This is a Statement of Special Inspections document for the Sioux Falls Boiler Plant project at the Sioux Falls VA Medical Center (Project #438-22-900) with a date of 1/16/2025. The document outlines critical wind and seismic force resisting systems that require special inspection, including Ordinary Concentric Braced Frames, Ordinary Steel Moment Resisting Frames, and Ordinary Reinforced Concrete Shearwalls.

The document specifies that a Special Inspector of Record (SIOR) is not required per UFGS 01 45 35, Section 1.3.8. It details various horizontal and vertical Lateral Force Resisting System (LFRS) elements requiring inspection, such as continuous roof ties, concrete grade beams, OSB sheathed shear walls, and diaphragm cross rod bracing. The document also notes that Designated Seismic Systems (DSS) do not apply to this project due to the Seismic Design Category being less than C, though it includes provisions for final walk-down inspections and compliance documentation if such systems were present.

View the file

Other files

File Type Posted
Structural Merged - Addendum 4.pdf PDF
Electrical - Addendum 4 Final Version.pdf PDF
438-22-900 Replace Boiler Plant QA 2 02-12-25.docx DOCX document
260533 - Raceways and Boxes for Electrical System - Addendum 4.pdf PDF
Civil Merged - Addendum 4.pdf PDF
AE121 - Addendum 4.pdf PDF
36C26324R0136 0006.docx DOCX document
102600 Wall and Door Protection - Addendum 4.pdf PDF
EP602 - PANEL SCHEDULES.pdf PDF
MQ100 - MECHANICAL EQUIPMENT PLAN.pdf PDF
EP101 - ELECTRICAL POWER PLAN FIRST FLOOR.pdf PDF
017419 Construction Waste Management.pdf PDF
CU101 5 - CIVIL UTILITY PLAN.pdf PDF
GI001.pdf PDF
AE600.pdf PDF
014535 Special Inspections - Schedule of SI.pdf PDF
085653 Blast Resistant Windows.pdf PDF
SB302.pdf PDF
SE201.pdf PDF
122400 Window Shades.pdf PDF
PL700-WATER FLOW DIAGRAM.pdf PDF
GI110.pdf PDF
230923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC Addendum 3.pdf PDF
SB101.pdf PDF
263213 Engine Generators.pdf PDF
232111 BOILER PLANT PIPING SYSTEMS_Addendum_3.pdf PDF
CK502 - CIVIL DETAILS.pdf PDF
E502 - ELECTRICAL DETAILS.pdf PDF
CS102 5-CIVIL SITE PLAN.pdf PDF
CK503 - CIVIL DETAILS.pdf PDF
EP603 - PANEL SCHEDULES.pdf PDF
EP604 - PANEL SCHEDULES.pdf PDF
312011 - Earthwork.pdf PDF
EP102 - ENLARGED ELECTRICAL ROOM PLANS.pdf PDF
PL101-PLUMBING PLANS.pdf PDF
CG103 5-CIVIL EROSION CONTROL PLAN.pdf PDF
019100 General Commissioning Requirements.pdf PDF
PL300-PLUMBING SECTIONS.pdf PDF
PL701-PLUMBING WATER RISER DIAGRAM.pdf PDF
ES105 - NEW TUNNEL PLAN.pdf PDF
336300 STEAM ENERGY DISTRIBUTION.pdf PDF
270511 Requirements for Communications Installations.pdf PDF
SF401.pdf PDF
271500 Communications Structured Cabling.pdf PDF
087100 Door Hardware.pdf PDF
MP500 - PIPING DETAILS.pdf PDF
AE121.pdf PDF
CD102 5 - CIVIL EXISTING CONDITIONS_ DEMOLITION PLAN.pdf PDF
262600 Power Distribution Units for Static Uninteruptable Power Systems.pdf PDF
ES106 - ELECTRICAL - SECURITY GATE PLAN.pdf PDF
Show 40 more

Latest 50 of 134 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project:

Location:

Project #:

Date:

Project:

Location:

Project #:

Date:

Project Risk Category:

Project Design Wind Speed (mph):

Number of Stories:

Structure Height Above Grade (ft):

Hazardous Occupancy or attached to such? Group H Occupancies (2015 IBC, Section 415)

Sioux Falls Boiler Plant

Sioux Falls VAMC, SD

438-22-900

1/16/2025

STATEMENT OF SPECIAL INSPECTIONS

Project Seismic Design Category:

Professional Registration Number:

Consulting Firm Name (if any):

SIOR Office AND Mobile Phone Number:

Special Inspector of Record (SIOR)

A Special Inspector of Record (SIOR) IS NOT required (per UFGS 01 45 35, Section 1.3.8)

SIOR Name (Registered Professional):

Special Concentric Braced Frames Lettered Gridline only, see plan for call out

Ordinary Steel Moment resisting Frames (SMRF) Both orthoginal Directions, See plan for call out

Ordinary Reinforced Concrete Shearwalls See Key Notes

Lateral Force Resisting System (LFRS)

2015 IBC 1704.3.2 and 1704.3.3

Following is a listing of critical main wind/seismic force resisting systems for this structure. Carefully inspect these elements as part of the roles and responsiblities of the Special Inspector (reference the Schedule of Special Inspections for inspection checklists).

