This is a technical specification document (Section 09 67 23.30) for resinous epoxy base high performance flooring as part of a boiler plant project at the Sioux Falls VA Health Care System. The document specifies Sherwin-Williams HPF Resuflor SB as the basis of design, with detailed requirements for a multi-coat flooring system consisting of a primer coat (Resuprime MVB, 3-5 mils), broadcast coat with sand (Resuflor 3746 pigmented, 10-12 mils), grout coat (Resuflor 3741 Novalac, 12-15 mils), and topcoat (Resutile HTS 100, 3 mils).

The specifications include detailed performance requirements such as abrasion resistance, adhesion strength, coefficient of friction, compressive strength, and VOC content. Installation requirements specify ambient conditions between 65-85°F, relative humidity maximum of 80%, and proper moisture testing of concrete substrate. The contractor must have minimum 5 years experience in similar applications, and a mock-up is required for approval before proceeding with full installation. The document is part of VA project #438-22-900 and was issued as Addendum #3 dated 05-01-24.

View the file

Other files

File Type Posted
Structural Merged - Addendum 4.pdf PDF
Electrical - Addendum 4 Final Version.pdf PDF
438-22-900 Replace Boiler Plant QA 2 02-12-25.docx DOCX document
260533 - Raceways and Boxes for Electrical System - Addendum 4.pdf PDF
Civil Merged - Addendum 4.pdf PDF
AE121 - Addendum 4.pdf PDF
36C26324R0136 0006.docx DOCX document
102600 Wall and Door Protection - Addendum 4.pdf PDF
EP602 - PANEL SCHEDULES.pdf PDF
MQ100 - MECHANICAL EQUIPMENT PLAN.pdf PDF
EP101 - ELECTRICAL POWER PLAN FIRST FLOOR.pdf PDF
017419 Construction Waste Management.pdf PDF
CU101 5 - CIVIL UTILITY PLAN.pdf PDF
GI001.pdf PDF
AE600.pdf PDF
014535 Special Inspections - Schedule of SI.pdf PDF
085653 Blast Resistant Windows.pdf PDF
SB302.pdf PDF
SE201.pdf PDF
122400 Window Shades.pdf PDF
PL700-WATER FLOW DIAGRAM.pdf PDF
GI110.pdf PDF
230923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC Addendum 3.pdf PDF
SB101.pdf PDF
263213 Engine Generators.pdf PDF
232111 BOILER PLANT PIPING SYSTEMS_Addendum_3.pdf PDF
CK502 - CIVIL DETAILS.pdf PDF
E502 - ELECTRICAL DETAILS.pdf PDF
CS102 5-CIVIL SITE PLAN.pdf PDF
CK503 - CIVIL DETAILS.pdf PDF
EP603 - PANEL SCHEDULES.pdf PDF
EP604 - PANEL SCHEDULES.pdf PDF
312011 - Earthwork.pdf PDF
EP102 - ENLARGED ELECTRICAL ROOM PLANS.pdf PDF
PL101-PLUMBING PLANS.pdf PDF
CG103 5-CIVIL EROSION CONTROL PLAN.pdf PDF
019100 General Commissioning Requirements.pdf PDF
PL300-PLUMBING SECTIONS.pdf PDF
PL701-PLUMBING WATER RISER DIAGRAM.pdf PDF
ES105 - NEW TUNNEL PLAN.pdf PDF
336300 STEAM ENERGY DISTRIBUTION.pdf PDF
270511 Requirements for Communications Installations.pdf PDF
SF401.pdf PDF
271500 Communications Structured Cabling.pdf PDF
087100 Door Hardware.pdf PDF
MP500 - PIPING DETAILS.pdf PDF
AE121.pdf PDF
CD102 5 - CIVIL EXISTING CONDITIONS_ DEMOLITION PLAN.pdf PDF
262600 Power Distribution Units for Static Uninteruptable Power Systems.pdf PDF
ES106 - ELECTRICAL - SECURITY GATE PLAN.pdf PDF
Show 40 more

Latest 50 of 134 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sioux Falls VA Health Care System Sioux Falls Boiler Plant Sioux Falls, South Dakota #438-22-900

ADDENDUM #3 05-01-24

09 67 23.30 - 1

SECTION 09 67 23.30

RESINOUS (EPOXY BASE) HIGH PERFORMANCE FLOORING

1.1 SECTION INCLUDES

A. Resinous Systems of the Following Types:

1. Basis of Design: Sherwin-Williams HPF, Resuflor SB.

1.2 RELATED SECTIONS

A. Section 033000 – Cast-In-Place Concrete.

1.3 REFERENCES

A. ASTM International (ASTM):

1. ASTM C 413 - Standard Test Method for Absorption of Chemical-

Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes.

