Attachment 04 Additional Drawings.pdf

PDF 7 MB Posted

Attached to
Y1DA--Copy of EHRM Infrastructure Upgrades - Construction - Omaha VAMC DUPLICATE OF 36C776230036
Solicitation number
36C77623B00361
Issued by

About this file

This solicitation is for infrastructure upgrades at the Omaha VA Medical Center. Required work includes mechanical, electrical, and plumbing upgrades in various areas of the facility, such as telecommunications rooms, generator buildings, and exam rooms. Bids are due by August 15, 2023, with work to be completed within 540 calendar days of award. The total contract value is estimated between $5-10 million. The solicitation is unrestricted and set aside for service-disabled veteran-owned small businesses. The Department of Veterans Affairs Technology Acquisition Center is the contracting agency.

View the file

Other files

File Type Posted
Attachment 01 Question and Answer.docx DOCX document
36C77623B0036-1 0008.docx DOCX document
Attachment 01 Additional Questions and Answers.pdf PDF
Attachment 02 Spec 01 00 00 -2 POP Rev1.pdf PDF
36C77623B0036-1 0007.docx DOCX document
Attachment 03 Additional Drawing Sheet List.pdf PDF
ATTACHMENT 01 - SPECIFICATIONS SECTION 27 COMMUNICATIONS.zip ZIP file
36C77623B0036-1 0006.docx DOCX document
ATTACHMENT 02 - 09 65 19 19 STATIC DISSIPATIVE TILE.pdf PDF
Attachment 01 Omaha EHRM V21 - RFI Responses.pdf PDF
36C77623B0036-1 0005.docx DOCX document
Attachment 03 Tech Notes 636 704.B01.00 TN001.T.20230726.pdf PDF
Attachment 04 Omaha EHRM Addendum Mech Drawings.pdf PDF
Attachment 02 09 65 16 Resiliant Tile Flooring.pdf PDF
36C77623B0036-1 0004.docx DOCX document
Davis Bacon Wage Determinations.pdf PDF
36C77623B0036-1 0003.docx DOCX document
36C77623B0036-1 0002.docx DOCX document
Attachment 1 Site Visit Sign In EHRM Infrastructure Upgrades Construction.pdf PDF
36C77623B0036-1 0001.docx DOCX document
Attachment 09 VA-Omaha EHRM Civil_20230515 - Drawing.pdf PDF
Attachment 06 Omaha EHRM Structural_20230515 - Drawing.pdf PDF
Attachment 03 Specification vol 1 Rev1.pdf PDF
Attachment 07 OMAHA VA EHRM_BID SET_ELECTRICAL - Drawing.pdf PDF
Attachment 04 OMAHA VA EHRM_BID SET_ARCHITECTURAL - drawings.pdf PDF
Attachment 05 OMAHA VA EHRM_BID SET_MECHANICAL - Drawing (1).pdf PDF
Attachment 14 Specification Vol 2 Rev1.pdf PDF
Attachment 08 OMAHA VA EHRM_BID SET_TECHNOLOGY - Drawing.pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical (2).pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical.pdf PDF
Attachment 01 Omaha EHRM 100 Narrative Elec Revised.pdf PDF
Attachment 16 Service Contract Wage Determinations.gov.pdf PDF
Attachment 10 DBA Wage Determination 4.13.2023.gov.pdf PDF
Attachment 15 HEFP SEP SOP Process Flow Data Center Phase v1.0.pdf PDF
Attachment 13 - Site Visit EHRM Minor Construction Project- Omaha.docx DOCX document
Attachment 11 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 12 - Limitations on Subcontracting - Construction.docx DOCX document
36C77623B0036-1_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEYNOTES

B818A

OFFICE

B818A

OFFICE

B818A

OFFICE

TELECOMMUNICATIONS

RM.

B721

(TYP)

(TYP)

(TYP)

(TYP)

1 2

TELECOMMUNICATIONS

RM.

B818A

TELECOMMUNICATIONS

RM.

B611

TELECOMMUNICATIONS

RM.

B611

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:3

P

M

AW DAWMAY 15, 2023

01-FE101

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDBLDG. 01 - LEVEL 00 FIRE PROTECTION

ENLARGED PLANS

636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

1/4" = 1'-0"

BLDG. 01 - RM. B721 FIRE PROTECTION DEMOLITION PLAN

1/4" = 1'-0"

BLDG. 01 - RM. B721 FIRE PROTECTION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. B818 FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. B818 FIRE PROTECTION PLAN

NO. DESCRIPTION

1 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER DEMOLITION WORK.

COORDINATE SYSTEM SHUT DOWN, FIRE WATCH, AND DEMOLITION WITH NFPA

REQUIREMENTS & VA SITE REQUIREMENTS. REMOVE EXISTING SPRINKLER HEADS,

FITTINGS, & SHORT SECTIONS OF PIPE, AS NEEDED FOR INSTALLATION OF NEW

BRANCH PIPE AND SPRINKLER HEADS.

2 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER WORK.

RECONFIGURE PIPING FOR PROPER HEAD PLACEMENT & INSTALL UPRIGHT

SPRINKLER HEADS IN THIS AREA PER NFPA 13 ORDINARY HAZARD GROUP 1

OCCUPANCY. DO NOT PLACE SPRINKLER HEADS ABOVE IT OR ELECTRICAL

EQUIPMENT. ROOM PLANNED AS ANSI/TIA-942-B RATING 1.

3 NEW MECHANICAL EQUIPMENT. SEE MECHANICAL PLANS FOR MORE INFORMATION.

4 ELECTRICAL PANELS (SHOWN FOR REFERENCE).

5 DATA RACK. SEE TECHNOLOGY PLANS FOR MORE INFORMATION.

NORTH

1/2" = 1'-0"

BLDG. 01 - RM. B611

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. B611

FIRE PROTECTION PLAN

Revisions: Date:

Addendum #5 07/28/2023

B024C

B024D

TELEPHONE

SWITCH

ROOM

OFFICE

B024C

B024D

TELEPHONE

SWITCH

ROOM

OFFICE

B024C

B024D

TELEPHONE

SWITCH

ROOM

OFFICE

TELECOM

TELECOM

TELECOM

TELECOM

TELECOM

TELECOM B714

B717

OFFICE

OFFICE

B714

B717

OFFICE

OFFICE

B714

B717

OFFICE

OFFICE

(TYP)

5 (TYP)

TELECOMMUNICATIONS

RM.

B024C

OFFICE

B024D

(TYP)

(TYP)

5 (TYP)

TELECOMMUNICATIONS

RM.

BIOMED OFFICE

B717 2

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:4

P

M

AW DAWMAY 15, 2023

01-FE102

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDBLDG. 01 - LEVELS 00 & 01 FIRE PROTECTION

ENLARGED PLANS

636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

1/4" = 1'-0"

BLDG. 01 - RM. B024C

FIRE PROTECTION DEMOLITION PLAN

1/4" = 1'-0"

BLDG. 01 - RM. B024C

FIRE PROTECTION PLAN

NO. DESCRIPTION

1 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER DEMOLITION WORK.

COORDINATE SYSTEM SHUT DOWN, FIRE WATCH, AND DEMOLITION WITH NFPA

REQUIREMENTS & VA SITE REQUIREMENTS. REMOVE EXISTING SPRINKLER HEADS,

FITTINGS, & SHORT SECTIONS OF PIPE, AS NEEDED FOR INSTALLATION OF NEW

BRANCH PIPE AND SPRINKLER HEADS.

2 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER WORK.

RECONFIGURE PIPING FOR PROPER HEAD PLACEMENT & INSTALL UPRIGHT

SPRINKLER HEADS IN THIS AREA PER NFPA 13 ORDINARY HAZARD GROUP 1

OCCUPANCY. DO NOT PLACE SPRINKLER HEADS ABOVE IT OR ELECTRICAL

EQUIPMENT. ROOM PLANNED AS ANSI/TIA-942-B RATING 1.

