CG103 5-CIVIL EROSION CONTROL PLAN.pdf
PDF 1 MB Posted
- Solicitation number
- 36C26324R0136
About this file
This is a civil erosion control plan drawing for a boiler plant replacement project at the Sioux Falls VA Medical Center. The drawing (CG103) provides detailed specifications for construction site erosion control measures and includes a site layout plan at 1"=20' scale.
The plan outlines specific requirements including: installation of erosion control measures, inlet protection for existing and proposed drains, driven post construction fencing, concrete washout stations, and track pad construction entrances. Key notes detail proper soil management, with surplus soil to be hauled offsite and reusable soil to be covered with secured tarpaulins. The contractor must comply with EPA concrete washout containment methods, City of Sioux Falls nuisance vegetation requirements, and perform regular inspections of erosion controls within 24 hours of rain events exceeding 0.5 inches or weekly at minimum. The drawing shows designated areas for soil stockpiles, laydown yards, and construction trailers, with specific phasing requirements for fence installation related to walkway construction. The project is part of VA project #438-22-900 with a noted construction document submission date of 08-09-2024.
View the file
Other files
Show 40 more
Latest 50 of 134 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G A
R F
I E
L D
V E
N U
E
G A
R F
I E
L D
V E
N U
E
C O
N S
T R
U C
T I O
N
E N
T R
A N
C E
CONSTRUCTIO
N
ENTRANCE
LAYDOWN YARD AND/OR
TRAILER AREA
D
D
ST
YD
YD
YD
OWS
N
SCALE: 1" = 20'
0 50 100
CG103
CIVIL EROSION CONTROL PLAN
NOTES
1. REFER TO DRAWING C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
2. SURPLUS SOIL SHALL BE HAULED OFFSITE AND DISPOSED OF IN ACCORDANCE WITH
FEDERAL, STATE, AND LOCAL REQUIREMENTS.
3. SOIL THAT IS TO BE RE-USED MAY BE STORED ONSITE AND COVERED WITH SECURED
TARPAULINS TO PREVENT EROSION.
4. EROSION CONTROL MAY BE REMOVED ONCE A MOWABLE STAND OF GRASS HAS GROWN
AND PAVEMENT HAS BEEN INSTALLED.
3. THE CONTRACTOR SHALL DISCHARGE NO WASTE OR SURPLUS CONCRETE ONTO THE VA
PROPERTY DUE TO WASHING OF CONCRETE CONTAINERS. THE CONTRACTOR SHALL
UTILIZE THE METHODS PROVIDED BY THE EPA TO CONTAIN CONCRETE WASHOUT FOR
PROPER DISPOSAL OR REUSE. THE CONTRACTOR SHALL ENSURE THE COLLECTED
CONCRETE WASHOUT IS REMOVED AND SURRENDERED TO A STATE OF SOUTH DAKOTA OR
CITY OF SIOUX FALLS APPROVED WASTE CONCRETE COLLECTION SITE.
4. THE CONTRACTOR SHALL STAGE ALL MATERIALS AND STOCKPILES WITHIN THE FENCED
FOOTPRINT OF THE PROJECT. THE CONTRACTOR SHALL MAINTAIN GOOD HOUSEKEEPING
PRACTICES WITHIN THE STAGING AREA AT ALL TIMES.
5. THE CONTRACTOR SHALL COLLECT ALL DEBRIS WITHIN THE AREA DEFINED AS THE
CONSTRUCTION SITE AT THE END OF EACH SHIFT. DEBRIS SHALL BE COLLECTED AND
STORED IN CLOSED CONTAINERS AND REMOVED WITHOUT DISTURBING SIOUX FALLS VA
MEDICAL CENTER GROUNDS OR AESTHETICS. THE WASTE CONTAINER SHALL BE CONTAINED
WITHIN THE CONFINES OF THE CONSTRUCTION SITE.
6. THE CONTRACTOR SHALL PROVIDE TO THE STATE OF SOUTH DAKOTA DEPARTMENT OF
AGRICULTURE AND NATURAL RESOURCES AIR QUALITY OFFICE THE APPROPRIATE BOILER
INFORMATION. (MAKE, MODEL, SERIAL NUMBER, FUEL USE, HORSEPOWER...)
