MQ100 - MECHANICAL EQUIPMENT PLAN.pdf

PDF 721 KB Posted

Attached to
Y1NB--PN: 438-22-900, Replace Boiler Plant (SF) 36C26324R0136
Solicitation number
36C26324R0136
Issued by

About this file

This is a mechanical equipment plan drawing for a boiler plant replacement project at the VA Medical Center in Sioux Falls, SD. The drawing (MQ100) shows the first floor mechanical steam equipment layout at 1/8" = 1' scale, dated June 25, 2024, with revisions through January 17, 2025.

The plan details the locations of multiple boilers (12-B-101, 12-B-102, 12-B-103, and a future 12-B-104), boiler feed water pumps, economizers, chemical feed tanks, fuel oil polishers, and associated control panels. Key spaces shown include the boiler room (109), control room (103), generator room (110), electrical room (111), and storage areas. The drawing includes specific notes about boiler tube pull clearance, door swing clearance, and instructions to coordinate boiler control panel placement with VA Sioux Falls operators. The project is being managed by Burns & McDonnell Engineering Company from Kansas City, MO, and is part of construction project number 438-22-900.

View the file

Other files

File Type Posted
Structural Merged - Addendum 4.pdf PDF
Electrical - Addendum 4 Final Version.pdf PDF
438-22-900 Replace Boiler Plant QA 2 02-12-25.docx DOCX document
260533 - Raceways and Boxes for Electrical System - Addendum 4.pdf PDF
Civil Merged - Addendum 4.pdf PDF
AE121 - Addendum 4.pdf PDF
36C26324R0136 0006.docx DOCX document
102600 Wall and Door Protection - Addendum 4.pdf PDF
EP602 - PANEL SCHEDULES.pdf PDF
EP101 - ELECTRICAL POWER PLAN FIRST FLOOR.pdf PDF
017419 Construction Waste Management.pdf PDF
CU101 5 - CIVIL UTILITY PLAN.pdf PDF
GI001.pdf PDF
AE600.pdf PDF
014535 Special Inspections - Schedule of SI.pdf PDF
085653 Blast Resistant Windows.pdf PDF
SB302.pdf PDF
SE201.pdf PDF
122400 Window Shades.pdf PDF
PL700-WATER FLOW DIAGRAM.pdf PDF
GI110.pdf PDF
230923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC Addendum 3.pdf PDF
SB101.pdf PDF
263213 Engine Generators.pdf PDF
232111 BOILER PLANT PIPING SYSTEMS_Addendum_3.pdf PDF
CK502 - CIVIL DETAILS.pdf PDF
E502 - ELECTRICAL DETAILS.pdf PDF
CS102 5-CIVIL SITE PLAN.pdf PDF
CK503 - CIVIL DETAILS.pdf PDF
EP603 - PANEL SCHEDULES.pdf PDF
EP604 - PANEL SCHEDULES.pdf PDF
312011 - Earthwork.pdf PDF
EP102 - ENLARGED ELECTRICAL ROOM PLANS.pdf PDF
PL101-PLUMBING PLANS.pdf PDF
CG103 5-CIVIL EROSION CONTROL PLAN.pdf PDF
019100 General Commissioning Requirements.pdf PDF
PL300-PLUMBING SECTIONS.pdf PDF
PL701-PLUMBING WATER RISER DIAGRAM.pdf PDF
ES105 - NEW TUNNEL PLAN.pdf PDF
336300 STEAM ENERGY DISTRIBUTION.pdf PDF
270511 Requirements for Communications Installations.pdf PDF
SF401.pdf PDF
271500 Communications Structured Cabling.pdf PDF
087100 Door Hardware.pdf PDF
MP500 - PIPING DETAILS.pdf PDF
AE121.pdf PDF
CD102 5 - CIVIL EXISTING CONDITIONS_ DEMOLITION PLAN.pdf PDF
262600 Power Distribution Units for Static Uninteruptable Power Systems.pdf PDF
ES106 - ELECTRICAL - SECURITY GATE PLAN.pdf PDF
CS101 5 - CIVIL SITE PLAN.pdf PDF
Show 40 more

Latest 50 of 134 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B.2 C

BOILER RM

A.1 B B.3

1.1

5.1

STORAGE

ELEC RM

CONTROL

TELECOM

STORAGE

SUPERVISOR

GENERATOR

REF

A B.2 C

BOILER RM

A.1 B B.3

1.1

5.1

STORAGE

ELEC RM

CONTROL

TELECOM

STORAGE

SUPERVISOR

GENERATOR

REF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

Architecture Engineering Design-Build paradigm

MECHANICAL EQUIPMENT PLAN

CONTROLLED UNCLASSIFIED INFORMATION

BDI MFM

SIOUX FALLS BOILER PLANT 438-22-900

VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105

100% CONSTRUCTION DOCUMENTS

06/25/2024

FULLY SPRINKLERED

1/8" = 1' 0"

MECHANICAL STEAM EQUIPMENT PLAN

FIRST FLOOR

NOTES:

1. FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS SEE

DRAWING M-000.

KEYED NOTES:

1. BOILER TUBE PULL CLEARANCE.

2. BOILER DOOR SWING CLEARANCE.

3. REFER TO PLUMBING PLAN, PL101 FOR PLUMBING EQUIPMENT

PLAN.

4. REFER TO CIVIL DRAWINGS FOR BELOW GRADE FUEL OIL

STORAGE TANK DETAILS.

5. LOCATE BOILER CONTROL PANEL SO IT CAN BE SEEN FROM THE

CONTROL ROOM. COORDINATE THE EXACT LOCATION OF THE

CONTROL PANEL WITH VA SIOUX FALLS BOILER ROOM

OPERATORS AND DESIGN MANAGER.

E5

PLAN

N

TRUE

N

WS-1 WS-2

FO MONITOR

12-BFWP-104 (FUTURE)

Burns & McDonnell Engineering Company, Inc.

9450 WARD PARKWAY, KANSAS CITY, MO

Burns & McDonnell Engineering Company, Inc.

9450 WARD PARKWAY, KANSAS CITY, MO

Burns & McDonnell Engineering Company, Inc.

9450 WARD PARKWAY, KANSAS CITY, MO

12-BFWP-103 (BELOW)

12-BFWP-102 (BELOW)

12-BFWP-101 (BELOW)

12-CR-001 12-DA-001

12-B-101

12-B-102

12-B-103

FUTURE-12-B-104

12-BT-101 4

FUTURE-12-ECON-004

12-ECON-003

12-ECON-002

12-ECON-001

12-CRP-102 (BELOW)

12-CRP-101 (BELOW)

12-CF-TK-002

12-CF-TK-001

12-FOP-103 /-104

12-FOP-101 /-102

FO POLISHER SKID

BOILER CONTROL

PANEL (TYP 3)

FLAME SAFEGUARD

CONTROL PANEL

(TYP 3)

1 Addendum 1 08-09-2024

Addendum 22 09-12-2024

12-FOT-001

12-FOT-002

3 Addendum 3 01-17-2025

Jan-16-2025

File details come from the government source that posted it. Updated .