CLIN 03 Bldg 20- Quarterly Sprinkler 12-22-25 Fail.pdf
PDF 64 KB Posted
- Solicitation number
- 36C25926Q0408
About this file
This is a Semi-Annual Inspection Report for water-based fire protection systems completed on December 15, 2025, at VA Grand Junction Building 20 located at 2121 North Ave, Grand Junction, Colorado. The inspection was conducted by James Trudeau of Platinum Fire Protection in accordance with NFPA 25 2011 standards for inspection, testing, and maintenance of water-based fire protection systems.
The report identifies three deficiencies requiring corrective action. Deficiency #1 notes that control valves, including those on backflow preventers with locks or electrical supervision, are not properly identified with required control and inspector test signs per code section 13.3.2.2. Deficiency #2 indicates the B20 flow inspector test connection located in the mechanical room lacks required signage. Deficiency #3 documents that a 3-inch OS&Y backflow valve (#1) in the mechanical room also lacks required signage. The inspection found no deficiencies in general wet system questions or wet system categories. Inspector James Trudeau certified that all information is accurate and equipment was left in operational condition upon completion, with the report printed on December 22, 2025. Contact information for Platinum Fire Protection includes phone number 303-688-0177 and email rachel@platfire.com.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Semi Annual Inspection Report
Completed on: 12-15-2025 for
VA Grand Junction Building 20 2121 North Ave
Grand Junction, CO
Conducted By:
James Trudeau
Platinum Fire Protection PO Box 607
Mead, CO 80542
This Joint Commission inspection was performed in accordance with the following codes and regulations:
• NFPA 25 2011 - Standard for the Inspection, Testing, and Maintenance of Water Based Fire Protection Systems
Deficiencies - General Questions
Deficiency #1
Are the control valves (including valves on backflow preventers) with locks or electrical supervision properly identified? - 13.3.2.2: No
Notes: Missing control and inspectors test signs
Deficiencies - General Wet System Questions
None
Deficiencies - Wet
None
Deficiencies - Inspectors Test Connection
Deficiency #2
Location: Mechanical room Description: B20 flow Signs: No
Notes: No sign
Deficiencies - Valves
Deficiency #3
Location: Mechanical room Valve Type: OS&Y Size: 3 Description: Backflow #1 Signs: No
Notes: No sign
Report of Inspection / Test Semi-Annual NFPA 25
12-15-2025 Property VA Grand Junction Building 20 2121 North Ave Grand Junction CO
Print Date: 12-22-2025
Conducted by: James Trudeau
Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com
Copyright 2025 Inspect Point
Inspector Signature
I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.
Inspector Name Signature Date Completed
James Trudeau 2025-12-15
Report of Inspection / Test Semi-Annual NFPA 25
12-15-2025 Property VA Grand Junction Building 20 2121 North Ave Grand Junction CO
Print Date: 12-22-2025
Conducted by: James Trudeau
Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com