This is a mechanical equipment plan drawing for a boiler plant replacement project at the VA Medical Center in Sioux Falls, SD. The drawing (MQ100) shows the first floor mechanical steam equipment layout at 1/8" = 1' scale, dated June 25, 2024, with revisions through January 17, 2025.
The plan details the locations of multiple boilers (12-B-101, 12-B-102, 12-B-103, and a future 12-B-104), boiler feed water pumps, economizers, chemical feed tanks, fuel oil polishers, and associated control panels. Key spaces shown include the boiler room (109), control room (103), generator room (110), electrical room (111), and storage areas. The drawing includes specific notes about boiler tube pull clearance, door swing clearance, and instructions to coordinate boiler control panel placement with VA Sioux Falls operators. The project is being managed by Burns & McDonnell Engineering Company from Kansas City, MO, and is part of construction project number 438-22-900.
View the file
Other files
Show 40 more
Latest 50 of 134 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B.2 C
BOILER RM
A.1 B B.3
1.1
5.1
STORAGE
ELEC RM
CONTROL
TELECOM
STORAGE
SUPERVISOR
GENERATOR
REF
A B.2 C
BOILER RM
A.1 B B.3
1.1
5.1
STORAGE
ELEC RM
CONTROL
TELECOM
STORAGE
SUPERVISOR
GENERATOR
REF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
Architecture Engineering Design-Build paradigm
MECHANICAL EQUIPMENT PLAN
CONTROLLED UNCLASSIFIED INFORMATION
BDI MFM
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
100% CONSTRUCTION DOCUMENTS
06/25/2024
FULLY SPRINKLERED
1/8" = 1' 0"
MECHANICAL STEAM EQUIPMENT PLAN
FIRST FLOOR
NOTES:
1. FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS SEE
DRAWING M-000.
KEYED NOTES:
1. BOILER TUBE PULL CLEARANCE.
2. BOILER DOOR SWING CLEARANCE.
3. REFER TO PLUMBING PLAN, PL101 FOR PLUMBING EQUIPMENT
PLAN.
4. REFER TO CIVIL DRAWINGS FOR BELOW GRADE FUEL OIL
STORAGE TANK DETAILS.
5. LOCATE BOILER CONTROL PANEL SO IT CAN BE SEEN FROM THE
CONTROL ROOM. COORDINATE THE EXACT LOCATION OF THE
CONTROL PANEL WITH VA SIOUX FALLS BOILER ROOM
OPERATORS AND DESIGN MANAGER.
E5
PLAN
N
TRUE
N
WS-1 WS-2
FO MONITOR
12-BFWP-104 (FUTURE)
Burns & McDonnell Engineering Company, Inc.
9450 WARD PARKWAY, KANSAS CITY, MO
Burns & McDonnell Engineering Company, Inc.
9450 WARD PARKWAY, KANSAS CITY, MO
Burns & McDonnell Engineering Company, Inc.
9450 WARD PARKWAY, KANSAS CITY, MO
12-BFWP-103 (BELOW)
12-BFWP-102 (BELOW)
12-BFWP-101 (BELOW)
12-CR-001 12-DA-001
12-B-101
12-B-102
12-B-103
FUTURE-12-B-104
12-BT-101 4
FUTURE-12-ECON-004
12-ECON-003
12-ECON-002
12-ECON-001
12-CRP-102 (BELOW)
12-CRP-101 (BELOW)
12-CF-TK-002
12-CF-TK-001
12-FOP-103 /-104
12-FOP-101 /-102
FO POLISHER SKID
BOILER CONTROL
PANEL (TYP 3)
FLAME SAFEGUARD
CONTROL PANEL
(TYP 3)
1 Addendum 1 08-09-2024
Addendum 22 09-12-2024
12-FOT-001
12-FOT-002
3 Addendum 3 01-17-2025
Jan-16-2025