7. THE CONTRACTOR SHALL COMPLY WITH THE CITY OF SIOUX FALLS NUISANCE VEGETATION
REQUIREMENTS WITHIN THE CONSTRUCTION SITE.
8. EROSION CONTROLS ARE TO BE INSPECTED AND DOCUMENTED VIA SDDOT 298 INSPECTION
FORMS WITHIN 24 HOURS OF A RAIN EVENT GREATER THAN 0.5 INCHES OR AT MINIMUM
WEEKLY. FAILED EROSION CONTROL MEASURES SHALL BE REPLACED AS SOON AS
POSSIBLE BUT NO LATER THAN 7 DAYS OF IDENTIFICATION.
9. TRACK PAD CONSTRUCTION ENTRANCE TO BE VISUALLY INSPECTED WEEKLY. MATS SHOULD
BE CLEANED (BRUSHED , EITHER MANUALLY OR MECHANICALLY) PRIOR TO VOIDS BEING
FILLED WITH SEDIMENT, AT MINIMUM EVERY TWO WEEKS AFTER RAIN EVENTS.
KEY NOTES
1. FURNISH AND INSTALL EROSION CONTROL (DETAIL B3, CK501).
2. FURNISH AND INSTALL INLET PROTECTION FOR EXISTING STRUCTURES TO REMAIN (DETAILS
D7 AND D9, CK501).
3. FURNISH AND INSTALL INLET PROTECTION AT THE TIME OF INSTALLATION OF PROPOSED
DRAINS WHILE CONSTRUCTION CONTINUES (DETAILS D7 AND D9, CK501).
4. FURNISH AND INSTALL DRIVEN POST CONSTRUCTION FENCE (DETAIL F4, CK501).
5. FURNISH AND INSTALL CONCRETE WASHOUT STATION (DETAIL C1, CK503).
6. FURNISH AND INSTALL TRACK PAD CONSTRUCTION ENTRANCE (DETAIL B7, CK501).
7. FURNISH AND INSTALL CONSTRUCTION AND SAFETY SIGNS SUCH AS "AUTHORIZED
PERSONNEL ONLY", "CONSTRUCTION ZONE", "HARD HAT REQUIRED" .1
Scale: 1" = 20'
CIVIL EROSION CONTROL PLAN
SOIL
STOCKPILE
SOIL
STOCKPILE
GATE
Scientists I Engineers I Program Managers
Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248
T. 781-275-6050 www.mabbett.com
Mabbett
R
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
100% CONSTRUCTION DOCUMENT SUBMISSION
08-09-2024
RBB EG
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
MATCHLINE SHEET CG104MATCHLINE SHEET CG104
PHASE I FENCE
INSTALLATION TO BE
REMOVED UPON
COMPLETION OF WALKWAY
CONSTRUCTION
PHASE II FENCE
INSTALLATION TO BE
INSTALLED UPON
COMPLETION OF WALKWAY
CONSTRUCTION
1 ADDENDUM 1
08-09-2024
2 ADDENDUM 2 (NO CHANGES TO THIS SHEET) 09-12-2024
3 ADDENDUM 3 01-17-2025
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text
SANITARY MH RIM 1488.26 INV. OUT 1482.41 (S)
AutoCAD SHX Text SANITARY MH RIM 1489.81 INV. IN 1480.08 (S) INV. IN 1480.02 (W) INV. OUT 1479.92 (N)
AutoCAD SHX Text SANITARY MH RIM 1489.05 INV. IN 1478.62 (S) INV. IN 1477.65 (W) INV. OUT 1477.48 (N)
AutoCAD SHX Text SANITARY MH RIM 1488.93 INV. IN 1477.73 (SE) INV. IN 1477.41 (S) INV. OUT 1477.15 (W)
AutoCAD SHX Text
SANITARY MH RIM 1484.69 INV. IN 1476.31
AutoCAD SHX Text SANITARY MH RIM 1495.88 INV. IN 1489.55 (SE) INV. IN 1489.56 (S) INV. OUT 1489.44 (NW)
AutoCAD SHX Text
SANITARY MH RIM 1499.62 INV. OUT 1491.46
AutoCAD SHX Text
EXISTING BRICK BUILDING (11)
AutoCAD SHX Text
EXISTING BRICK BUILDING (8)
AutoCAD SHX Text
EXISTING STUCCO BUILDING (10)
AutoCAD SHX Text
EXISTING MAINTENANCE GARAGE
AutoCAD SHX Text
EXISTING BUILDING (T15)
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
BASE OF WATER TANK
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONCRETE PARKING LOT (5)
AutoCAD SHX Text
CONCRETE PARKING LOT (3B)
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONC. CURB & GUTTER
AutoCAD SHX Text
CONCRETE DRIVEWAY
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
TRANSFORMER MOUNTED ON CONC.
