This is a Semi Annual Inspection Report for the water-based fire protection system at VA Grand Junction Building 5, located at 2121 North Ave, Grand Junction, CO. The inspection was completed on December 15, 2025, by James Trudeau of Platinum Fire Protection and conducted in accordance with NFPA 25 2011 standards for the inspection, testing, and maintenance of water-based fire protection systems.

The report identifies four deficiencies requiring attention: two system gauges are due for replacement (Deficiency #1 per section 5.2.4.1); a drain test could not be conducted after opening a closed valve due to a frozen main drain valve presenting risk of damage (Deficiency #2 per section 13.3.1.2.1); flow could not be observed during the wet sprinkler system test due to the frozen main drain valve, with drain readings taken using the inspector's test valve wide open (Deficiency #3 per section 13.2.5); and an inspector's test connection at the riser lacks a required sign (Deficiency #4). No deficiencies were identified in the general wet system questions or valve inspection categories. The inspector certifies that all equipment tested was left in operational condition upon completion of the inspection except as noted in the deficiencies.

View the file

Other files

File Type Posted
CLIN 03 Bldg 22 Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 1- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 01 VA- NFS-Kitchen Hood 2121- N Ave-FAIL.pdf PDF
CLIN 01 VA -Grnd Junc CLC Kitchen Hood 2121 N Ave FAIL.pdf PDF
CLIN 02 VA B37 Audible Deficiencies.pdf PDF
36C25926Q0408 0002.docx DOCX document
CLIN 03 Bldg 12- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 7- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 36- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 35- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 02 VA Hosp - Grand Junction Battery List 2025.pdf PDF
CLIN 03 Bldg 34- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 6- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 20- Quarterly Sprinkler 12-22-25 Fail.pdf PDF
CLIN 03 Bldg 8- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 33- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 13- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 37- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 45- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
Questions and Answers.docx DOCX document
36C25926Q0408 0001.docx DOCX document
36C25926Q0408.docx DOCX document
Attachment 2 - Price Schedule.docx DOCX document
Attachment 3 - VA Notice of Limitations on Subcontracting.docx DOCX document
Attachment 1 - SOW.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Semi Annual Inspection Report

Completed on: 12-15-2025 for

VA Grand Junction Building 5 2121 North Ave

Grand Junction, CO

Conducted By:

James Trudeau

Platinum Fire Protection PO Box 607

Mead, CO 80542

This Joint Commission inspection was performed in accordance with the following codes and regulations:

• NFPA 25 2011 - Standard for the Inspection, Testing, and Maintenance of Water Based Fire Protection Systems

Deficiencies - General Questions

Deficiency #1

Are the gauges on system in good condition and showing normal water supply pressure? - 5.2.4.1: No

Notes: 2 gauges due for replacement

Deficiency #2

Was a drain test conducted after opening any closed valve? - 13.3.1.2.1: No

Notes: Main drain valve is frozen. Cannot open without risk of breaking it.

Deficiencies - General Wet System Questions

None

Deficiencies - Wet

Deficiency #3

Sprinkler Type: Wet Is flow observed? - 13.2.5: No

Notes: Main drain valve is frozen shut. Afraid to force and break it. Drain readings taken with inspectors test valve wide open

Deficiency #3 - Photo #1

Date Taken: August 20, 2025

Deficiencies - Inspectors Test Connection

Report of Inspection / Test Semi-Annual NFPA 25

12-15-2025 Property VA Grand Junction Building 5 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com

Copyright 2025 Inspect Point

Deficiency #4

Location: Riser Description: Inspectors test Signs: No

Notes: No sign

Deficiencies - Valves

None

Report of Inspection / Test Semi-Annual NFPA 25

12-15-2025 Property VA Grand Junction Building 5 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com

Inspector Signature

I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.

Inspector Name Signature Date Completed

James Trudeau 2025-12-15

Report of Inspection / Test Semi-Annual NFPA 25

12-15-2025 Property VA Grand Junction Building 5 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com