SF330 Technical Question and Answer1 - Pgh Heinz PA.pdf
Standard Form PDF 94 KB Posted
- Solicitation number
- 36C77622R0035
About this file
This document contains a pre-solicitation notice and statement of work for architectural and engineering services related to an infrastructure upgrade project at a Veterans Affairs medical center campus. The Department of Veterans Affairs Technology Acquisition Center is seeking standard form 330 qualification packages from interested firms for a firm-fixed price design contract. The scope of work involves site visits, studies, and preparing drawings, specifications, and cost estimates to upgrade existing infrastructure to support a new electronic health record system at the VA Pittsburgh Healthcare System's H.J. Heinz campus. Key requirements include upgrades to electrical systems, communications infrastructure, and physical security. The pre-solicitation notice provides instructions for a two-phase selection process, with the contract set aside exclusively for service-disabled veteran-owned small businesses. The deadline for phase one SF330 submissions is April 4, 2022.
View the file
Other versions and copies of SF 330
Show all 20
Who attaches SF 330
| State | Files |
|---|---|
| Florida | 97 |
| Maryland | 41 |
| Pennsylvania | 23 |
| Washington | 21 |
| Texas | 19 |
Other files
| File | Type | Posted |
|---|---|---|
| 36C77622R0035_1.docx | DOCX document | |
| 36C77622R0035.docx | DOCX document | |
| PPQ.docx | DOCX document | |
| SOW _ EHRM Infrastructure Upgrades _ Pittsburgh Heinz_PA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Questions and Response Tracking Sheet - 36C77622R0035 - EHRM Infrastructure Upgrades Design Pittsburgh - Heinz, PA
Question#
Question
Receive Date
Question
Answered
Date Contractor Questions VA Response to Question
1 3/18/2022 3/24/2022
Is the design schedule (144 calendar days) included in the Statement of Work a negotiable Item?
Yes, the design schedule (144 calendar days) is negotiable up to 365 calendar days maximum for the total design process from award to completion.