3 NEW MECHANICAL EQUIPMENT. SEE MECHANICAL PLANS FOR MORE INFORMATION.

4 ELECTRICAL PANELS (SHOWN FOR REFERENCE).

5 DATA RACK. SEE TECHNOLOGY PLANS FOR MORE INFORMATION.

NORTH

1/2" = 1'-0"

BLDG. 01 - RM. 1510

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 1510 FIRE PROTECTION PLAN

1/4" = 1'-0"

BLDG. 01 - RM. B717 FIRE PROTECTION DEMOLITION PLAN

1/4" = 1'-0"

BLDG. 01 - RM. B717 FIRE PROTECTION PLAN

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

5 5

1205B

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

1205B

5 5 5

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:4

P

M

AW DAWMAY 15, 2023

01-FE103

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDBLDG. 01 - LEVEL 01 FIRE PROTECTION

ENLARGED PLANS

636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

1/2" = 1'-0"

BLDG. 01 - RM. 1616

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 1616 FIRE PROTECTION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 1656

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 1656

FIRE PROTECTION PLAN

NO. DESCRIPTION

1 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER DEMOLITION WORK.

COORDINATE SYSTEM SHUT DOWN, FIRE WATCH, AND DEMOLITION WITH NFPA

REQUIREMENTS & VA SITE REQUIREMENTS. REMOVE EXISTING SPRINKLER HEADS,

FITTINGS, & SHORT SECTIONS OF PIPE, AS NEEDED FOR INSTALLATION OF NEW

BRANCH PIPE AND SPRINKLER HEADS.

2 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER WORK.

RECONFIGURE PIPING FOR PROPER HEAD PLACEMENT & INSTALL UPRIGHT

SPRINKLER HEADS IN THIS AREA PER NFPA 13 ORDINARY HAZARD GROUP 1

OCCUPANCY. DO NOT PLACE SPRINKLER HEADS ABOVE IT OR ELECTRICAL

EQUIPMENT. ROOM PLANNED AS ANSI/TIA-942-B RATING 1.

3 NEW MECHANICAL EQUIPMENT. SEE MECHANICAL PLANS FOR MORE INFORMATION.

4 ELECTRICAL PANELS (SHOWN FOR REFERENCE).

5 DATA RACK. SEE TECHNOLOGY PLANS FOR MORE INFORMATION.

NORTH

1/2" = 1'-0"

BLDG. 01 - RM. 1205B FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 1205B FIRE PROTECTION PLAN

RESP

STORAGE

WAITER

DUMB

STORAGE

STORAGE

STORAGE

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:5

P

M

AW DAWMAY 15, 2023

01-FE105

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDBLDG. 01 - LEVELS 05-08 FIRE PROTECTION

ENLARGED PLANS

636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

1/2" = 1'-0"

BLDG. 01 - RM. 5414

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 5414 FIRE PROTECTION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 6414

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 6414 FIRE PROTECTION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 7414

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 7414 FIRE PROTECTION PLAN 1/2" = 1'-0"

BLDG. 01 - RM. 8414

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 8414 FIRE PROTECTION PLAN

NO. DESCRIPTION

1 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER DEMOLITION WORK.

COORDINATE SYSTEM SHUT DOWN, FIRE WATCH, AND DEMOLITION WITH NFPA

REQUIREMENTS & VA SITE REQUIREMENTS. REMOVE EXISTING SPRINKLER HEADS,

FITTINGS, & SHORT SECTIONS OF PIPE, AS NEEDED FOR INSTALLATION OF NEW

BRANCH PIPE AND SPRINKLER HEADS.

2 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER WORK.

RECONFIGURE PIPING FOR PROPER HEAD PLACEMENT & INSTALL UPRIGHT

SPRINKLER HEADS IN THIS AREA PER NFPA 13 ORDINARY HAZARD GROUP 1

OCCUPANCY. DO NOT PLACE SPRINKLER HEADS ABOVE IT OR ELECTRICAL

EQUIPMENT. ROOM PLANNED AS ANSI/TIA-942-B RATING 1.

3 NEW MECHANICAL EQUIPMENT. SEE MECHANICAL PLANS FOR MORE INFORMATION.

4 ELECTRICAL PANELS (SHOWN FOR REFERENCE).

5 DATA RACK. SEE TECHNOLOGY PLANS FOR MORE INFORMATION.

NORTH

14003

IT CLOSET

14002

IT CLOSET

TELECOMMUNICATIONS

RM.

TELECOMMUNICATIONS

RM.

10414

TELECOMMUNICATIONS

RM.

14002

TELECOMMUNICATIONS

RM.

11414

TELECOMMUNICATIONS

RM.

12018

TELECOMMUNICATIONS

RM.

12018

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:0

P

M

AW DAWMAY 15, 2023

01-FE106

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDBLDG. 01 - LEVELS 09-12 & 14 FIRE

PROTECTION ENLARGED PLANS

636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

1/2" = 1'-0"

BLDG. 01 - RM. 9414

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 9414 FIRE PROTECTION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 10414

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 10414 FIRE PROTECTION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 14003,14004

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 14003,14004

FIRE PROTECTION PLAN

NO. DESCRIPTION

1 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER DEMOLITION WORK.

COORDINATE SYSTEM SHUT DOWN, FIRE WATCH, AND DEMOLITION WITH NFPA

REQUIREMENTS & VA SITE REQUIREMENTS. REMOVE EXISTING SPRINKLER HEADS,

FITTINGS, & SHORT SECTIONS OF PIPE, AS NEEDED FOR INSTALLATION OF NEW

BRANCH PIPE AND SPRINKLER HEADS.

2 AREA SHOWN HATCHED INDICATES SCOPE OF FIRE SPRINKLER WORK.

RECONFIGURE PIPING FOR PROPER HEAD PLACEMENT & INSTALL UPRIGHT

SPRINKLER HEADS IN THIS AREA PER NFPA 13 ORDINARY HAZARD GROUP 1

OCCUPANCY. DO NOT PLACE SPRINKLER HEADS ABOVE IT OR ELECTRICAL

EQUIPMENT. ROOM PLANNED AS ANSI/TIA-942-B RATING 1.

3 NEW MECHANICAL EQUIPMENT. SEE MECHANICAL PLANS FOR MORE INFORMATION.

4 ELECTRICAL PANELS (SHOWN FOR REFERENCE).

5 DATA RACK. SEE TECHNOLOGY PLANS FOR MORE INFORMATION.

NORTH

1/2" = 1'-0"

BLDG. 01 - RM. 11414

FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 11414

FIRE PROTECTION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 12018 FIRE PROTECTION DEMOLITION PLAN

1/2" = 1'-0"

BLDG. 01 - RM. 12018 FIRE PROTECTION PLAN

GENERAL MECHANICAL NOTES

GENERAL DEMOLITION NOTES

DRAWING SYMBOLS

MECHANICAL EQUIPMENT

SYMBOLS - PIPINGSYMBOLS - DUCTWORK

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE DEPARTMENT OF VETERANS AFFAIRS (VA) STANDARDS.

2. ALL WORK SHALL BE IN CONFORMANCE WITH THE INTERNATIONAL MECHANICAL CODE - LATEST EDITION ADOPTED BY THE VA. THE VA SERVES AS AUTHORITY HAVING JURISDICTION.

3. THESE DOCUMENTS ARE INTENDED TO COMPLY WITH APPLICABLE CODES. WHERE DISCREPANCIES OCCUR, NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE CODES AND STANDARDS AT NO ADDITIONAL COST TO THE OWNER.

CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING ALL LABOR, MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS, HARDWARE, AND COST FOR INSTALLATION FOR A COMPLETE

AND OPERATIONAL SYSTEM.

4. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW, COMPLETE WITH MANUFACTURER’S GUARANTEE OR WARRANTY AND SHALL BE LISTED BY A NATIONALLY RECOGNIZED

TESTING LABORATORY.

5. PENETRATIONS THROUGH FIRE RATED WALLS BY DIVISION 23 CONTRACTOR SHALL BE SEALED WITH APPROPRIATE FIRE PROOFING MATERIAL TO RESTORE FIRE RATING. REFER TO

ARCHITECTURAL DRAWINGS FOR FIRE RATED WALLS.

6. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL DEBRIS ON A DAILY BASIS. ALL NEW MATERIALS AWAITING INSTALLATION SHALL BE KEPT IN AREAS DESIGNATED BY THE OWNER.

7. DRAWINGS SHALL NOT BE SCALED TO OBTAIN DIMENSIONS. REFER TO DIMENSIONED ARCHITECTURAL FLOOR PLANS. IF THE DIMENSIONS CANNOT BE DETERMINED BY THE INFORMATION GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR ADDITIONAL INFORMATION.

8. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.

9. INFORMATION CONTAINED ON THE MECHANICAL DRAWINGS IS IN ITSELF INCOMPLETE AND VOID UNLESS USED IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, THE SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC., AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND WITH ALL THEREIN BY REFERENCE, WHICH THE CONTRACTOR

CERTIFIES KNOWLEDGE OF BY SIGNING THE CONTRACT.

10. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY REVIEW OF SHOP DRAWINGS OR PERIODIC OBSERVATION OF CONSTRUCTION, FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION PROCESSES AND CONSTRUCTION TECHNIQUES (INCLUDING EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION, FORM WORK, ETC.), FOR COORDINATION OF THE VARIOUS TRADES, AND FOR SAFE CONDITIONS ON THE JOB SITE. VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE ENGINEER AS SOON AS THEY ARE FOUND. WORK

SHALL NOT PROGRESS UNTIL WRITTEN PERMISSION FROM THE ENGINEER IS OBTAINED.

11. PROVIDE VOLUME BALANCING DAMPERS FOR ALL SUPPLY DIFFUSERS, RETURN AND EXHAUST GRILLES AND AT EACH INDIVIDUAL BRANCH VENTILATION SUPPLY, RETURN AND RELIEF DUCT.

12. PLACE DIFFUSERS AS CLOSE TO PLAN LOCATION AS POSSIBLE WITHOUT INTERFERING WITH OTHER CEILING DEVICES.

13. ALL NEW EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED SO AS TO BE EASILY ACCESSIBLE. ALL CLEARANCES FOR EQUIPMENT PER MANUFACTURERS GUIDELINES AND CODE COMPLIANCE

SHALL BE REQUIRED.

14. PROVIDE ACCESS PANELS FOR VALVES, ETC. THAT ARE LOCATED IN CONCEALED AREAS. COORDINATE WITH GENERAL CONTRACTOR FOR EXACT LOCATION AND WITH ARCHITECTURAL PLANS

FOR FINISHES.

15. ALL COMPONENTS OF SYSTEMS SHALL BE PROVIDED FOR A COMPLETELY OPERATIONAL, UNDERSTANDABLE, SAFE, AND CLEAN SYSTEM; INCLUDING BUT NOT LIMITED TO EXTRANEOUS FIXTURE TRIM AS SPECIFIED, SERVICE AND COMMISSIONING INTO OPERATION, LABELS, TESTING AND CLEANING, FIRE AND LIFE SAFETY REQUIREMENTS, AND CONSIDERING THE REQUESTS OF OWNERS

PERSONNEL.

16. ELECTRICAL PANELS SHOWN FOR REFERENCE. DO NOT ROUTE ANY COMPONENTS ABOVE OR IN FRONT OF ELECTRICAL EQUIPMENT. MAINTAIN CODE REQUIRED CLEARANCES.

17. ALL DUCTWORK SIZES SHOWN ON DRAWINGS ARE CLEAR INTERIOR DIMENSIONS.

18. THERMOSTATS SHALL BE MOUNTED 4'-0" ABOVE FINISHED FLOOR AND COORDINATED WITH ARCHITECTURAL PLANS. IF THERMOSTATS ARE INSTALLED ADJACENT TO A LIGHT SWITCH ALIGN

MOUNTING HEIGHT WITH LIGHT SWITCH.

19. PROVIDE CONCEALING FLANGES AT ALL VISIBLE DUCT PENETRATIONS THROUGH WALLS.

20. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL INTERCONNECTING CONTROL WIRING.

21. PLANS ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE OF WORK AND GENERAL LOCATIONS OF EQUIPMENT, MATERIALS, ETC. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LAYOUT OWN WORK ACCORDINGLY AND IS RESPONSIBLE FOR DETERMINING EXACT LOCATIONS FOR EQUIPMENT, MATERIALS, ETC.

22. THE EXISTING MECHANICAL SYSTEMS SHALL BE MODIFIED PER SPECIFIED PLANS AND SPECIFICATIONS. FIELD VERIFY EXISTING MECHANICAL SYSTEMS REQUIREMENTS PRIOR TO BIDDING.

23. COORDINATE SCOPE OF WORK WITH THE WORK OF OTHER TRADES PRIOR TO INSTALLATION. ISSUES DUE TO LACK OF COORDINATION EFFORT WILL BE CORRECTED AT NO ADDITIONAL COST TO

THE OWNER.

COORDINATE LOCATION OF SYSTEM COMPONENTS WITHIN LIMITS OF STRUCTURE AND OTHER ENGINEERED SYSTEMS. ROUTE ALL MECHANICAL SYSTEMS IN CONCEALED SPACES AND INSTALL COMPONENTS AS HIGH AS POSSIBLE. OFFSET SYSTEMS ROUTING AS REQUIRED, PROVIDING REQUIRED MATERIALS. PIPE SHALL NOT BE ROUTED IN EXTERIOR WALLS UNLESS NOTED.

COORDINATE ROUTING OF MECHANICAL SYSTEMS TO MAINTAIN REQUIRED SERVICE CLEARANCES AROUND ANY EQUIPMENT AND ELECTRICAL ITEMS.

24. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW SYSTEMS. COORDINATE

WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS SCOPE.

25. ALL ELEMENTS OF CONSTRUCTION SHALL BE INSTALLED BY SKILLED TRADESMEN OF THERE PARTICULAR TRADE, AND INSTALLED IN A NEAT WORKMANLIKE MANNER KEEPING WITH THE HIGHEST

STANDARDS OF THE TRADE.

26. COORDINATE SCOPE OF WORK WITH PROJECT SCHEDULES AGREED UPON BY OWNER AND ALL CONTRACTORS.

27. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS ABOUT DESIGN STANDARDS, PRODUCTS, DRAWINGS, SUBMITTALS, DOCUMENTATION, COORDINATION, AND INSTALLATION.

28. PROVIDE DIRECT-DIGITAL CONTROL SYSTEM(S) AS INDICATED ON THE PROJECT DOCUMENTS, POINT LIST, INTEROPERABILITY TABLES, DRAWINGS AND AS DESCRIBED IN THESE SPECIFICATIONS.

INCLUDE A COMPLETE AND WORKING DIRECT-DIGITAL CONTROL SYSTEM. PROVIDE ALL ENGINEERING, PROGRAMMING, CONFIGURATION/SETUP HARDWARE AND SOFTWARE, OPEN LICENSES, CONTROLS AND INSTALLATION MATERIALS, INSTALLATION LABOR, COMMISSIONING AND START-UP, TRAINING, FINAL PROJECT DOCUMENTATION AND WARRANTY. COORDINATE WITH VA

TECHNOLOGY STAFF FOR INTEGRATION OF REQUIRED SITE NETWORK SECURITY INTEGRATION.

29. CONTROLS SHALL BE AN EXTENSION OF THE EXISTING OWNER PROVIDED TEMPERATURE CONTROL SYSTEM. PROVIDE A COMPLETE AND FUNCTIONAL EXPANDED CONTROL SYSTEM TO ADD ON TO THE EXISTING SYSTEM TO CONTROL ALL EQUIPMENT PROVIDED UNDER THIS CONTRACT. PROVIDE COMPONENTS AND PROGRAMMING THAT MATCH EXISTING SYSTEM AND ARE COMPATIBLE WITH THE EXISTING SYSTEM, INCLUDING BUT NOT LIMITED TO CONTROL BOARDS, THERMOSTATS, WIRING, AND ACCESSORIES. FIELD VERIFY EXISTING PROGRAMMING FOR REUSE AND/OR UPDATING. ALL NEW BUILDING CONTROLLERS SHALL BE NATIVE BACNET. ALL NEW BACNET CONTROLLERS, DEVICES AND COMPONENTS SHALL BE LISTED BY BACNET TESTING LABORATORIES.

30. SEQUENCES INCLUDED IN THE SUBMITTAL MUST REFLECT WHAT IS ACTUALLY GOING TO BE PROGRAMMED, INCLUDING SUGGESTED CHANGES TO THE PLANS. COPIED SEQUENCES FROM THE PLANS WILL NOT BE ACCEPTED. INCLUDE SYSTEM GRAPHICS INDICATING MONITORED SYSTEMS, DATA (CONNECTED AND CALCULATED) POINT ADDRESSES, OPERATOR NOTATIONS, NETWORK

CONFIGURATION, ETC.

