ATTACHMENT 02 - 09 65 19 19 STATIC DISSIPATIVE TILE.pdf
PDF 219 KB Posted
- Attached to
- Y1DA--Copy of EHRM Infrastructure Upgrades - Construction - Omaha VAMC DUPLICATE OF 36C776230036
- Solicitation number
- 36C77623B00361
About this file
This document outlines the technical specifications for the installation of static dissipative flooring at a Veterans Affairs medical center. The flooring must be static dissipative vinyl tile composed of polyvinyl chloride, meeting standards for size, thickness, indentation resistance, slip resistance, and fire performance. The tile must be 1/8 inch thick, in 12 inch squares, and available in colors and patterns specified in construction drawings. Installation must follow the manufacturer's recommendations and industry standards, including substrate testing and preparation, acclimation of materials, layout of tiles, use of adhesives and underlayments, heat welding of seams, and application of sealants and edge trims. The flooring installer must have three years' experience and proper industry certification. Upon completion, the flooring must be cleaned, protected, and warranted against defects for five years.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs for infrastructure upgrades including construction work at the Omaha VA Medical Center. No further details are provided on required products, response dates, or value.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
05-01-18
09 65 19.19 - 1
SECTION 09 65 19.19
STATIC DISSIPATIVE FLOORING
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies the installation of static dissipative flooring and accessories required for a complete installation.
1.2 RELATED WORK:
A. Sustainable Design Requirements: Section 01 81 13, SUSTAINABLE
CONSTRUCTION REQUIREMENTS.
B. Resilient Base: Section 09 65 13, RESILIENT BASE AND ACCESSORIES.
C. Subfloor Testing and Preparation: Section 09 05 16, SUBSURFACE
PREPARATION FOR FLOOR FINISHES.
D. Removal of Existing Construction Containing Asbestos:
Section 02 82 13.19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.
E. Color, Pattern and Texture for Resilient Tile Flooring and Accessories:
Section 09 06 00, SCHEDULE FOR FINISHES.
1.3 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Sustainable Design Submittals as described below:
1. Volatile organic compounds per volume as described in
PART 2 - PRODUCTS.
2. Postconsumer and preconsumer recycled content as described in
PART 2 - PRODUCTS.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Resilient material manufacturer’s recommendations for adhesives, underlayment, primers, and polish.
3. Application, installation and maintenance instructions.
D. Samples:
1. Tile: Each type, color, thickness and finish.
2. Edge Strips: Each type, color, thickness and finish.
3. Feature Strips: Each type, color, thickness and finish.
E. Shop Drawings:
1. Layout of patterns as shown on the construction documents.
2. Edge strip locations showing types and detail cross sections.
F. Test Reports:
09 65 19.19 - 2
1. Abrasion resistance: Depth of wear for each tile type and color and volume loss of tile, certified by independent laboratory. Tested per
ASTM F510/F510M.
2. Moisture and pH test results as per Section 09 05 16, SUBSURFACE
PREPARATION FOR FLOOR FINISHES.
1.4 DELIVERY:
A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.
B. Materials from containers which have been distorted, damaged or opened prior to installation are not acceptable.
1.5 STORAGE:
A. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives, and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.
1.6 QUALITY ASSURANCE:
A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program.
1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:
a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.
b. Career long training.
c. Manufacturer endorsed training.
d. Fundamental journeyman skills certification.
SPEC WRITER NOTE: Mock-up must be approved by Contracting Officer Representative (COR) in the project’s design stage before including requirement in specification.
C. Furnish product type materials from the same production run.
09 65 19.19 - 3
1.7 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of
Construction”.
B. Resilient Flooring: Submit a written warranty executed by the manufacturer, agreeing to repair or replace resilient flooring that fails within the warranty period.
C. Limited Warranty Period: 5 years D. Limited Warranty shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under the requirements of the Contract Documents.
