2021-02-05_Temple-VAMC-Bldg--221_SprinklerScan.pdf

PDF 291 KB Posted

Attached to
J042--Fire Alarm and Suppression Systems Monitoring, Maintenance, Repairs and Installations
Solicitation number
36C25722Q0008
Issued by

About this file

This document is a request for quote from the Department of Veterans Affairs for fire alarm and sprinkler system maintenance services at the Central Texas Veterans Health Care System in Temple, Texas. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses and interested vendors must be verified on the VIP vendor database. The contract will be a firm-fixed price award for base year services plus four option years in accordance with the statement of work. Technical questions are due by December 6th and offers must be submitted electronically by the time and date specified in the SF-1449. A site visit is available and masks are required.

View the file

Other files

File Type Posted
36C25722Q0008 0003.docx DOCX document
SF30 - 36C25722Q0008 0003.pdf PDF
SF30 - 36C25722Q0008 0002.pdf PDF
36C25722Q0008 0002.docx DOCX document
REVISED SOW - FIRE Maint Mon SOW - 2021.pdf PDF
36C25722Q0008 0001.docx DOCX document
2021-11-19_Waco-VAMC-Bldg--202_SprinklerScan.pdf PDF
2021-02-24_Temple-VAMC-Bldg--204_SprinklerScan.pdf PDF
2020-08-31_Temple-VAMC-Bldg--204_FireScan.pdf PDF
2021-10-19_Temple-VAMC-Bldg--146_SprinklerScan.pdf PDF
WACO - sign in sheet - VHACTXBuvalC_120321_100124.pdf PDF
Inspection Schedule - Temple_Waco.xlsx XLSX spreadsheet
2021-10-26_Temple-VAMC-Bldg--146_FireScan.pdf PDF
2021-02-01_Waco-VAMC-Bldg--11_FireScan.pdf PDF
2021-05-26_Waco-VAMC-Bldg--91_FireScan.pdf PDF
2021-11-18_Waco-VAMC-Bldg--7_SprinklerScan.pdf PDF
2021-01-14_Waco-VAMC-Bldg--94_SprinklerScan.pdf PDF
2021-10-26_Temple-VAMC-Bldg--147_FireScan.pdf PDF
2021-10-19_Temple-VAMC-Bldg--147_SprinklerScan.pdf PDF
2021-01-13_Waco-VAMC-Bldg--11_SprinklerScan.pdf PDF
2021-04-05_Temple-VAMC-Bldg--221_FireScan.pdf PDF
2021-03-04_Waco-VAMC-Bldg--94_FireScan.pdf PDF
2021-11-30_Temple-VAMC-Bldg--163_SprinklerScan.pdf PDF
2021-11-18_Temple-VAMC-Bldg--163_FireScan.pdf PDF
2021-09-30_Waco-VAMC-Bldg--4_FireScan.pdf PDF
2020 VA Waco Hydrant Report.xlsx XLSX spreadsheet
2020 Temple VA Hydrants.xlsx XLSX spreadsheet
SF30 - 36C25722Q0008 0001.pdf PDF
2021-09-02_Temple-VAMC-Bldg--202_FireScan.pdf PDF
2021-05-19_Waco-VAMC-Bldg--91_SprinklerScan.pdf PDF
2021-11-10_Waco-VAMC-Bldg--7_FireScan.pdf PDF
2021-10-19_Waco-VAMC-Bldg--4_SprinklerScan.pdf PDF
QUESTION and ANSWERS.pdf PDF
TEMPLE - sign in sheet - VHACTXBuvalC_120321_100216.pdf PDF
Wage Determination Waco TX.pdf PDF
36C25722Q0008.pdf PDF
Limitations on Subcontracting Acknowledgment and Certification.pdf PDF
Wage Determination Temple TX.pdf PDF
36C25722Q0008_2.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sprinkler Inspection, Testing and/or Maintenance Certificate

For

Temple VAMC Bldg. 221 1901 Veterans Memorial Dr

Temple, TX 76504

This inspection was performed in accordance with NFPA 101, EDITION 2012, LIFE

SAFETY CODE, NFPA 72, EDITION 2010, FIRE ALARM SYSTEMS, NFPA 25,

EDITION 2011,WATER-BASED FIRE PROTECTION SYSTEMS and other regulatory standards applicable to this inspection.

