19. Price Breakdown Worksheet.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C26127Q0047
About this file
This is a Price Breakdown Worksheet template for Solicitation No. 36C26127Q0047, a commercial construction project to replace flooring at three VA McClellan locations in Northern California. The worksheet requires bidders to itemize costs across five construction divisions: Division 01 (General Requirements), Division 02 (Existing Conditions), Division 07 (Thermal and Moisture Protection), Division 09 (Finishes), and Other Costs, with each division broken down by cost categories of Material, Labor, Equipment, and Other. The template culminates in a summary section requiring subtotals for each cost category, followed by line items for Overhead, Profit, Bonds and Insurance, and a final Total Quote Costs/Offer.
The solicitation is a firm-fixed-price construction requirement set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a closing date of November 17, 2026, at 3:00 P.M. PT and a performance period of 160 calendar days after Notice to Proceed. Work locations include McClellan VA Clinic (Building 98), Administrative Building 209, and Administrative Building 949 in McClellan Park, California. Bid bonds, payment bonds, and performance bonds are required. Request for Information submissions must be made by November 3, 2026, at 12:00 P.M. PT to Mr. Rosario Chaidez at Rosario.chaidez1@va.gov. The NAICS code is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45.0 million.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26127Q0047 Attachment – Cost/Price Breakdown Worksheet
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 - General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 02 – Existing Conditions |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 07- Thermal and Moisture Protection |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 09- Finishes |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Other Costs (If applicable) |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Other Costs Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| Total Quote Costs/Offer = |
| $ |
| $ |
| $ |
| $ |
| $ |
*NOTE: All other costs may be included as a separate item and must be specified in this breakdown.
File details come from the government source that posted it. Updated .