CG103 5-CIVIL EROSION CONTROL PLAN.pdf

PDF 1 MB Posted

Attached to
Y1NB--PN: 438-22-900, Replace Boiler Plant (SF) 36C26324R0136
Solicitation number
36C26324R0136
Issued by

About this file

This is a civil erosion control plan drawing for a boiler plant replacement project at the Sioux Falls VA Medical Center. The drawing (CG103) provides detailed specifications for construction site erosion control measures and includes a site layout plan at 1"=20' scale.

The plan outlines specific requirements including: installation of erosion control measures, inlet protection for existing and proposed drains, driven post construction fencing, concrete washout stations, and track pad construction entrances. Key notes detail proper soil management, with surplus soil to be hauled offsite and reusable soil to be covered with secured tarpaulins. The contractor must comply with EPA concrete washout containment methods, City of Sioux Falls nuisance vegetation requirements, and perform regular inspections of erosion controls within 24 hours of rain events exceeding 0.5 inches or weekly at minimum. The drawing shows designated areas for soil stockpiles, laydown yards, and construction trailers, with specific phasing requirements for fence installation related to walkway construction. The project is part of VA project #438-22-900 with a noted construction document submission date of 08-09-2024.

View the file

Other files

File Type Posted
Structural Merged - Addendum 4.pdf PDF
Electrical - Addendum 4 Final Version.pdf PDF
438-22-900 Replace Boiler Plant QA 2 02-12-25.docx DOCX document
260533 - Raceways and Boxes for Electrical System - Addendum 4.pdf PDF
Civil Merged - Addendum 4.pdf PDF
AE121 - Addendum 4.pdf PDF
36C26324R0136 0006.docx DOCX document
102600 Wall and Door Protection - Addendum 4.pdf PDF
EP602 - PANEL SCHEDULES.pdf PDF
MQ100 - MECHANICAL EQUIPMENT PLAN.pdf PDF
EP101 - ELECTRICAL POWER PLAN FIRST FLOOR.pdf PDF
017419 Construction Waste Management.pdf PDF
CU101 5 - CIVIL UTILITY PLAN.pdf PDF
GI001.pdf PDF
AE600.pdf PDF
014535 Special Inspections - Schedule of SI.pdf PDF
085653 Blast Resistant Windows.pdf PDF
SB302.pdf PDF
SE201.pdf PDF
122400 Window Shades.pdf PDF
PL700-WATER FLOW DIAGRAM.pdf PDF
GI110.pdf PDF
230923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC Addendum 3.pdf PDF
SB101.pdf PDF
263213 Engine Generators.pdf PDF
232111 BOILER PLANT PIPING SYSTEMS_Addendum_3.pdf PDF
CK502 - CIVIL DETAILS.pdf PDF
E502 - ELECTRICAL DETAILS.pdf PDF
CS102 5-CIVIL SITE PLAN.pdf PDF
CK503 - CIVIL DETAILS.pdf PDF
EP603 - PANEL SCHEDULES.pdf PDF
EP604 - PANEL SCHEDULES.pdf PDF
312011 - Earthwork.pdf PDF
EP102 - ENLARGED ELECTRICAL ROOM PLANS.pdf PDF
PL101-PLUMBING PLANS.pdf PDF
019100 General Commissioning Requirements.pdf PDF
PL300-PLUMBING SECTIONS.pdf PDF
PL701-PLUMBING WATER RISER DIAGRAM.pdf PDF
ES105 - NEW TUNNEL PLAN.pdf PDF
336300 STEAM ENERGY DISTRIBUTION.pdf PDF
270511 Requirements for Communications Installations.pdf PDF
SF401.pdf PDF
271500 Communications Structured Cabling.pdf PDF
087100 Door Hardware.pdf PDF
MP500 - PIPING DETAILS.pdf PDF
AE121.pdf PDF
CD102 5 - CIVIL EXISTING CONDITIONS_ DEMOLITION PLAN.pdf PDF
262600 Power Distribution Units for Static Uninteruptable Power Systems.pdf PDF
ES106 - ELECTRICAL - SECURITY GATE PLAN.pdf PDF
CS101 5 - CIVIL SITE PLAN.pdf PDF
Show 40 more

