Structural Merged - Addendum 4.pdf
PDF 3 MB Posted
- Solicitation number
- 36C26324R0136
About this file
This file contains structural engineering drawings and details for a boiler plant replacement project at a VA facility. The drawings include foundation and slab plans, foundation details, and general structural details across three sheets.
Sheet 1 shows ground floor foundation plans with detailed column schedules, wall opening schedules, and equipment pad layouts. Sheet 2 provides foundation details including overhead door reinforcing, foundation wall sections, and various equipment pad details. Sheet 3 contains CMU wall reinforcing diagrams and details for structural components. The drawings are prepared by Moon Tree and Paradigm Engineering for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management. The plans appear to be fully finalized construction documents, indicated by the "FULLY FINALIZED" stamp, and include specific dimensions, reinforcement requirements, and construction notes for contractors to follow during execution of the boiler plant replacement work.
View the file
Other files
Show 40 more
Latest 50 of 134 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRUE
N
PLAN
N
TRUE
N
PLAN
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
| Sheets and Views |
| SB101 |
| SB302 |
| S-302 |
| SG003 |
| SG003 |
File details come from the government source that posted it. Updated .