AutoCAD SHX Text
TRANSFORMER 13.8 KV FEEDER 2 JBOX 3 MOUNTED ON CONC.
AutoCAD SHX Text
TRANSFORMER & SWITCH BOX
AutoCAD SHX Text
TRANSFORMER MOUNTED ON CONC.
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
VAULT LID
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
VENT
AutoCAD SHX Text
EXISTING BRICK BUILDING (5)
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. BARRIER WALL
AutoCAD SHX Text
CONCRETE WALL & DUMPSTER PAD
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
HANDRAIL
AutoCAD SHX Text
HANDRAIL
AutoCAD SHX Text
BOLLARD (TYP.)
AutoCAD SHX Text
UNKNOWN VALVE
AutoCAD SHX Text
LIGHT POLE FOUNDATION
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
CROSSWALK
AutoCAD SHX Text
CROSSWALK
AutoCAD SHX Text
CONCRETE DRIVEWAY
AutoCAD SHX Text
CONCRETE DRIVEWAY
AutoCAD SHX Text
CONCRETE DRIVEWAY
AutoCAD SHX Text
CONCRETE DRIVEWAY
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
EDGE OF CONC.
AutoCAD SHX Text
EDGE OF CONC.
AutoCAD SHX Text 36"
AutoCAD SHX Text 14"
AutoCAD SHX Text 24"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 30"
AutoCAD SHX Text
CONC. WALL
AutoCAD SHX Text
TRUNCATED DOME DETECTOR PLATE
AutoCAD SHX Text
TRUNCATED DOME DETECTOR PLATE
AutoCAD SHX Text
IRRIGATION VALVE
AutoCAD SHX Text F.F.E. 1490.15'
AutoCAD SHX Text
BASEMENT F.F.E. 1479.84'
AutoCAD SHX Text F.F.E. 1489.02'
AutoCAD SHX Text F.F.E. 1492.87'
AutoCAD SHX Text F.F.E. 1490.61'
AutoCAD SHX Text F.F.E. 1490.71'
AutoCAD SHX Text
EDGE OF GRAVEL
AutoCAD SHX Text
BOLLARD (TYP.)
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text
SANITARY MH RIM 1487.42 INV. IN 1480.63
AutoCAD SHX Text NOTE: THIS STEAM LINE IS LOCATED WITHIN A UTILITY TUNNEL THAT CONTAINS VARIOUS UTILITY LINES WITHIN.
AutoCAD SHX Text NOTE: THIS GAS LINE WAS UNABLE TO LOCATED VIA SUE INVESTIGATION AND IS SHOWN APPROXIMATELY BASED ON PROVIDED INFORMATION.
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
PILE
AutoCAD SHX Text
PILE
AutoCAD SHX Text
PILE
AutoCAD SHX Text
PILE
AutoCAD SHX Text
PILE
AutoCAD SHX Text
PILE
AutoCAD SHX Text
PIPES
AutoCAD SHX Text
EXISTING BUILDING (7)
AutoCAD SHX Text
EXISTING BUILDING (9)
AutoCAD SHX Text
EXISTING BUILDING (19)
AutoCAD SHX Text
CONCRETE PARKING LOT (4)
AutoCAD SHX Text
PILE
AutoCAD SHX Text
CONCRETE PARKING LOT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE LOADING DOCK AREA
AutoCAD SHX Text
BLOCK WALL
AutoCAD SHX Text
TANK
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
APPROXIMATE NATURAL GAS PIPELINE
AutoCAD SHX Text 6"
AutoCAD SHX Text 1" H.W.
AutoCAD SHX Text
(CU.)
AutoCAD SHX Text
CONTROLLED UNCLASSIFIED INFORMATION
AutoCAD SHX Text
CUI
File details come from the government source that posted it. Updated .