2021-11-18_Waco-VAMC-Bldg--7_SprinklerScan.pdf
PDF 183 KB Posted
- Attached to
- J042--Fire Alarm and Suppression Systems Monitoring, Maintenance, Repairs and Installations
- Solicitation number
- 36C25722Q0008
About this file
This solicitation requests quotes for fire alarm and sprinkler system maintenance services for the Central Texas Veterans Health Care System in Temple, Texas. Interested Service-Disabled Veteran Owned Small Businesses must submit fixed-price quotes by December 6, 2021 for consideration. The base year and four option years are available under the firm-fixed-price contract to be awarded. Technical questions are due by December 6th and site visits will be provided upon request. Interested parties must have active System for Award Management registration and be verified on the Vendor Information Pages database to receive awards under this Veterans First Contracting opportunity from the Department of Veterans Affairs Network Contracting Office 17.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sprinkler Inspection, Testing and/or Maintenance Certificate
For
Waco VAMC Bldg. 7 4800 Memorial Dr Waco, TX 76711
This inspection was performed in accordance with NFPA 101, EDITION 2012, LIFE
SAFETY CODE, NFPA 72, EDITION 2010, FIRE ALARM SYSTEMS, NFPA 25,
EDITION 2011,WATER-BASED FIRE PROTECTION SYSTEMS and other regulatory standards applicable to this inspection.
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Annual Inspection Inspection Completion Date Nov 18, 2021
Building: Waco VAMC Bldg. 7 Company: Convergint Technologies - Central Texas Contact: Che Buval Contact: Adrian Mendez Title: Safety Officer Title: Inspector
Page of 1 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Executive Summary Generated by: BuildingReports.com
Building Information Building: Waco VAMC Bldg. 7 Contact: Che Buval
Address: 4800 Memorial Dr Phone: 254-743-0133
Address: Fax:
City/State/Zip: Waco, TX 76711 Mobile:
Country: United States of America Email: Che.Buval@va.gov
Inspection Performed By Company: Convergint Technologies - Central Texas Inspector: Adrian Mendez
Address: 10535 Boyer Blvd Phone: 5124661490
Address: Suite 300 Fax:
City/State/Zip: Austin, Texas 78758 Mobile: 5124661490
Country: United States Email: Adrian.mendez@1stfpservices.com
Page of 2 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Inspection Completion Date: Nov 18, 2021 Building: Waco VAMC Bldg. 7 EC 02.03.05 EP 01 Quarterly test of supervisory signal devices (except valve tamper switches). NFPA 72-
2010 Table 14.4.5 Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Pressure Switch 1 0 1 1 1
EC 02.03.05 EP 02 Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Tamper Switch 16 16 0 16 16
Waterflow Switch 13 13 0 13 13
EC 02.03.05 EP 09 Annual test of main drains at system low point or at all system risers. NFPA 25-2011:
13.2.5; 13.3.3.4; Table 13.1.1.2; Table 13.8.1
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Drain 1 1 0 1 1
EC 02.03.05 EP 10 Quarterly inspection of all fire department water supply connections. NFPA 25-2011:
13.7; Table 13.1.1.2
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Fire Dep't Connection 1 0 1 1 1
LS 02.01.35 EP 03/EP 04 Piping supports are not damaged or loose. Piping not used to support any other item.
NFPA 101-2012 18/19.3.5
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Piping 1 0 1 1 1
LS 02.01.35 EP 05 Annual - Sprinkler heads undamaged, free from corrosion, foreign materials, paint.
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Fast Response 1 1 0 1 1
LS 02.01.35 EP 07 At least six spare sprinkler heads of each type and temperature rating installed in the facility, with associated wrenches, are kept in a cabinet that will not exceed 100 degrees
F. NFPA 25-2011: 5.4.1
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Sprinkler Box 2 2 0 2 2
LS 02.01.35 EP 14 All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Air Compressor 1 1 0 1 1
Alarm Valve 1 1 0 1 1
Backflow Prevention 1 1 0 1 1
Check Valve 1 1 0 1 1
Control Valve 12 11 1 12 12
Dry Pipe Valve 3 3 0 3 3
Gauge 18 18 0 18 18
Page of 3 37Convergint Technologies - Central Texas Download Date: 12/07/2021
LS 02.01.35 EP 14 All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Hose Connection 9 9 0 9 9
Inspector's Test 13 13 0 13 13
Post Indicator Valve 1 1 0 1 1
Quick Opening Device 2 2 0 2 2
Total Device Count: 98
Page of 4 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Certification Company: Convergint Technologies - Central Texas Building: Waco VAMC Bldg. 7 Inspector: Adrian Mendez Contact: Che Buval
Signed: Nov 18, 2021 Signed: Nov 18, 2021
Adrian Mendez Certifications Certification Type Number Texas State Certification - Fire Sprinkler Systems
Page of 5 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Discrepancy Report Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.
Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer’s replacement/upgrade program is included.
Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade
No items found during this inspection.
ScanID Location Problem Reference Fire Dep't Connection
33964570 by loading dock Improper Position NFPA25 4.1.4
Dry Pipe Pressure Switch
33964559 Basement Mech room BC-105 Defective NFPA25 4.1.4
Dry Pipe, Area-North Attic Piping
68138378 Basement Mech room BC-105 Leaking/Corrosion
Wet Pipe Control Valve
33964552 Basement Mech room BC-105 Leaking NFPA25 13.3.2.2 (5) javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964570');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964559');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','68138378');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964552');
Page of 6 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Proposed Solutions Report Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.
ScanID Location Solution Model # Cost Fix
Fire Dep't Connection
33964570 by loading dock Correct T/M
Dry Pipe Pressure Switch
33964559 Basement Mech room BC-105 Replace/Adjust EPS10-1 T/M
Dry Pipe, Area-North Attic Piping
68138378 Basement Mech room BC-105 Replace T/M
Wet Pipe Control Valve
33964552 Basement Mech room BC-105 Replace packing KS II T/M
PO #: (none) T/M
Page of 7 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Inspection & Testing Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 The Inspection & Testing section lists all of the items inspected in your building, which are then categorized by the applicable code reference. The most recent inspection is listed in the far right column and is based on the Finish Date of that inspection. The latest inspection uploaded in each previous quarter appears in the four columns to the left.
Passed=P, Failed=F, Replaced=R
EC 02.03.05 EP 01
Quarterly test of supervisory signal devices (except valve tamper switches). NFPA 72- 2010 Table 14.4.5
Each initiating device circuit shall be tested for correct indication at the control unit. (2010 ed.) (NFPA 72 Table
14.4.2.2 (13.c)) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Pressure Switch 1 0 1 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Pressure Switch Basement Mech room
BC-105
33964559 1 10/07-F 01/13-F 04/14-P 07/09-P 11/18-F
Device Total: 1 Return to Executive Summary
Page of 8 37Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 02
Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.
Valve shall be operated and signal receipt shall be verified to be within the first two revolutions of the hand wheel or within one-fifth of the travel distance, or per the manufacturer's published instructions. (2010 ed.) (NFPA 72 Table
14.4.2.2 (14i.1)) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Tamper Switch 16 16 0 16 16
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Tamper Switch Basement Mech room
BC-105
41143875 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Tamper Switch Basement Mech room
BC-105
41143874 1-22 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Tamper Switch Basement Mech room
BC-105
41143873 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Tamper Switch Basement Mech room
BC-105
41143872 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Tamper Switch Basement Mech room
BC-105
41143871 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Tamper Switch Basement Mech room
BC-105
41143870 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Tamper Switch Basement stair to sub basement
33964580 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Tamper Switch Basement stair 1 33964621 1 10/08-F 01/13-F 04/14-F 07/09-F 11/16-P Tamper Switch Basement stair 2 33964608 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Tamper Switch 1st stair 1 above ceiling 33964623 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Tamper Switch 1st stair 2 33964606 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Tamper Switch 1st stair 3 33964592 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Tamper Switch 2nd stair 1 33964612 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Tamper Switch 2nd stair 2 33964595 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Tamper Switch 2nd stair 3 33964585 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Tamper Switch outside 41143876 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Device Total: 16 Return to Executive Summary
Page of 9 37Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 02
Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.