2. ASTM D 635 - Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position.

3. ASTM D 695 - Standard Test Method for Compressive Properties of Rigid Plastics.

4. ASTM D1475 - Standard Test Method For Density of Liquid Coatings, Inks, and Related Products.

5. ASTM D 2047 - Standard Test Method for Static Coefficient of Friction of Polish- Coated Flooring Surfaces as Measured by the James Machine.

6. ASTM D 2240 - Standard Test Method for Rubber Property—Durometer Hardness.

7. ASTM D 2244 - Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates.

8. ASTM D2369 - Standard Test Method for Volatile Content of Coatings.

9. ASTM D 2370 - Standard Test Method for Tensile Properties of Organic Coatings.

10. ASTM D 3960 - Standard Practice for Determining Volatile Organic Compound (VOC) Content of Paints and Related Coatings.

11. ASTM D 4060 - Standard Test Method for Abrasion Resistance of Organic Coatings by the Taber Abraser.

12. ASTM D 4366 - Standard Test Methods for Hardness of Organic Coatings by Pendulum Damping Tests

13. ASTM D5441 - Standard Test Method for Analysis of Methyl Tert- Butyl Ether (MTBE) by Gas Chromatography.

14. ASTM D 7234 - Standard Test Method for Pull-Off Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers.

15. ASTM F 1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride.

16. ASTM F 2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

09 67 23.30 - 2

17. ASTM G 154 - Standard Practice for Operating Fluorescent Ultraviolet (UV) Lamp Apparatus for Exposure of Nonmetallic Materials.

B. Deutsches Institut fur Normung (DIN):

1. DIN 53460 – Testing of Plastics; Determination of the Vicat Softening Temperature of Thermoplastics.

C. International Concrete Repair Institute (ICRI):

1. ICRI 310.2R - Selecting and Specifying Concrete Surface

Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair.

D. Military Specifications (MIL):

1. MIL-D-3134J - Deck Covering Materials.

E. National Floor Safety Institute (NFSI):

1. ANSI/NFSI B101.1 - Test Method for Measuring Wet SCOF of Common

Hard-Surface Floor Materials.

1.4 SUBMITTALS

A. Submit under provisions of Section 01300.

B. Product Data:

1. Manufacturer's data sheets on each product to be used, including properites, VOC content, wet static coefficient of friction, compressive strength, tensile strength, eloongation and similar properties.

2. Preparation instructions and recommendations.

3. Storage and handling requirements and recommendations.

4. Typical installation methods.

C. Verification Samples: Two representative units of each system, including color and texture.

D. Shop Drawings: Include details of materials, construction and finish. Include relationship with adjacent construction.

E. Manufacturer’s Certification: Submit manufacturer’s certification that materials comply with specified requirements and are suitable for intended application.

F. Manufacturer’s Project References: Submit manufacturer’s list of successfully completed resinous flooring system projects, including project name and location, name of architect, and type and quantity of flooring systems furnished.

G. Applicator’s Project References: Submit applicator’s list of successfully completed resinous flooring system projects, including project name and location, name of architect, and type and quantity of flooring systems applied.

H. Care and Maintenance Instructions: Submit manufacturer’s care

09 67 23.30 - 3 and maintenance instructions, including cleaning instructions.

1.5 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section with a minimum five years documented experience.

B. Applicator’s Qualifications:

1. Applicator regularly engaged, for a minimum of 5 years, in application of resinous flooring systems of similar type to that specified.

2. Employ persons trained for application of resinous flooring systems.

C. Source Limitations: Provide each type of product from a single manufacturing source to ensure uniformity.

D. Mock-Up: Construct a mock-up with actual materials in sufficient time for Architect’s review and to not delay construction progress.

Locate mock -up as acceptable to Architect and provide temporary foundations and support.

1. Intent of mock-up is to demonstrate quality of workmanship and visual appearance.

2. If mock-up is not acceptable, rebuild mock-up until satisfactory results are achieved.

3. Retain mock-up during construction as a standard for comparison with completed work.

4. Do not alter or remove mock-up until work is completed or removal is authorized.

1.6 PRE-INSTALLATION CONFERENCE

A. Convene a conference approximately two weeks before scheduled commencement of the Work. Attendees shall include Architect, Contractor and trades involved. Agenda shall include schedule, responsibilities, critical path items and approvals.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Delivery Requirements: Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name, manufacturer, and batch number.

B. Storage and Handling Requirements:

1. Store and handle materials in accordance with manufacturer’s instructions.

2. Keep materials in manufacturer’s original, unopened containers and packaging until application.

3. Store materials in clean, dry area indoors between 65 and 80 degrees F (18 and 27 degrees C).

4. Store materials out of direct sunlight.

5. Keep materials from freezing.

6. Protect materials during storage, handling, and application to

09 67 23.30 - 4 prevent contamination or damage.

