Civil Merged - Addendum 4.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26324R0136
About this file
This file contains civil engineering drawings and details for a boiler plant replacement project at the VA Medical Center in Sioux Falls, SD. The drawings include civil utility plans, existing conditions/demolition plans, utility profiles, and construction details. Key components shown include steam pipeline tunnels, water storage tanks (two 40,000-gallon underground FRP tanks), fuel oil storage tanks (two underground double-walled FRP tanks with 68,031-gallon total capacity), electrical duct banks, communications infrastructure, and drainage systems.
The plans detail specific requirements for utility relocations, including natural gas pipeline relocation, steam line decommissioning, and protection of existing utilities during construction. Detailed construction specifications are provided for items such as concrete work, pipe trenching, catchbasin protection, and erosion control measures. The drawings are dated August 9, 2024 and are marked as 100% Construction Document Submission, prepared by Mabbett & Associates Inc. and Paradigm Architecture Engineering Design-Build for the Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files
Show 40 more
Latest 50 of 134 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G A
R F
I E
L D
V E
N U
E
G A
R F
I E
E
N U
E
REFER TO NOTE 2 FOR
DECOMMISSIONING STEAM PIPING
PRIOR TO DEMOLITION.
REFER TO NOTE 2 FOR
DECOMMISSIONING STEAM PIPING
PRIOR TO DEMOLITION.
EXISTING STEAM VAULTS TO REMAIN.
REFER TO NOTE 11.
REFER TO NOTE 13.
N
SCALE: 1" = 20'
0 50 100
CD101
CIVIL EXISTING CONDITIONS/
DEMOLITION PLAN
NOTES
1. REFER TO DRAWING C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL (PL101, PL201), AND ELECTRICAL
(ED101) DEMOLITION DRAWINGS.
3. REMOVE AND DISPOSE OF PAVEMENT TO THE LIMITS REQUIRED FOR THE INSTALLATION OF
NEW WORK.
4. ALL PAVEMENT SHALL BE SAWCUT TO ALLOW THE BACKFILL TO BE COMPACTED AND
PAVEMENT PATCHED AS PER THE SPECIFICATIONS AND SITE DETAILS.
5. REMOVE AND DISPOSE OF CONCRETE SIDEWALKS TO THE LIMITS REQUIRED FOR NEW
WORK.
6. PROTECT TREES TO REMAIN WITHIN THE LIMIT OF WORK UNLESS NOTED OTHERWISE.
7. PROTECT EXISTING UTILITIES IN PLACE. IF CONFLICT SUBMIT RFI TO VA COR TO DETERMINE
AN ALTERNATE SOLUTION.
8. SOIL MAY BE STOCKPILED FOR FUTURE RE-USE AS BACKFILL ONLY. SURPLUS SOIL SHALL
BE REMOVED AND DISPOSED.
9. REMOVE AND DISPOSE OF TOPSOIL.
10. REPAIR AFFECTED UTILITIES TO ALLOW FOR CONTINUED USE.
11. RELOCATE NATURAL GAS PIPELINE PRIOR TO EXCAVATING FOR UNDERGROUND TANKS.
12. PROTECT FIXTURES (I.E. EXISTING LIGHT POLES, FIRE HYDRANTS, AND SIGNS) TO REMAIN IN
PLACE WITHIN THE LIMIT OF WORK UNLESS NOTED OTHERWISE. THE CONTRACTOR IS
RESPONSIBLE FOR REPLACEMENT OR REPAIR OF FIXTURES SHOULD THEY BE DAMAGED
DURING CONSTRUCTION.
13. UTILITY LOCATIONS WITHIN THIS LOCATION WERE BEYOND THE SCOPE OF SURVEY.
CONTRACTOR TO VERIFY ALL UTILITIES IN FIELD.
KEY NOTES
1. REMOVE AND DISPOSE OF CONCRETE PAVEMENT.
2. REMOVE AND DISPOSE OF CURB.
3. REMOVE AND DISPOSE OF CONCRETE PAD.
4. REMOVE AND DISPOSE OF TREE.
5. NOT USED ON THIS SHEET.
6. REMOVE AND DISPOSE STORM INLET AND PIPING. SEE NOTE 10.
7. STEAM PIPELINE TO REMAIN ACTIVE UNTIL NEW STEAM LINE IS INSTALLED. EXISTING LINE
TO BE CAPPED IN PLACE ONCE NEW STEAM LINE IS INSTALLED AND ACTIVE.
8. REMOVE AND DISPOSE PORTION OF WATER PIPELINE. SEE NOTE 10.
9. REMOVE SIGN AND RETURN TO OWNER.
10. REMOVE PARKING LOT LIGHTS AND RETURN TO OWNER.
11. REMOVE BOLLARD AND RETURN TO OWNER.
12. REMOVE AND DISPOSE OF ELECTRICAL DUCT BANK. REFER TO CU101 FOR PHASING OF
DEMOLITION.
13. REMOVE AND DISPOSE OF COMMUNICATION LINE. REFER TO NOTE 2.
Scale: 1" = 20'
CIVIL EXISTING CONDITIONS/DEMOLITION PLAN
Scientists I Engineers I Program Managers
Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248
T. 781-275-6050 www.mabbett.com
Mabbett
R
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
100% CONSTRUCTION DOCUMENT SUBMISSION
08-09-2024
RBB EG
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
MATCHLINE SHEET CD102
MATCHLINE SHEET CD102
REFER
TO
NOTE
12.