Vane-type and pressure switch-type waterflow alarm devices shall be tested semiannually. Per NFPA 25, Section 5.3.3.1, mechanical waterflow alarm devices shall be tested quarterly. Water shall be flowed through an inspector's test connection indicating the flow of water equal to that from a single sprinkler of the smallest orifice size installed in the system for wet-pipe systems, or an alarm test bypass connection for dry-pipe, pre-action, or deluge systems.
(2010 ed.) (NFPA 72 Table 14.4.2.2 (14j)) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Waterflow Switch 13 13 0 13 13
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Waterflow Switch Basement Mech room
BC-105
58262996 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Waterflow Switch Basement Mech room
BC-105
33964561 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Waterflow Switch Basement Mech room
BC-105
33964575 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Waterflow Switch Basement mech room
BC-105
58262985 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Waterflow Switch Basement stair 1 33964620 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Waterflow Switch Basement stair 2 33964607 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Waterflow Switch Basement stairwell to sub basement 33964582 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Waterflow Switch 1st stair 1 above ceiling 33964622 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Waterflow Switch 1st stair 2 33964601 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Waterflow Switch 1st stair 3 33964593 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Waterflow Switch 2nd stair 1 above ceiling 33964611 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Waterflow Switch 2nd stair 2 33964598 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Waterflow Switch 2nd stair 3 33964586 1 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Device Total: 13 Return to Executive Summary
Page of 10 37Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 09
Annual test of main drains at system low point or at all system risers. NFPA 25-2011:
13.2.5; 13.3.3.4; Table 13.1.1.2; Table 13.8.1
A main drain test shall be conducted annually at each water-based fire protection system riser to determine whether there has been a change in the condition of the water supply piping and control valves. Auxiliary and low-point drains in preaction or deluge systems shall be operated after each system operation and before the onset of freezing conditions (and thereafter as needed). (2011 ed.) (NFPA 25 13.2.5; 13.4.4.3.2) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Drain 1 1 0 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Drain Basement mech room
BC-105
33964572 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Page of 11 37Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 10
Quarterly inspection of all fire department water supply connections. NFPA 25-2011:
13.7; Table 13.1.1.2
Fire department connections shall be inspected quarterly to verify the following: Connections are visible and accessible, couplings or swivels are not damaged and rotate smoothly, plugs or caps are in place and undamaged, gaskets are in place and in good condition, identification signs are in place, the check valve is not leaking, the automatic drain valve is in place and operating properly and the clapper is in place and operating properly. (2011 ed.) (NFPA 25 13.7.1) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Fire Dep't Connection 1 0 1 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Fire Dep't Connection by loading dock 33964570 0 10/07-P 01/13-P 04/14-P 07/09-P 11/18-F
Page of 12 37Convergint Technologies - Central Texas Download Date: 12/07/2021
LS 02.01.35 EP 03/EP
Piping supports are not damaged or loose. Piping not used to support any other item.
NFPA 101-2012 18/19.3.5
Sprinkler pipe and fittings shall be inspected annually from the floor level. Pipe and fittings shall be in good condition and free of mechanical damage, leakage, and corrosion. Sprinkler piping shall not be subjected to external loads by materials either resting on the pipe or hung from the pipe. (2011 ed.) (NFPA 25 5.2.2 through 5.2.2.2) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Piping 1 0 1 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Piping Basement Mech room
BC-105
68138378 0 11/18-F
Page of 13 37Convergint Technologies - Central Texas Download Date: 12/07/2021
LS 02.01.35 EP 05 Annual - Sprinkler heads undamaged, free from corrosion, foreign materials, paint.
