Attachment 01 Additional Questions and Answers.pdf
PDF 111 KB Posted
- Attached to
- Y1DA--Copy of EHRM Infrastructure Upgrades - Construction - Omaha VAMC DUPLICATE OF 36C776230036
- Solicitation number
- 36C77623B00361
About this file
This document contains additional questions and answers pertaining to a federal solicitation for infrastructure upgrades at the Omaha Veterans Affairs Medical Center. The solicitation seeks a contractor to supply and install a backup generator meeting specifications, provide training on new equipment including the generator, and review proposed UPS and electrical configurations to determine if they meet intended requirements. No additional network equipment will be provided by the VA. The related federal contract opportunity is for EHRM infrastructure upgrades and construction at the Omaha VAMC with solicitation number 36C77623B00361 from the Department of Veterans Affairs Technology Acquisition Center in Austin.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Additional Questions and Answers: Omaha EHRM 636-21-704
Q1. Will the Generator be government provided contractor installed equipment?
A1. No, contractor will supply the generator per specifications.
Q2. What will be the duration for training/certification, and will there be any costs?
A2. Training shall be supplied on any new equipment, especially generator. Exact duration is not available.
Q3. Does the VA have extra network equipment (Switch gear, routers, UPS's) to keep the network connected during construction and cut over between the old network room and the new network room?
A3. No
Q4. Input Breaker (600A) and to the Bypass Input Breaker (600A). This is not needed as we would be supplying the configuration as a dual-input UPS with a Maintenance Bypass cabinet that has the two
(2) needed sub feed breakers (for both Server and Phone PDU’s) integrated. Please confirm this configuration will be acceptable.
A4. VA would need to review the equipment proposed to use to determine if it met the intended requirements to delete circuit breakers.
Q5. Refer to Drawing Sheet 01-EP110. The UPS System is equipped with EPO (Emergency Power Off)
Dry contacts. The breakers feeding the UPS in UPSDPA and UPSDPB will not need to be shunt-tripped. Please confirm this configuration will be acceptable.
A5. VA would need to review the equipment proposed to use to determine if it met the intended requirements.