This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.

Annual Inspection Inspection Completion Date Feb 5, 2021

Building: Temple VAMC Bldg. 221 Company: Convergint Technologies - Central Texas Contact: Che Buval Contact: Silvester Harrison Title: Safety Officer Title: 1st FP Inspector

Page of 1 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Executive Summary Generated by: BuildingReports.com

Building Information Building: Temple VAMC Bldg. 221 Contact: Che Buval

Address: 1901 Veterans Memorial Dr Phone: 254-743-0133

Address: Fax:

City/State/Zip: Temple, TX 76504 Mobile:

Country: United States of America Email: Che.Buval@va.gov

Inspection Performed By Company: Convergint Technologies - Central Texas Inspector: Silvester Harrison

Address: 10535 Boyer Blvd Phone: 512-312-9768

Address: Suite 300 Fax:

City/State/Zip: Austin, Texas 78758 Mobile:

Country: United States Email: sly@1stfpservices.com

Page of 2 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Inspection Completion Date: Feb 5, 2021 Building: Temple VAMC Bldg. 221 EC 02.03.05 EP 01 Quarterly test of supervisory signal devices (except valve tamper switches). NFPA 72-

2010 Table 14.4.5 Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Pressure Switch 4 4 0 4 4

EC 02.03.05 EP 02 Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.

Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Tamper Switch 28 28 0 28 28

Waterflow Switch 20 20 0 20 20

EC 02.03.05 EP 09 Annual test of main drains at system low point or at all system risers. NFPA 25-2011:

13.2.5; 13.3.3.4; Table 13.1.1.2; Table 13.8.1

Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Drain 4 4 0 4 4

EC 02.03.05 EP 10 Quarterly inspection of all fire department water supply connections. NFPA 25-2011:

13.7; Table 13.1.1.2

Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Fire Dep't Connection 4 4 0 4 4

LS 02.01.35 EP 07 At least six spare sprinkler heads of each type and temperature rating installed in the facility, with associated wrenches, are kept in a cabinet that will not exceed 100 degrees

F. NFPA 25-2011: 5.4.1

Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Sprinkler Box 4 4 0 4 4

LS 02.01.35 EP 14 All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Air Compressor 4 4 0 4 4

Backflow Prevention 7 7 0 7 7

Check Valve 4 4 0 4 4

Control Valve 28 27 1 28 28

Dry Pipe Valve 4 4 0 4 4

Electric Bell 4 4 0 4 4

Gauge 24 24 0 24 24

Inspector's Test 20 20 0 20 20

Manifold 16 16 0 16 16

Total Device Count: 175

Page of 3 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Certification Company: Convergint Technologies - Central Texas Building: Temple VAMC Bldg. 221 Inspector: Silvester Harrison Contact: Che Buval

Signed: Feb 4, 2021 Signed: Feb 4, 2021

Page of 4 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Discrepancy Report Generated by: BuildingReports.com

Building: Temple VAMC Bldg. 221 The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.

Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer’s replacement/upgrade program is included.

Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade

No items found during this inspection.

ScanID Location Problem Reference

Wet Pipe Control Valve

62468998 2nd floor riser room bldg. b wet system Damaged/Worn NFPA25 13.2.3 javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468998');

Page of 5 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Proposed Solutions Report Generated by: BuildingReports.com

Building: Temple VAMC Bldg. 221 The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.

ScanID Location Solution Model # Cost Fix

Wet Pipe Control Valve

62468998 2nd floor riser room bldg. b wet system Replace BFV-N T/M

PO #: (none) T/M

Page of 6 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Inspection & Testing Generated by: BuildingReports.com

Building: Temple VAMC Bldg. 221 The Inspection & Testing section lists all of the items inspected in your building, which are then categorized by the applicable code reference. The most recent inspection is listed in the far right column and is based on the Finish Date of that inspection. The latest inspection uploaded in each previous quarter appears in the four columns to the left.