Sprinklers shall be inspected from the floor level annually. Sprinklers shall not show signs of leakage; shall be free of corrosion, foreign materials, paint, and physical damage and shall be installed in the correct orientation. (2011 ed.) (NFPA 25 5.2.1.1 through 5.2.1.4) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Fast Response 1 1 0 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Fast Response Building 52280581 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Page of 14 37Convergint Technologies - Central Texas Download Date: 12/07/2021
LS 02.01.35 EP 07
At least six spare sprinkler heads of each type and temperature rating installed in the facility, with associated wrenches, are kept in a cabinet that will not exceed 100 degrees
F. NFPA 25-2011: 5.4.1
A supply of spare sprinklers (never fewer than six) shall be maintained on the premises so that any sprinklers that have operated or been damaged in any way can be promptly replaced. (2011 ed.) (NFPA 25 5.4.1.4) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Sprinkler Box 2 2 0 2 2
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Sprinkler Box Basement mech room
BC-105
33964567 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Sprinkler Box Basement mech room
BC-105
33964569 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Device Total: 2 Return to Executive Summary
Page of 15 37Convergint Technologies - Central Texas Download Date: 12/07/2021
LS 02.01.35 EP 14
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Compressors used in conjunction with dry pipe sprinkler systems shall be maintained in accordance with the manufacturer's instructions. (2011 ed.) (NFPA 25 5.4.2.4) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Air Compressor 1 1 0 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Air Compressor Basement Mech room
BC-105
33964547 0 10/07-P 01/13-P 04/14-P 07/09-P 11/18-P
Page of 16 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Monthly: Alarm valves and system riser check valves shall be externally inspected monthly. Periodically: Internal components shall be cleaned/repaired as necessary in accordance with the manufacturer's instructions. (2011 ed.)
(NFPA 25 13.4.1.1; 13.4.1.3.1)
Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Alarm Valve 1 1 0 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Alarm Valve Basement Mech room
BC-105
33964553 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Page of 17 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
All backflow preventers installed in fire protection system piping shall be tested annually by conducting a forward flow test of the system at the designed flow rate, including hose stream demand, where hydrants or inside hose stations are located downstream of the backflow preventer. (2011 ed.) (NFPA 25 13.6.2.1) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Backflow Prevention 1 1 0 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Backflow Prevention
Basement Mech room
BC-105
41143877 0 01/13-P 04/14-P 07/09-P 11/16-P
Page of 18 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Monthly: Alarm valves and system riser check valves shall be externally inspected monthly. Periodically: Internal components shall be cleaned/repaired as necessary in accordance with the manufacturer's instructions. (2011 ed.)
(NFPA 25 13.4.1.1)
Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Check Valve 1 1 0 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Check Valve Basement Mech room
BC-105
33964577 1 10/07-P 01/13-P 04/14-P 07/09-P 11/18-P
Page of 19 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Monthly: Valves secured with locks or supervised in accordance with applicable NFPA standards shall be permitted to be inspected monthly. Periodically: Each control valve shall be operated annually through its full range and returned to its normal position. (2011 ed.) (NFPA 25 13.3.2.1.1; 13.3.3.1) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Control Valve 12 11 1 12 12
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Control Valve Basement Mech room
BC-105
33964549 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Control Valve Basement Mech room
BC-105
33964548 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Control Valve Basement Mech room
BC-105
33964550 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Control Valve Basement Mech room
BC-105
33964554 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Control Valve Basement Mech room
BC-105
33964551 1 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Control Valve Basement Mech room
BC-105
33964552 1 10/07-P 01/13-P 04/14-P 07/09-P 11/18-F
Control Valve Basement stair 2 68138367 1 11/16-P Control Valve Basement stair 3 68138375 1 11/16-P Control Valve 1st stair 2 68138368 1 11/16-P Control Valve 1st stair 3 68138372 1 11/16-P Control Valve 2nd stair 2 68138369 1 11/16-P Control Valve 2nd stair 3 68138370 1 11/16-P
Device Total: 12 Return to Executive Summary
Page of 20 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Each dry pipe valve shall be trip tested annually during warm weather. (2011 ed.) (NFPA 25 13.4.4.2.2) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Dry Pipe Valve 3 3 0 3 3
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Dry Pipe Valve Basement mech room
BC-105 Attic North 33964556 0 10/07-P 01/13-P 04/14-P 07/09-P 11/18-P
Dry Pipe Valve Basement mech room BC-105 Attic South
58262988 0 10/07-P 01/13-P 04/14-P 07/09-P 11/18-P
Dry Pipe Valve Basement mech room BC-105 Loading Dock
58262983 0 10/07-P 01/13-P 04/14-P 07/09-P 11/18-P
Device Total: 3 Return to Executive Summary
Page of 21 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Gauges are in good condition and normal pressure is being maintained. [Inspection frequency will depend on type of system gauge]; Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge. (2011 ed.) (NFPA 25 13.2.7.1; 5.3.2.1) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Gauge 18 18 0 18 18
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Gauge Basement mech room
BC-105
58262986 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
58262987 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
68138377 0 11/16-P
Gauge Basement mech room
BC-105
41143883 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
41143882 0 10/07-P 01/13-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
41143879 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
58262992 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
58262990 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
58262991 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
41143878 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement mech room
BC-105
33964568 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P
Gauge Basement stair 2 41143886 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Gauge Basement stair 3 68138374 0 11/16-P Gauge 1st stair 2 41143887 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Gauge 1st stair 3 68138373 0 11/16-P Gauge 2nd stair 2 52280623 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Gauge 2nd stair 2 41143888 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Gauge 2nd stair 3 68138371 0 11/16-P
Device Total: 18 Return to Executive Summary
Page of 22 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Class I and Class III standpipe system hose valves shall be tested annually by opening and closing the valves.