1 ADDENDUM 1
08-09-2024
2 ADDENDUM 2 (NO CHANGES TO THIS SHEET) 09-12-2024
3 ADDENDUM 3 01-17-2025
4 ADDENDUM 4 02-10-2025
EXISTING COMMUNICATION TO REMAIN
IN PLACE. SEE NOTES 2 AND 7.
DRAIN PIPELINE WEST OF BOILER PLANT
0+00 1+00 1+75
N E
W
D
R A
I N
M
N
H O
L E
WATER MAIN
6" PVC ROOF DRAIN
INV=1487.5±
6" PVC SEWER SERVICE
INV=1478.7±
P
C
R
A
S
MATCH EXISTING
INV=1480.8±
MATCH EXISTING
INV=1482.6±
P
R
A
S
INV=1482.1±
R I M
6" FLOOR SLAB
E X
I S
T I N
G
S
T E
U
T
E
X
I S
T
I N
G
G
R
A
D
E
ROAD
EXISTING STEAM PIPE ZONE
WEST OF PROPOSED BOILER PLANT
2'' GAS
PLASTIC
STEAM PIPELINE IN TUNNEL
0+00 1+00 2+00 3+00
EXISTING STEAM VAULT 4
CONCRETE
PARKING
LOT
PROPOSED BOILER PLANT
FFE = 1493.0±
N E
W
S
T E
U
E
A S
T
SOFT WATER. REFER TO PLUMBING
DRAWINGS FOR CONTINUATION INSIDE NEW TUNNEL.
REFER TO MECHANICAL DRAWINGS FOR
PIPING CONTINUATION INSIDE BOILER PLANT.
REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR SLAB AND
FOOTING PENETRATIONS.
UTILITY TUNNEL
STEAM VAULT
REFER TO STRUCTURAL DRAWINGS
FOR STEAM VAULT CONNECTION WITH
EXISTING VAULT.
REFER TO MECHANICAL DRAWINGS FOR
PIPING CONNECTIONS AND CONTINUATION
INSIDE EXISTING AND NEW VAULTS
REFER TO MECHANICAL DRAWINGS FOR
DEMOLITION OF EXISTING STEAM PIPING.
M E
D I U
M
V
O L T
A G
E
D U
B
N
K
R E
L O
C A
T E
D
W
A T
E R
R E
L O
C A
T E
D
C
O M
M
BASE &
FOOTING
C
L
E
A
R
A
N
C
H
D P
E
W
A T
E R
C O
M M
D
U C
T
B
A N
K
PROPOSED GRADE
HPS AND CPS. REFER TO MECHANICAL
DRAWINGS FOR PIPING CONNECTIONS AND
CONTINUATION INSIDE NEW TUNNEL.
PROPOSED GRADE
REFER TO STRUCTURAL DETAIL F5 ON SB302.
REFER TO STRUCTURAL DETAIL F1 ON SB302.
UTILITY TUNNEL
REFER TO STRUCTURAL DRAWINGS
FOR UTILITY TUNNEL CONSTRUCTION,
CONNECTION WITH EXISTING TUNNEL,
AND PROPOSED BOILER PLANT
FOUNDATION
PROPANE STORAGE ROOM
FOOTING
WATER MAIN EAST SIDE OF BOILER PLANT
0+00 1+00 1+75
PROPOSED GRADE
8" PVC WATER MAIN
PROPOSED
BOILER PLANT
E L E
C T
R
IC
A L C
O N
D U
IT
COMMUNICATION CONDUIT
WATER PIPELINE FROM
STORAGE TANKS
FUEL PIPELINE FROM
STORAGE TANKS
NATURAL GAS SERVICE
0+00 1+00 2+00 3+00
P
T
U
R
S
P
P
E
L
I N
E
6" FLOOR SLAB
FOOTING
PROPOSED BOILER PLANT
FFE = 1493.0±
REFER TO MECHANICAL DRAWINGS FOR
PIPING CONTINUATION INSIDE BOILER PLANT.
REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR SLAB AND
FOOTING PENETRATIONS.
12'' DRAIN
REFER TO MECHANICAL DRAWINGS FOR
PIPING CONTINUATION INSIDE BUILDING 19.
REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR SLAB AND
FOOTING PENETRATIONS.
C
O
M
M
U
N
I C
A
T
I O
N
D
U
I T
MEDIUM VOLTAGE ELECTRIC
0+00 1+00 2+00
C O
M M
D
U C
T
B
A N
K
N E
W
S
T E
U N
N E
L
N E
W
J U
N C
T I O
N
B O
X
N
O
FP
FP
WATER
WATER
PROPOSED
WALKWAY
PROPOSED
WALKWAY
F O
O T
I N
G
M
E
D
I
L
T
A
B
N
K
CLEARANCE
0.5' MIN
SCALE: 1" = 20'
0 50 100
CJ301
CIVIL UTILITY PROFILE
NOTES
1. REFER TO DRAWING C001 FOR CIVIL LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
2. REFER TO CS101 FOR ALIGNMENT.
3. EXISTING PIPE SIZES OBTAINED FROM TOPOGRAPHIC SURVEY
CONDUCTED BY HONOR ENGINEERING IN NOVEMBER 2022,
UTILITY LOCATING CONDUCTED IN NOVEMBER 2022, AND
V.A.M.R.O.C. SITE PLAN DRAWING TITLED UTILITY MAP STEAM/GAS
DATED JUNE 2007 STEAM GAS DRAWING PROVIDED BY THE VA.