Passed=P, Failed=F, Replaced=R

EC 02.03.05 EP 01

Quarterly test of supervisory signal devices (except valve tamper switches). NFPA 72- 2010 Table 14.4.5

Each initiating device circuit shall be tested for correct indication at the control unit. (2010 ed.) (NFPA 72 Table

14.4.2.2 (13.c)) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Pressure Switch 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Pressure Switch 1st floor riser room bldg. a attic systems 49875124 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Pressure Switch 1st floor riser room bldg. b attic systems

49875088 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Pressure Switch 1st floor riser room bldg. c attic systems

49875019 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Pressure Switch 1st floor riser room bldg. d attic systems

49875051 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Device Total: 4 Return to Executive Summary

Page of 7 45Convergint Technologies - Central Texas Download Date: 12/07/2021

EC 02.03.05 EP 02

Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.

Valve shall be operated and signal receipt shall be verified to be within the first two revolutions of the hand wheel or within one-fifth of the travel distance, or per the manufacturer's published instructions. (2010 ed.) (NFPA 72 Table

14.4.2.2 (14i.1)) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Tamper Switch 28 28 0 28 28

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Tamper Switch 1st Flr riser rm bldg d

1st Flr system 1 West 49875043 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. a 1st floor system

49875116 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Tamper Switch 1st floor riser room bldg. a 1st floor system

49875115 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Tamper Switch 1st floor riser room bldg. a 2nd floor system 1

49875118 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Tamper Switch 1st floor riser room bldg. a 2nd floor system 2

49875117 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Tamper Switch 1st floor riser room bldg. a attic systems

49875130 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Tamper Switch 1st floor riser room bldg. a bottom of backflow

49875142 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. a top of backflow

49875143 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. b 1st floor system east

49875079 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Tamper Switch 1st floor riser room bldg. b 1st floor system west

49875080 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Tamper Switch 1st floor riser room bldg. b 2nd floor system east

49875081 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Tamper Switch 1st floor riser room bldg. b 2nd floor system west

49875082 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Tamper Switch 1st floor riser room bldg. b attic systems

49875094 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. b bottom of backflow

49875106 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Tamper Switch 1st floor riser room 49875107 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Page of 8 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 bldg. b top of backflow

Tamper Switch 1st floor riser room bldg. c 1st floor system 1 west

49875007 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. c 1st floor system 2 east

49875006 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. c 2nd floor system 1 west

49875009 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. c 2nd floor system 2 east

49875008 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. c attic systems

49875014 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. c bottom of backflow

49875033 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. c top of backflow

49875034 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. d 1st floor system 2 east

49875042 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. d 2nd floor system 1 west

49875045 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. d 2nd floor system 2 east

49875044 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. d attic systems

49875057 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. d bottom of backflow

49875070 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Tamper Switch 1st floor riser room bldg. d top of backflow

49875071 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Device Total: 28 Return to Executive Summary

Page of 9 45Convergint Technologies - Central Texas Download Date: 12/07/2021

EC 02.03.05 EP 02

Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.

Vane-type and pressure switch-type waterflow alarm devices shall be tested semiannually. Per NFPA 25, Section 5.3.3.1, mechanical waterflow alarm devices shall be tested quarterly. Water shall be flowed through an inspector's test connection indicating the flow of water equal to that from a single sprinkler of the smallest orifice size installed in the system for wet-pipe systems, or an alarm test bypass connection for dry-pipe, pre-action, or deluge systems.

(2010 ed.) (NFPA 72 Table 14.4.2.2 (14j)) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Waterflow Switch 20 20 0 20 20

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Waterflow Switch 1st Flr riser rm bldg a

1st Flr system 1 49875112 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg a 1st Flr system 2

49875111 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg a 2nd Flr system 1

49875114 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg a 2nd Flr system 2

49875113 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Waterflow Switch 1st Flr riser rm bldg b 1st Flr system east

49875075 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Waterflow Switch 1st Flr riser rm bldg b 1st Flr system west

49875076 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Waterflow Switch 1st Flr riser rm bldg b 2nd Flr system east

49875077 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Waterflow Switch 1st Flr riser rm bldg b 2nd Flr system west

49875078 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Waterflow Switch 1st Flr riser rm bldg c 1st Flr system 1 west

49875003 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg c 1st Flr system 2 east

49875002 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg c 2nd Flr system 1 West

49875005 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg c 2nd Flr system 2 east

49875004 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg d 1st Flr system 1 West

49875039 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg d 1st Flr system 2 east

49875038 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg d 2nd Flr system 1 West

49875041 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st Flr riser rm bldg d 2nd Flr system 2 east

49875040 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st floor riser room bldg. a attic systems

49875125 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Waterflow Switch 1st floor riser room bldg. b attic systems