1.8 APPLICABLE PUBLICATIONS:
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. ASTM International (ASTM):
D2047-11................Test Method for Static Coefficient of Friction of Polish-Coated Flooring Surfaces as Measured by the James Machine
D2240-05(R2010).........Test Method for Rubber Property—Durometer
Hardness
D4078-02(R2008).........Water Emulsion Floor Finish
E648-14c................Critical Radiant Flux of Floor Covering Systems
Using a Radiant Energy Source
E662-14.................Specific Optical Density of Smoke Generated by
Solid Materials
E1155/E1155M-14.........Determining Floor Flatness and Floor Levelness
Numbers
F510/F510M-14...........Resistance to Abrasion of Resilient Floor
Coverings Using an Abrader with a Grit Feed
Method
F710-11.................Preparing Concrete Floors to Receive Resilient
Flooring
F1869-11................Test Method for Measuring Moisture Vapor
Emission Rate of Concrete Subfloor Using
Anhydrous Calcium Chloride
F2170-11................Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in Situ Probes
C. Code of Federal Regulation (CFR):
09 65 19.19 - 4
40 CFR 59...............Determination of Volatile Matter Content, Water
Content, Density Volume Solids, and Weight
Solids of Surface Coating
E. International Standards and Training Alliance (INSTALL):
F. ASTM International:
a. ASTM E 648 Standard Test Method for Critical Radiant Flux of
Floor-Covering Systems Using a Radiant Heat Energy Source
b. ASTM E 662 Standard Test Method for Specific Optical Density of
Smoke Generated by Solid Materials
c. ASTM F 710 Standard Practice for Preparing Concrete Floors to
Receive Resilient Flooring
d. ASTM F 1066 Standard Specification for Vinyl Composition Tile
e. ASTM F 1482, Standard Guide to Wood Underlayment Products
Available for Use Under Resilient Flooring
f. ASTM F 1861 Standard Specification for Resilient Wall Base
g. ASTM F 1869 Standard Test Method for Measuring Vapor Emission
Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
h. ASTM F 2170 Standard Test Method for Determining Relative
Humidity in Concrete Floor Slabs Using in situ Probes G. National Fire Protection Association (NFPA):
a. NFPA 253 Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source
b. NFPA 258 Standard Test Method for Measuring the Smoke Generated by Solid Materials
H. Canadian Standards
a. CAN/ULC-S102.2 Surface Burning Characteristics of Flooring, Floor
Covering and Miscellaneous Materials and Assemblies I. ANSI/ESD Standards
a. ANSI/ESD STM 7.1 :Floor Materials—Resistive Characterization of Materials
b. ANSI/ESD STM 97.1: Floor Materials and Footwear—Resistance in Combination with a Person
c. ANSI/ESD STM 97.2: Floor Materials and Footwear Voltage Measurement in Combination with a Person
J.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS:
A. Provide adhesives, underlayment, primers, and polish recommended by resilient floor material manufacturer.
1. Description: Static dissipative vinyl tile composed of polyvinyl chloride resin, plasticizers, fillers, pigments, and antistatic additive with colors and texture dispersed uniformly throughout its thickness.
2. Tile shall meet size, thickness, indentation, impact, deflection, dimensional stability, resistance to chemicals, squareness, and resistance to heat requirements of ASTM F 1066 Standard Specification for Vinyl Composition Tile, Class 2, through pattern.
3. Pattern and Color: as shown in drawings
4. Size: 12 in. x 12 in.
5. Thickness: 1/8"/0.125 in. (3.2mm)
09 65 19.19 - 5
B. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per
ASTM E648.
C. Smoke Density: Less than 450 per ASTM E662.
1. Fire Performance Characteristics: Provide resilient vinyl composition tile flooring with the following fire performance characteristics as determined by testing material in accordance with ASTM test methods indicated below by a certified testing laboratory or other testing agency acceptable to authorities having jurisdiction:
1. CAN/ULC-S102.2 – Flame Spread Rating and Smoke Developed – Results as tested.
D. Slip Resistance – Not less than 0.5 when tested with ASTM D2047.
2.2 RUBBER TILE:
A.
2.3
2.5
2.6 ADHESIVES:
A. Provide water resistant type adhesive for flooring, base and accessories as recommended by the manufacturer to suit substrate conditions. VOC content to be less than the 50 grams/L when calculated according to 40 CFR 59 (EPA Method 24). Submit manufacturer’s descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.
2.7 PRIMER FOR CONCRETE SUBFLOORS:
A. Provide in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR
FLOOR FINISHES.
2.8 LEVELING COMPOUND FOR CONCRETE FLOORS:
A. Provide cementitious products with latex or polyvinyl acetate resins in the mix in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR
FLOOR FINISHES.
2.9 POLISH AND CLEANERS:
A. Cleaners: As recommended in writing by floor tile manufacturer.
B. Polish: ASTM D4078.
SPEC WRITER NOTE: Verify that mouldings are shown on construction documents.
09 65 19.19 - 6
2.10 MOULDING:
A. Provide tapered mouldings of vinyl and types as indicated on the construction documents for both edges and transitions of flooring materials specified. Provide vertical lip on moulding of maximum 6 mm
(1/4 inch). Provide bevel change in level between 6 and 13 mm (1/4 and
1/2 inch) with a slope no greater than 1:2.
B. For sealing joints between the top of wall base or integral cove cap and irregular wall surfaces such as masonry, provide plastic filler applied according to the manufacturer's recommendations.
C. Provide transition/reducing strips tapered to meet abutting materials.
D. Provide threshold of thickness and width as shown on the drawings.
E. Provide resilient edge strips of width shown on the drawings, of equal gauge to the flooring, homogeneous vinyl or rubber composition, tapered or bullnose edge, with color to match or contrast with the flooring, or as selected by the Architect from standard colors available.