Latest 50 of 134 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G A

R F

I E

L D

V E

N U

E

G A

R F

I E

L D

V E

N U

E

C O

N S

T R

U C

T I O

N

E N

T R

A N

C E

CONSTRUCTIO

N

ENTRANCE

LAYDOWN YARD AND/OR

TRAILER AREA

D

D

ST

YD

YD

YD

OWS

N

SCALE: 1" = 20'

0 50 100

CG103

CIVIL EROSION CONTROL PLAN

NOTES

1. REFER TO DRAWING C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.

2. SURPLUS SOIL SHALL BE HAULED OFFSITE AND DISPOSED OF IN ACCORDANCE WITH

FEDERAL, STATE, AND LOCAL REQUIREMENTS.

3. SOIL THAT IS TO BE RE-USED MAY BE STORED ONSITE AND COVERED WITH SECURED

TARPAULINS TO PREVENT EROSION.

4. EROSION CONTROL MAY BE REMOVED ONCE A MOWABLE STAND OF GRASS HAS GROWN

AND PAVEMENT HAS BEEN INSTALLED.

3. THE CONTRACTOR SHALL DISCHARGE NO WASTE OR SURPLUS CONCRETE ONTO THE VA

PROPERTY DUE TO WASHING OF CONCRETE CONTAINERS. THE CONTRACTOR SHALL

UTILIZE THE METHODS PROVIDED BY THE EPA TO CONTAIN CONCRETE WASHOUT FOR

PROPER DISPOSAL OR REUSE. THE CONTRACTOR SHALL ENSURE THE COLLECTED

CONCRETE WASHOUT IS REMOVED AND SURRENDERED TO A STATE OF SOUTH DAKOTA OR

CITY OF SIOUX FALLS APPROVED WASTE CONCRETE COLLECTION SITE.

4. THE CONTRACTOR SHALL STAGE ALL MATERIALS AND STOCKPILES WITHIN THE FENCED

FOOTPRINT OF THE PROJECT. THE CONTRACTOR SHALL MAINTAIN GOOD HOUSEKEEPING

PRACTICES WITHIN THE STAGING AREA AT ALL TIMES.

5. THE CONTRACTOR SHALL COLLECT ALL DEBRIS WITHIN THE AREA DEFINED AS THE

CONSTRUCTION SITE AT THE END OF EACH SHIFT. DEBRIS SHALL BE COLLECTED AND

STORED IN CLOSED CONTAINERS AND REMOVED WITHOUT DISTURBING SIOUX FALLS VA

MEDICAL CENTER GROUNDS OR AESTHETICS. THE WASTE CONTAINER SHALL BE CONTAINED

WITHIN THE CONFINES OF THE CONSTRUCTION SITE.

6. THE CONTRACTOR SHALL PROVIDE TO THE STATE OF SOUTH DAKOTA DEPARTMENT OF

AGRICULTURE AND NATURAL RESOURCES AIR QUALITY OFFICE THE APPROPRIATE BOILER

INFORMATION. (MAKE, MODEL, SERIAL NUMBER, FUEL USE, HORSEPOWER...)

7. THE CONTRACTOR SHALL COMPLY WITH THE CITY OF SIOUX FALLS NUISANCE VEGETATION

REQUIREMENTS WITHIN THE CONSTRUCTION SITE.

8. EROSION CONTROLS ARE TO BE INSPECTED AND DOCUMENTED VIA SDDOT 298 INSPECTION

FORMS WITHIN 24 HOURS OF A RAIN EVENT GREATER THAN 0.5 INCHES OR AT MINIMUM

WEEKLY. FAILED EROSION CONTROL MEASURES SHALL BE REPLACED AS SOON AS

POSSIBLE BUT NO LATER THAN 7 DAYS OF IDENTIFICATION.

9. TRACK PAD CONSTRUCTION ENTRANCE TO BE VISUALLY INSPECTED WEEKLY. MATS SHOULD

BE CLEANED (BRUSHED , EITHER MANUALLY OR MECHANICALLY) PRIOR TO VOIDS BEING

FILLED WITH SEDIMENT, AT MINIMUM EVERY TWO WEEKS AFTER RAIN EVENTS.