(2011 ed.) (NFPA 25 13.5.6.2.1) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Hose Connection 9 9 0 9 9
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Hose Connection Basement Stair 1 33964618 0 10/07-P 01/13-P 04/14-P 07/09-P 11/16-P Hose Connection Basement Stair 2 33964602 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Hose Connection Basement Stairwell to sub basement 33964579 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Hose Connection 1st Stair 1 33964616 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Hose Connection 1st Stair 2 33964599 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Hose Connection 1st Stair 3 33964590 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Hose Connection 2nd Stair 1 33964609 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Hose Connection 2nd Stair 2 33964594 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Hose Connection 2nd Stair 3 33964587 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Device Total: 9 Return to Executive Summary
Page of 23 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Testing the waterflow alarms on wet pipe systems shall be accomplished by opening the inspector's test connection. (2011 ed.) (NFPA 25 5.3.3.3) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Inspector's Test 13 13 0 13 13
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Inspector's Test Sub-Basement air handler room 33964583 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Inspector's Test Basement stair 1 33964619 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test Basement stair 2 33964603 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test Basement stairwell to sub basement 33964581 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Inspector's Test 1st stair 1 33964617 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test 1st stair 2 33964600 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test 1st stair 3 33964591 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test 2nd stair 1 33964610 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test 2nd stair 1 above ceiling 33964615 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Inspector's Test 2nd stair 2 33964597 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test 2nd stair 2 33964596 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test 2nd stair 3 33964584 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P Inspector's Test 2nd stair 3 33964588 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Device Total: 13 Return to Executive Summary
Page of 24 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Post indicator valves shall be opened until spring or torsion is felt in the rod, indicating that the rod has not become detached from the valve. Post indicating and outside screw and yoke valves shall be backed a one-quarter turn from the fully open position to prevent jamming. (2011 ed.) (NFPA 25 13.3.3.2/13.3.3.3) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Post Indicator Valve 1 1 0 1 1
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Post Indicator Valve outside 33964578 0 10/08-P 01/13-P 04/14-P 07/09-P 11/16-P
Page of 25 37Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Quick-opening devices, if provided, shall be tested quarterly. (2011 ed.) (NFPA 25 13.4.4.2.4) Devices Tested Q4/21 Pass Q4/21 Fail Q4/21 Tested YTD (2021) Total Quantity Quick Opening Device 2 2 0 2 2
Device Type Location ScanID Address Q4/20 Q1/21 Q2/21 Q3/21 Q4/21 Quick Opening Device
Basement mech room
BC-105
33964562 0 10/07-P 01/13-P 04/14-P 07/09-P 11/18-P
Quick Opening Device
Basement mech room
BC-105
58262989 0 10/07-P 01/13-P 04/14-P 07/09-P 11/18-P
Device Total: 2 Return to Executive Summary
Page of 26 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Service Summary Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 The Service Summary section provides an overview of the services performed in this report.