4. EXISTING UTILITIES TO REMAIN SHALL BE SUPPORTED AND
PROTECTED IN PLACE.
5. ALL UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE ONLY
AND WERE COMPILED ACCORDING TO AVAILABLE RECORD PLANS
FROM THE VARIOUS UTILITY COMPANIES AND PUBLIC AGENCIES.
ACTUAL LOCATIONS MUST BE DETERMINED IN THE FIELD.
BEFORE DESIGNING, EXCAVATING, BLASTING, INSTALLING
BACKFILLING, GRADING, PAVEMENT RESTORATION OR
REPAIRING: ALL UTILITY COMPANIES, PUBLIC & PRIVATE MUST BE
NOTIFIED INCLUDING THOSE IN CONTROL OF UTILITIES NOT
SHOWN ON THIS PLAN. MABBETT ASSUMES NO RESPONSIBILITY
FOR DAMAGES INCURRED AS A RESULT OF UTILITIES OMITTED
OR INACCURATELY SHOWN. BEFORE FUTURE CONNECTIONS, THE
APPROPRIATE UTILITY ENGINEERING DEPARTMENTS MUST BE
CONSULTED. CALL SOUTH DAKOTA ONE CALL AT 811.
6. WATER MAIN TO BE INSTALLED 6-FEET BELOW FINISH GROUND
SURFACE TO COMPLY WITH SECTION 5.26 OF THE VA DESIGN
MANUAL.
7. WATER MAIN TO BE INSTALLED AT LEAST 18-INCHES ABOVE
EXISTING SEWER SERVICE PER SECTION 5.2.9 OF THE VA DESIGN
MANUAL.
Scale: H:1" = 20'; V:1"=2'
C1
Scientists I Engineers I Program Managers
Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248
T. 781-275-6050 www.mabbett.com
Mabbett
R
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
100% CONSTRUCTION DOCUMENT SUBMISSION
08-09-2024
RBB EG
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
Scale: H:1" = 20'; V:1"=2'
F1
Scale: H:1" = 20'; V:1"=2'
C3
Scale: H:1" = 20'; V:1"=2'
C4
1 ADDENDUM 1 (NO CHANGES TO THIS SHEET) 08-09-2024
2 ADDENDUM 2 (NO CHANGES TO THIS SHEET) 09-12-2024
3 ADDENDUM 3 01-17-2025
Scale: H:1" = 20'; V:1"=2'
C7
4 ADDENDUM 4 02-10-2025
NTS
NOTES:
1. EXPANSION JOINTS SHALL BE LOCATED 30-FEET APART OR WHERE SIDEWALK ABUTS CONCRETE
DRIVEWAYS, CURB OR OTHER ADJACENT STRUCTURES.
2.
'' BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL
EXTEND THE FULL DEPTH OF THE CONCRETE.
3. FORMED EXPANSION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A
" RADIUS.
4. CONTROL JOINTS SHALL BE
" DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF
SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB.
5. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A
FINE BRUSH IN A TRANSVERSE DIRECTION.
6.
" DEEP CONTROL JOINTS (TYP.) SPACED AT 6' OR EQUAL TO SIDEWALK WIDTH.
7. T = THICKNESS OF PAVEMENT
TYPICAL SECTION
EXPANSION AND SCORED JOINT DETAIL
M
I N
NTS
NOTES:
1. PAVEMENT TO BE AT MINIMUM 7'' OF PORTLAND CEMENT CONCRETE WITH AT MINIMUM
8'' OF AGGREGATE BASE COURSE. THE THICKNESS OF THE AGGREGATE BASE COURSE
MAY NEED TO BE INCREASED IF POOR SUBGRADE AND WEATHER CONDITIONS ARE
ENCOUNTERED DURING CONSTRUCTION.
2. CONCRETE PAVEMENT SHALL MEET THE MINIMUM REQUIREMENTS OF SDDOT
STANDARD SPECIFICATIONS SECTION 380.
3. MINIMUM COMPRESSIVE STRENGTH FOR PORTLAND CEMENT CONCRETE PAVING
SHALL BE 4,000 PSI AT 28 DAYS (SECTION 8.11.2 OF THE CITY OF SIOUX FALLS
ENGINEERING DESIGN STANDARDS FOR PUBLIC IMPROVEMENTS).
NOTES:
1. ON PCC PAVEMENT A KEYWAY LONGITUDINAL JOINT WITH TIE BARS SHALL BE USED
WHEN CURB AND GUTTER IS POURED SEPARATELY.
2. CURB AND GUTTER SHALL BE CONSTRUCTED USING M-6 CONCRETE UNLESS
MONOLITHICALLY CONSTRUCTED WITH THE ADJACENT PAVEMENT. IN MONOLITHIC
PAVING, CONCRETE MIX FOR THE CURB AND GUTTER MAY BE THE SAME AS THE
ADJACENT CONCRETE PAVEMENT.