1.8 PROJECT CONDITIONS

A. Apply flooring system under the following ambient conditions:

1. Ambient and Concrete Floor Temperatures: Between 65 and 85 degrees F (18 and 29 degrees C).

2. Material Temperature: Between 65 and 85 degrees F (18 and 29 degrees C).

3. Relative Humidity: Maximum 80 percent.

4. Dew Point: Floor temperature more than 5 degrees over dew point.

B. Do not apply flooring system under ambient conditions outside manufacturer’s limits.

1.9 WARRANTY

A. Submit manufacturer’s standard warranty.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design: The Sherwin-Williams High Performance Flooring, 866-540-1299 swflooring@sherwin.com Website:

https://industrial.sherwin-williams.com dustin.e.kaatz@sherwin.com

B. Requests for substitutions will be considered and must be provided 2 weeks prior to bid for alternate product approval.

C. ADDM #3 Basis of Design: RESUFLOR NOVALAC SB.

1. Primer Coat: Resuprime MVB, 3-5 mils- dependent on moisture levels. General Contractor must conduct moisture content test on new concrete slab and provide results to VA COR and Architect for direction before proceeding with work.

2. Broadcast Coat with sand (30/50 mesh or acceptable size): Resuflor 3746 pigmented, 10-12 mils.

3. Grout Coat: Resuflor 3741 Novalac, 12-15 mils.

4. Topcoat: Resutile HTS 100, 3 mils.

5. Color: As selected by Architect from manufacturer's full range.

6. Cove Base: Resuflor 3561V or ResiCove

2.2 SYSTEM PROPERTIES

A. Basis of Design:

1. Abrasion Resistance, Taber Abraser CS-17 Taber Abrasion Wheel, 1,000 gram load, 1,000 revolutions, ASTM D4060, 18 mg/loss

2. Adhesion to Concrete, psi [MPa], ASTM D4541, 450 [3.10]

(concrete failed)

3. Adhesion to Concrete, psi [MPa[, ASTM D7234, 732 [4.48]

(concrete failed)

4. Coefficient of Friction-COF, James Friction Tester, ASTM D2047, 0.63

5. Coefficient of Friction-Wet Static, BOT 3000, ANSI/NFSI B101.1, 09 67 23.30 - 5

0.94

6. Compressive Strength, psi [MPa], ASTM D695, 13,500 [93.079]

7. Flammabilitymm/min, ASTM D635, 182 mm/min

8. König Hardness, ASTM D22540, 171.3

9. Shore D hardness, ASTM D2240, 80-85 @ 0 sec | 75-80 @ 15 sec

10. Sward Hardness (1mil flim), ASTM D2240, 30-40

11. Tensile Strength, psi [MPa], ASTM D2370, 8,000 [55.158]

12. Percent Elongation (resin only), ASTM D2370, 6%

13. Volatile Organic Compound, VOC,lb/gal [g/l], ASTM D3960, Resuflor

MPE A+B= 0.41

[49] Resuflor UVE A+B=0.67 [81] Resutile HTS 100 A+B+C=0.05 [6]

14. Water Absorption (24 hours0, ASTM D570, 0.2% weight increase

2.3 PRODUCT PROPERTIES

A. Basis of Design: Resuflor 3746: A neutral, two-component, high solids epoxy.

1. Percent Solids, by weight (by volume), ASTM D1475, A + B: 95.45

(94.56).

2. Volatile Organic Compound-VOC, ASTM D3960, Mixed A + B: 0.41 lb./gal (49 g/L).

3. Abrasion Resistance, mg loss, Taber Abraser, C-17 Taber

Abrasion Wheel, 1,000 gram load, 1,000 revolutions, ASTM D4060: 83.1.

4. Coefficient of Friction-COF, James Friction Tester, ASTM D2047:

0.59-0.62.

5. Adhesion to Concrete, ASTM D5441: 732 psi (4.48 MPa) concrete failed.

6. Adhesion to Concrete, ASTM D7234: 450 psi (3.10 MPa) concrete failed.

7. Compressive Strength, ASTM D695: 13,500 psi (93.079 MPa).

8. Tensile Strength, ASTM D2370: 8,000 psi (55.158 MPa).

9. Percent Elongation, ASTM D2370: 5.

10. Shore D Hardness, ASTM D2240: 80-85 @ 0 sec, 75-80 @ 15 sec.

B. Basis of Design: Resutile HTS 100: A clear high solids, three-component, satin finish, aliphatic, moisture- cure urethane.

1. Percent Solids, by weight (by volume), ASTM D2369, A + B + C:

94.02 (92.57).