49875089 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Page of 10 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Waterflow Switch 1st floor riser room bldg. c attic systems 49875020 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Waterflow Switch 1st floor riser room bldg. d attic systems

49875052 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Device Total: 20 Return to Executive Summary

Page of 11 45Convergint Technologies - Central Texas Download Date: 12/07/2021

EC 02.03.05 EP 09

Annual test of main drains at system low point or at all system risers. NFPA 25-2011:

13.2.5; 13.3.3.4; Table 13.1.1.2; Table 13.8.1

A main drain test shall be conducted annually at each water-based fire protection system riser to determine whether there has been a change in the condition of the water supply piping and control valves. Auxiliary and low-point drains in preaction or deluge systems shall be operated after each system operation and before the onset of freezing conditions (and thereafter as needed). (2011 ed.) (NFPA 25 13.2.5; 13.4.4.3.2) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Drain 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Drain 1st Flr riser rm bldg a attic system 49875145 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Drain 1st Flr riser rm bldg b attic system

49875110 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Drain 1st Flr riser rm bldg c attic system

49875037 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Drain 1st Flr riser rm bldg d attic system

49875074 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 12 45Convergint Technologies - Central Texas Download Date: 12/07/2021

EC 02.03.05 EP 10

Quarterly inspection of all fire department water supply connections. NFPA 25-2011:

13.7; Table 13.1.1.2

Fire department connections shall be inspected quarterly to verify the following: Connections are visible and accessible, couplings or swivels are not damaged and rotate smoothly, plugs or caps are in place and undamaged, gaskets are in place and in good condition, identification signs are in place, the check valve is not leaking, the automatic drain valve is in place and operating properly and the clapper is in place and operating properly. (2011 ed.) (NFPA 25 13.7.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Fire Dep't Connection 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Fire Dep't Connection

1st Flr east side bldg c 49875022 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Fire Dep't Connection

1st Flr east side bldg d 49875054 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Fire Dep't Connection

1st Flr west side bldg a 49875127 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Fire Dep't Connection

1st Flr west side bldg b 49875091 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Page of 13 45Convergint Technologies - Central Texas Download Date: 12/07/2021

LS 02.01.35 EP 07

At least six spare sprinkler heads of each type and temperature rating installed in the facility, with associated wrenches, are kept in a cabinet that will not exceed 100 degrees

F. NFPA 25-2011: 5.4.1

A supply of spare sprinklers (never fewer than six) shall be maintained on the premises so that any sprinklers that have operated or been damaged in any way can be promptly replaced. (2011 ed.) (NFPA 25 5.4.1.4) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Sprinkler Box 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Sprinkler Box 1st Flr riser rm bldg a 49875129 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Sprinkler Box 1st Flr riser rm bldg b 49875093 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P Sprinkler Box 1st Flr riser rm bldg c 49875024 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Sprinkler Box 1st Flr riser rm bldg d 49875056 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 14 45Convergint Technologies - Central Texas Download Date: 12/07/2021

LS 02.01.35 EP 14

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Compressors used in conjunction with dry pipe sprinkler systems shall be maintained in accordance with the manufacturer's instructions. (2011 ed.) (NFPA 25 5.4.2.4) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Air Compressor 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Air Compressor 1st Flr riser rm bldg a attic system 49875123 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Air Compressor 1st Flr riser rm bldg b attic system

52280578 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Air Compressor 1st Flr riser rm bldg c attic system

49875018 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Air Compressor 1st Flr riser rm bldg d attic system

49875050 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 15 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

All backflow preventers installed in fire protection system piping shall be tested annually by conducting a forward flow test of the system at the designed flow rate, including hose stream demand, where hydrants or inside hose stations are located downstream of the backflow preventer. (2011 ed.) (NFPA 25 13.6.2.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Backflow Prevention 7 7 0 7 7

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Backflow Prevention

1st Flr riser rm bldg a 49875144 0 08/03-P 11/09-P 02/03-P

Backflow Prevention

1st Flr riser rm bldg b 49875108 0 08/03-P 11/09-P 02/03-P

Backflow Prevention

1st Flr riser rm bldg b 49875109 0 08/03-P 11/09-P 02/03-P

Backflow Prevention

1st Flr riser rm bldg c 49875035 0 08/03-P 11/09-P 02/04-P

Backflow Prevention

1st Flr riser rm bldg c 49875036 0 08/03-P 11/09-P 02/04-P

Backflow Prevention

1st Flr riser rm bldg d 49875073 0 08/03-P 11/09-P 02/04-P

Backflow Prevention

1st Flr riser rm bldg d 49875072 0 08/03-P 11/09-P 02/04-P

Device Total: 7 Return to Executive Summary

Page of 16 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Monthly: Alarm valves and system riser check valves shall be externally inspected monthly. Periodically: Internal components shall be cleaned/repaired as necessary in accordance with the manufacturer's instructions. (2011 ed.)

