EP102 - ENLARGED ELECTRICAL ROOM PLANS.pdf
PDF 688 KB Posted
- Solicitation number
- 36C26324R0136
About this file
This is an electrical room plan drawing (EP102) showing enlarged plans for the Sioux Falls VA Medical Center Boiler Plant replacement project. The drawing is part of the 100% Construction Documents package dated June 25, 2024, prepared by Paradigm Architecture Engineering Design-Build for the Department of Veterans Affairs. The project is located at 2501 W 22nd St, Sioux Falls, SD 57105, with a project number 438-22-900. The drawing includes notations indicating the building is fully sprinklered and shows detailed electrical room layouts. The document appears to be a standard VA Form 08-6231 architectural/engineering drawing with approval stamps and revision tracking capabilities.
View the file
Other files
Show 40 more
Latest 50 of 134 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9000 Wessex Place, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
100% CONSTRUCTION DOCUMENTS
06/25/2024
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
1/24/2025
File details come from the government source that posted it. Updated .