Device Type Service Quantity
Failed/Other Control Valve Annual 1 Fire Dep't Connection Inspected 1 Piping Annual 1 Pressure Switch Tested 1
Total 4
Passed Air Compressor Inspected 1 Alarm Valve Inspected 1 Backflow Prevention Inspected 1 Check Valve Inspected 1 Control Valve Annual 11 Drain Tested 1 Dry Pipe Valve Annual 1 Dry Pipe Valve Partial Trip Test 2 Fast Response Inspected 1 Gauge Inspected 18 Hose Connection Annual 7 Hose Connection Inspected 2 Inspector's Test Inspected 3 Inspector's Test Tested 10 Post Indicator Valve Annual 1 Quick Opening Device Tested 2 Sprinkler Box Inspected 2 Tamper Switch Tested 16 Waterflow Switch Tested 13
Total 94 Grand Total 98
Page of 27 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Wet Pipe Fire Sprinkler Systems Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 This section lists out all the devices and components that have been associated with a Wet Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Tamper Switch
Type Description Location Number of Turns
Zone /Address
OK ScanID
Lever Supervisory Basement Mech room BC-105 1 41143875 Lever Supervisory Basement Mech room BC-105 2 1-22 41143874 Lever Supervisory Basement Mech room BC-105 2 1 41143870
Components Control Valve
Type Manufacturer Model Location Size Position Status OK ScanID
OS&Y Kennedy KS II Basement Mech room BC-
6" Open Locked & Supervised
33964552
Description Main Control
Devices Gauge
Location Service Date Basement mech room BC-105 04/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID System Pressure 70 Air/Water 1/4 41143878 javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143875');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143874');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143870');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143878');
Page of 28 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Dry Pipe Fire Sprinkler Systems Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 This section lists out all the devices and components that have been associated with a Dry Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Pressure Switch Type Description Manufacturer Low High Zone/Address OK ScanID Low Supervisory System Sensor 4 1 33964559
Components Inspector's Test
Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 33964615
Location 2nd stair 1 above ceiling
Devices Quick Opening Device
Manufacturer Model # Serial # Trip psi Low psi High psi Air Pressure OK ScanID Tyco ACC-1 35 45 58262989
Building: Waco VAMC Bldg. 7 Area-Dock This section lists out all the devices and components that have been associated with a Dry Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Tamper Switch
Type Description Location Number of Turns
Zone /Address
OK ScanID
OS&Y Supervisory Basement Mech room BC-105 2 1 41143871
Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Pressure Switch Potter Electric 2.619999 1/2” 1 58262985
Devices Gauge
Location Service Date Basement mech room BC-105 04/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID City Pressure 70 Air/Water 1/4 58262986
Gauge javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964559');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964615');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262989');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143871');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262985');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262986');
Page of 29 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Location Service Date Basement mech room BC-105 05/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID System Pressure 35 Air/Water 1/4 58262987
Gauge Location Service Date Basement mech room BC-105 05/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID System Pressure 35 Air/Water 1/4 68138377
Gauge Location Service Date Basement mech room BC-105 04/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID Air Pressure 48 Air/Water 1/4 58262990
Building: Waco VAMC Bldg. 7 Area-North Attic This section lists out all the devices and components that have been associated with a Dry Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Tamper Switch
Type Description Location Number of Turns
Zone /Address
OK ScanID
OS&Y Supervisory Basement Mech room BC-105 2 1 41143872
Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Pressure Switch Potter Electric PS10-2 1.889999 .50 1 33964561
Components Control Valve
Type Manufacturer Model Location Size Position Status OK ScanID
OS&Y American AVK Basement Mech room BC-
4" Open Locked & Supervised
33964551
Description Main Control