2. Volatile Organic Compound-VOC, ASTM D3960, Mixed A + B + C: 0.05 lb/gal (6 g/L).

3. Abrasion Resistance, mg loss, Taber Abraser, C-17 Taber

Abrasion Wheel, 1,000 gram load, 1,000 revolutions, ASTM D4060: 18.

4. Coefficient of Friction-COF, James Friction Tester, ASTM D2047: 0.63.

5. Wet Static Coefficient of Friction, BOT 3000, ANSI/NFSI B101.1:

0.94.

6. Flammability, ASTM G154: 182 mm/min.

7. Resistance to Yellowing as measured using ASTM D2244 after 1000 consecutive hours UV exposure in QUV, ASTM G154, <10 increase of yellow units (CIE Lab Δb)

8. Tensile Strength, (resin only), ASTM D2370: 6,250 psi (43,092 MPa).

09 67 23.30 - 6

9. Percent Elongation, (resin only), ASTM D2370: 6.

10. König Hardness, (3 mil/76.2 micron film), ASTM D4366: 171.3.

11. Water Absorption, 24-hour immersion, ASTM C413: 0.2 percent weight increase.

C. Broadcast Sand: Organic minerals, additives, integrally non-pigmented.

a. Shape: Random.

b. Size: 30/50 Mesh.

c. Surface Texture: Slip Resistant- Semi-Smooth

d. Color: N/A or Selected by Architect if decorative. ADDM #3

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine concrete surfaces to receive flooring system. Verify concrete is structurally sound.

B. Moisture Testing of Concrete: Perform at least one of the following two tests to determine moisture in concrete. Type of test and frequence as recommended by manufacturer and installer.

1. In-situ Probe Test:

a. Measure relative humidity in concrete in accordance with

ASTM F 2170.

b. Application of flooring system shall start only if test results are below 75 percent relative concrete humidity.

c. If test results are above limits, notify Architect and flooring manufacturer in writing.

C. Do not begin preparation or installation until satisfactory moisture test results are achieved. Provide flooring manufacturer's recommended moisture vapor control coating if required.

3.2 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Protection of In-Place Conditions: Protect adjacent surfaces and adjoining walls from contact with flooring system materials.

C. Surface Preparation:

1. Prepare concrete surface in accordance with manufacturer’s instructions.

2. Remove dirt, dust, debris, oil, grease, curing agents, bond breakers, paint, coatings, sealers, silicones, and other surface contaminants which could adversely affect application of flooring system.

3. Mechanical Preparation: Steel shot blast concrete or grind to a minimum surface profile of ICRI 310.2R, CSP 3-5.

4. Key-cut termination points with 1/4-inch (6-mm) by 1/4-inch (6-

mm) cut.

09 67 23.30 - 7

5. Patch depressions, divots, and cracks in concrete in accordance with manufacturer’s instructions.

6. Mechanically remove loose, delaminated, and damaged concrete and repair in accordance with manufacturer’s instructions.

7. Joints: Fill joints in accordance with manufacturer’s instructions.

3.3 INSTALLATION

A. Install flooring system in accordance with manufacturer’s instructions and approved submittals at locations indicated on the Drawings.

B. Ensure concrete is dry, clean, and prepared in accordance with manufacturer’s instructions.

C. Allow concrete to cure a minimum of 7 days before applying flooring system.

D. Mixing:

1. Mix material components together in accordance with manufacturer’s instructions.

2. Mix only enough material that can be applied within working time.

3. Add and mix colorants with materials in accordance with manufacturer’s instructions to achieve uniform color.

E. Apply flooring system materials to obtain consistent mil thickness and smooth, uniform appearance and texture.

F. Overlay: Apply overlay in accordance with manufacturer’s instructions. Apply overlay to prepared concrete surface.

G. Traction Aggregate: Broadcast traction aggregate in accordance with manufacturer’s instructions. Broadcast traction aggregate into wet overlay.

H. Cove:

1. Apply cove primer and cove in accordance with manufacturer’s instructions at locations indicated on the Drawings.

2. Apply cove to height and shape as indicated on the Drawings.

3. Apply cove to create seamless, smooth transition between flooring and walls.

I. Seal Coat:

1. Apply seal coat in accordance with manufacturer’s instructions.

3.4 Apply seal coat over traction aggregate.

3.5 FIELD QUALITY CONTROL

A. Field Inspection: Coordinate field inspection in accordance with appropriate sections in Division 01.

09 67 23.30 - 8

B. Manufacturer’s Services: Coordinate manufacturer’s services in accordance with appropriate sections in Division 01.

3.6 CLEANING AND PROTECTION

A. Allow flooring system to dry in accordance with manufacturer’s instructions before opening to traffic.

B. Allow flooring system to dry a minimum of 1 week before cleaning by mechanical means.

C. Protect completed flooring system from damage during construction.