PL101-PLUMBING PLANS.pdf
PDF 703 KB Posted
- Solicitation number
- 36C26324R0136
About this file
This is a plumbing plan drawing (PL101) for the Sioux Falls Boiler Plant replacement project at the Veterans Affairs Medical Center in Sioux Falls, SD. The drawing shows detailed underground plumbing and first-floor equipment plans at 1/8" = 1'-0" scale, including sanitary sewer lines, water supply lines, floor drains, and various plumbing equipment locations.
The drawing details include city water entry points, connections to water towers, soft water lines to Building 11, storm and sanitary sewer exits, natural gas entry, and specialized plumbing systems such as trap primers and blowdown tanks. Key equipment shown includes city water tanks, fuel oil tanks, propane storage, and a caustic storage tank with pump for a dealkalizer system. The drawing is part of 100% Construction Documents dated 06/25/2024, with addenda dated 08/09/2024 and 01/17/2025, prepared by Burns & McDonnell Engineering Company for the VA Office of Construction and Facilities Management.
View the file
Other files
Show 40 more
Latest 50 of 134 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFREF
A B.2 C
BOILER RM
A.1 B B.3
1.1
5.1
STORAGE
ELEC RM
CONTROL
TELECOM
STORAGE
10" S
SUPERVISOR
4" SS UP4" NG UP
2" SS UP
2" V UP
2" V UP
3" SS UP
2" SS UP
4" SS UP
FD-E
FD-C
FD-R
FD-R
FD-E FD-E
8" CW UP 8" CW UP
8" PCW UP
10" S UP
S S
4" SS
FD-R
2" SS UP
GENERATOR
PL300
2" SS UP
4" SS UP
6" SS
4" SS
CITY WATER
TANK
CITY WATER
TANK
(CWV)
(CWV)
4" SS
4" SS
FD-E
FD-E
FD-E
FD-E
4" SV UP
4" SV UP
4" SV UP
S S
S S
S S
4" NG 4" SS UP
FCO
FD-E
4" SS UP
FD-E
6" SCW UP
4" WOG2" DCW UP
FD-E
FCO
FCO
6" SS UP
I.E.= 98' - 0"
4" SS
4" SS
4" SS
4" SS6" SS
I.E.= 96' - 7"I.E.= 89' - 0"I.E.= 88' - 10"
I.E.= 93' - 0"
I.E.= 98' - 3"
I.E.= 97' - 10"
I.E.= 97' - 7"
I.E.= 97' - 6"
I.E.= 92' - 8" I.E.= 92' - 8"
8" CW
8" CW
8" PCW
I.E.= 93' - 3"
I.E.= 89' - 2"
6" SS
4" SS
4" SS
I.E.= 97' - 3"I.E.= 96' - 8"
2" IWS UP2" IWS UP
2" IWS
2" IWS
2" V UP
FD-C
WOMENS LOCKER
CORRIDOR
BREAKROOM
FCOFCO
4" SS
2" S
S
2" SS UP
PROPANE STORAGE
UNISEX TOILET
MENS LOCKER
S L O
P E
SLOPE
12-BPIW-1
12-BPIW-2
6" CW
6" CW
C W
2" IWS
2" IWS
6" CW UP
FUEL OIL
TANK
FUEL OIL
TANK
A B.2 C
BOILER RM
A.1 B B.3
1.1
5.1
STORAGE
ELEC RM
CONTROL
TELECOM
STORAGE
SUPERVISOR
FD-E
FD-E
FD-E
PP-707
PP-705B
FD-C
PP-702
PP-101
PP-408
PP-528
FD-R
FD-R
12-WS-1
PP-502
12-BFP-1 12-BFP-2
12-BFP-3
12-BFP-4
FD-R
12-FCCU-2
12-FCCU-3
PP-604
GENERATOR
PL300
12-WS-2
12-FCCU-4
PP-707FD-E
PP-705B
FD-E
FD-E
FD-E
FD-E
12-FCCU-1
TP-1
TP-1
GAS METER
TP-1
FD-E
FD-CPP-702
PROPANE STORAGE
PP-804
PP-804
PP-804
PP-804
FD-C
12-DKT-1
Architecture Engineering Design-Build paradigm 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Burns & McDonnell Engineering Company, Inc.
9450 WARD PARKWAY, KANSAS CITY, MO
CONTROLLED UNCLASSIFIED INFORMATION
100% CONSTRUCTION DOCUMENTS
06/25/2024
FULLY SPRINKLERED
PLUMBING PLANS
PL101
S. FISCHBACH J. YOUNG
SIOUX FALLS BOILER PLANT 438-22-900
VAMC-Sioux Falls: 2501 W 22nd St, Sioux Falls, SD 57105
#NOTES:
1. FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS SEE
DRAWING PL000.
2. FOR FIXTURE CONNECTION SIZES, REFER TO PLUMBING
FIXTURE SCHEDULE ON PL600.
3. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR
OPERATING, CLEANING, SERVICING, MAINTENANCE, AND
CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY
PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON
PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE
LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE
NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND
STRAINERS, TRANSMITTERS, CONTROL DEVICES. PRIOR TO
COMMENCING INSTALLATION WORK, REFER CONFLICTS
BETWEEN THIS REQUIREMENT AND CONTRACT DOCUMENTS
TO THE COR FOR RESOLUTION. FAILURE OF THE
CONTRACTOR TO RESOLVE, OR POINT OUT ANY ISSUES WILL
RESULT IN THE CONTRACTOR CORRECTING AT NO
ADDITIONAL COST OR TIME TO THE GOVERNMENT.
4. ALL INVERT ELEVATIONS (I.E.) ARE BASED ON FINISHED
FLOOR = 100'-0".
KEYED NOTES:
1. CITY WATER ENTRY. REFER TO CIVIL DRAWING C104 FOR PIPE CONTINUATION.
2. CITY WATER LINE TO WATER TOWER. REFER TO CIVIL DRAWING CU101 FOR PIPE CONTINUATION.
3. SOFT WATER LINE TO BUILDING 11. REFER TO PL201 FOR PIPE CONTINUATION.
4. STORM WATER BUILDING EXIT. REFER TO CIVIL DRAWING CU101 FOR PIPE CONTINUATION.
5. SANITARY SEWER BUILDING EXIT. REFER TO CIVIL DRAWING CU101 FOR PIPE CONTINUATION.
6. TANKS SHOWN FOR CLARITY. REFER TO CIVIL DRAWINGS FOR TANK LOCATIONS AND WATER LINE TIE-IN DETAILS. REFER TO 33 16 00 FOR SPECIFICATIONS AND PL500.
7. NATURAL GAS ENTRY. REFER TO CIVIL DRAWING CU101 FOR PIPE CONTINUATION.
8. PROVIDE SLEEVE IN FOUNDATION THAT EXTENDS 6" ABOVE AND BELOW FOUNDATION. SLEEVE SHALL BE 2" LARGER THAN PIPE.
9. UP TO TRAP PRIMER. ROUTE TRAP PRIMER LINES TO FLOOR DRAINS AS SHOWN.
10. ROUTE DOMESTIC WATER TO BLOWDOWN TANK. REFER TO DRAWING MP101.
11. 4" UP TO TRENCH OUTLET.
12. TO OIL WATER SEPARATOR. REFER TO CIVIL DRAWING CG101 FOR PIPE CONTINUATION.
13. BLOWDOWN PIT SHALL HAVE 6" OUTLET ON FD-E.
14. ROUTE 2" VENT FROM WATER TANKS TO BUILDING WALL. ROUTE 6'-0" ABOVE GRADE AND SUPPORT FROM BUILDING STRUCTURE. INCLUDE RAIN CAP ON VENT LINE.
15. CAUSTIC STORAGE TANK AND PUMP FOR DEALKALIZER. REFER TO PROJECT SPECIFICATIONS 22 67 21.
16. INSTALL CITY WATER METER PRIOR TO BACK FLOW ASSEMBLY. REFER TO CITY WATER METER INSTALLATION DETAILS ON PL501.
TRUE
N
PLAN
N
1/8" = 1'-0" E5
PLUMBING PLAN - UNDERGROUND
TRUE
N
PLAN
N
1/8" = 1'-0" E2
PLUMBING EQUIPMENT PLAN - 1ST FLOOR
1 1 3
Addendum 1 08-09-2024
Addendum 3 01-17-2025
16 16
Jan-16-2025
File details come from the government source that posted it. Updated .