KEY NOTES

1. FURNISH AND INSTALL EROSION CONTROL (DETAIL B3, CK501).

2. FURNISH AND INSTALL INLET PROTECTION FOR EXISTING STRUCTURES TO REMAIN (DETAILS

D7 AND D9, CK501).

3. FURNISH AND INSTALL INLET PROTECTION AT THE TIME OF INSTALLATION OF PROPOSED

DRAINS WHILE CONSTRUCTION CONTINUES (DETAILS D7 AND D9, CK501).

4. FURNISH AND INSTALL DRIVEN POST CONSTRUCTION FENCE (DETAIL F4, CK501).

5. FURNISH AND INSTALL CONCRETE WASHOUT STATION (DETAIL C1, CK503).

6. FURNISH AND INSTALL TRACK PAD CONSTRUCTION ENTRANCE (DETAIL B7, CK501).

7. FURNISH AND INSTALL CONSTRUCTION AND SAFETY SIGNS SUCH AS "AUTHORIZED

PERSONNEL ONLY", "CONSTRUCTION ZONE", "HARD HAT REQUIRED" .1

Scale: 1" = 20'

CIVIL EROSION CONTROL PLAN

SOIL

STOCKPILE

SOIL

STOCKPILE

GATE

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180-1248

T. 781-275-6050 www.mabbett.com

Mabbett

R

200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans

Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans

Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

100% CONSTRUCTION DOCUMENT SUBMISSION

08-09-2024

RBB EG

SIOUX FALLS BOILER PLANT 438-22-900

VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105

MATCHLINE SHEET CG104MATCHLINE SHEET CG104

PHASE I FENCE

INSTALLATION TO BE

REMOVED UPON

COMPLETION OF WALKWAY

CONSTRUCTION

PHASE II FENCE

INSTALLATION TO BE

INSTALLED UPON

COMPLETION OF WALKWAY

CONSTRUCTION

1 ADDENDUM 1

08-09-2024

2 ADDENDUM 2 (NO CHANGES TO THIS SHEET) 09-12-2024

3 ADDENDUM 3 01-17-2025

AutoCAD SHX Text 6"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 6"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text

SANITARY MH RIM 1488.26 INV. OUT 1482.41 (S)

AutoCAD SHX Text SANITARY MH RIM 1489.81 INV. IN 1480.08 (S) INV. IN 1480.02 (W) INV. OUT 1479.92 (N)

AutoCAD SHX Text SANITARY MH RIM 1489.05 INV. IN 1478.62 (S) INV. IN 1477.65 (W) INV. OUT 1477.48 (N)

AutoCAD SHX Text SANITARY MH RIM 1488.93 INV. IN 1477.73 (SE) INV. IN 1477.41 (S) INV. OUT 1477.15 (W)

AutoCAD SHX Text

SANITARY MH RIM 1484.69 INV. IN 1476.31

AutoCAD SHX Text SANITARY MH RIM 1495.88 INV. IN 1489.55 (SE) INV. IN 1489.56 (S) INV. OUT 1489.44 (NW)

AutoCAD SHX Text

SANITARY MH RIM 1499.62 INV. OUT 1491.46

AutoCAD SHX Text

EXISTING BRICK BUILDING (11)

AutoCAD SHX Text

EXISTING BRICK BUILDING (8)

AutoCAD SHX Text

EXISTING STUCCO BUILDING (10)

AutoCAD SHX Text

EXISTING MAINTENANCE GARAGE

AutoCAD SHX Text

EXISTING BUILDING (T15)

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

BASE OF WATER TANK

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONCRETE PARKING LOT (5)

AutoCAD SHX Text

CONCRETE PARKING LOT (3B)

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONC. CURB & GUTTER

AutoCAD SHX Text

CONCRETE DRIVEWAY

AutoCAD SHX Text

FUEL TANK

AutoCAD SHX Text

TRANSFORMER MOUNTED ON CONC.