Dry Pipe Valve Manufacturer Model # Location Internal Date OK ScanID
Tyco DPV-1 Basement mech room BC-105 Attic North
01/13/2021 33964556
Type Status Position Size Serial # Flanged by Grooved 4"
Water psi Air Pressure Trip Air Trip Time Total Timing (sec)
Partial Trip Date
Full Trip Date javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262987');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','68138377');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262990');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143872');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964561');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964551');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964556');
Page of 30 37Convergint Technologies - Central Texas Download Date: 12/07/2021
52 43 15 394.890014648437 04/14/2021 01/07/2020
Devices Gauge
Location Service Date Basement mech room BC-105 04/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID Quick Opening Device
Air/Water 38 1/4 41143883
Gauge Location Service Date Basement mech room BC-105 04/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID Air Pressure 38 Air/Water 1/4 41143879
Piping Location Type Size Internal Date Basement Mech room BC-105
Steel 4" 09/18/2018
Hangers Braces Fittings Identified Antifreeze ScanID Normal Cast Iron 68138378
Building: Waco VAMC Bldg. 7 Area-South Attic This section lists out all the devices and components that have been associated with a Dry Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Tamper Switch
Type Description Location Number of Turns
Zone /Address
OK ScanID
OS&Y Supervisory Basement Mech room BC-105 2 1 41143873
Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Pressure Switch Potter Electric 3.140000 .50 1 58262996
Components Dry Pipe Valve
Manufacturer Model # Location Internal Date OK ScanID
Tyco DPV-1 Basement mech room BC-105 Attic South
01/13/2021 58262988
Type Status Position Size Serial # Flanged by Grooved 4"
Water psi Air Pressure Trip Air Trip Time Total Timing (sec)
Partial Trip Date
Full Trip Date
62 47 10 136.160003662109 01/07/2020 01/13/2021
Inspector's Test javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143883');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143879');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','68138378');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143873');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262996');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262988');
Page of 31 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 15 33964584
Location 2nd stair 3
Devices Gauge
Location Service Date Basement mech room BC-105 04/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID Quick Opening Device
50 Air/Water 1/4 58262992
Gauge Location Service Date Basement mech room BC-105 04/12/2024
Type Manufacturer Model # Static psi Fill Type Size OK ScanID System Pressure 70 1/4 58262991 javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964584');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262992');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','58262991');
Page of 32 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Standpipe Systems Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 This section lists out all the devices and components that have been associated with a Standpipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Devices Hose Connection Location Size OK ScanID Basement Stair 1 Class I - 2.5" 33964618 Basement Stair 2 Class I - 2.5" 33964602 Basement Stairwell to sub basement Class I - 2.5" 33964579 1st Stair 1 Class I - 2.5" 33964616 1st Stair 2 Class I - 2.5" 33964599 1st Stair 3 Class I - 2.5" 33964590 2nd Stair 1 Class I - 2.5" 33964609 2nd Stair 2 Class I - 2.5" 33964594 2nd Stair 3 Class I - 2.5" 33964587 javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964618');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964602');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964579');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964616');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964599');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964590');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964609');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964594');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964587');
Page of 33 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Inventory & Warranty Report Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Air Compressor Pump 1.02% 1
Alarm Valve Valve 1.02% 1
Backflow Prevention Valve 1.02% 1
Check Valve Valve 1.02% 1
Control Valve Valve 12.24% 12