31. ALL SOFTWARE WORK INVOLVING THIS INTEGRATION PROCESS IS THE RESPONSIBILITY OF THE TEMPERATURE CONTROL CONTRACTOR AND MUST BE COMPLETED BY A TECHNICIAN CERTIFIED WITH THE EXISTING SYSTEM. THE TCC MUST SUBMIT A COPY OF THE CERTIFICATION DOCUMENTATION FOR THE SYSTEM PROGRAMMER PRIOR TO COMPLETING ANY WORK IN ORDER TO INSURE

THE INTEGRITY OF THE SYSTEM.

32. THE TCC IS ALSO RESPONSIBLE FOR PROVIDING AND INSTALLING ALL ROUTERS, SWITCHES, JACE’S, SOFTWARE LICENSES, DRIVERS, ETC, AS NEEDED FOR A COMPLETE INSTALLATION INCLUDING FULL INTEGRATION. THE TCC IS RESPONSIBLE FOR ALL GRAPHICS GENERATION AND POINT MAPPING OF POINTS TO BE ADDED IN THE PROJECT. THE TCC SHALL UTILIZE THE EXISTING DATABASE AS AN EXAMPLE FOR ALL PROGRAMMING, GRAPHICS, ANIMATIONS, AND POINT MAPPING FOR WORK DONE ON THE PROJECT IN ORDER TO MAINTAIN CONSISTENCY WITHIN

THE BAS.

33. LOCATIONS OF CONDENSING UNITS ARE SCHEMATIC IN NATURE. CONTRACTOR SHALL COORDINATE FINAL PLACEMENT OF CONDENSING UNITS WITH VA.

1. ALL PIPING AND DUCTWORK IS SHOWN SCHEMATICALLY BASED ON EXISTING PLANS. CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF VERIFYING ROUTES OF ALL EXISTING CONDITIONS AND EXISTING UTILITIES PRIOR TO BIDDING AND STARTING OF WORK. IF CONDITIONS DIFFER GREATLY CONTACT ENGINEER.

2. CONDUCT A PRECONSTRUCTION AIR AND WATER FLOW TEST OF EXISTING SYSTEMS AND MAINS SERVING EACH AREA AND FLOOR BEFORE STARTING ANY DEMOLITION WORK. SUBMIT REPORT

OF FLOWS AND FINDINGS TO ENGINEER AND OWNER.

3. COORDINATE SCHEDULE OF WORK WITH OWNER AND PROVIDE SUFFICIENT NOTICE BEFORE ANY SHUTDOWNS, TO MINIMIZE DISRUPTIONS TO ANY CONCURRENT OPERATIONS.

4. COMPLY WITH SITE SAFETY PROCEDURES OF OWNER, GENERAL CONTRACTOR, AND OSHA.

5. DEMOLISH MATERIALS, EQUIPMENT, AND ASSOCIATED SYSTEMS AS SHOWN WITHIN SCOPE OF WORK AREA AS DESIGNATED/NOTED. DEMOLISH ALL BRANCH DUCT AND PIPE, SUPPORTS, ACCESSORIES, EQUIPMENT, TERMINAL DEVICES, CONTROLS, WIRING, CONDUITS, AND ASSOCIATED ITEMS BACK TO RESPECTIVE MAINS. THEN CAP, SEAL, REPAIR, REINSULATE MAIN CONNECTIONS AS REQUIRED. NOTHING SHALL BE ABANDONED IN PLACE UNLESS NOTED OTHERWISE. REMOVE ALL DEMOLISHED ITEMS FROM SITE AND DISPOSE PROPERLY PER LOCAL LAWS.

6. HATCHED OR GRAYED OUT AREAS ARE NOT WITHIN CONTRACT BOUNDARY. COORDINATE WITH OWNER IF SUCH AREAS REQUIRE ACCESS TO COMPLETE SCOPE OF WORK, SUCH AS REMOVING

A BRANCH MAIN BACK TO LARGER MAIN TO ELIMINATE DEAD LEGS.

7. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW SYSTEMS. COORDINATE

WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS SCOPE.

8. SAVE NOTED ITEMS FOR REUSE OR OWNERS SALVAGE. STORE NOTED ITEMS AND OTHER ITEMS IDENTIFIED BY OWNER IN OWNER’S DESIGNATED STORAGE AREA.

9. PROTECT EXISTING TO REMAIN EQUIPMENT, MATERIALS, AND SURROUND SITE FROM DAMAGE DURING DEMOLITION. REPAIRS AND REPLACEMENT OF EXISTING TO REMAIN CONDITIONS SHALL

BE THE CONTRACTOR’S RESPONSIBILITY.

10. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS.

H4

H7

A

01-SF-3

01-TU-1-4

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT №

BUILDING № WHERE EQUIPMENT IS LOCATED

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT № 4)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY (AIR HANDLER UNIT № 1)

DRAWING NUMBER WHERE DRAWN

BUILDING № WHERE EQUIPMENT IS LOCATED

TYPICAL UNIT №

NOTES:

1. DEVICE CONTROL/CONNECTION PANEL.

2. MANUFACTURER'S RECOMMENDED MAINTENANCE/OPERATIONAL CLEARANCE. KEEP

THIS AREA CLEAR AND ACCESSIBLE FOR COIL AND PANEL MAINTENANCE AND

REPAIR.

EXISTING MECHANICAL EQUIPMENT - DEMOLITION

MECHANICAL EQUIPMENT

NOTE 2 (TYP)

NOTE 1 (TYP)

?"SYS (EX) GENERAL PIPING - EXISTING TO REMAIN

?" GENERAL PIPING - TO BE DEMOLISHED

?"SYS GENERAL PIPING - NEW WORK

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HHWR HEATING HOT WATER RETURN

REF REFRIGERANT PIPING (LIQ/SUC)

TYPICAL MECHANICAL SYSTEM - SUPPLY PIPING

TYPICAL MECHANICAL SYSTEM - RETURN PIPING

SYSTEM LABEL SYSTEM DESCRIPTION

POINT OF CONNECTION

POINT OF DEMOLITION

BOTTOM CONNECTION

END DROP / DOWN

END UP / RISER

HEADER FLANGE CAP

PIPE END CAP

RISE / DROP IN-LINE

TEE DOWN

TEE UP

TOP CONNECTION

UP & DN / RISER

VALVE - BALL, NORMALLY CLOSED

VALVE - BALL, NORMALLY OPEN

VALVE - CHECK

VALVE - CONTROL 2-WAY (2-POSITION)

VALVE - CONTROL 2-WAY (MODULATING)

VALVE - PPRESSURE REDUCING VALVE (PRV)

VALVE - SHUT-OFF, NORMALLY CLOSED

VALVE - SHUT-OFF, NORMALLY OPEN

BACKFLOW PREVENTER (BFP)

BACKFLOW PREVENTER (BFP-RPZ)

CONTINUATION BREAK

COUPLING

DIRECTION OF FLOW

DIRECTION OF PITCH

FLEX CONNECTION

FLOW METER

M METER

PRESSURE GAUGE

REDUCER

DIFFERENTIAL PRESSURE SENSOR

MANUAL DRAIN w/ ¾" HOSE CONNECTION

FOS FUEL OIL SUPPLY

FOR FUEL OIL RETURN

LIMIT OF DEMOLITION

SUPPLY DIFFUSER/GRILLE (CEILING, SQUARE 4-WAY)

SEE NOTES 1, 2, 3.

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

FC

10"x8"SA

FLEXIBLE CONNECTION (FC) - EQUIPMENT,

VIBRATION, OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS. VANE SYMBOL ARE NOT

SHOWN ON PLANS)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

DUCT LABELING NOTE:

• INSIDE DIMENSIONS: WIDTH x DEPTH

• SA = SUPPLY AIR

• RA = RETURN AIR

• OA = OUTSIDE AIR SUPPLY

• EA = EXHAUST AIR

EXISTING DUCT TO REMAIN

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

10"x8"SA(EX)

10"x8"

NEW DUCT

EXHAUST GRILLE

SEE NOTES 1, 2, 3.

