36C77623B0036-1 0005.docx

DOCX document 24 KB Posted

Attached to
Y1DA--Copy of EHRM Infrastructure Upgrades - Construction - Omaha VAMC DUPLICATE OF 36C776230036
Solicitation number
36C77623B00361
Issued by

About this file

This amendment modifies a solicitation for infrastructure upgrades at the Omaha Veterans Affairs Medical Center. The amendment extends the bid response date to August 4, 2023 at 2:00 PM Eastern Time. It provides responses to technical questions from offerors in Attachment 1, additional flooring specifications in Attachment 2, technology notes in Attachment 3, and mechanical drawings in Attachment 4. The scope of work includes EHRM infrastructure upgrades for Project 363-21-704. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency.

View the file

Other files

File Type Posted
Attachment 01 Question and Answer.docx DOCX document
36C77623B0036-1 0008.docx DOCX document
Attachment 01 Additional Questions and Answers.pdf PDF
Attachment 02 Spec 01 00 00 -2 POP Rev1.pdf PDF
Attachment 04 Additional Drawings.pdf PDF
36C77623B0036-1 0007.docx DOCX document
Attachment 03 Additional Drawing Sheet List.pdf PDF
ATTACHMENT 01 - SPECIFICATIONS SECTION 27 COMMUNICATIONS.zip ZIP file
36C77623B0036-1 0006.docx DOCX document
ATTACHMENT 02 - 09 65 19 19 STATIC DISSIPATIVE TILE.pdf PDF
Attachment 01 Omaha EHRM V21 - RFI Responses.pdf PDF
Attachment 03 Tech Notes 636 704.B01.00 TN001.T.20230726.pdf PDF
Attachment 04 Omaha EHRM Addendum Mech Drawings.pdf PDF
Attachment 02 09 65 16 Resiliant Tile Flooring.pdf PDF
36C77623B0036-1 0004.docx DOCX document
Davis Bacon Wage Determinations.pdf PDF
36C77623B0036-1 0003.docx DOCX document
36C77623B0036-1 0002.docx DOCX document
Attachment 1 Site Visit Sign In EHRM Infrastructure Upgrades Construction.pdf PDF
36C77623B0036-1 0001.docx DOCX document
Attachment 09 VA-Omaha EHRM Civil_20230515 - Drawing.pdf PDF
Attachment 06 Omaha EHRM Structural_20230515 - Drawing.pdf PDF
Attachment 03 Specification vol 1 Rev1.pdf PDF
Attachment 07 OMAHA VA EHRM_BID SET_ELECTRICAL - Drawing.pdf PDF
Attachment 04 OMAHA VA EHRM_BID SET_ARCHITECTURAL - drawings.pdf PDF
Attachment 05 OMAHA VA EHRM_BID SET_MECHANICAL - Drawing (1).pdf PDF
Attachment 14 Specification Vol 2 Rev1.pdf PDF
Attachment 08 OMAHA VA EHRM_BID SET_TECHNOLOGY - Drawing.pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical (2).pdf PDF
Attachment 02 Omaha EHRM 100 Narrative Mechanical.pdf PDF
Attachment 01 Omaha EHRM 100 Narrative Elec Revised.pdf PDF
Attachment 16 Service Contract Wage Determinations.gov.pdf PDF
Attachment 10 DBA Wage Determination 4.13.2023.gov.pdf PDF
Attachment 15 HEFP SEP SOP Process Flow Data Center Phase v1.0.pdf PDF
Attachment 13 - Site Visit EHRM Minor Construction Project- Omaha.docx DOCX document
Attachment 11 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 12 - Limitations on Subcontracting - Construction.docx DOCX document
36C77623B0036-1_1.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to extend bid date and provide responses to questions

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF

SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the soli citation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF

FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.

NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO

AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) July 26, 2023 636-21-704 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77623B0036-1 06-28-2023

X X X August 4, 2023, at 2:00 PM Eastern Time X Project: EHRM Infrastructure Upgrades - Omaha Project 363-21-704

The purpose of this amendment is to is to provide responses to technical questions and provide additional specifications and drawings.

See the following continuation page and the corresponding attachments.

Shon Johnson Contracting Officer

CONTINUATION PAGE

Continuation:

List of attachments:

a. Response to RFIs – Attachment 01

b. Resilient Flooring Plan – Attachment 02

c. Technology Notes – Attachment 03

d. Mechanical Drawings – Attachment 04 M-102 M-103 M-105

G-ME101

See attached document: Attachment 01 Omaha EHRM V21 - RFI Responses.

See attached document: Attachment 02 09 65 16 Resiliant Tile Flooring.

See attached document: Attachment 03 Tech Notes 636 704.B01.00 TN001.T.20230726.

See attached document: Attachment 04 Omaha EHRM Addendum Mech Drawings.

End of Document