AutoCAD SHX Text

TRANSFORMER 13.8 KV FEEDER 2 JBOX 3 MOUNTED ON CONC.

AutoCAD SHX Text

TRANSFORMER & SWITCH BOX

AutoCAD SHX Text

TRANSFORMER MOUNTED ON CONC.

AutoCAD SHX Text

EXHAUST FAN

AutoCAD SHX Text

VAULT LID

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

EXHAUST FAN

AutoCAD SHX Text

VENT

AutoCAD SHX Text

EXISTING BRICK BUILDING (5)

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. BARRIER WALL

AutoCAD SHX Text

CONCRETE WALL & DUMPSTER PAD

AutoCAD SHX Text

CONCRETE WALL

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

HANDRAIL

AutoCAD SHX Text

HANDRAIL

AutoCAD SHX Text

BOLLARD (TYP.)

AutoCAD SHX Text

UNKNOWN VALVE

AutoCAD SHX Text

LIGHT POLE FOUNDATION

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

CROSSWALK

AutoCAD SHX Text

CROSSWALK

AutoCAD SHX Text

CONCRETE DRIVEWAY

AutoCAD SHX Text

CONCRETE DRIVEWAY

AutoCAD SHX Text

CONCRETE DRIVEWAY

AutoCAD SHX Text

CONCRETE DRIVEWAY

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

EDGE OF CONC.

AutoCAD SHX Text

EDGE OF CONC.

AutoCAD SHX Text 36"

AutoCAD SHX Text 14"

AutoCAD SHX Text 24"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 30"

AutoCAD SHX Text

CONC. WALL

AutoCAD SHX Text

TRUNCATED DOME DETECTOR PLATE

AutoCAD SHX Text

TRUNCATED DOME DETECTOR PLATE

AutoCAD SHX Text

IRRIGATION VALVE

AutoCAD SHX Text F.F.E. 1490.15'

AutoCAD SHX Text

BASEMENT F.F.E. 1479.84'

AutoCAD SHX Text F.F.E. 1489.02'

AutoCAD SHX Text F.F.E. 1492.87'

AutoCAD SHX Text F.F.E. 1490.61'

AutoCAD SHX Text F.F.E. 1490.71'

AutoCAD SHX Text

EDGE OF GRAVEL

AutoCAD SHX Text

BOLLARD (TYP.)

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text

SANITARY MH RIM 1487.42 INV. IN 1480.63

AutoCAD SHX Text NOTE: THIS STEAM LINE IS LOCATED WITHIN A UTILITY TUNNEL THAT CONTAINS VARIOUS UTILITY LINES WITHIN.

AutoCAD SHX Text NOTE: THIS GAS LINE WAS UNABLE TO LOCATED VIA SUE INVESTIGATION AND IS SHOWN APPROXIMATELY BASED ON PROVIDED INFORMATION.

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

PILE

AutoCAD SHX Text

PILE

AutoCAD SHX Text

PILE

AutoCAD SHX Text

PILE

AutoCAD SHX Text

PILE

AutoCAD SHX Text

PILE

AutoCAD SHX Text

PIPES

AutoCAD SHX Text

EXISTING BUILDING (7)

AutoCAD SHX Text

EXISTING BUILDING (9)

AutoCAD SHX Text

EXISTING BUILDING (19)

AutoCAD SHX Text

CONCRETE PARKING LOT (4)

AutoCAD SHX Text

PILE

AutoCAD SHX Text

CONCRETE PARKING LOT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

CONC. CURB

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CONCRETE LOADING DOCK AREA

AutoCAD SHX Text

BLOCK WALL

AutoCAD SHX Text

TANK

AutoCAD SHX Text

CONCRETE WALL

AutoCAD SHX Text

APPROXIMATE NATURAL GAS PIPELINE

AutoCAD SHX Text 6"

AutoCAD SHX Text 1" H.W.

AutoCAD SHX Text

(CU.)

AutoCAD SHX Text

CONTROLLED UNCLASSIFIED INFORMATION

AutoCAD SHX Text

CUI

File details come from the government source that posted it. Updated .