This document outlines the scope of work for an infrastructure upgrade project at the Omaha VA Medical Center. The project involves upgrading the structured cabling and backbone systems across multiple buildings on the medical center campus. Key aspects include installing new underground conduit, building out telecom rooms and the main computer room, installing intra-building and inter-building backbone cabling, and replacing all horizontal cabling with new Category 6A cabling. The work is broken into five phases: installing new pathways and infrastructure; installing backbone cabling; installing horizontal cabling; cutting over systems to the new cabling; and demolishing old cabling and equipment. The solicitation is for a construction contract through the Department of Veterans Affairs to complete this infrastructure upgrade work while keeping existing systems operational.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE EXISTING MAIN COMPUTER ROOM (MCR) AND TELECOM ROOMS (TR) TO REMAIN
OPERATIONAL DURING THE INSTALLATION OF THE NEW STRUCTURED CABLING AND
BACKBONE CABLING SYSTEMS. THE EXISTING SYSTEMS SHALL NOT BE DISRUPTED UNLESS
COORDINATED IN ADVANCE WITH OIT AND AT THEIR DISCRETION ON DATE AND TIME.
2. COORDINATE EACH TR CUTOVER WITH OIT AT THEIR DISCRETION ON DATE AND TIME.
PHASE 1 - PATHWAYS AND INFRASTRUCTURE
1. INSTALL NEW INTER-BUILDING UNDERGROUND DUCT BANK CONDUITS.
2. BUILD OUT NEW MCR LAYOUT.
A. COORDINATE BUILDOUT WITH OIT FOR EXISTING FIBER OPTIC INFRASTRUCTURE TO
EXISTING TR AND EXISTING MCR EQUIPMENT TO REMAIN FUNCTIONAL .
3. BUILD OUT NEW TR SPACES.
4. INSTALL NEW INTRA-BUILDING BACKBONE CABLING PATHWAYS.
PHASE 2 - BACKBONE CABLING
1. INSTALL INTER-BUILDING BACKBONE CABLING.
2. INSTALL INTRA-BUILDING BACKBONE CABLING.
3. TERMINATE AND TEST.
PHASE 3 - HORIZONTAL CABLING
1. INSTALL NEW CAT 6A CABLING.
A. TERMINATE CABLING IN NEW TR PATCH PANELS.
B. NEATLY COIL CABLING AT EXISTING OR EXPANDED TR LOCATIONS FOR CUTOVER TO
NEW RACKS AND PATCH PANELS.
C. NEATLY COIL CABLING AT EXISTING OUTLET LOCATIONS.
PHASE 4 - CUTOVER
1. OIT INSTALLATION OF NETWORK SWITCHES AT EACH TR PLANNED FOR CUTOVER
2. REMOVE EXISTING OUTLET CABLING FROM OUTLET AND ROUTE NEW CAT 6A CABLING INTO
OUTLET.
A. NEATLY COIL EXISTING CABLING ABOVE CEILING.
3. REMOVE EXISTING EQUIPMENT RACKS AND INSTALL NEW EQUIPMENT RACKS EQUIPMENT IN
REMODELED OR EXPANDED TR.
4. TERMINATE AND TEST NEW CABLING.
5. OIT CUTOVER AND PATCHING TO NETWORK SWITCHES.
PHASE 5 - DEMOLITION
1. REMOVE OLD FIBER OPTIC BACKBONE CABLING FROM EACH OLD TR FOLLOWING
SUCCESSFUL CUTOVER TO NEW TR.
A. OTHER EXISTING SYSTEMS IN OLD TR TO REMAIN FUNCTIONAL.
2. REMOVE OLD HORIZONTAL CABLING FROM EACH OUTLET BACK TO ITS SOURCE FOLLOWING
SUCCESSFUL CUTOVER.
3. REMOVE ALL EQUIPMENT RACKS AND ASSOCIATED EQUIPMENT FROM EACH OLD TR
FOLLOWING SUCCESSFUL CUTOVER. COORDINATE WITH OIT PRIOR TO REMOVING EXISTING
EQUIPMENT RACKS FROM OLD TR AS ACTIVE CABLING AND EQUIPMENT MAY REMAIN.