(NFPA 25 13.4.1.1)

Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Check Valve 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Check Valve 1st Flr 1a-116 storage room above ceiling 49875126 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Check Valve 1st Flr riser rm bldg b 49875090 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Check Valve 1st Flr riser rm bldg c 49875021 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Check Valve 1st Flr riser rm bldg d 49875053 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 17 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Monthly: Valves secured with locks or supervised in accordance with applicable NFPA standards shall be permitted to be inspected monthly. Periodically: Each control valve shall be operated annually through its full range and returned to its normal position. (2011 ed.) (NFPA 25 13.3.2.1.1; 13.3.3.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Control Valve 28 27 1 28 28

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Control Valve 1st Flr riser rm bldg a 62469000 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469001 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469002 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469003 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469006 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469004 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469005 1 02/04-P Control Valve 1st Flr riser rm bldg b 57774984 1 02/03-P Control Valve 1st Flr riser rm bldg b 57774989 1 02/03-P Control Valve 1st Flr riser rm bldg c 57774988 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774987 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774986 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774990 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774991 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774992 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774993 1 02/04-P Control Valve 1st floor riser room bldg. b attic systems 62468995 1 02/04-P

Control Valve 1st floor riser room bldg. b wet system

62468997 1 02/03-P

Control Valve 1st floor riser room bldg. b wet system

62468996 1 02/03-P

Control Valve 1st floor riser room bldg. d

57774999 1 02/04-P

Control Valve 1st floor riser room bldg. d

62469007 1 02/04-P

Control Valve 1st floor riser room bldg. d

57774994 1 02/04-P

Control Valve 1st floor riser room bldg. d

57774995 1 02/04-P

Control Valve 1st floor riser room bldg. d

57774996 1 02/04-P

Control Valve 1st floor riser room bldg. d

57774998 1 02/04-P

Control Valve 1st floor riser room bldg. d

57774997 1 02/04-P

Control Valve 2nd floor riser room 62468999 1 02/04-P

Page of 18 45Convergint Technologies - Central Texas Download Date: 12/07/2021 bldg. b wet system

Control Valve 2nd floor riser room bldg. b wet system

62468998 1 02/04-F

Device Total: 28 Return to Executive Summary

Page of 19 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Each dry pipe valve shall be trip tested annually during warm weather. (2011 ed.) (NFPA 25 13.4.4.2.2) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Dry Pipe Valve 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Dry Pipe Valve 1st Flr riser rm bldg a attic system 49875131 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Dry Pipe Valve 1st Flr riser rm bldg b attic system

49875095 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Dry Pipe Valve 1st Flr riser rm bldg c attic system

49875015 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Dry Pipe Valve 1st Flr riser rm bldg d attic system

49875058 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 20 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Waterflow alarm devices including, but not limited to, water motor gongs, shall be tested quarterly. (2011 ed.)

(NFPA 25 5.3.3.1)

Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Electric Bell 4 4 0 4 4

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Electric Bell 1st Flr riser rm bldg a 49875128 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Electric Bell 1st Flr riser rm bldg b 49875092 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P Electric Bell 1st Flr riser rm bldg c 49875023 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Electric Bell 1st Flr riser rm bldg d 49875055 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 21 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Gauges are in good condition and normal pressure is being maintained. [Inspection frequency will depend on type of system gauge]; Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge. (2011 ed.) (NFPA 25 13.2.7.1; 5.3.2.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Gauge 24 24 0 24 24

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Gauge 1st Flr riser rm bldg a

1st Flr system 1 49875120 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg a 1st Flr system 2

49875119 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg a 2nd Flr system 1

49875122 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg a 2nd Flr system 2

49875121 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg a attic dry system

49875133 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg a attic dry system