Vertical LFRS Elements Notes

Ordinary Concentric Braced Frames North - South Direction Only, See Plan

Shear Wall Hold Downs Identified on Plan & in Detail Sheet X.XX

Horizontal LFRS Elements Notes

Continuous Roof Ties See Key Notes on Roof Plan

Concrete Grade Beams Resisting Lateral Loads Office Portion Only, see plan key notes

Ordinary Reinforced Masonry Shear Walls High Bay, Numbered Gridlines only, see plan

OSB Sheathed Shear Walls (nailing, sill bolting, Etc) See schedule on plan

Out of Plane Wall Connections See Structural Details XX & XX

Diaphragm Cross Rod Bracing See Roof Plan for locations

Cast in Place Concrete Floor and Roof Diaphragms See sheet XX for details and rebar schedule

Collector Elements Identified on plan with key notes

Concrete over metal deck 2nd floor and roof

Metal Roof Deck & Related Fastening System See Roof Plan

1/16/2025

Designated Seismic Systems (DSS)

(2015 IBC 1705.13.3.4) (ASCE 7-10, 13.2.2, C13.2.2) (UFC 3-310-04, 2-11.2 & 2-13.2.2)

Special Force Transfer Connection See Detail X on Sheet X.XX

Statement of Special Inspections Page 1 of 2

Sioux Falls Boiler Plant

Sioux Falls VAMC, SD

438-22-900

1.

2.

3.

4.

5.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

DESIGNATED SEISMIC SYSTEMS DO NOT APPLY TO THIS PROJECT, due to the Seismic Design Category being less than C.

ELECTRICAL Designated Seismic Systems (DSS) Requiring a Certificate of Compliance

DSS Emergency or Standby Power System

DSS Component XX

DSS Component XX

DSS Component XX

DSS Component XX

DSS Component XX

DSS Component XX

DSS Component XX

DSS Component XX

If additional space is required, append an additional sheet listing the remaining DSS

MECHANICAL/PLUMBING Designated Seismic Systems (DSS) Requiring a Certificate of Compliance

1. Record observations of Final Walk Down Inspection

2. Document that Inspections were performed in accordance with the Schedule of Special Inspections

3. Document that all Designated Seismic Systems are installed according to construction/manufacturer document requirements, and that Compliance Certificates have been collected (UFC 03 301 01, 2-13.2.2.1).

Statement of Special Inspections Page 2 of 2

DSS Component XX

DSS Component XX

Final Walk Down Inspection and Report

(UFC 3 301 01 SECTION 2-2.4.3)

Designated Seismic Systems shall receive a final walk-down inspection by the Registered Design Professional in Responsible

Charge

Final Walk Down Report, Prepared by the Registered Design Professional in Responsible Charge, Must Include:

If additional space is required, append an additional sheet listing the remaining DSS

OTHER Designated Seismic Systems (DSS) Requiring a Certificate of Compliance

DSS Building egress stair systems

DSS Building fire sprinkler systems

DSS Component XX

DSS Component XX

DSS Gas lines and associated fittings, anchorage, & flexible Connections

DSS Component XX

LATERAL FORCE RESISTING SYSTEM IDENTIFICATION

USER NOTES (Not intended to print)

< Edit Blue text/cells only

SPECIAL INSPECTOR OF RECORD (SIOR) DETERMINATION

< The Special Inspector of Record (SIOR) is a DOD mandate. Enter the requested data to determine whether an SIOR is required or is not required.

< For DB contracts insert the SIOR contact information. For DBB contracts enter, "Contractor to provide prior to construction start".

< The SIOR must be a registered professional engineer, and must not be an employee of the General Contractor, or an employee of a Sub-Contractor performing construction for this project.

DESIGNATED SEISMIC SYSTEMS (DSS)

This section identifies whether Designated Seismic Systems apply to this project or do not apply. Additionally, and where DSS apply, some explanation is provided below for what a Designated Seismic System is for this specific project.

Example entries are provided, replace/delete as necessary

NEXT: COMPLETE THE SCHEDULE OF SPECIAL INSPECTIONS TEMPLATE.

Edit, print, and append the Schedule of Special Inspections Template to this Statement of Special Inspections and insert both at the back of the project Special Inspections Specification 01 45 35.

2. The component conveys, supports, or otherwise contains toxic, highly toxic, or explosive substances where the quantity of the a material excees a threshold quantity established by the authority having jurisdiction and is sufficient to pose a threat to the public if released (RC I thru V + SDC C thru F).

3. The component is in, or attached to, a Risk Category IV or V structure, and it is needed for continued operation of the facility, or its faiure could impair the continued operation of the facility (RC IV thru V + SDC

C thru F).

4. The component conveys, supports, or otherwise contains hazardous substances and is attached to a structure, or portion thereof, classified by the authority having jurisdiction as a hazardous occupancy (RC I thru V + SDC C thru F).

FINAL WALK DOWN INSPECTION AND REPORT FOR NON-STRUCTURAL DSS

< A non-structural DSS final walk down inspection applies to this project

< …Certificates of compliance documenting that the requirements are met shall be submited to the buidling offical

(2015 IBC 1704.5 & 1705.13.3) and shall be maintained in a file identified as "Equipment Certification Documentation".

This file shall be part of the final project O&M Manual

< Designated Seismic Systems DO NOT APPLY to this project, nothing further is required as part of this Statement of

DSS for this project are nonstructural components with an importance factor of 1.5 AND with the following project conditions (UFC 3-310 SECTION 2-11.2) (ASCE 7-10, 13.1.3):

1. The component is required to function for life-safety purposes after an earthquake, including fire sprinkler systems and egress stairways (RC I thru V + SDC C thru F).