F. Provide metal edge strips of width shown on the drawings and of required thickness to protect exposed edges of the flooring. Provide units of maximum available length to minimize the number of joints.
Use butt-type metal edge strips for concealed anchorage or overlap-type metal edge strips for exposed anchorage. Unless otherwise shown, provide strips made of extruded aluminum with a mill finish.
G. Fasteners for Aluminum Mouldings: Stainless steel of type required for substrate condition.
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS:
A. Maintain flooring materials and areas to receive resilient flooring at a temperature above 20 degrees C (68 degrees F) for three (3) days before application, during application and two (2) days after application, unless otherwise directly by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C (55 degrees F) thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
B. Do not install flooring until building is permanently enclosed and wet construction in or near areas to receive tile materials is complete, dry and cured.
3.2 SUBFLOOR TESTING AND PREPARATION:
A. Prepare and test surfaces to receive resilient tile and adhesive as per
Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.
09 65 19.19 - 7
1. Remove existing resilient floor and existing adhesive.
B. Prepare concrete substrates in accordance with ASTM F710.
C. Perform work regarding removal of flooring and adhesive containing asbestos as specified in Section 02 82 13.19, ASBESTOS FLOOR TILE AND
MASTIC ABATEMENT.
D. Subfloor Cleaning: The surface shall be free of dust, solvents, varnish, paint, wax, oil, grease, sealers, release agents, curing compounds, residual adhesive, adhesive removers and other foreign materials that might affect the adhesion of resilient flooring to the concrete or cause a discoloration of the flooring from below. Remove residual adhesives as recommended by the flooring manufacturer. Remove curing and hardening compounds not compatible with the adhesives used, as indicated by a bond test or by the compound manufacturer's recommendations for flooring. Avoid organic solvents. Spray paints, permanent markers and other indelible ink markers must not be used to write on the back of the flooring material or used to mark the concrete slab as they could bleed through, telegraphing up to the surface and permanently staining the flooring material. If these contaminants are present on the substrate they must be mechanically removed prior to the installation of the flooring material.
E. Concrete pH Testing: Perform pH tests on concrete floors regardless of their age or grade level. All test results shall be documented and retained.
3.3 INSTALLATION:
A. Install in accordance with manufacturer's instructions for application and installation unless specified otherwise.
B. Mix tile from at least two containers. An apparent line either of shades or pattern variance is not acceptable.
C. Tile Layout:
1. If layout is not shown on construction documents, lay tile symmetrically about center of room or space with joints aligned.
2. Vary edge width as necessary to maintain full size tiles in the field, no edge tile to be less than 1/2 the field tile size, except where irregular shaped rooms make it impossible.
09 65 19.19 - 8
3. Place tile pattern in the same direction; do not alternate tiles unless specifically indicated in the construction documents to the contrary.
D. Application:
1. Adhere floor tile to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
2. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
3. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.
4. Roll tile floor with a minimum 45 kg (100 pound) roller.
E. Install flooring with adhesives, tools, and procedures in strict accordance with the manufacturer's written instructions. Observe the recommended adhesive trowel notching, open times, and working times.
E. Seal joints at pipes with sealants in accordance with Section 07 92 00, JOINT SEALANTS.
F. Installation of Edge Strips:
1. Locate edge strips under center line of doors unless otherwise shown on construction documents.
2. Set resilient edge strips in adhesive. Anchor metal edge strips with anchors and screws.
3. Where tile edge is exposed, butt edge strip to touch along tile edge.
4. Where thin set ceramic tile abuts resilient tile, set edge strip against floor file and against the ceramic tile edge.
3.4 CLEANING AND PROTECTION:
A. Clean adhesive marks on exposed surfaces during the application of resilient materials before the adhesive sets. Exposed adhesive is not acceptable.
B. Keep traffic off resilient material for a minimum 72 hours after installation.
C. Clean flooring as recommended in accordance with manufacturer’s printed maintenance instructions and within the recommended time frame. As
09 65 19.19 - 9 required by the manufacturer, apply the recommended number of coats and type of polish and/or finish in accordance with manufacturer’s written instructions.
D. When construction traffic occurs over tile, cover resilient materials with reinforced kraft paper properly secured and maintained until removal is directed by COR. At entrances and where wheeled vehicles or carts are used, cover tile with plywood, hardboard, or particle board over paper, secured and maintained until removal is directed by COR.
E. When protective materials are removed and immediately prior to acceptance, replace damaged tile and mouldings, re-clean resilient materials.
3.5 LOCATION:
A. Unless otherwise indicated in construction documents, install tile flooring, under areas where casework, laboratory and pharmacy furniture and other equipment occur.
B. Extend tile flooring for room into adjacent closets and alcoves.
- - - E N D - - -