3. THE CURB TRANSITION LENGTH AT ADA CURB RAMPS WILL BE DEPENDENT ON THE
TYPE OF CURB RAMP BEING INSTALLED. THE PLANS SHOULD CALL OUT THE LENGTH
OF THE TRANSITIONS.
NTS
PLAN
SECTION
WATER FLOW
AREA TO BE PROTECTED
WORK AREA
12''
MIN.
NOTES:
1. FILTER MEDIA MAY BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER.
2% MAX
WORK AREA
COMPOST SOCKS (8'')
'' X 1
'' WOODEN STAKES PLACED 10' O.C.
'' X 1
'' WOODEN STAKES PLACED 10' O.C.
COMPOST SOCKS (8'')
AREA TO BE PROTECTED
'' R. (TYP.)
EXPANSION JOINT WITH
'' BITUMINOUS JOINT FILLER
CONTROL JOINT
WIDE AND DEEP
SAWCUT OR TOOLED
M6 CEMENT
CONCRETE
8" GRAVEL
BORROW
3/
NTS
NTS
NTS
NTS
CATCHBASIN
GRATE
POLYPROPYLENE
BOOT
CATCHBASIN
FRAME
OPTIONAL
OVERFLOW
DUMP STRAPS
EXPANSION RESTRAINT
" NYLON ROPE 2"
FLAT WASHERS)
DUMP STRAPS
SILT SACK
CATCHBASIN GRATE
NOTES:
1. INSPECT AT MINIMUM WEEKLY OR AFTER RAIN EVENT.
2. MAINTAIN AS NECESSARY.
3. REPLACE SILT SACKS ONCE THE BAG IS FILLED HALF WAY WITH DEBRIS.
4. DO NOT EMPTY SILT SACK CONTENTS INTO CATCH BASIN.
NTS
NOTE:
1. REFER TO PLAN FOR SPACING AND PLACEMENT.
1'-9" ±
PARKING STALL
9'-0''
TYP.
T Y
P
NOTES:
1. ALL PAINT MARKINGS SHALL BE THE COLOR WHITE.
4'' TYP.
NTS
3000 PSI CONCRETE
Y
P
NTS
NOTES:
1. ONCE THE SITE IS ESTABLISHED WHERE TRACKOUT CONTROL SYSTEM IS TO BE PLACED, ANY EXCESSIVE UNEVEN TERRAIN SHOULD BE
LEVELED OUT OR REMOVED SUCH AS LARGE ROCKS, LANDSCAPING MATERIALS, OR SUDDEN ABRUPT CHANGES IN ELEVATION.
2. THE INDIVIDUAL MATS CAN START TO BE PLACED INTO POSITION. THE FIRST MAT SHOULD BE PLACED NEXT TO THE CLOSEST POINT OF
EGRESS. THIS WILL ENSURE THAT THE VEHICLE WILL EXIT STRAIGHT FROM THE SITE ONTO THE PAVED SURFACE.
3. AFTER THE FIRST MAT IS PLACED DOWN IN THE PROPER LOCATION, MATS SHOULD BE ANCHORED TO PREVENT THE POTENTIAL MOVEMENT
WHILE THE ADJOINING MATS ARE INSTALLED. ANCHORS SHOULD BE PLACED AT EVERY ANCHOR POINT (IF FEASIBLE) TO HELP MAINTAIN THE
MAT IN ITS CURRENT POSITION.
4. AFTER THE FIRST MAT IS ANCHORED IN ITS PROPER PLACE, AN H BRACKET SHOULD BE PLACED AT THE END OF THE FIRST MAT BEFORE
ANOTHER MAT IS PLACED ADJACENT TO THE FIRST MAT.
5. ONCE THE SECOND MAT IS PLACED ADJACENT TO THE FIRST MAT, MAKE SURE THE H BRACKET IS CORRECTLY SITUATED BETWEEN THE TWO
MATS, AND SLIDE MATS TOGETHER.
6. NEXT THE CONNECTOR STRAPS SHOULD BE INSTALLED TO CONNECT THE TWO MATS TOGETHER.
7. UPON PLACEMENT OF EACH NEW MAT IN THE SYSTEM, THAT MAT SHOULD BE ANCHORED AT EVERY ANCHOR POINT TO HELP STABILIZE THE
MAT AND ENSURE THE SYSTEM IS CONTINUOUS WITH NO GAPS IN BETWEEN THE MATS.
8. SUCCESSIVE MATS CAN THEN BE PLACED TO CREATE THE TRACKOUT CONTROL SYSTEM REPEATING THE ABOVE STEPS.
ROAD
PROJECT
LOCATION
USE AND MAINTENANCE
1. VEHICLES SHOULD TRAVEL DOWN THE LENGTH OF THE
TRACKOUT CONTROL SYSTEM AND NOT CUT ACROSS
THE MATS.
2. DRIVERS SHOULD TURN THE WHEEL OF THEIR VEHICLES
SUCH THAT THE VEHICLE WILL MAKE A SHALLOW S-TURN
ROUTE DOWN THE LENGTH OF THE TRACKOUT CONTROL
SYSTEM.