TECHNOLOGY PHASING NOTES
1. THE LOCATION OF THE CONDUIT, HAND HOLES AND/OR MAINTENANCE HOLES SHOWN ARE
APPROXIMATE LOCATIONS. FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIVATE AND/OR
PUBLIC PRIOR TO THE INSTALLATION OF THE COMPONENT. FIELD COORDINATE THE FINAL
LOCATION WITH THE OWNER AND ENGINEER PRIOR TO INSTALLATION.
2. POTHOLING TO LOCATE EXISTING UNDERGROUND UTILITIES, IF APPLICABLE, SHALL BE
INCLUDED IN THE CONTRACTOR'S BID. CONTRACTOR IS RESPONSIBLE FOR FINAL
PLACEMENT OF HAND HOLES AND/OR MAINTENANCE HOLES AND SHALL NOTIFY THE
ENGINEER OF FINAL LOCATIONS PRIOR TO INSTALLATION.
3. HAND HOLES AND/OR MAINTENANCE HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF
THE FRAME WILL BE FLUSH WITH THE GROUND LINE.
4. REMOVAL AND REPLACEMENT OF THE EXISTING UNDERGROUND UTILITIES THAT ARE
REQUIRED TO COMPLETE THE INSTALLATION SHALL BE INCLUDED IN THE CONTRACTOR'S
BID.
5. CONTRACTOR SHALL INCLUDE IN THEIR BID ANY REMOVAL AND REPLACEMENT OF EXISTING
SIDEWALK, PAVEMENT, GRASS, SHRUBS, TREES, ETC. THAT WILL BE IMPACTED BY THE
INSTALLATION OF THE NEW CONDUITS SHOWN ON THE DRAWINGS. IF TREES ARE REQUIRED
TO BE REMOVED THE CONTRACTOR SHALL CONTACT THE OWNER AND DISCUSS OPTIONS
PRIOR TO CUTTING DOWN ANY TREE OR SHRUB OVER 5' IN HEIGHT.
6. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN
REQUIRED MINIMUM DEPTH TO AVOID EXISTING UNDERGROUND UTILITIES.
7. PROVIDE A MINIMUM OF 25'-0" SLACK LOOP WITHIN EACH HAND HOLES AND/OR
MAINTENANCE HOLES. SLACK LOOP SHALL BE SECURE SO COPPER AND FIBER IS NOT
RESTING ON EARTH AFTER FINAL INSTALLATION.
TECHNOLOGY OUTSIDE PLANT NOTES
1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE
INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY
BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR SHALL VISIT THE
SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS.
2. ITEMS (i.e. EQUIPMENT RACKS, SWITCHES, ETC.) REMOVED AND NOT RELOCATED
REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN.
(i.e., FOR MAINTENANCE PURPOSES).
3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION
SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED
PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL
LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.
4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO
EQUIPMENT, SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER.
CONDUIT CONCEALED IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT
AFFECTED BY OTHER CONSTRUCTION.
5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE
CONDUIT IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG.
WHERE CONDUIT IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS,
ETC., SHALL ALSO BE REMOVED.
6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE
REMOVING EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.
7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING
EXISTING CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE
INSTALLED IN ALL REUSED CONDUIT TO ASSURE PROPER GROUND PATH.
8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A
JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND
CONDUIT AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.
9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE
SOURCE.
10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND
ALL ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE
RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.
TECHNOLOGY DEMOLITION NOTES
1. SCOPE OF WORK INCLUDES RE-USE OF EXISTING TELECOMMUNICATIONS OUTLET ROUGH-
IN FOR NEW CATEGORY 6A CABLING. NEW CATEGORY 6A CABLING AT EXISTING OUTLET
LOCATIONS SHALL BE AS FOLLOWSBASED ON 0.230" O.D. REDUCED DIAMETER CAT 6A
CABLE:
• EXISTING 1/2" CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF TWO (2) CAT
6A CABLES.
• EXISTING 3/4” CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF FOUR (4) CAT
6A CABLES.
• EXISTING 1” CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF SEVEN (7) CAT
6A CABLES.
• PROVIDE NEW CONDUIT AND BACKBOX AT LOCATIONS EXCEEDING THE REQUIREMENTS
LISTED ABOVE. NEW CONDUIT SIZE SHALL BE BASED ON 40% FILL, TAKING INTO
CONSIDERATION THE DERATING OF THE CONDUIT CAPACITY FOR EACH 90 DEGREE
BEND.
• FOR BIDDING PURPOSES AT ALL LOCATIONS WITH THREE (3) OR MORE CABLES AS
INDICATED ON PLAN THE CONTRACTOR SHALL ASSUME 1/2" EXISTING CONDUIT AND
WILL BE REQUIRED TO PROVIDE NEW 3/4" OR LARGER RACEWAY.
2. FOR EXISTING ROUGH-IN WITH SHALLOW BACK BOXES: PROVIDE A SURFACE MOUNT
BACKBOX INSTALLED OVER TOP OF EXISTING IN-WALL BACKBOX (LEVITON 42777 OR SIM),
WITH AN ANGLED FACEPLATE (LEVITON 42081 SERIES OR SIM) TO ALLOW FOR BEND RADIUS
OF NEW CAT 6A CABLING.
3. NEW OUTLET LOCATIONS REQUIRING NEW IN-WALL OR SURFACE MOUNT ROUGH-IN ARE
NOTED ON THE DRAWINGS. ALL OTHER OUTLETS ARE ASSUMED TO UTILIZE EXISTING
ROUGH-IN.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADDITIONAL CONDUIT SLEEVES
AS REQUIRED FOR NEW CABLING PATHWAYS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CABLE LOCATIONS WITHIN FURNITURE
AND WILL BE RESPONSIBLE FOR ALL FURNITURE MOVES TO COMPLETE THE INSTALLATION
OF CABLING IN OUTLETS.
6. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.
UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN
MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON
BUILDING STRUCTURE.
7. BOXES LOCATED ON OPPOSITE SIDES OF NON-RATED WALLS SHALL BE OFFSET A MINIMUM
OF 6" HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE
OFFSET A MINIMUM OF 24" HORIZONTALLY. "THRU-THE-WALL" BOXES SHALL NOT BE
ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.
8. VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH
ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING
THE ACTUAL TELECOMMUNICATIONS INSTALLATION, ADJUST OUTLETS OR CONNECTION
LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.
9. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO
ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION
DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN
ADVANCE BY THE OTHER CONTRACTOR.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL
OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE
EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR
SEALED INTO OPENINGS.
11. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL
BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF
THROUGH-PENETRATION FIRESTOPS. REFER TO DIVISION 7 FOR ADDITIONAL INFORMATION
AND REQUIREMENTS SPECIFIC TO FIRESTOPPING.
12. THE TECHNOLOGY CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
THE CEILINGS, CEILING TILES, AND CEILING GRID ASSOCIATED WITH THE AREAS OF WORK
BY ALL CONTRACTORS.
13. ALL CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 27 05 36 FOR INSTALLATION REQUIREMENTS.
14. FLUSH MOUNT ALL NEW TELECOMMUNICATION OUTLETS AT +18" FROM FLOOR
(CENTERLINE DIMENSION), EXCEPT WHERE OTHERWISE NOTED. OUTLETS MAY BE SURFACE
MOUNTED WHEN CONDUIT IS SPECIFIED EXPOSED.
15. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO THE
WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES
DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE
RATING, AND FINISH.
16. CONTRACTOR TO PROVIDE A FULL TIME RCDD SUPERVISOR FOR ALL DIVISION 27 WORK.
TECHNOLOGY INSTALLATION NOTES:
NOTES:
1. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10 ADDITIONAL 2-PORTS CAT 6A INFORMATION
OUTLETS IN THEIR PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS
WILL BE DETERMINED BY THE VA AT A LATER DATE.