Drain Device 1.02% 1
Dry Pipe Valve Valve 3.06% 3
Fast Response Sprinkler 1.02% 1
Fire Dep't Connection Hose 1.02% 1
Gauge Device 18.37% 18
Hose Connection Hose 9.18% 9
Inspector's Test Valve 13.27% 13
Piping Sprinkler 1.02% 1
Post Indicator Valve Valve 1.02% 1
Pressure Switch Alarm 1.02% 1
Quick Opening Device Device 2.04% 2
Sprinkler Box Sprinkler 2.04% 2
Tamper Switch Alarm 16.33% 16
Waterflow Switch Alarm 13.27% 13
Device Type Qty Model # Type Description Install Date
In Service - 2 Years to 3 Years Gauge 1 Supply Pressure 04/28/2019 Gauge 5 System Pressure 04/28/2019 Control Valve 1 OS&Y Isolation 04/28/2019 Gauge 1 City Pressure 04/12/2019 Gauge 1 Supply Pressure 04/12/2019
Dry Pipe, Area-Dock Gauge 1 Air Pressure 04/12/2019 Gauge 1 City Pressure 04/12/2019 Gauge 2 System Pressure 04/12/2019
Dry Pipe, Area-North Attic Gauge 1 Air Pressure 04/12/2019 Gauge 1 Quick Opening
Device 04/12/2019
Dry Pipe, Area-South Attic
Page of 34 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Gauge 1 Quick Opening Device
04/12/2019
Gauge 1 System Pressure 04/12/2019
Wet Pipe Gauge 1 System Pressure 04/12/2019
In Service - 3 Years to 5 Years Inspector's Test 2 08/28/2018 Sprinkler Box 2 08/28/2018 Control Valve 1 OS&Y Main Control 08/28/2018 Post Indicator Valve 1 Ground 08/28/2018 Backflow Prevention 1 2000SS Double Check 08/28/2018 Control Valve 3 OS&Y Main Control 08/28/2018 Control Valve 5 OS&Y Isolation 08/28/2018 Tamper Switch 1 Control Valve Supervisory 08/28/2018 Tamper Switch 8 OS&Y Supervisory 08/28/2018 Tamper Switch 1 PIV Lever Supervisory 08/28/2018 Waterflow Switch 5 Lever Alarm 08/28/2018 Waterflow Switch 5 Vane Alarm 08/28/2018 Drain 1 Angle Main 08/28/2018 Air Compressor 1 A Automatic Tankless 08/28/2018 Dry Pipe Valve 1 DPV-1 Flanged 08/28/2018 Quick Opening Device 1 ACC-1 08/28/2018 Inspector's Test 1 08/28/2018 Inspector's Test 8 718 08/28/2018 Alarm Valve 1 J-1 Flanged by Grooved 08/28/2018 Gauge 1 System Pressure 08/28/2018
Dry Pipe Inspector's Test 1 08/28/2018 Pressure Switch 1 EPS10-1 Low Supervisory 08/28/2018 Quick Opening Device 1 ACC-1 08/28/2018
Dry Pipe, Area-Dock Tamper Switch 1 OSYSU-2 OS&Y Supervisory 08/28/2018 Waterflow Switch 1 Pressure Switch Alarm 08/28/2018
Dry Pipe, Area-North Attic Control Valve 1 OS&Y Main Control 08/28/2018 Tamper Switch 1 OSYSU-2 OS&Y Supervisory 08/28/2018 Waterflow Switch 1 PS10-2 Pressure Switch Alarm 08/28/2018
Dry Pipe, Area-South Attic Inspector's Test 1 08/28/2018 Tamper Switch 1 OSYSU-2 OS&Y Supervisory 08/28/2018 Waterflow Switch 1 Pressure Switch Alarm 08/28/2018 Dry Pipe Valve 1 DPV-1 Flanged by Grooved 08/28/2018
Standpipe
Page of 35 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Hose Connection 9 08/28/2018
Wet Pipe Tamper Switch 3 OSYSU-2 Lever Supervisory 08/28/2018
In Service - 5 Years to 10 Years Dry Pipe, Area-North Attic
Dry Pipe Valve 1 DPV-1 Flanged by Grooved 08/28/2015
In Service - 15 Years to 25 Years Check Valve 1 G-1 Grooved 08/28/1998 Fast Response 1 4180 Attic 01/28/1998
In Service - 25 Years or Older Fire Dep't Connection 1 Siamese 09/01/1995
Dry Pipe, Area-North Attic Piping 1 Steel 09/01/1995
Wet Pipe Control Valve 1 KS II OS&Y Main Control 09/01/1995
Page of 36 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Zone Address Report Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.
Address Device Type Location Type ScanID
Control Panel 1 Zone/Circuit: 22
Tamper Switch Basement Mech room BC-105 Lever 41143874 javascript:openEditDevice('load-edit-p2-device','771914','2332162','41143874');
Page of 37 37Convergint Technologies - Central Texas Download Date: 12/07/2021
Notes & Recommendations Generated by: BuildingReports.com
Building: Waco VAMC Bldg. 7 The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by SystemID.
Note Device Type Location Comment ScanID General Note System yellow tagged.
2 Fire Dep't Connection by loading dock Improper Position 33964570 Ball drip out of position.
Dry Pipe
3 Pressure Switch Basement Mech room BC-105 Defective 33964559 Replace and set low air at 25psi.
Dry Pipe, Area-North Attic
4 Piping Basement Mech room BC-105 Leaking/Corrosion 68138378 4x leaking couplings on 4” riser return bend.
Wet Pipe
5 Control Valve Basement Mech room BC-105 Leaking 33964552 Unable to stop packing gland leak. Replace packing.
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964570');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','33964559');
javascript:openEditDevice('load-edit-p2-device','771914','2332162','68138378');
Sprinkler Inspection, Testing and/or Maintenance Certificate
File details come from the government source that posted it. Updated .