49875132 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg b 1st Flr system West

49875084 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg b 1st Flr system east

49875083 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg b 2nd Flr system West

49875086 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg b 2nd Flr system east

49875085 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg b attic dry system

49875096 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg b attic dry system

49875097 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Gauge 1st Flr riser rm bldg c 1st Flr system 1 West

49875012 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg c 1st Flr system 2 east

49875013 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg c 2nd Flr system 1 West

49875010 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg c 2nd Flr system 2 east

49875011 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg c attic dry system

49875016 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg c attic dry system

49875017 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg d 1st Flr system 1 West

49875047 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg d 49875046 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 22 45Convergint Technologies - Central Texas Download Date: 12/07/2021

1st Flr system 2 east

Gauge 1st Flr riser rm bldg d 2nd Flr system 1 West

49875049 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg d 2nd Flr system 2 east

49875048 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg d attic dry system

49875059 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Gauge 1st Flr riser rm bldg d attic dry system

49875060 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Device Total: 24 Return to Executive Summary

Page of 23 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

Testing the waterflow alarms on wet pipe systems shall be accomplished by opening the inspector's test connection. (2011 ed.) (NFPA 25 5.3.3.3) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Inspector's Test 20 20 0 20 20

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Inspector's Test 1st Flr riser rm bldg a

1st Flr system 1 49875141 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg a 1st Flr system 2

49875140 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg a 2nd Flr system 1

49875139 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg a 2nd Flr system 2

49875138 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Inspector's Test 1st Flr riser rm bldg b 1st Flr system West

49875104 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Inspector's Test 1st Flr riser rm bldg b 1st Flr system east

49875105 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Inspector's Test 1st Flr riser rm bldg b 2nd Flr system West

49875102 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Inspector's Test 1st Flr riser rm bldg b 2nd Flr system east

49875103 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Inspector's Test 1st Flr riser rm bldg c 1st Flr system 1 West

49875031 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg c 1st Flr system 2 east

49875032 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg c 2nd Flr system 1 West

49875029 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg c 2nd Flr system 2 east

49875030 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg d 1st Flr system 1 West

49875067 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg d 1st Flr system 2 east

49875068 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg d 2nd Flr system 1 West

49875065 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test 1st Flr riser rm bldg d 2nd Flr system 2 east

49875066 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test attic attic middle between a&b

49875284 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P

Inspector's Test attic attic middle between a&b

49875285 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test attic attic middle between c&d

49875249 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Inspector's Test attic attic middle between c&d

49875250 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Page of 24 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Device Total: 20 Return to Executive Summary

Page of 25 45Convergint Technologies - Central Texas Download Date: 12/07/2021

All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5

A flow test shall be conducted every 5 years at the hydraulically most remote hose connections of each zone of an automatic standpipe system to verify the water supply still provides the design pressure at the required flow. (2011 ed.) (NFPA 25 6.3.1.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Manifold 16 16 0 16 16

Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Manifold 1st Flr riser rm bldg a

1st Flr system 1 49875134 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg a 1st Flr system 2

49875135 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg a 2nd Flr system 1

49875136 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg a 2nd Flr system 2

49875137 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg b 1st Flr system 1 West

49875099 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Manifold 1st Flr riser rm bldg b 1st Flr system east

49875098 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Manifold 1st Flr riser rm bldg b 2nd Flr West

49875101 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Manifold 1st Flr riser rm bldg b 2nd Flr east

49875100 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P

Manifold 1st Flr riser rm bldg c 1st Flr West

49875026 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg c 1st Flr east

49875025 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg c 2nd Flr West

49875028 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg c 2nd Flr east

49875027 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg d 1st Flr 1 west

49875062 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg d 1st Flr 2 east

49875061 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg d 2nd Flr 1 West

49875064 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Manifold 1st Flr riser rm bldg d 2nd Flr 2 east

49875063 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P

Device Total: 16 Return to Executive Summary

Page of 26 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Service Summary Generated by: BuildingReports.com

Building: Temple VAMC Bldg. 221 The Service Summary section provides an overview of the services performed in this report.

Device Type Service Quantity

Failed/Other Control Valve Tested 1

Total 1

Passed Air Compressor Annual 1 Air Compressor Tested 3 Backflow Prevention Inspected 7 Check Valve Annual 1 Check Valve Inspected 3 Control Valve Inspected 4 Control Valve Tested 23 Drain Tested 4 Dry Pipe Valve Annual 1 Dry Pipe Valve Tested 3 Electric Bell Tested 4 Fire Dep't Connection Annual 1 Fire Dep't Connection Inspected 3 Gauge 'Inspected', 1 Gauge Inspected 23 Inspector's Test Tested 20 Manifold Tested 16 Pressure Switch Annual 1 Pressure Switch Tested 3 Sprinkler Box Inspected 4 Tamper Switch Tested 28 Waterflow Switch Tested 20

Total 174 Grand Total 175

Page of 27 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Wet Pipe Fire Sprinkler Systems Generated by: BuildingReports.com

Building: Temple VAMC Bldg. 221 This section lists out all the devices and components that have been associated with a Wet Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.

Alarms Tamper Switch

Type Description Location Number of Turns

Zone /Address

OK ScanID

Control Valve Supervisory 1st floor riser room bldg. b top of backflow

3 1 49875107

Control Valve Supervisory 1st floor riser room bldg. b bottom of backflow

3 1 49875106

Control Valve Supervisory 1st floor riser room bldg. a 1st floor system 1

3 1 49875116

Control Valve Supervisory 1st floor riser room bldg. a 1st floor system 2

3 1 49875115

Control Valve Supervisory 1st floor riser room bldg. a 2nd floor system 1

3 1 49875118

Control Valve Supervisory 1st floor riser room bldg. a 2nd floor system 2

3 1 49875117

Control Valve backflow 1st floor riser room bldg. c top of backflow

3 1 49875034

Control Valve Supervisory 1st floor riser room bldg. c bottom of backflow

3 1 49875033

Control Valve Supervisory 1st floor riser room bldg. c 2nd floor system 1 west

3 1 49875009

Control Valve Supervisory 1st floor riser room bldg. c 2nd floor system 2 east

3 1 49875008

Control Valve Supervisory 1st floor riser room bldg. c 1st floor system 1 west

3 1 49875007

Control Valve Supervisory 1st floor riser room bldg. c 1st floor system 2 east

3 1 49875006

Control Valve Supervisory 1st floor riser room bldg. d bottom of backflow

3 1 49875070

Control Valve Supervisory 1st floor riser room bldg. d top of backflow

3 1 49875071

Control Valve Supervisory 1st floor riser room bldg. d 1st floor system 2 east

3 1 49875042

Control Valve Supervisory 1st Flr riser rm bldg d 1st Flr system 1 West

3 1 49875043

Control Valve Supervisory 1st floor riser room bldg. d 2nd floor system 2 east

3 1 49875044 javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875107');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875106');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875116');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875115');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875118');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875117');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875034');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875033');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875009');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875008');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875007');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875006');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875070');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875071');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875042');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875043');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875044');

Page of 28 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Control Valve Supervisory 1st floor riser room bldg. d 2nd floor system 1 west

3 1 49875045

Control Valve Supervisory 1st floor riser room bldg. a top of backflow

3 1 49875143

Control Valve Supervisory 1st floor riser room bldg. a bottom of backflow

3 1 49875142

Control Valve Supervisory 1st floor riser room bldg. b 2nd floor system east

3 1 49875081

Control Valve Supervisory 1st floor riser room bldg. b 2nd floor system west

3 1 49875082

Control Valve Supervisory 1st floor riser room bldg. b 1st floor system west

3 1 49875080

Control Valve Supervisory 1st floor riser room bldg. b 1st floor system east

3 1 49875079

Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Vane Potter Electric VSR 39 4 1 49875113 Vane Potter Electric VSC 30 4 1 49875005 Vane Potter Electric VSC 34 4 1 49875004 Vane Potter Electric VSC 27 4 1 49875003 Vane Potter Electric VSC 29 4 1 49875002 Vane Potter Electric VSR 32 4 inch 1 49875038 Vane Potter Electric VSR 29 4 1 49875039 Vane Potter Electric VSR 30 4 1 49875040 Vane Potter Electric VSR 34 4 1 49875041 Vane Potter Electric VSR 34 4 1 49875112 Vane Potter Electric VSR 32 4 1 49875111 Vane Potter Electric VSR 27 4” 1 49875114 Vane Potter Electric VSR 25 4 1 49875077 Vane Potter Electric VSR 38 4 1 49875078 Vane Potter Electric VSR 23 4 1 49875076 Vane Potter Electric VSR 22 4 1 49875075

