This document is an Annual Fire Pump Inspection and Testing Report for the VA Sepulveda facility located at 16111 Plummer Street in North Hills, California. The report details a comprehensive inspection of the facility's electric fire pump system, conducted on 6/12/24, using a Peerless pump with a Tornatech controller and US MOTORS driver. The pump has a rated capacity of 1000 gpm at 120 psi, with testing performed at 0%, 50%, 100%, and 150% of rated flow using 2.5" nozzle orifices. All inspection items were marked as "Pass", including fire pump start/stop pressures, pump house conditions, control valve inspections, and electrical system checks.
The performance test results demonstrate the fire pump's operational capabilities, with suction pressures ranging from 82 psi at 0% flow to 48 psi at 150% flow, and discharge pressures from 225 psi to 145 psi across the flow ranges. The pump maintained system pressures between 175-142 psi during testing, with RPM slightly decreasing from 3571 to 3545 as flow increased. Both automatic and manual starts were conducted, with 4 starts each deemed satisfactory. The test was performed using flow meters, 45s, diffusers, 50' hoses, and a test kit, and complies with NFPA 25 and California Code of Regulations, Title 19 requirements.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .