About this file

This file is an Excel spreadsheet containing a detailed inventory of existing floor finishes across three VA facilities at McClellan Park, California. The spreadsheet documents floor surface materials by room and building level, tracking square footage (SF) for carpet, tile, wood structural flooring (WSF), luxury vinyl tile (LVT), epoxy, concrete, and unknown surfaces, along with linear footage (LF) of wall base for each space.

The inventory covers three buildings: Building 98 (Clinic with basement, first floor); Building 209 (Administrative building with basement, first, and second floors); and Building 949 (Administrative building with first, second, and third floors). The data provides specific room-by-room breakdowns identifying space types such as offices, corridors, examination rooms, conference rooms, mechanical rooms, restrooms, and storage areas. This information directly supports Solicitation 36C26127Q0047 for flooring replacement work, enabling bidders to calculate material quantities and labor requirements for the firm-fixed-price construction project with a 300-calendar-day performance period following notice to proceed. The spreadsheet serves as a critical technical reference document for cost estimation and procurement planning in this SDVOSB set-aside flooring replacement solicitation.

View the file

Other files

File Type Posted
06 10 00 Rough Carpentry.pdf PDF
36C26127Q0047 Amendment 0003.pdf PDF
Updated SOW ATTACHMENT_Reference Drawings 20261106.pdf PDF
20261117_RFI Responses Replace Flooring MCC.pdf PDF
Updated SOW Replace Flooring in McCellan_20261105_.pdf PDF
36C26127Q0047 Amendment 0002.pdf PDF
36C26127Q0047 Amendment 0001.pdf PDF
Site Visit Sign-in 612A4 27 020 _ 10 23 2026.pdf PDF
36C26127Q0047_Sol.pdf PDF
18. Site Visit Flyer 36C26127Q0047.pdf PDF
2. SOW ATTACHMENT_Reference Drawings.pdf PDF
16._VHA ICRA PROJECT.pdf PDF
13. RB-2_WALL BASE.pdf PDF
9. LVT-2_LUXURY VINYL TILE.pdf PDF
14. RST_RESILIENT STAIR TREADS.pdf PDF
6. CPT-1_CARPET.pdf PDF
1. SOW ATTACHMENT_Specifications_.pdf PDF
8. LVT-1_LUXURY VINYL TILE.pdf PDF
3. SOW ATTACHMENT_Bldg 209 McClellan Lead-Asbestos REP 2017.pdf PDF
12. RB-1_MILLWORK_WALL_FINISHING_SYSTEMS.pdf PDF
19. Price Breakdown Worksheet.docx DOCX document
20. Requests for Information RFI_ Form.docx DOCX document
5. Schluter_vinpro-data-sheet.pdf PDF
11. PCRA 612A4-27-020 Replace Flooring in McCellan.pdf PDF
4. SOW ATTACHMENT_1996 BW Asbestos Survey Bldgs 209.pdf PDF
7. ILSM 612A4-27-020 Replace Flooring in McCellan.pdf PDF
17. WD CA20260007 dtd 9 3 2026.pdf PDF
15. Tarkett Wall Base Made in USA.pdf PDF
10. MANN-0263 Made in the USA Supply Chain PDF v7_Digital.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

98_B

BUILDING 98 - BASEMENT
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
BASEMENTLOADING379
BASEMENTMECHANICAL606
BASEMENTMECHANICAL A46
BASEMENTSTAIR TREAD
BASEMENTSTAIR LANDING

98_1

BUILDING 98 - FIRST
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
FIRST1H00CORRIDOR
FIRST1A11CORRIDOR
FIRST#1STAIR #1610
FIRST#1STAIR #1 LANDINGS200
FIRST#2STAIR #2
FIRST#2STAIR #2 LANDINGS
FIRST#3STAIR #3540
FIRST1A04CORRIDOR23085
FIRST1A10CORRIDOR1290
FIRST1A24CORRIDOR1500
FIRST1A30CORRIDOR18784
FIRST1C21OFFICE12645
FIRST1B08CONSULT ROOM
FIRST1B10CORRIDOR
FIRST1B24EXAM ROOM
FIRST1B22OFFICE
FIRST1B15EXAM ROOM
FIRST1B17EXAM ROOM
FIRST1B19EXAM ROOM
FIRST1C63OFFICE
FIRST1C65OFFICE
FIRST1C67PRINTING
FIRST1C67ASTORAGE
FIRST1C93ARECEPTION
FIRST1A24CORRIDOR
FIRST1A30CORRIDOR
FIRST1E19ULTRASOUND
FIRST1E00ACORRIDOR
FIRST1E01RECEPTION
FIRST1E03RECORDS
FIRST1E15CHOLDING
FIRST1E15BDRESSING
FIRST1E07BREAKROOM
FIRST1E00CORRIDOR
FIRST1E12DRESSING
FIRST1D17MAMMO

98_2

BUILDING 98 - SECOND
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
SECOND2U05EXAM ROOM
SECOND2U03BEXAM ROOM
SECOND2U03AEXAM ROOM
SECOND#1STAIR #1420
SECOND#1STAIR LANDING820
SECOND#2STAIR #2
SECOND#2STAIR #2 LANDING
SECOND#3STAIR #359
SECOND#3STAIR #3 LANDING20333
SECOND2T30AVESTIBULE19741
SECOND2T30CORRIDOR9237
SECOND2M20CORRIDOR314300
SECOND2M25EXAM ROOM
SECOND2M27OFFICE
SECOND#3STAIR LANDING
SECOND#3STAIR FLOOR
SECOND2A30CORRIDOR
SECOND2A32CORRIDOR
SECOND2Q00ACORRIDOR
SECOND2Q10CORRIDOR
SECOND2Q01EQUIPMENT
SECOND2P31EXAM ROOM
SECOND2P27EXAM ROOM
SECOND2P29TREATMENT

209_B

BUILDING 209 - BASEMENT
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
BASEMENT2OFFICE
BASEMENT3OFFICE
BASEMENT4BREAKROOM
BASEMENT5OPEN OFFICE
BASEMENT5OFFICE
BASEMENT6HAC
BASEMENT7CHASE
BASEMENT8STORAGE
BASEMENT9ELEVATOR
BASEMENT10PUMP ROOM
BASEMENT15LOADING DOCK
BASEMENT19VACANT
BASEMENT20IT
BASEMENT21OFFICE
BASEMENT22OFFICE
BASEMENT23OFFICE
BASEMENT24PRINTING
BASEMENT26MENS
BASEMENT26STORAGE
BASEMENT27CONFERENCE ROOM
BASEMENT28CORRIDOR
BASEMENT29WOMENS
BASEMENT30MECHANICAL
BASEMENT31MECHANICAL
BASEMENT22ASTORAGE
BASEMENT22BSTORAGE
BASEMENT23ACORRIDOR
BASEMENT29AVESTIBULE
BASEMENT29BLACTATION
BASEMENT5AOFFICE
BASEMENT7AELECTRICAL
BASEMENT7BDUNGEON
BASEMENT8ASTORAGE
BASEMENTC1CORRIDOR
BASEMENTC3CORRIDOR
BASEMENTC4CORRIDOR
BASEMENTSTAIR #15065
BASEMENTSTAIR #232

209_1

BUILDING 209 - FIRST
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
FIRST100MECHANICAL129
FIRST101ENTRY21937
FIRST102STAIR #132
FIRST102STAIR #1 TREAD1451380
FIRST103LOBBY32128
FIRST104OFFICE28860
FIRST105OFFICE11842
FIRST106OFFICE27363
FIRST107OFFICE30264
FIRST108CONFERENCE ROOM15444
FIRST109OFFICE20157
FIRST110OFFICE11039
FIRST111OFFICE25362
FIRST112IT OFFICE31570
FIRST113OFFICE20155
FIRST114MANAGEMENT2,082264
FIRST115OFFICE15247
FIRST116MENS
FIRST117WOMENS
FIRST118CORRIDOR18176
FIRST119IT
FIRST120HAC
FIRST122STAIR #24416
FIRST122STAIR #2 LANDING4619
FIRST122STAIR #2 TREAD400
FIRST125BREAKROOM18054
FIRST126OPEN OFFICE SPACE3,313301
FIRST127OFFICE16650
FIRST128CONFERENCE ROOM9947
FIRST130CONFERENCE ROOM668107
FIRST103ACORRIDOR15350
FIRST111AOFFICE17454
FIRST113AOFFICE10635
FIRST114AMANAGEMENT10538
FIRST114BMANAGEMENT10638
FIRST114COFFICE10237
FIRST114DOFFICE8533
FIRST114EOFFICE10338
FIRST114FOFFICE9936
FIRST126AOFFICE10038
FIRST126BOFFICE9938
FIRST126COFFICE9737
FIRST126DOFFICE9737
FIRST126EOFFICE13544

