PL300-PLUMBING SECTIONS.pdf

PDF 283 KB Posted

Attached to
Y1NB--PN: 438-22-900, Replace Boiler Plant (SF) 36C26324R0136
Solicitation number
36C26324R0136
Issued by

About this file

This is a plumbing section drawing (PL300) from a construction document package for the Sioux Falls VA Medical Center Boiler Plant replacement project. The drawing shows plumbing sections and details including 8" cold water lines, 6" secondary cold water lines, and domestic cold water connections, with specific elevations noted. The drawing is part of the 100% Construction Documents set dated June 25, 2024, prepared by Paradigm Architecture Engineering Design-Build and Burns & McDonnell Engineering Company.

The drawing includes technical specifications for a water quality monitoring system and provisions for a 4" city water meter installation with 20" lay length requirement. Key notes emphasize that all serviceable items (valves, filters, strainers, transmitters, control devices) must be accessible from floor level or permanent platforms without portable ladders. The project is located at the VAMC-Sioux Falls facility at 2501 W 22nd St, Sioux Falls, SD 57105, and the drawing indicates the facility will be fully sprinklered.

View the file

Other files

File Type Posted
Structural Merged - Addendum 4.pdf PDF
Electrical - Addendum 4 Final Version.pdf PDF
438-22-900 Replace Boiler Plant QA 2 02-12-25.docx DOCX document
260533 - Raceways and Boxes for Electrical System - Addendum 4.pdf PDF
Civil Merged - Addendum 4.pdf PDF
AE121 - Addendum 4.pdf PDF
36C26324R0136 0006.docx DOCX document
102600 Wall and Door Protection - Addendum 4.pdf PDF
EP602 - PANEL SCHEDULES.pdf PDF
MQ100 - MECHANICAL EQUIPMENT PLAN.pdf PDF
EP101 - ELECTRICAL POWER PLAN FIRST FLOOR.pdf PDF
017419 Construction Waste Management.pdf PDF
CU101 5 - CIVIL UTILITY PLAN.pdf PDF
GI001.pdf PDF
AE600.pdf PDF
014535 Special Inspections - Schedule of SI.pdf PDF
085653 Blast Resistant Windows.pdf PDF
SB302.pdf PDF
SE201.pdf PDF
122400 Window Shades.pdf PDF
PL700-WATER FLOW DIAGRAM.pdf PDF
GI110.pdf PDF
230923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC Addendum 3.pdf PDF
SB101.pdf PDF
263213 Engine Generators.pdf PDF
232111 BOILER PLANT PIPING SYSTEMS_Addendum_3.pdf PDF
CK502 - CIVIL DETAILS.pdf PDF
E502 - ELECTRICAL DETAILS.pdf PDF
CS102 5-CIVIL SITE PLAN.pdf PDF
CK503 - CIVIL DETAILS.pdf PDF
EP603 - PANEL SCHEDULES.pdf PDF
EP604 - PANEL SCHEDULES.pdf PDF
312011 - Earthwork.pdf PDF
EP102 - ENLARGED ELECTRICAL ROOM PLANS.pdf PDF
PL101-PLUMBING PLANS.pdf PDF
CG103 5-CIVIL EROSION CONTROL PLAN.pdf PDF
019100 General Commissioning Requirements.pdf PDF
PL701-PLUMBING WATER RISER DIAGRAM.pdf PDF
ES105 - NEW TUNNEL PLAN.pdf PDF
336300 STEAM ENERGY DISTRIBUTION.pdf PDF
270511 Requirements for Communications Installations.pdf PDF
SF401.pdf PDF
271500 Communications Structured Cabling.pdf PDF
087100 Door Hardware.pdf PDF
MP500 - PIPING DETAILS.pdf PDF
AE121.pdf PDF
CD102 5 - CIVIL EXISTING CONDITIONS_ DEMOLITION PLAN.pdf PDF
262600 Power Distribution Units for Static Uninteruptable Power Systems.pdf PDF
ES106 - ELECTRICAL - SECURITY GATE PLAN.pdf PDF
CS101 5 - CIVIL SITE PLAN.pdf PDF
Show 40 more

Latest 50 of 134 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA.1B

12-BFP-112-BFP-2

FD-EFD-E

8" CW

8" CW 8" CW

8" CW

6" SCW

6" SCW

8" CW

-7' - 4" BOP EL

8" CW

-7' - 4" BOP EL

PP-804

3/4" DCW

Architecture Engineering Design-Build paradigm 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Burns & McDonnell Engineering Company, Inc.

9450 WARD PARKWAY, KANSAS CITY, MO

CONTROLLED UNCLASSIFIED INFORMATION

100% CONSTRUCTION DOCUMENTS

06/25/2024

FULLY SPRINKLERED

PLUMBING SECTIONS

PL300

S. FISCHBACH J. YOUNG

SIOUX FALLS BOILER PLANT 438-22-900

VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105

SECTION

PL101BFP SECTION

0 2' 4' 8'

SCALE IN FEET

NOTES:

1. FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS SEE

DRAWING PL000.

2. FOR FIXTURE CONNECTION SIZES, REFER TO PLUMBING

FIXTURE SCHEDULE ON PL600.

3. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR

OPERATING, CLEANING, SERVICING, MAINTENANCE, AND

CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY

PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON

PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE

LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE

NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND

STRAINERS, TRANSMITTERS, CONTROL DEVICES. PRIOR TO

COMMENCING INSTALLATION WORK, REFER CONFLICTS

BETWEEN THIS REQUIREMENT AND CONTRACT DOCUMENTS

TO THE COR FOR RESOLUTION. FAILURE OF THE

CONTRACTOR TO RESOLVE, OR POINT OUT ANY ISSUES WILL

RESULT IN THE CONTRACTOR CORRECTING AT NO

ADDITIONAL COST OR TIME TO THE GOVERNMENT.

KEYED NOTES:

1. WATER QUALITY MONITORING SYSTEM. REFER TO

SPECIFICATION 22 05 19 METERS AND GAUGES FOR

PLUMBING AND PIPING.

2. ALLOW 20" OF LAY LENGTH FOR 4" CITY WATER METER

INSTALLATION. REFER TO DETAIL 3/PL501. LINES MAY BE

STACKED PER DETAIL.

Addendum 3 01-17-2025

2 2

Jan-16-2025

File details come from the government source that posted it. Updated .