CLIN 03 Bldg 22 Quarterly Sprinkler 12-22-25 FAIL.pdf
PDF 62 KB Posted
- Solicitation number
- 36C25926Q0408
About this file
This is a Semi-Annual Inspection Report for water-based fire protection systems at VA Grand Junction Building 22, completed on December 16, 2025, in accordance with NFPA 25 2011 standards. The inspection was conducted by James Trudeau of Platinum Fire Protection, located in Mead, Colorado.
The report identifies two deficiencies requiring attention. Deficiency #1 concerns the wet sprinkler system, where no flow was observed from the Building 22 system due to water being supplied from Building 7; the inspector directed review of the separate Building 7 report for detailed results. Deficiency #2 addresses the inspector's test connection located in the secure pharmacy storage area, which failed the test due to a flow switch requiring replacement, with no delay mechanism noted. All other general questions and general wet system questions yielded no deficiencies. The inspector certified that all equipment tested was left in operational condition except as noted in the deficiencies section.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Semi Annual Inspection Report
Completed on: 12-16-2025 for
VA Grand Junction Building 22 2121 North Ave
Grand Junction, CO
Conducted By:
James Trudeau
Platinum Fire Protection PO Box 607
Mead, CO 80542
This Joint Commission inspection was performed in accordance with the following codes and regulations:
• NFPA 25 2011 - Standard for the Inspection, Testing, and Maintenance of Water Based Fire Protection Systems
Deficiencies - General Questions
None
Deficiencies - General Wet System Questions
None
Deficiencies - Wet
Deficiency #1
Sprinkler Type: Wet Is flow observed? - 13.2.5: No
Notes: Water fed from bldg 7. See that report for results.
Deficiencies - Inspectors Test Connection
Deficiency #2
Location: Secure pharmacy storage Description: Bldg 22 inspectors test Pass?: No
Notes: No delay. Flow switch Needs to be replaced
Report of Inspection / Test Semi-Annual NFPA 25
12-16-2025 Property VA Grand Junction Building 22 2121 North Ave Grand Junction CO
Print Date: 12-22-2025
Conducted by: James Trudeau
Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com
Copyright 2025 Inspect Point
Inspector Signature
I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.
Inspector Name Signature Date Completed
James Trudeau 2025-12-16
Report of Inspection / Test Semi-Annual NFPA 25
12-16-2025 Property VA Grand Junction Building 22 2121 North Ave Grand Junction CO
Print Date: 12-22-2025
Conducted by: James Trudeau
Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com