3. MATS SHOULD BE CLEANED ONCE THE VOIDS BETWEEN
THE PYRAMIDS BECOME FULL OF SEDIMENT. TYPICALLY
THIS WILL NEED TO BE PERFORMED WITHIN TWO WEEKS
AFTER A STORM EVENT. BRUSHING IS THE PREFERRED
METHOD OF CLEANING, EITHER MANUALLY OR
MECHANICALLY.
4. THE USE OF ICE MELT, ROCK SALT, SNOW MELT, DE-ICER,
ETC. SHOULD BE UTILIZED AS NECESSARY DURING THE
WINTER MONTHS AND AFTER A SNOW EVENT TO
PREVENT ICE BUILDUP.
TRACKOUT CONTROL
SYSTEM MAT
ANCHOR
POINT
ANCHOR
POINT
6"
30"
T
= THICKNESS SHALL
BE EQUAL TO
THE DEPTH OF THE
ADJACENT
PAVEMENT BUT NOT
LESS THAN 6"
T
= T
-7/8"
2"
20"
22"
10"
1/2" RADIUS
FLOWLINE
T
T
1/2" RADIUS
3" RADIUS
2.0% SLOPE
9"9"
MIN. PATCH WIDTH 4'-0"
1 1/4" EPOXY COATED DEFORMED BAR - 18" LONG
1 1/4" EPOXY COATED SMOOTH BAR - 18" LONG
SPACING AT EACH COLD JOINT
PAVEMENT EDGE
FULL-DEPTH
SEVERANCE
WITH A SAW BLADE
8" SCARIFIFICATION AND
RECOMPACTION OF SUBGRADE
NEW PORTLAND CEMENT
CONCRETE PAVEMENT
NTS
RUNOFF
WATER
WITH
SEDIMENT
OVERFLOW
CURB
INLET
NOTES:
1. THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE
PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE
OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS.
2. ALTERNATE DESIGN COULD UTILIZE GRAVEL FILLED BAGS.
3. FILTER FABRIC SHALL CONFORM TO SECTION 831 OF SDDOT STANDARD
SPECIFICATIONS FOR ROADS AND BRIDGES, LATEST EDITION.
GUTTER
2" x 4" WOOD STUD
CURB INLET
WIRE SCREEN
FILTER FABRIC
CONCRETE BLOCKS
FILTER FABRIC
WIRE MESH
FILTERED WATER
2" x 4" WOOD STUD
7'-0''
TYP.
T Y
P
GRAVEL (GRADED
GRAVEL WITH
1.5'' MAX.
AGGREGATE SIZE)
NTS
50'-0'' MIN.
12"
PIPE BEDDING
MATERIAL TO
BE HAND
TAMPED OR
SHOVEL SLICED
AROUND
HAUNCHES.
UNDISTURBED SOIL FOR BASE
(SEE NOTE 1)
HAUNCHING &
BEDDING
B =OUTSIDE DIAMETER
OF PIPE BARREL.
NATIVE MATERIAL, IF SATISFACTORY
(IF NATIVE MATERIAL IS NOT
ACCEPTABLE, GRANULAR MATERIAL
SHALL BE USED AND COMPACTED TO
A MINIMUM 90% STANDARD PROCTOR
DENSITY)
SPRINGLINE
INITIAL
BACKFILL
NATIVE MATERIAL, IF SATISFACTORY (IF
NATIVE MATERIAL IS NOT ACCEPTABLE,
GRANULAR MATERIAL SHALL BE USED AND
COMPACTED TO A MINIMUM 95% STANDARD
PROCTOR DENSITY)
FINAL BACKFILL TO GRADE
1/2 B
1/4 B
(4" MIN.)
MIN. 6"-9"
PIPE BEDDING MATERIAL
(INSTALL TO TOP OF PIPE)
NTS
NOTES:
1. IF BASE IS UNSTABLE, TRENCH SHALL BE UNDERCUT AND STABILIZED WITH TRENCH
STABILIZATION MATERIAL. SPECIFICATIONS AS PER MANUFACTURER'S RECOMMENDATIONS AND
A.S.T.M. C12.
2. BEDDING MATERIAL
95% PASSING 3/4" SIEVE
95% RETAINED #4 SIEVE
(CLEAN ANGULAR, WELL-GRADED, CRUSHED ROCK. PEA ROCK MAY BE USED FOR SANITARY
SEWER SERVICE LINES.)
3. THE REQUIRED BEDDING MATERIAL UNDER THE BOTTOM OF THE PIPE SHALL BE INSTALLED PRIOR
TO PIPE INSTALLATION.
ADJUSTABLE CAST
IRON VALVE BOX. SIZED IN
ACCORDANCE WITH
MANUFACTURER'S METHODS.
DIAMETER SHALL BE LESS
THAN 9 INCHES
MECHANICAL JOINT GATE VALVE
2-8" X 4" X 16"
CONCRETE BLOCKS
NTS
8'-2 1/4''
11.5 GA GALV.
FABRIC
1.625'' DIAM. X 0.047''
GALV. RAIL
HORIZONTAL RAILS
CUT 96'' BEFORE
NOTCH
1.625'' DIAM. X
0.065'' GALV. RAIL
VERTICAL RAILS
NOTES:
1. INSTALL TEMPORARY FENCE PER ASTM F3342-19 STANDARD GUIDE FOR
TEMPORARY FENCE APPLICATIONS FOR CONSTRUCTION SITES.
