

TN506 TECHNOLOGY DIAGRAMS

TN507 TECHNOLOGY DIAGRAMS

TN508 TECHNOLOGY DIAGRAMS

TN600 TECHNOLOGY SCHEDULES

TECHNOLOGY SHEET INDEX

00-TN000 TECHNOLOGY COVERSHEET

00-TN001 TECHNOLOGY NOTES AND SHEET INDEX

00-TN002 SITE PLAN - TECHNOLOGY

01-TD100 BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD100A BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT A

01-TD100B BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD100C BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD100D BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD100E BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD101 BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD101A BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT A

01-TD101B BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD101C BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD101D BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD101E BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD102 BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD102B BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD102C BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD102D BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD102E BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD103 BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD103B BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD103C BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD103D BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD103E BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD104 BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD104B BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD104C BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD104D BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD104E BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD105 BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD105B BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD105C BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD105D BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD105E BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD106 BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD106B BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD106C BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD106D BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD106E BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD107 BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD107B BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD107C BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD107D BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD107E BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD108 BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD108B BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD108C BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD108D BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD108E BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD109 BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD109B BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD109C BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD109D BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD109E BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD110 BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD110B BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD110C BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN- TECHNOLOGY - QUADRANT C

01-TD110D BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD110E BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD111 BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD111B BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD111C BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C

01-TD111D BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD111E BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD112 BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD112B BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD112D BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D

01-TD112E BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD113 BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD113B BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B

01-TD113E BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E

01-TD114 BLDG. 01 - LEVEL 14 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

01-TD114E BLDG. 01 - LEVEL 14 FLOOR DEMOLITION - TECHNOLOGY - QUADRANT E

01-TN100 BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN100A * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT A

01-TN100B * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN100C * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN100D * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN100E * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN100TR-A BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN100TR-B BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN100TR-C BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN100TR-D BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN101 BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN101A * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT A

01-TN101B * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN101C * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN101D * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN101E * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN101TR-A BLDG. 01 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN101TR-B BLDG. 01 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN102 BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN102B * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN102C * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN102D * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN102E * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN102TR BLDG. 01 - LEVEL 02 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN103 BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN103B * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN103C * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN103D * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN103E * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN103TR BLDG. 01 - LEVEL 03 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN104 BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN104B * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN104C * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN104D * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN104E * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN104TR BLDG. 01 - LEVEL 04 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN105 BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN105B * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN105C * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN105D * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN105E * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN105TR BLDG. 01 - LEVEL 05 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN106 BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN106B * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN106C * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT C

01-TN106D * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT D

01-TN106E * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT E

01-TN106TR BLDG. 01 - LEVEL 06 - TECHNOLOGY ROOM ENLARGEMENTS

01-TN107 BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - OVERALL

01-TN107B * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT B

01-TN107C * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT C

Revisions: Date:

ADDENDUM 4 07/26/2023

Sheets
00-TN001 - TECHNOLOGY NOTES AND SHEET INDEX

File details come from the government source that posted it. Updated .