SD-14

270 CFM

SUPPLY DUCT UP ("X")

EXHAUST DUCT UP ("Y")

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR

GRILLE BELOW DUCT

EXHAUST OR RETURN BOTTOM

REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN REGISTER OR

TOP GRILLE (WALL TYPE)

RETURN DUCT UP ("/")

SUPPLY DIFFUSER WITH BLANK-OFF (CEILING,

SQUARE 3-WAY) SEE NOTES 1, 2, 3.

SUPPLY DUCT DOWN ("X")

EXHAUST DUCT DOWN ("Y")

RETURN DUCT DOWN ("/")

(ROUND) (RECT.)

EG-21

80 CFM

NOTES:

1. AIR TERMINAL LABEL:

AIR TERMINAL TYPE

BALANCED FLOW RATE

2. AIR TERMINAL TYPE:

Sx = SUPPLY, Rx = RETURN, Ex = EXHAUST xD = DIFFUSER xG = GRILLE xR = REGISTER (WITH INTEGRATED VOLUME DAMPER)

(EX. SG-14 = SUPPLY GRILLE)

3. REFER TO AIR DEVICE SCHEDULE FOR DETAILS.

SD-14

270 CFM

RETURN GRILLE (CEILING)

SEE NOTES 1, 2, 3.

RG-24

270 CFM

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:0

P

M

AW RAWMAY 15, 2023

M-100

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDMECHANICAL LEGEND, NOTES, AND

ABBREVIATIONS

636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

XFER TRANSFER

VAMCS VA MASTER CONSTRUCTION SPECIFICATIONS

VAHBS VA HOSPITAL BUILDING SYSTEM

VBA VETERANS BENEFITS ADMINISTRATION

VHA VETERANS HEALTH ADMINISTRATION

VA DEPARTMENT OF VETERANS AFFAIRS

UTIL UTILITY

UPC UNIVERSAL PLUMBING CODE

UL UNDERWRITER'S LABORATORY

TEMP TEMPERATURE

TYP TYPICAL

SS STAINLESS STEEL

SPEC SPECIFICATION

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATION...

SI INTERNATIONAL SYSTEM OF UNITS

SHT SHEET

SEN SENSIBLE HEAT

SCI SPINAL CODE INJURY

SA SUPPLY AIR

RM ROOM

RO REVERSE OSMOSIS

RDS ROOM DATA SHEETS

REQD REQUIRED

RA RETURN AIR

R/E RETURN OR EXHAUST

PSS PRIMARY SECONDARY SYSTEM

PGW PROPYLENE GLYCOL-WATER SOLUTION

OR OPERATING ROOM

OD OUTSIDE DIAMETER

OC ON CENTER

OA OUTSIDE AIR

NTS NOT TO SCALE

NSPC NATIONAL STANDARD PLUMBING CODE

NOM NOMINAL

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

NO NORMALLY OPEN

NIC NOT IN CONTRACT

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NFC NATIONAL FIRE CODES

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEC NATIONAL ELECTRICAL CODE

NC NORMALLY CLOSED

NA NOT APPLICABLE (ALSO N/A)

MRI MAGNETIC RESONANCE IMAGING

MIN MINIMUM

MH MANHOLE

MER MECHANICAL EQUIPMENT ROOM

MECH MECHANICAL

MAX MAXIMUM

LPG LIQUID PROPANE GAS

IPC INTERNATIONAL PLUMBING CODE

ID INSIDE DIAMETER

ICU INTENSIVE CARE UNIT

I/O INPUT/OUTPUT

IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA

IBC INTERNATIONAL BUILDING CODE

HAC HOUSEKEEPING AIDE’S CLOSET

GS GALVANIZED STEEL

GA GAUGE

EX EXISTING (OR EXIST)

EPACT ENERGY POLICY ACT

EPA ENVIROMENTAL PROTECTION AGENCY

ELEC ELECTRIC OR ELECTRICAL

EL ELEVATION

ESMT EASEMENT

ETO ETHYLENE OXIDE

EA EXHAUST AIR

DWG DRAWING

DEMO DEMOLITION

CO2 CARBON DIOXIDE

CENT CENTRIFUGAL

BMT BONE MARROW TRANSPLANT

BLDG BUILDING

ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASHRAE

AMERICAN SOCIETY OF HEATING REFRIGERATION AIR

CONDITIONING ENGINEERS

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AMB AMBIENT

AFG ABOVE FINISHED GRADE

AFF ABOVE FINISHED FLOOR

ADA AMERICANS WITH DISABILITIES ACT

A/E ARCHITECTS AND ENGINEERS

GENERAL ABBREVIATIONS

YR YEAR

WPD WATER SIDE PRESSURE DROP

WG WATER GAGE

WB WET-BULB (TEMPERATURE)

W WATTS

TSP TOTAL STATIC PRESSURE

TD TEMPERATURE DIFFERENCE

SQ M SQUARE METER

SQ FT SQUARE FOOT (FEET)

SP GR SPECIFIC GRAVITY

SCFM STANDARD CUBIC FEET PER MINUTE

SAT SUPPLY AIR TEMPERATURE

SI SQUARE INCHES

RPM REVOLUTIONS PER MINUTE

RLA RUN LOAD AMPERE

RAT RETURN AIR TEMPERATURE

RAF RADIO-FREQUENCY

PSIG POUNDS PER SQUARE INCH-GAGE

PSIA POUNDS PER SQUARE INCH ATMOSPHERE

PSI POUNDS PER SQUARE INCH

PPM PARTS PER MILLION

PA PASCAL

NPLV NON-STANDARD PART LOAD VALUE

Nm NEWTON-METER

NC NOISE CRITERIA

MTD MEAN TEMPERATURE DIFFERENCE

M/S METERS PER SECOND

MM MILLIMETER

MIN MINIMUM

MHP MOTOR HORSEPOWER

MERV MINIMUM EFFICIENCY REPORTING VALUE

MCA MULTICHANNEL ANALYZER

MCA MAXIMUM CURRENT AMPACITY

MBH 1000 BTUH

MAX MAXIMUM

M METER

LWT LEAVING WATER TEMPERATURE

LVG LEAVING

LH LATENT HEAT

LGT LEAVING GLYCOL TEMPERATURE

LF LINEAR FOOT (FEET)

LBS/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

L/S LITERS PER SECOND

L/M LITERS PER MINUTE

L/H LITERS PER HOUR

LF LINEAR FEET (FOOT)

L LITER

kWH KILOWATT HOUR kW KILOWATT kPA KILO PASCAL

KG/HR KILOGRAM PER HOUR

KG KILOGRAM

IPLV INTEGRATED PART LOAD VALUE

IN-LB INCH-POUND

IN WG INCH WATER GAUGE

IN HG INCHES OF MERCURY

IN INCHES

HZ HERTZ

HT HEIGHT

HP HORSEPOWER

GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR

GPD GALLONS PER DAY

GAL GALLONS

GA GAUGE

FT-WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FT FEET

FPS FEET PER SECOND

FPM FEET PER MINUTE

F FAHRENHEIT

EWT ENTERING WATER TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

ENT ENTERING

EGT ENTERING GLYCOL TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EAT ENTERING AIR TEMPERATURE

DP DEWPOINT

DIA DIAMETER

DEG DEGREE

dB DECIBEL

DB DRY-BULB TEMPERATURE

COP COEFFICIENT OF PERFORMANCE

CM/S CENTIMETER PER SECOND

CM CUBIC METER

CFT CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

C CENTIGRADE (CELSIUS)

BTUH BRITISH THERMAL UNIT PER HOUR

BTU BRITISH THERMAL UNIT

BHP BRAKE HORSE POWER

APD AIR SIDE PRESSURE DROP

UNITS OF MEASURE

Wb WET-BULB (TEMPERATURE)

VSD VARIABLE SPEED DRIVE

VFD VARIABLE FREQUENCY DRIVE

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VAV VARIABLE AIR VOLUME

V VALVE

TWU THRU-WALL UNIT

TU TERMINAL UNIT

TSTAT THERMOSTAT

TSP TOTAL STATIC PRESSURE

TR TOP REGISTER

TG TRANSFER GRILLE

TD TEMPERATURE DIFFERENCE

SR SUPPLY AIR REGISTER

SPS STATIC PRESSURE SENSOR

SP STATIC PRESSURE

SG SUPPLY AIR GRILLE

SF SUPPLY FAN

SEN SENSIBLE HEAT

SDS SMOKE DAMPER (SUPPLY)

SDR SMOKE DAMPER (RETURN)

SDPR SMOKE DAMPER

SAT SUPPLY AIR TEMPERATURE

SA SUPPLY AIR

RTU ROOF TOP UNIT

RR RETURN REGISTER

RHC REHEAT COIL

RH RELATIVE HUMIDITY

RG RETURN GRILLE

RF RETURN FAN

REF REFRIGERANT LINESET PIPING

REA RELIEF AIR

RDS ROOM DATA SHEETS

RAD RETURN AIR DAMPER

RA RETURN AIR

R/E RETURN OR EXHAUST

PG PRESSURE GAGE

P PUMP

OAI OUTSIDE AIR INTAKE

OAD OUTDOOR AIR DAMPER

OA OUTSIDE AIR

O² OXYGEN

NO NORMALLY OPEN

NC NOISE CRITERIA

NC NORMALLY CLOSED

MZ MULTI-ZONE

MHP MOTOR HORSEPOWER

MERV MINIMUM EFFICIENCY REPORTING VALUE

MB MIXING BOX

MAT MIXED AIR TEMPERATURE

MA MIXED AIR

LWT LEAVING WATER TEMPERATURE

LVR LOUVER

LVG LEAVING

LAT LEAVING AIR TEMPERATURE

IAQ INDOOR AIR QUALITY

HX HEAT EXCHANGER

HWC HOT WATER COIL

HW HOT WATER (POTABLE)

HSTAT HUMIDISTAT

HD HOOD

HC HEATING COIL

HB HOSE BIBB

FV FACE VELOCITY

FM FLOW METER

FF FINAL FILTER

FD FIRE DAMPER

FD FLOOR DRAIN

EWT ENTERING WATER TEMPERATURE

ER EXHAUST REGISTER

ENT ENTERING

EH EXHAUST HOOD

EG EXHAUST GRILLE

EF EXHAUST FAN

EER ENERGY EFFICIENCY RATIO

ECU EVAPORATIVE CONDENSER UNIT

ECC ENGINEERING CONTROL CENTER

EC EVAPORATIVE COOLER

EAT ENTERING AIR TEMPERATURE

EA EXHAUST AIR

DXCC DIRECT EXPANSION COOLING COIL

DX DIRECT EXPANSION

DPS DIFFERENTIAL PRESSURE SENSOR

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DIW DEIONIZED WATER

DF DIFFUSER

DDC DIRECT DIGITAL CONTROLS

DB DECIBELS

D DAMPER - AUTOMATIC

CW COLD WATER (POTABLE)

CV CONSTANT VOLUME

CU CONDENSING UNIT

CR CEILING REGISTER

CP CONDENSATE PUMP

COP COEFFICIENT OF PERFORMANCE

COMP COMPRESSOR UNIT

CO² CARBON DIOXODE

CO CLEAN OUT

CHS CHILLED WATER SUPPLY

CHR CHILLED WATER RETURN

... CG CEILING GRILLE

CENT CENTRIFICAL

CD CEILING DIFFUSER

CCD COOLING COIL CONDENSATE DRAIN

CC COOLING COIL

CAV CONSTANT AIR VOLUME

BHP BRAKE HORSEPOWER

BG BOTTOM GRILLE

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AQST AQUASTAT

APD AIR PRESSURE DROP

AP ACCESS PANEL

AMP AMPERE

AHU AIR-HANDLING UNIT

MECHANICAL ABBREVIATIONS

PROVIDE A SECTION OF HIGH

COMPRESSION STRENGTH INSULATION

AT EACH HANGER POINT. INSULATION

MAY BE HALF ROUND OR FULL ROUND

AND EXTEND 2" BEYOND GALV. SHIELD

EACH WAY.

GALVANIZED IRON

SHEET SHIELD

INSULATION

STEEL PIPE SADDLE,

TACK WELDED TO PIPE,

FILL SADDLE WITH

INSULATION.

OVERSIZE HANGER TO ALLOW

LONGITUDINAL PIPE EXPANSION

AND PIPE INSULATION TO PASS

THROUGH UNBROKEN. (TYP)

UNI-SIRUT OR EQUIVALENT

HIGH DENSITY INSULATION INSERT

(TYP)

THREADED ROD.(TYP)

PIPE INSULATION(TYP)

INSULATION SHIELD (TYP)

INSTALL CLAMP ON ALL

PIPES LESS THAN 4"Ø

HIGH DENSITY INSULATION INSERT OR,

FOR APPLICATIONS PERMITTED IN

SPECIFICATIONS, STEEL SADDLE FILLED

WITH INSULATION.

NOTES:

1. REFER TO SPECIFICATIONS FOR MORE INFORMATION.

2. SERVICE: RECOMMENDED FOR SUSPENSION OF INSULATED (HOT OR COLD) PIPE WHEN FLEXIBILITY OF THE CLAMP IS DESIREABLE.

½"

T=THICKNESS

STEEL PLATE

B

AC

45°

D

PIPE SIZE

A

B

C

D

T

ROD SIZE

CLEVIS SIZE

ROD TAP

PIN DIA.

PIN HOLE

GRIP

2"

1"

3 1/2"

3" 4" 6"

3 1/2" 3 1/2"

2" 2"

1" 1"

1/2" 5/8" 5/8"

3/8" 3/8" 3/8"

3/8" 1/2" 1/2"

2" 2" 2"

3/8" 1/2" 1/2"

3/8" 1/2" 1/2"

1/2" 5/8" 5/8"

1/2" 1/2" 1/2"

USE TURNBUCKLE IF BUILDING

CONNECTION DOES NOT PROVIDE

ADJUSTMENT

HEX NUT

PIPE SIZE

ROD

SIZE

GRINNELL ROD ATTACHMENT

CLEVIS FIG. 299

1/8" COTTER PIN

VERTICAL ELBOW

INSULATION

PIPE

ADJUSTABLE CLEVIS GRINNELL FIG. 65 OR

ADJUSTABLE CLEVIS GRINNELL FIG. 260

INSULATION

PIPE

HANGER ROD

INSULATION PROTECTION SHEILD: GRINNELL

FIG. 167 (SIZE RANGE 1/2" THRU 24" PIPE WITH

INSULATION THICKNESS OF 1/2", 3/4", 1", 1-1/2",

AND 2")

PIPE COVERING PROTECTION SADDLE

SINGLE PIPE ROLLER COMPLETE

GRINNELL FIG. #171

HANGER ROD

PROVIDE A SECTION OF HIGH

COMPRESSION STRENGTH INSULATION

AT EACH HANGER POINT. INSULATION

MAY BE HALF ROUND OR FULL ROUND

AND EXTEND 2" BEYOND GALV. SHIELD

EACH WAY.

PROVIDE A SECTION OF HIGH COMPRESSION

STRENGTH INSULATION AT EACH HANGER POINT.

INSULATION MAY BE HALF ROUND OR FULL ROUND

AND EXTEND 2" BEYOND GALV. SHIELD EACH WAY.

PIPE CL

PIPE ℄

PIPE ℄

8" x 8" x 3/8" [203 x 203 x 8mm] STEEL PLATE

WELD PLATE TO

PIPE

SECURE TO ROOF SLAB WITH

(4) 3/8" [10mm] EXPANSION

BOLTS OR WELD TO STEEL

DECK

CONCRETE ROOF SLAB OR

STEEL ROOF DECK

ROOF SYSTEM

INSULATION AND

MEMBRANE

PRE-MOULDED FLEXIBLE

PIPE COUNTER FLASHING

CLAMPING RING

ROOF SURFACE

WELD PIPE SADDLE

SUPPORT TO PIPE.

PROVIDE WATER TIGHT

CONNECTION.

HIGH COMPRESSIVE

STRENGTH INSULATION

INSERT UNDER SHIELD

PIPE AND

INSULATION

INSULATION PROTECTION

SHIELD

SEALANT

2" [50mm] STEEL PIPE

2-1/2" [65mm] STEEL PIPE

PROVIDE VAPOR BARRIER

AS SPECIFIED ON PIPING

CONVEYING FLUID TO

DEGREE ____°F [ ___°C]

NOTES:

1. PROVIDE RESTRAINING CLAMPS 8'-0" [2,4m] O.C.

m m

[8 m m m m

[1

M

IN

[4

PROVIDE ALUMINUM

JACKET

FULL SIZE CONNECTION

CONDENSATE

DRAIN

UNION

UNION

MAX. UNIT

TOTAL S.P. + 2"

PITCH CONDENSATE

DRAIN LINE TO NEWEST

GUTTER DRAIN

1" MIN. CLEARANCE

PIPE SLEEVE DETAIL PIPE THRU FLOOR DETAIL

INSTALL AN ESCUTCHEON AROUND PIPES

EXPOSED IN FINISHED ROOMS. FOR ALL

INSULATED PIPING INSTALL A PLASTIC JACKET

EXTENDING 6" BEYOND THE WALL TO PROTECT

INSULATION FROM DAMAGE.

MAKE A SMOOTH ROUND OPENING IN WALL

SLIGHTLY LARGER THAN OUTSIDE DIAMETER

OF THE PIPE AND INSULATION.

ADD A BEAD OF NON-HARDENING

CAULK IN THE ANNULAR SPACE.

NOTES:

1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO CONTINUE THE INSULATION AND VAPOR BARRIER THROUGH ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT DAMAGING INSULATION, AND TO SEAL

AIRTIGHT AROUND INSULATED AND UNINSULATED PIPES FOR NOISE TRANSMISSION CONTROL.

2. FLOOR OPENINGS ARE SIMILAR. SEE SPECIFICATIONS FOR DIFFERENCES BETWEEN FLOOR AND WALL

PENETRATIONS.

3. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

FIRE SEALANT

NOTE 2

NOTE 3

NOTE 4

NOTE 4

PIPE

NOTE 2

NOTE 3

FIRE RATED WALL

(CONSTRUCTION VARIES)

FIRE RATED FLOOR

(CONSTRUCTION VARIES)

NOTES:

1. THIS DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL MOVEMENT. REFER TO SPECIFICATIONS FOR SELECTION OF THROUGH PENETRATION FIRE

STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE

SIZE SHALL ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF

PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.

4. WATER-TIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME. SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY BE

ENCLOSED IN ONE FRAME.

NON-FIRE RATED WALL(OR FLOOR)

(CONSTRUCTION VARIES)

NOTE 2

P

IP

E

FINISHED

FLOOR

INSULATION

METAL JACKET

WATERPROOF

SEALANT

BACKUP

MATERIAL

PIPE WITH

INSULATION

PIPE SLEEVE

ESCUTCHEON AT

EXPOSED AREAS

ONLY

PIPE WITHOUT

INSULATION

(±)1/8"

LUG, COUPLING,

OR HUB

RISER CLAMP

INSULATION AND

NEOPRENE MOUNTS

INSULATION

SEAL OPENING,

FIRESTOP IF

REQUIRED.

FLOOR

P

IP

E

PIPE SLEEVE

BACKUP MATERIAL

WATERPROOF

SEALANT (NOTE 1)

PIPE INSULATION

ESCUTCHEON (TYP)

INTERIOR SIDE OF

EXTERIOR WALL

INSULATED PIPE

SLEEVE THRU WALL

ABOVE GRADE

BARE PIPE SLEEVE

THRU WALL ABOVE

GRADE

WATERPROOF

SEALANT

(NOTE 1)

INTERIOR SIDE OF

EXTERIOR WALL

NOTES:

1. SEALANT-JOINT 1/4" WIDE MIN. BY 3/8" DEEP MIN.

NOTES:

1. CONTRACTOR SHALL COORDINATE EXHAUST

SILENCER HEIGHT WITH ANY ELECTRICAL CONDUIT.

STAINLESS STEEL JACKETED

EXHAUST PIPE (ASTM A53 SCH.10)

WITH 4" THICK CALCIUM SILICATE

INSULATION. PIPE SHALL BE SIZED

BY MUFFLER SELECTION.

ROOF

UNISTRUT SUPPORTS

SECURED TO Z-PURLIN

ENGINE EXHAUST SILENCER WITH

STAINLESS STEEL JACKETED 4" THICK

CALCIUM SILICATE INSULATION

MOUNTING BRACKET - SADDLE TYPE

WITH GALV. METAL PROTECTIVE SHIELD

FLANGED SPOOL WITH GASKET.

LENGTH AS REQUIRED

STAINLESS STEEL FLEXIBLE CONNECTOR

WITH GASKETS AT EACH FLANGE

Y-HEADER (IF REQUIRED)

ENGINE OUTLINE

EXHAUST FLANGE (ASTM

A53 SCH.10) OUTLET WITH

GASKET

STEEL (ASTM A53 SCH.10)

FLOATING FLANGE WITH GASKET

PROVIDE GENERATOR EXHAUST

PIPE SUPPORT

BUILDING

ALL-THREAD

HANGER RODS

WALL THIMBLE

OPTIONAL MOUNTING BRACKET -

BACK TO BACK STEEL CHANNEL

WITH WELDED STITCH PLATE

TRAPEZE TYPE

LONG SWEEP ELBOW

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:1

P

M

AW RAWMAY 15, 2023

M-102

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDMECHANICAL DETAILS 636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

NTS

PIPE SUPPORTS DETAIL

NTS

PIPE SUPPORT ON ROOF

NTS

TYPICAL CONDENSATE TRAP DETAIL

NTS

PIPE PENETRATIONS DETAIL

1/4" = 1'-0"

EXHAUST SILENCER SUPPORT

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

G ra p h ic S ca le

/2

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

A/E:Consultant:

Approved: Spinklered

Office of Construction and Facilities Management FULLY SPRINKLERED

B

IM

/V

IS

N

O m a h a

E H

R M

/O m a h a

E H

R M

V

.r v t

/2

/2

:0

:2

P

M

AW RAWMAY 15, 2023

M-103

636 - OMAHA VA MEDICAL CENTER

ISSUE FOR BIDMECHANICAL SCHEDULES 636-21-704OMAHA EHRM INFRASTRUCTURE

UPGRADE DESIGN

4. ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECT SWTICH.

3. PROVIDE MICROPROCESSOR CONTROL, THERMOSTAT, BACNET INTERFACE, LOW AMBIENT WIND BAFFLE KIT, INTEGRAL CONDENSATE PUMP, SECONDARY DRAIN PAN WITH WATER LEAK SENSOR. CONDENSER PAD. INSTALL PER MANUFACTURER GUIDELINES.

2. LOCATIONS OF CONDENSING UNITS ARE SCHEMATIC IN NATURE. CONTRACTOR SHALL COORDINATE FINAL PLACEMENT OF CONDENSING UNITS WITH VA.

1. BASED ON LG LAU1480HYV3 OUTDOOR UNIT AND LG LAN180HYV3 INDOOR UNIT.

NOTES:

9-ASHP-1 9 B12A WALL MT. SPLIT 813 0.2 18 24 80 67 [ 95 ] [ 22 ] 70 90 [ -4 ] - TSTAT - DDC 14.81 DIRECT 19 1 208/230 R410A 164 SEE NOTES 1,2,3,4

CFM IN MBH °F °F °F MBH °F °F °F AMPS CONTROL AMPS CONTROL

Db Wb

TOTAL

CAPACITY MIN SEER

EAT OSA DESIGN

TEMP

MIN. HEAT

CAPACITY

EAT

Db

LAT

Db

OSA DESIGN

TEMP

INDOOR FAN OUTDOOR UNIT FAN

MCA PHASE VOLT

MARK BLDG ROOM TYPE

TOTAL SUPPLY

AIR FLOW

EXT STATIC

PRESSURE

CAPACITY HEATING CAPACITY ELECTRICAL DATA

REFRIG.

PIPE LENGTH

MAX. FT

REMARKS

SPLIT SYSTEM AIR CONDITIONER / EVAPORATOR SCHEDULE

1. SEE DETAIL FOR DAMPER IN BRANCH DUCT SERVING EACH DIFFUSER.

NOTES:

SD-53 150 350 0.1 DUCT MOUNTED 12x12 10x10 19 OBD WHITE SEE NOTE 1

SD-13 110 380 0.09 CEILING 24x24 10Ø 22 OBD WHITE SEE NOTE 1

SD-12 70 280 0.1 CEILING 24x24 8Ø 23 OBD WHITE SEE NOTE 1

CFM CFM IN WG IN X IN IN DB

MIN MAXMARK

AIRFLOW

MAX APD

MOUNTING

PANEL/FRAME SIZE NECK SIZE NOISE CRITERIA

DAMPER FINISH REMARKS

AIR DEVICE SCHEDULE (SUPPLY)

2. OMIT FIRE PROTECTION DUE TO SPACE LIMITATIONS AND/OR LACK OF EXISTING SPRINKLER SYSTEM. SPACE TO HAVE FIRE-SMOKE ALARM SYSTEM.

VARIANCES: 1. IT RACK COOLING LOAD PER 35% COMMENTS BY OMAHA VA AND MEETING WITH VA-OIT FEB-24-2022.

* 35% VA COMMENTS: Cooling per TR/number of racks will be as follows. We need 5kW per rack, however in aggregate we don't need 5kW for each of four racks. Update standard and TR design checklist with new language, applicable for both new construction and renovations.

1 rack TR = 5kW (e.g. single 5kW cooling unit).

2 rack TR = 7kW (e.g. 3.5kW x2 cooling units).

3 rack TR = 8.5 kW (e.g. 3.5kW + 2.5kW x2 cooling units).

4 rack TR =10kW (e.g. 2.5kW x4 or 5kW x2 cooling units).

Other designs meeting these maximum expected aggregated load levels are acceptable. Multiple smaller units will assist in avoiding equipment freeze-up in some types of equipment.

** Meeting with VA-OIT Feb-24-2022: MCR to use existing equipment with 80kw load.

ACC 2433 3 TR >96 - EXISTING DX EXISTING N 1 WS Remain as it. DDC upgrades for monitoring only.

ACC 2011 4 TR >96 - EXISTING DX EXISTING N 1 WS Remain as it. DDC upgrades for monitoring only.

ACC 1433 3 TR >96 - EXISTING DX EXISTING N 1 WS Remain as it. DDC upgrades for monitoring only.

ACC 1011 3 TR >96 - EXISTING DX EXISTING N 1 WS Remain as it. DDC upgrades for monitoring only.

ACC G433 6 TR >96 - EXISTING DX EXISTING N 1 WS Remain as it. DDC upgrades for monitoring only.

ACC G011 3 TR >96 - EXISTING DX EXISTING N 1 WS Remain as it. DDC upgrades for monitoring only.

D OFFICES 109 Telecommunications Rm 1 TE <96 5 kw (17,060 btu/hr) NONE NONE N 1 NONE Design alert eliminate fire protection and cooling.

15 Research R200A Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

9 DIALYSIS B12A Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser 8 OFFICES 104A Telecommunications Rm 1 TE <96 5 kw (17,060 btu/hr) NONE NONE N 1 NONE Design alert eliminate fire protection and cooling.

6 DENTAL 109 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

2 BOILER PLANT 202 Telecommunications Rm 1 TE <96 5 kw (17,060 btu/hr) NONE NONE N 1 NONE Design alert eliminate fire protection and cooling.

1 14002 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser 1 12018 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 11414 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 10414 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 9414 Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 8414 Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser 1 7414 Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 6414 Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 5414 Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 4374A Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser 1 3254B Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 2448 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 2255A Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 1656 Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 1616 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser 1 1510 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 1205B Telecommunications Rm 3 TR >96 8.5 kw (29,002 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 B721 Telecommunications Rm 34 TR >96 80 kw (272,960 btuh) EXISTING DX NONE N + 1 3 WS Existing CRAC units to remain. Qty (2) 105 kw cooling capacity.

1 B611 Telecommunications Rm 1 TR >96 5 kw (17,060 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser 1 B818A Telecommunications Rm 2 TR >96 7 kw (23,884 btu/hr) DX NONE N 1 WS Dedicated CRAC with air cooled condenser

1 B024C Telecommunications Rm 3 TR >96 8.5 kw (29,002 btu/hr) DX NONE N 3 WS Dedicated CRAC with air cooled condenser

NUM. NUM. NUM. QTY TE / TR <96 OR >96

PER VA COMMENTS

OIT/OMAHA VARIANCE

DX / CW / VAV

DX-Vertiv-Encl

DRY FOG /

NONE

N 1 / 2 / 3 / 4 CA (clean agent) WS (wet system)

CA-Vertiv-Encl / NONE

BLDG ROOM ROOM NAME IT RACKS ROOM TYPE

QTY WORK

AREA

OUTLETS

HEAT LOAD

BASIS OF DESIGN

HVAC SYSTEM

TYPE

HUMIDIFIER

CRITICAL

REDUNDANCY

LEVEL

ANSI/TIA-9

43-B

RATING

FIRE SUPPRESSION

SYSTEM TYPE

NOTES

OIT TR ROOM DESIGN INPUT COORDINATION SCHEDULE: *INCLUDES CHANGES FROM VARIANCES, DESIGN ALERTS, MEETINGS, AND

COMMENTS

5. INTERLOCK DAMPER OPERATION WITH EXHAUST FAN.

4. INTERLOCK DAMPER OPERATION WITH GENERATOR.

3. CONTROLS PROVIDED BY CONTROLS CONTRACTOR.

2. PROVIDE LOUVER WITH INSULATED LOW LEAKAGE DAMPER. SPRING OPEN WITH ACTUATOR POWERED CLOSED. PROVIDE 1/4" MESH BUG SCREEEN.

1. LOUVER SHALL BE BLAST AND MISSILE RATED. REFER TO SPECIFICATIONS FOR DETAILS.

NOTES:

G-IAL-3 G-ME101 GENERATOR INTAKE POTTORFF / EFD-637 114 x 104 19,000 400 0.02 SEE NOTES 1-5.

G-IAL-2 G-ME101 GENERATOR INTAKE POTTORFF / EFD-637 114 x 104 19,000 400 0.02 SEE NOTES 1-5.

G-IAL-1 G-ME101 GENERATOR INTAKE POTTORFF / EFD-637 114 x 86 19,000 459 0.02 SEE NOTES 1-5.

G-EAL-3 G-ME101 GENERATOR EXHAUST POTTORFF / EDD-637 40 x 36 3,450 655 0.05 SEE NOTES 1-5.

G-EAL-2 G-ME101 GENERATOR EXHAUST POTTORFF / EFD-637 114 x 86 28,500 689 0.02 SEE NOTES 1-5.

G-EAL-1 G-ME101 GENERATOR EXHAUST POTTORFF / EFD-637 114 x 86 28,500 689 0.02

KYNAR FINISH. REFER TO

ARCHITECTURAL

PLANS FOR COLOR.

SEE NOTES 1-5.

IN CFM F/m IN WG

MARK LOCATION SYSTEM AND/OR SERVICE MANUFACTURER / MODEL

SIZE (W x H) AIRFLOW

FREE AREA

VELOCITY

SP IN WC

FINISH REMARKS

LOUVER SCHEDULE

5. VERTIV TO PROVIDE A 277 V STEP-DOWN TRANSFORMER AS REQUIRED.

4. PROVIDE UNIT WITH FACTORY SUPPLIED CONDENSATE PUMP AS REQUIRED. PUMP TO BE INSTALLED IN FIELD PER MANUFACTURER'S RECOMMENDATIONS.

3. PROVIDE UNIT WITH FACTORY MOUNTED FUSED INTEGRAL DISCONNECT SWITCH.

2. RE-HEAT COIL SHALL BE WIRED AND CONTROLLED TO LOCK-OUT, TURN OFF, DURING EMERGENCY GENERATOR OPERATION.

1. PROVIDE MICROPROCESSOR CONTROL, PROGRAMMABLE THERMOSTAT, BACNET INTERFACE, DISCONNECT SWITCH, CONDENSATE PUMP, AIR FILTER BOX, WIRE MESH RETURN GRILLE, SUPPLY FLANGE, SECONDARY DRAIN PAN WITH WATER LEAK SENSOR. INSTALL PER MANUFACTURER GUIDELINES. INSULATE SUPPLY DUCTS AND TRANSITIONS WITH 2" WRAP.

NOTES:

15-CRAC-1 15 R200A DX CRAC INDOOR UNIT 750 0.3 18.5 16.5 75.0 61 16.3 208 1 Ø 60 20.2 25.3 30 54 x 30 x 20 225 LIEBERT MINI-MATE2 / MMD18E NOTES:…