2. POSTS TO BE 10' O.C. AND DRIVEN TO A MINIMUM DEPTH OF 24 INCHES.
3. GATE POSTS TO BE SET IN CONCRETE FOOTING.
4. FABRIC TO BE INSTALL IN ACCORDANCE WITH ASTM F 567 IN LENGTHS NOT LESS
THAN 21 FEET.
NTS
1.6
0.1
1.7
1.6
1.3 1.5
0.6
1.3
1.2
1.1
0.3
1.2
0.8
0.6
0.2
0.5
NOTES:
1. REMOTE FUEL FILL STATION TO BE MOUNTED ON STAINLESS STEEL STAND WITH
LEGS.
NTS
TOPSOIL
NOTES:
1. INSTALL 6" AND COMPACT TOPSOIL TO 4'' MINIMUM.
2. COMPACT SUBGRADE TO 85% PROCTOR.
3. SOD.
SUBGRADE
GRASS
FINISHED GRADE,
TREATMENT VARIES
ROOF JOINTS OFFSET
FROM TUNNEL
TONGUE FOR JOINT
TUNNEL LENGTH ADJUSTABLE
UP TO 14.75'
PLAN VIEW
GROOVE FOR JOINT
NOTES:
1. ALL CONCRETE SHALL HAVE A 28 DAYS COMPRESSIVE STRENGTH OF 4500 PSI.
2. REINFORCING STEEL SHALL COMPLY WITH ASTM A615 GRADE 60 REBAR. BAR BENDING
AND PLACEMENT SHALL COMPLY WITH THE LATEST ACI STANDARDS.
3. STANDARD STRUCTURAL DESIGN BASED ON AASHTO HS 20 WHEEL LOADING. 1'' O.D.
BUTYL RUBBER ROPER MASTIC SHALL BE PROVIDED FOR PLACEMENT BETWEEN EACH
SECTION.
SECTION VIEW
7.2'
6.4'
NTS
NUMBER OF DUCTS VARY
DEPENDING ON LOCATION.
REFER TO ELECTRICAL
DRAWINGS FOR SPECIFIC
DUCT BANK
CONFIGURATIONS AND
ELECTRICAL DETAIL 1 ON
E-501 FOR INTERIOR
CONSTRUCTION AND
SPACING OF DUCT BANK.
REFER TO CIVIL DETAIL D7 ON CK503, STRUCTURAL,
AND ELECTRICAL PLANS FOR MORE DETAILS
1.5 1.5
0.7
0.7
0.8
0.8
ASSEMBLY LIST
6"Ø INLET, PIPE STUB W/ FLEX CONNECTOR
6"Ø OUTLET, PIPE STUB W/ FLEX CONNECTOR
1 1/2"Ø OIL DRAW OFF, FPT
INLET BAFFLE
3'-6" x 2'-6" MANWAY
1 1/2"Ø SLUDGE DRAW OFF, FPT
WEIR WALL
OIL RETENTION BAFFLE
COALESCING MEDIA
2"Ø LEVEL SWITCH MTG. PROVISION, FLANGED
BOTTOM HOLD DOWN FLANGE
1.9
1.5
1.5
EMPTY WGT. APPROX.=575#
OPERATING CAP.=755 GAL.
OPERATING WGT.=6,865#
NORMAL OIL CAP.=30 GAL.
OIL SPILL CAP.=340 GAL.
WEIGHTS & CAPACITIES
VERTICAL OUTLET FLUME
0.4
9"9"
1 1/4" EPOXY COATED
DEFORMED BAR - 18" LONG
1 1/4" EPOXY COATED SMOOTH
BAR - 18" LONG
SPACING AT EACH COLD JOINT
1/2" REINFORCING
REBAR AT MID-SPAM
AND SPACED 1' O.C. E.W.
1/2" REINFORCING
REBAR AT MID-SPAM
AND SPACED 1' O.C.
E.W.
FINISHED GRADE
UTILITY LABELED, CAST
IRON COVER CONFORMING
WITH ASTM A48
PIPELINE
PIPELINE
FINISHED GRADE
8" AGGREGATE BASE
COURSE PER SDDOT
SECTION 260 AND 882
6'
7.2'
BEDDING PER MANUFACTURER'S RECOMMENDATION
NTS
MATCH EXISTING. SEE DETAIL F8
FOR LAWN OR D1 FOR PAVED
AREAS.
18" MIN.
6"
TYP.
SAWCUT (IN PAVEMENT
SECTIONS ONLY)
EXISTING
SURFACE
NATIVE BACKFILL,
IF AVAILABLE
AGGREGATE BASE
6'' BASE MIN.
OR MATCH EXISTING
WHICHEVER IS GREATER
NOTES:
1. ALL TRENCHES IN ARTERIAL AND COLLECTOR STREETS SHALL BE BACKFILLED AND TEMPORARILY PAVED OR STEEL
PLATED AT THE END OF EACH WORKING DAY.
2. TRAFFIC CONTROL TO MEET THE CURRENT EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
3. BACKFILL MATERIAL TO BE PLACED IN 8" MAX. LIFTS AT 95% COMPACTION.
4. WHEN WEATHER CONDITIONS PREVENT USING SELECT NATIVE FILL, CRUSHED QUARTZITE MATERIAL (ROCK DUST)
MAY BE USED FOR BACKFILL WITH CITY ENGINEER'S APPROVAL. COMPACTION REQUIREMENTS MUST BE FOLLOWED
FOR CRUSHED QUARTZITE MATERIAL.