2. CONTRACTOR TO FIELD VERIFY CONDUIT.
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
OMAHA EHRM INFRASTRUCTURE
UPGRADE DESIGN
636-21-704
B
IM
/V
IS
N
O m a h a
E H
R M
/6
-7
.B
.T R
.r v t
/2
/2
:0
:1
P
M
TECHNOLOGY NOTES AND SHEET INDEX
PDN DJJ
ISSUED FOR BID
FULLY SPRINKLERED
636 - OMAHA VA MEDICAL CENTER
MAY 15, 2023
Office of Construction and
Facilities Management 00-TN001
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com # 21005326.00
TECHNOLOGY SHEET INDEX
01-TN107D * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN107E * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN107TR BLDG. 01 - LEVEL 07 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN108 BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN108B * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN108C * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN108D * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN108E * BLDG. 01 - LEVEL 08 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN108TR BLDG. 01 - LEVEL 08 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN109 BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN109B * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN109C * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN109D * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN109E * BLDG. 01 - LEVEL 09 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN109TR BLDG. 01 - LEVEL 09 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN110 BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN110B * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN110C * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN110D * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN110E * BLDG. 01 - LEVEL 10 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN110TR BLDG. 01 - LEVEL 10 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN111 BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN111B * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN111C * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN111D * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN111E * BLDG. 01 - LEVEL 11 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN111TR BLDG. 01 - LEVEL 11 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN112 BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN112B * BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN112E * BLDG. 01 - LEVEL 12 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN112TR BLDG. 01 - LEVEL 12 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN113 BLDG. 01 - LEVEL 13 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN113E * BLDG. 01 - LEVEL 13 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN114 BLDG. 01 - LEVEL 14 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN114E * BLDG. 01 - LEVEL 14 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN114TR BLDG. 01 - LEVEL 14 - TECHNOLOGY ROOM ENLARGEMENTS
02-TN200 BLDG. 02- LEVEL 00 FLOOR PLAN - TECHNOLOGY
02-TN201 BLDG. 02- LEVEL 01 FLOOR PLAN - TECHNOLOGY
02-TN202 BLDG. 02- LEVEL 02 FLOOR PLAN - TECHNOLOGY
06-TD101 BLDG. 06 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY
06-TN101 BLDG. 06 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
06-TN101TR BLDG. 06 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS
08-TN201 BLDG. 08 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
09-TD100 BLDG. 09 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY
09-TD101 BLDG. 09 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY
09-TN100 BLDG. 09 - LEVEL 00 FLOOR PLAN - TECHNOLOGY
09-TN101 BLDG. 09 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
09-TN101TR BLDG. 09 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
15-TD100 BLDG. 15 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TD101 BLDG. 15 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TD102 BLDG. 15 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TD103 BLDG. 15 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY
15-TN100 BLDG. 15 - LEVEL 00 FLOOR PLAN - TECHNOLOGY
15-TN101 BLDG. 15 - LEVEL 01 FLOOR PLAN - TECHNOLOGY
15-TN102 BLDG. 15 - LEVEL 02 FLOOR PLAN - TECHNOLOGY
15-TN103 BLDG. 15 - LEVEL 03 FLOOR PLAN - TECHNOLOGY
ACC-TN100 BLDG. ACC - LEVEL 00 - TECHNOLOGY
ACC-TN101 BLDG. ACC - LEVEL 01 - TECHNOLOGY
ACC-TN102 BLDG. ACC - LEVEL 02 - TECHNOLOGY
D-TN101 BLDG. D - LEVEL 01 FLOOR PLANS - TECHNOLOGY
G-TN101 GEN. BLDG. - LEVEL 01 FLOOR PLANS - TECHNOLOGY
TN400 TECHNOLOGY DETAILS
TN401 TECHNOLOGY DETAILS
TN402 TECHNOLOGY DETAILS
TN500 TECHNOLOGY DIAGRAMS
TN501 TECHNOLOGY DIAGRAMS
TN502 TECHNOLOGY DIAGRAMS
TN503 TECHNOLOGY DIAGRAMS
TN504 TECHNOLOGY DIAGRAMS
TN505 TECHNOLOGY DIAGRAMS
TN506 TECHNOLOGY DIAGRAMS
TN507 TECHNOLOGY DIAGRAMS
TN508 TECHNOLOGY DIAGRAMS
TN600 TECHNOLOGY SCHEDULES
TECHNOLOGY SHEET INDEX
00-TN000 TECHNOLOGY COVERSHEET
00-TN001 TECHNOLOGY NOTES AND SHEET INDEX
00-TN002 SITE PLAN - TECHNOLOGY
01-TD100 BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD100A BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT A
01-TD100B BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD100C BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD100D BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD100E BLDG. 01 - LEVEL 00 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD101 BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD101A BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT A
01-TD101B BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD101C BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD101D BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD101E BLDG. 01 - LEVEL 01 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD102 BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD102B BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD102C BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD102D BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD102E BLDG. 01 - LEVEL 02 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD103 BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD103B BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD103C BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD103D BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD103E BLDG. 01 - LEVEL 03 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD104 BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD104B BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD104C BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD104D BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD104E BLDG. 01 - LEVEL 04 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD105 BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD105B BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD105C BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD105D BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD105E BLDG. 01 - LEVEL 05 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD106 BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD106B BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD106C BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD106D BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD106E BLDG. 01 - LEVEL 06 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD107 BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD107B BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD107C BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD107D BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD107E BLDG. 01 - LEVEL 07 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD108 BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD108B BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD108C BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD108D BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD108E BLDG. 01 - LEVEL 08 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD109 BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD109B BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD109C BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD109D BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD109E BLDG. 01 - LEVEL 09 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD110 BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD110B BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD110C BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN- TECHNOLOGY - QUADRANT C
01-TD110D BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD110E BLDG. 01 - LEVEL 10 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD111 BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD111B BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD111C BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT C
01-TD111D BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD111E BLDG. 01 - LEVEL 11 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD112 BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD112B BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD112D BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT D
01-TD112E BLDG. 01 - LEVEL 12 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD113 BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD113B BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT B
01-TD113E BLDG. 01 - LEVEL 13 FLOOR DEMOLITION PLAN - TECHNOLOGY - QUADRANT E
01-TD114 BLDG. 01 - LEVEL 14 FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
01-TD114E BLDG. 01 - LEVEL 14 FLOOR DEMOLITION - TECHNOLOGY - QUADRANT E
01-TN100 BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN100A * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT A
01-TN100B * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN100C * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN100D * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN100E * BLDG. 01 - LEVEL 00 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN100TR-A BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN100TR-B BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN100TR-C BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN100TR-D BLDG. 01 - LEVEL 00 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN101 BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN101A * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT A
01-TN101B * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN101C * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN101D * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN101E * BLDG. 01 - LEVEL 01 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN101TR-A BLDG. 01 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN101TR-B BLDG. 01 - LEVEL 01 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN102 BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN102B * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN102C * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN102D * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN102E * BLDG. 01 - LEVEL 02 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN102TR BLDG. 01 - LEVEL 02 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN103 BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN103B * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN103C * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN103D * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN103E * BLDG. 01 - LEVEL 03 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN103TR BLDG. 01 - LEVEL 03 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN104 BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN104B * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN104C * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN104D * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN104E * BLDG. 01 - LEVEL 04 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN104TR BLDG. 01 - LEVEL 04 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN105 BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN105B * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN105C * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN105D * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN105E * BLDG. 01 - LEVEL 05 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN105TR BLDG. 01 - LEVEL 05 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN106 BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN106B * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN106C * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT C
01-TN106D * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT D
01-TN106E * BLDG. 01 - LEVEL 06 FLOOR PLAN - TECHNOLOGY - QUADRANT E
01-TN106TR BLDG. 01 - LEVEL 06 - TECHNOLOGY ROOM ENLARGEMENTS
01-TN107 BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - OVERALL
01-TN107B * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT B
01-TN107C * BLDG. 01 - LEVEL 07 FLOOR PLAN - TECHNOLOGY - QUADRANT C
Revisions: Date:
ADDENDUM 4 07/26/2023
| Sheets |
| 00-TN001 - TECHNOLOGY NOTES AND SHEET INDEX |