209_2

BUILDING 209 - SECOND
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
SECOND1OFFICE14145
SECOND122STAIR #1800
SECOND122STAIR #24220
SECOND122STAIR #2 LANDING4118
SECOND122STAIR #2 TREAD400
SECOND201VESTIBULE14140
SECOND202LOBBY462104
SECOND203OFFICE23759
SECOND204OFFICE21055
SECOND205OFFICE21656
SECOND206OFFICE4,005347
SECOND207EQUIPMENT ROOM18151
SECOND208CONFERENCE ROOM14168
SECOND209CORRIDOR9123
SECOND210MENS
SECOND211LACTATION ROOM*96*36* = LVT-2
SECOND212OFFICE13544
SECOND213STORAGE1815
SECOND214IT
SECOND216HAC
SECOND217VESTIBULE3012
SECOND218WOMENS
SECOND219BREAKROOM21261
SECOND219.1VESTIBULE21259
SECOND220OFFICE3,792313
SECOND221CONFERENCE ROOM28466
SECOND222OFFICE13443
SECOND223OFFICE13544
SECOND224OFFICE13644
SECOND225OFFICE13744
SECOND201ALANDING15320

949_1

BUILDING 949 - FIRST
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
FIRST100MECHANICAL
FIRST101CONFERENCE39979
FIRST102OI&T
FIRST103OFFICE21058
FIRST104OFFICE20258
FIRST105LIBRARY20755
FIRST106OFFICE20954
FIRST107OFFICE21356
FIRST108OFFICE20657
FIRST109OFFICE20757
FIRST110OFFICE20256
FIRST111WOMEN
FIRST111AHAC
FIRST112STORAGE18353
FIRST114OFFICE42087
FIRST115LOUNGE
FIRST116CONFERENCE618112
FIRST117OFFICE14949
FIRST118MEANS
FIRST119STORAGE3320
FIRST123MECHANICAL
FIRST127CONFERENCE41384
FIRST128ELEVATOR VESTIBULE9542
FIRST129ELECTRICAL7113
FIRST130CORRIDOR793292
FIRST132CONFERENCE
FIRSTC-127VESTIBULE10728
FIRSTSSTAIRS452838

949_2

BUILDING 949 - SECOND
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
SECOND200STORAGE7941
SECOND201OFFICE34859
SECOND202OFFICE19755
SECOND203OFFICE21357
SECOND204OFFICE838153
SECOND205STAIRS505619
SECOND205LLANDING2815
SECOND208OFFICE26263
SECOND212HAC
SECOND213OFFICE18953
SECOND214OFFICE620125
SECOND217COPY7130
SECOND218OFFICE614111
SECOND220MENS
SECOND221CORRIDOR927375
SECOND222OFFICE596119
SECOND225OFFICE616126
SECOND230BREAKROOM28892
SECOND231HAC
SECOND233ELEVATOR VESTIBULE5729
SECOND209AOFFICE33075
SECOND209BOFFICE33085
SECOND212AWOMENS
SECOND217AIT
SECOND230AOFFICE10445

949_3

BUILDING 949 - THIRD
EXISTING FLOOR FINISHES
ROOMCARPETTILEWSFLVTEPOXYCONCRETEUNKNOWNWALL BASE
LEVELROOMLABELSFSFSFSFSFSFSFLF
THIRD300OFFICE13547
THIRD301OFFICE34973
THIRD302OFFICE20356
THIRD303OFFICE21257
THIRD304OFFICE42085
THIRD306OFFICE20457
THIRD307OFFICE20963
THIRD308OFFICE20957
THIRD309OFFICE20557
THIRD310OFFICE40486
THIRD311WOMENS
THIRD312BREAKROOM
THIRD314OFFICE41387
THIRD316OFFICE20657
THIRD317COPY20657
THIRD318OFFICE20357
THIRD319OFFICE19956
THIRD320OFFICE19554
THIRD321HAC
THIRD322OFFICE630118
THIRD325OFFICE20657
THIRD326OFFICE20657
THIRD327OFFICE20658
THIRD328OFFICE20056
THIRD329OFFICE20257
THIRD330OFFICE9637
THIRD333ELEVATOR VESTIBULE4822
THIRD321AMENS
THIRDCCORRIDOR909355
THIRDSSTAIRS505519
THIRDSLLANDING2815

File details come from the government source that posted it. Updated .