REFER TO
STRUCTURAL
DETAIL F1 ON
SB302 FOR
TUNNEL
CONSTRUCTION &
FOOTING
REQUIREMENT
CK501
CIVIL DETAILS
Scale: NTS
CIVIL DETAILS
Scientists I Engineers I Program Managers
Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248
T. 781-275-6050 www.mabbett.com
Mabbett
R
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
100% CONSTRUCTION DOCUMENT SUBMISSION
08-09-2024
RBB EG
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
1 ADDENDUM 1 (NO CHANGES TO THIS SHEET) 08-09-2024
2 ADDENDUM 2 (NO CHANGES TO THIS SHEET) 09-12-2024
3 ADDENDUM 3 01-17-2025
R F
I E
E
N U
E
G A
R F
I E
E
N U
E
EXISTING STEAM PIPE MH5
APPROXIMATELY 10-12 FEET BELOW GRADE
PROPOSED
BOILER PLANT
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
W
E
E
S T
S T
E
E
E
D
D
D D
D D
D D
D
D
D
D
D
S T
P
P
W
W
W
W
W
G A
S
G A
S
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G A
S
W
W
W
W
W
W
W
W
W
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
W
W
W
W
W
W
F
U
E
L
F
U
E
L
FUEL
FUEL
V V
V
V
G A
S
G A
S
G A
S
W
W
W
W
F P
D
D
ST
YD
YD
YD
OWS
F P
F U
E L c c c
C
C
C
C
C
C
C
C c
C
E E
E E
E E
C
C
C
C
C
C
C
C
SEE NOTES 2 & 10 FOR
NATURAL GAS PIPELINE
REQUIREMENTS.
SEE NOTE 2 FOR ELECTRICAL
CONDUIT REQUIREMENTS.
SEE NOTE 2
CB-1
RIM = 1488.9
INV = 1482.3
DMH-1
RIM = 1489.5
INV = 1481.5
CB-2
RIM = 1488.9
INV = 1481.8
YD-1
RIM =1489.0
INV = 1486.0
YD-2
RIM =1489.0
INV = 1487.1
YD-3
RIM =1489.0
INV = 1486.4
DMH-3
RIM = 1490.6
INV(S) = 1482.2
INV(E) = 1482.2
OWS-1
RIM = 1492.4
INV IN = 1491.4
INV OUT = 1490.8
6" SEWER
INV = 1482.6±
L=5.5
4" SEWER
INV= 1490.6
L=15±
S=0.05
SEE NOTE 2 FOR NATURAL GAS
PIPELINE REQUIREMENTS.
D
D
ST
YD
YD
YD
OWS
M
IN
EXISTING STEAM PIPE
APPROXIMATELY 6-7
FEET BELOW GRADE
COMMUNICATION INSTALL
CANNOT CLOSE ROADWAY.
INSTALL MUST BE PHASED TO
ALLOW ACCESS. SEE NOTE 10.
SEE NOTE 5.
SEE NOTE 9.
SEE NOTE 2 FOR
CONTINUATION OF
CONNECTION.
4'' HDPE
REFER TO NOTE 13.
SEE NOTE 2 FOR
STRUCTURAL PENETRATION
DETAIL.
SEE NOTE 2 FOR
STRUCTURAL PENETRATION
DETAIL.
N
SCALE: 1" = 20'
0 50 100
CU101
CIVIL UTILITY PLAN
NOTES
1. REFER TO DRAWING C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, FIRE PROTECTION, AND ELECTRICAL
DRAWINGS FOR MORE INFORMATION.
3. REFER TO CIVIL UTILITY PROFILE SHEETS, CJ301 AND CJ302.
4. LOCATION OBTAINED FROM VA, V.I.F. 4-INCH HIGH PRESSURE NATURAL GAS. V.I.F.
5. REFER TO SPECIFICATIONS FOR PERFORMANCE REQUIREMENTS.
6. REFER TO PLUMBING PLANS PL101 AND PL201 FOR WATER LINE CONFIGURATION IN TUNNEL
7. WATER LINE TO BE CONNECTED TO EXISTING WATER TOWER LINE. REFER TO SHEET CU102
FOR CONTINUATION AND CU103 FOR PHASING.
8. UTILITIES SHOWN IN THIS LOCATION WERE BEYOND THE LIMIT OF WORK FOR TOPOGRAPHIC
SURVEY ACTIVITIES. CONTRACTOR IS REQUIRED TO VERIFY ALL LOCATIONS IN FIELD.
9. CONTRACTOR REQUIRED TO VERIFY IN FIELD UTILITY MANHOLE.
10. REFER TO CS101 FOR PHASING.
11. UTILITY LOCATIONS WITHIN THIS LOCATION WERE BEYOND THE SCOPE OF SURVEY.
CONTRACTOR TO VERIFY ALL UTILITIES IN FIELD.