Components Check Valve

Type Location Internal Date Size OK ScanID Grooved 1st Flr riser rm bldg c 08/22/2018 4" 49875021 Grooved 1st Flr riser rm bldg d 08/22/2018 4" 49875053

Grooved 1st Flr 1a-116 storage room above ceiling

08/22/2018 4" 49875126

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV-N 1st floor riser room bldg. b wet system

4" Open Supervised 62468997

Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875045');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875143');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875142');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875081');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875082');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875080');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875079');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875113');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875005');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875004');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875003');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875002');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875038');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875039');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875040');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875041');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875112');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875111');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875114');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875077');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875078');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875076');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875075');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875021');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875053');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875126');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468997');

Page of 29 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV-N 1st floor riser room bldg. b wet system

4" Open Supervised 62468996

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg b

4" Open Supervised 57774984

Description Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg b

4" Open Supervised 57774989

Description Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg c

4" Open Supervised 57774988

Description Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg c

4" Open Supervised 57774987

Description Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV 1st Flr riser rm bldg c

4" Open Supervised 57774986

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV 1st Flr riser rm bldg c

4" Open Supervised 57774990

Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468996');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774984');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774989');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774988');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774987');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774986');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774990');

Page of 30 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV 1st Flr riser rm bldg c

4" Open Supervised 57774991

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV 1st Flr riser rm bldg c

4" Open Supervised 57774992

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV 1st Flr riser rm bldg c

4" Open Supervised 57774993

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st floor riser room bldg. d

4" Open Supervised 57774994

Description Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st floor riser room bldg. d

4" Open Supervised 57774995

Description Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV-N 1st floor riser room bldg. d

4" Open Supervised 57774998

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV-N 1st floor riser room bldg. d

4" Open Supervised 57774997

Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774991');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774992');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774993');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774994');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774995');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774998');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774997');

Page of 31 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg a

4" Open Supervised 62469000

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg a

4" Open Supervised 62469001

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg a

4" Open Supervised 62469002

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg a

4" Open Supervised 62469003

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg a

4" Open Supervised 62469006

Description Isolation

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg a

4" Open Supervised 62469004

Description Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Victaulic 702 1st Flr riser rm bldg a

4" Open Supervised 62469005

Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469000');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469001');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469002');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469003');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469006');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469004');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469005');

Page of 32 45Convergint Technologies - Central Texas Download Date: 12/07/2021

Main Control

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Tyco BFV-N 2nd floor riser room bldg. b wet system

4" Open Supervised 62468998

Description Isolation

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID test and drain

65 27 27 49875138

Location 1st Flr riser rm bldg a 2nd Flr system 2

65 30 30 49875029

Location 1st Flr riser rm bldg c 2nd Flr system 1 West

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 34 34 49875030

Location 1st Flr riser rm bldg c 2nd Flr system 2 east

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 27 27 49875031

Location 1st Flr riser rm bldg c 1st Flr system 1 West

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 29 29 49875032

Location 1st Flr riser rm bldg c 1st Flr system 2 east

65 32 32 49875068

Location 1st Flr riser rm bldg d 1st Flr system 2 east

Inspector's Test javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468998');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875138');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875029');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875030');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875031');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875032');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875068');

Page of 33 45Convergint Technologies - Central Texas Download Date: 12/07/2021

65 20 29 49875067

Location 1st Flr riser rm bldg d 1st Flr system 1 West

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 30 30 49875066

Location 1st Flr riser rm bldg d 2nd Flr system 2 east

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 34 34 49875065

Location 1st Flr riser rm bldg d 2nd Flr system 1 West

65 34 34 49875141

Location 1st Flr riser rm bldg a 1st Flr system 1

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 32 32 49875140

Location 1st Flr riser rm bldg a 1st Flr system 2

65 33 33 49875139

Location 1st Flr riser rm bldg a 2nd Flr system 1

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID test and drain 65 25 25 49875103

Location 1st Flr riser rm bldg b 2nd Flr system east

Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID test and drain 38 3865 49875102

Location 1st Flr riser rm bldg b 2nd Flr system West javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875067');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875066');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875065');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875141');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875140');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875139');

javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875103…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .