This is a Semi-Annual Inspection Report for water-based fire protection systems completed on December 15, 2025, at VA Grand Junction Building 20 located at 2121 North Ave, Grand Junction, Colorado. The inspection was conducted by James Trudeau of Platinum Fire Protection in accordance with NFPA 25 2011 standards for inspection, testing, and maintenance of water-based fire protection systems.

The report identifies three deficiencies requiring corrective action. Deficiency #1 notes that control valves, including those on backflow preventers with locks or electrical supervision, are not properly identified with required control and inspector test signs per code section 13.3.2.2. Deficiency #2 indicates the B20 flow inspector test connection located in the mechanical room lacks required signage. Deficiency #3 documents that a 3-inch OS&Y backflow valve (#1) in the mechanical room also lacks required signage. The inspection found no deficiencies in general wet system questions or wet system categories. Inspector James Trudeau certified that all information is accurate and equipment was left in operational condition upon completion, with the report printed on December 22, 2025. Contact information for Platinum Fire Protection includes phone number 303-688-0177 and email rachel@platfire.com.

View the file

Other files

File Type Posted
CLIN 03 Bldg 22 Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 1- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 01 VA- NFS-Kitchen Hood 2121- N Ave-FAIL.pdf PDF
CLIN 01 VA -Grnd Junc CLC Kitchen Hood 2121 N Ave FAIL.pdf PDF
CLIN 02 VA B37 Audible Deficiencies.pdf PDF
36C25926Q0408 0002.docx DOCX document
CLIN 03 Bldg 12- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 7- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 36- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 35- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 02 VA Hosp - Grand Junction Battery List 2025.pdf PDF
CLIN 03 Bldg 34- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 6- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 8- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 33- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 5- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 13- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 37- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
CLIN 03 Bldg 45- Quarterly Sprinkler 12-22-25 FAIL.pdf PDF
Questions and Answers.docx DOCX document
36C25926Q0408 0001.docx DOCX document
36C25926Q0408.docx DOCX document
Attachment 2 - Price Schedule.docx DOCX document
Attachment 3 - VA Notice of Limitations on Subcontracting.docx DOCX document
Attachment 1 - SOW.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Semi Annual Inspection Report

Completed on: 12-15-2025 for

VA Grand Junction Building 20 2121 North Ave

Grand Junction, CO

Conducted By:

James Trudeau

Platinum Fire Protection PO Box 607

Mead, CO 80542

This Joint Commission inspection was performed in accordance with the following codes and regulations:

• NFPA 25 2011 - Standard for the Inspection, Testing, and Maintenance of Water Based Fire Protection Systems

Deficiencies - General Questions

Deficiency #1

Are the control valves (including valves on backflow preventers) with locks or electrical supervision properly identified? - 13.3.2.2: No

Notes: Missing control and inspectors test signs

Deficiencies - General Wet System Questions

None

Deficiencies - Wet

None

Deficiencies - Inspectors Test Connection

Deficiency #2

Location: Mechanical room Description: B20 flow Signs: No

Notes: No sign

Deficiencies - Valves

Deficiency #3

Location: Mechanical room Valve Type: OS&Y Size: 3 Description: Backflow #1 Signs: No

Notes: No sign

Report of Inspection / Test Semi-Annual NFPA 25

12-15-2025 Property VA Grand Junction Building 20 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com

Copyright 2025 Inspect Point

Inspector Signature

I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.

Inspector Name Signature Date Completed

James Trudeau 2025-12-15

Report of Inspection / Test Semi-Annual NFPA 25

12-15-2025 Property VA Grand Junction Building 20 2121 North Ave Grand Junction CO

Print Date: 12-22-2025

Conducted by: James Trudeau

Platinum Fire Protection PO Box 607 Mead CO 80542 3036880177 rachel@platfire.com

Copyright 2025 Inspect Point

File details come from the government source that posted it. Updated .