12. TRENCHING, LAYING OF CONCRETE CELL DUCT, AND PREP FOR INSTALLATION IS TO BE DONE PRIOR TO TUNNEL INSTALLATION AND DEMOLITION OF EXISTING MEDIUM VOLTAGE LINE. UPON
APPROVAL FOR OUTAGE DURING INSTALLATION OF JUNCTION BOX 3 (REFER TO ELECTRICAL
PLANS), EXISTING MEDIUM VOLTAGE LINE FEEDER TO BE DISCONNECTED AND NEW MEDIUM
VOLTAGE LINE FEEDER TO BE CONNECTED (REFER TO ELECTRICAL PLANS FOR
REQUIREMENTS). AFTER CONNECTION IS COMPLETE, DEMOLITION OF EXISTING MEDIUM
VOLTAGE LINE CAN COMMENCE.
13. PROTECT EXISTING UTILITIES IN PLACE DURING CONSTRUCTION OF REPLACEMENT UTILITIES.
14. REFER TO MECHANICAL SHEET MD101 FOR SOFT WATER CONNECTION IN TUNNEL.
KEY NOTES
1. FURNISH AND INSTALL 6-INCH PVC SEWER SERVICE (DETAIL E9, CK501).
2. FURNISH AND INSTALL GATE VALVE AND 8-INCH PVC WATER MAIN (DETAIL F1, CK501 AND
DETAIL D5, CK502).
3. FURNISH AND INSTALL HDPE DRAIN PIPE (DETAIL C9, CK502).
4. FURNISH AND INSTALL ELECTRICAL DUCT BANK (SEE NOTE 2 AND DETAIL B5, CK501).
5. FURNISH AND INSTALL 73,929 GALLONS OF WATER STORAGE. TANKS: (2) 40,000 GALLON
54'-4''L X 12'D UNDERGROUND FRP WATER STORAGE TANKS (DETAIL B1, CK502).
6. FURNISH AND INSTALL 68,031 GALLONS OF FUEL OIL STORAGE. TANKS: (2) 54'-4''L X 12'D
UNDERGROUND FRP DOUBLE WALLED FUEL OIL STORAGE TANKS (DETAIL F1, CK502).
7. FURNISH AND INSTALL COMMUNICATIONS CABLING. SEE NOTE 2.
8. FURNISH AND INSTALL FUEL PIPING AND REMOTE FILL WITH AUDIBLE ALARM. SEE NOTE 2
AND DETAIL F7, CK501.
9. FURNISH AND INSTALL STEAM MANHOLE (DETAIL F1, CK503).
10. FURNISH AND INSTALL DRAIN MANHOLE WITH LOCKABLE COVER (DETAILS F7, CK502 AND C5, CK503).
11. FURNISH AND INSTALL CATCH BASIN (DETAIL F5, CK502).
12. FURNISH AND INSTALL DUPLEX SUBMERSIBLE PUMPS AND CONTROLS. REFER TO SHEETS
PL101, PL600, AND SPECIFICATION 33 16 00.
13. FURNISH AND INSTALL 4-INCH FIRE PROTECTION LINE FOR BACKUP WATER PROVIDED BY
WATER TOWER. SEE NOTE 2.
14. FURNISH AND INSTALL CONCRETE COMMUNICATIONS MANHOLE. REFER TO ELECTRICAL
DETAILS.
15. FURNISH AND INSTALL WALL INDICATOR VALVE (DETAIL B7, CK503).
16. FURNISH AND INSTALL MEDIUM VOLTAGE DUCT BANK. REFER TO NOTE 2 AND E-501 DETAIL 1
FOR DUCT BANK CONFIGURATION.
17. FURNISH AND INSTALL COMMUNICATION DUCT BANK. REFER TO NOTES 2, 13, AND
ELECTRICAL DETAIL 1 ON E-501.
Scale: 1" = 20'
CIVIL UTILITY PLAN
Scientists I Engineers I Program Managers
Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248
T. 781-275-6050 www.mabbett.com
Mabbett
R
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
100% CONSTRUCTION DOCUMENT SUBMISSION
08-09-2024
RBB EG
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
SEE NOTES
2 AND 6.
6'' HDPE
L= 14.8
S= 0.034
6'' HDPE
L= 15.3
S= 0.013
6'' HDPE
L= 3.7
S=0.05
6'' SEWER
INV= 1478.6
L= 17±
S=0.05±
ROOF
DRAIN
10'' HDPE
L= 5±
S= 0.01
4'' HP GAS
SEE NOTE 4.
2'' LP GAS
SEE NOTE 4.
MATCHLINE SHEET CU102MATCHLINE SHEET CU102
H
P
E
P
E
L
P
E
H
D P
E
P
V C
SOFT WATER
CONNECTION
TO EXISTING
WITHIN TUNNEL
SEE NOTE 3.
12'' HDPE
L= 109+/-
S=0.012
1 ADDENDUM 1 08-09-2024
2 ADDENDUM 2 09-12-2024
3 ADDENDUM 3 01-17-2025
4'' PE
SEE NOTE 14.
4 ADDENDUM 4 02-10-2025
| Sheets and Views |
| 100% CD ADD. 4 20250210 |
| 438-22-900 CJ301-100% CD ADD. 4 20250210 |
| 100% CD ADD. 4 20250210 |
| 438-22-900 CK501-100% CD ADD. 4 20250210 |
| 100% CD ADD. 4 20250206 |
| 438-22-900 CU101-100% CD ADD. 4 20250210 |
| 100% CD ADD. 4 20250210 |
File details come from the government source that posted it. Updated .