2021-02-05_Temple-VAMC-Bldg--221_SprinklerScan.pdf
PDF 291 KB Posted
- Attached to
- J042--Fire Alarm and Suppression Systems Monitoring, Maintenance, Repairs and Installations
- Solicitation number
- 36C25722Q0008
About this file
This document is a request for quote from the Department of Veterans Affairs for fire alarm and sprinkler system maintenance services at the Central Texas Veterans Health Care System in Temple, Texas. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses and interested vendors must be verified on the VIP vendor database. The contract will be a firm-fixed price award for base year services plus four option years in accordance with the statement of work. Technical questions are due by December 6th and offers must be submitted electronically by the time and date specified in the SF-1449. A site visit is available and masks are required.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sprinkler Inspection, Testing and/or Maintenance Certificate
For
Temple VAMC Bldg. 221 1901 Veterans Memorial Dr
Temple, TX 76504
This inspection was performed in accordance with NFPA 101, EDITION 2012, LIFE
SAFETY CODE, NFPA 72, EDITION 2010, FIRE ALARM SYSTEMS, NFPA 25,
EDITION 2011,WATER-BASED FIRE PROTECTION SYSTEMS and other regulatory standards applicable to this inspection.
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Annual Inspection Inspection Completion Date Feb 5, 2021
Building: Temple VAMC Bldg. 221 Company: Convergint Technologies - Central Texas Contact: Che Buval Contact: Silvester Harrison Title: Safety Officer Title: 1st FP Inspector
Page of 1 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Executive Summary Generated by: BuildingReports.com
Building Information Building: Temple VAMC Bldg. 221 Contact: Che Buval
Address: 1901 Veterans Memorial Dr Phone: 254-743-0133
Address: Fax:
City/State/Zip: Temple, TX 76504 Mobile:
Country: United States of America Email: Che.Buval@va.gov
Inspection Performed By Company: Convergint Technologies - Central Texas Inspector: Silvester Harrison
Address: 10535 Boyer Blvd Phone: 512-312-9768
Address: Suite 300 Fax:
City/State/Zip: Austin, Texas 78758 Mobile:
Country: United States Email: sly@1stfpservices.com
Page of 2 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Inspection Completion Date: Feb 5, 2021 Building: Temple VAMC Bldg. 221 EC 02.03.05 EP 01 Quarterly test of supervisory signal devices (except valve tamper switches). NFPA 72-
2010 Table 14.4.5 Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Pressure Switch 4 4 0 4 4
EC 02.03.05 EP 02 Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Tamper Switch 28 28 0 28 28
Waterflow Switch 20 20 0 20 20
EC 02.03.05 EP 09 Annual test of main drains at system low point or at all system risers. NFPA 25-2011:
13.2.5; 13.3.3.4; Table 13.1.1.2; Table 13.8.1
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Drain 4 4 0 4 4
EC 02.03.05 EP 10 Quarterly inspection of all fire department water supply connections. NFPA 25-2011:
13.7; Table 13.1.1.2
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Fire Dep't Connection 4 4 0 4 4
LS 02.01.35 EP 07 At least six spare sprinkler heads of each type and temperature rating installed in the facility, with associated wrenches, are kept in a cabinet that will not exceed 100 degrees
F. NFPA 25-2011: 5.4.1
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Sprinkler Box 4 4 0 4 4
LS 02.01.35 EP 14 All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Devices Tested This Quarter Pass Fail Tested YTD (2021) Total Quantity Air Compressor 4 4 0 4 4
Backflow Prevention 7 7 0 7 7
Check Valve 4 4 0 4 4
Control Valve 28 27 1 28 28
Dry Pipe Valve 4 4 0 4 4
Electric Bell 4 4 0 4 4
Gauge 24 24 0 24 24
Inspector's Test 20 20 0 20 20
Manifold 16 16 0 16 16
Total Device Count: 175
Page of 3 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Certification Company: Convergint Technologies - Central Texas Building: Temple VAMC Bldg. 221 Inspector: Silvester Harrison Contact: Che Buval
Signed: Feb 4, 2021 Signed: Feb 4, 2021
Page of 4 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Discrepancy Report Generated by: BuildingReports.com
Building: Temple VAMC Bldg. 221 The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.
Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer’s replacement/upgrade program is included.
Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade
No items found during this inspection.
ScanID Location Problem Reference
Wet Pipe Control Valve
62468998 2nd floor riser room bldg. b wet system Damaged/Worn NFPA25 13.2.3 javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468998');
Page of 5 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Proposed Solutions Report Generated by: BuildingReports.com
Building: Temple VAMC Bldg. 221 The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.
ScanID Location Solution Model # Cost Fix
Wet Pipe Control Valve
62468998 2nd floor riser room bldg. b wet system Replace BFV-N T/M
PO #: (none) T/M
Page of 6 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Inspection & Testing Generated by: BuildingReports.com
Building: Temple VAMC Bldg. 221 The Inspection & Testing section lists all of the items inspected in your building, which are then categorized by the applicable code reference. The most recent inspection is listed in the far right column and is based on the Finish Date of that inspection. The latest inspection uploaded in each previous quarter appears in the four columns to the left.
Passed=P, Failed=F, Replaced=R
EC 02.03.05 EP 01
Quarterly test of supervisory signal devices (except valve tamper switches). NFPA 72- 2010 Table 14.4.5
Each initiating device circuit shall be tested for correct indication at the control unit. (2010 ed.) (NFPA 72 Table
14.4.2.2 (13.c)) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Pressure Switch 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Pressure Switch 1st floor riser room bldg. a attic systems 49875124 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Pressure Switch 1st floor riser room bldg. b attic systems
49875088 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Pressure Switch 1st floor riser room bldg. c attic systems
49875019 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Pressure Switch 1st floor riser room bldg. d attic systems
49875051 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Device Total: 4 Return to Executive Summary
Page of 7 45Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 02
Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.
Valve shall be operated and signal receipt shall be verified to be within the first two revolutions of the hand wheel or within one-fifth of the travel distance, or per the manufacturer's published instructions. (2010 ed.) (NFPA 72 Table
14.4.2.2 (14i.1)) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Tamper Switch 28 28 0 28 28
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Tamper Switch 1st Flr riser rm bldg d
1st Flr system 1 West 49875043 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. a 1st floor system
49875116 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Tamper Switch 1st floor riser room bldg. a 1st floor system
49875115 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Tamper Switch 1st floor riser room bldg. a 2nd floor system 1
49875118 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Tamper Switch 1st floor riser room bldg. a 2nd floor system 2
49875117 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Tamper Switch 1st floor riser room bldg. a attic systems
49875130 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Tamper Switch 1st floor riser room bldg. a bottom of backflow
49875142 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. a top of backflow
49875143 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. b 1st floor system east
49875079 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Tamper Switch 1st floor riser room bldg. b 1st floor system west
49875080 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Tamper Switch 1st floor riser room bldg. b 2nd floor system east
49875081 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Tamper Switch 1st floor riser room bldg. b 2nd floor system west
49875082 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Tamper Switch 1st floor riser room bldg. b attic systems
49875094 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. b bottom of backflow
49875106 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Tamper Switch 1st floor riser room 49875107 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Page of 8 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 bldg. b top of backflow
Tamper Switch 1st floor riser room bldg. c 1st floor system 1 west
49875007 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. c 1st floor system 2 east
49875006 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. c 2nd floor system 1 west
49875009 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. c 2nd floor system 2 east
49875008 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. c attic systems
49875014 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. c bottom of backflow
49875033 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. c top of backflow
49875034 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. d 1st floor system 2 east
49875042 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. d 2nd floor system 1 west
49875045 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. d 2nd floor system 2 east
49875044 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. d attic systems
49875057 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. d bottom of backflow
49875070 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Tamper Switch 1st floor riser room bldg. d top of backflow
49875071 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Device Total: 28 Return to Executive Summary
Page of 9 45Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 02
Six-month testing of tamper switches and vane-type and pressure-type water-flow devices. Quarterly testing of mechanical water-flow devices. NFPA 72-2010 Table 14.4.5; NFPA 25-2011 Table 5.1.1.2.
Vane-type and pressure switch-type waterflow alarm devices shall be tested semiannually. Per NFPA 25, Section 5.3.3.1, mechanical waterflow alarm devices shall be tested quarterly. Water shall be flowed through an inspector's test connection indicating the flow of water equal to that from a single sprinkler of the smallest orifice size installed in the system for wet-pipe systems, or an alarm test bypass connection for dry-pipe, pre-action, or deluge systems.
(2010 ed.) (NFPA 72 Table 14.4.2.2 (14j)) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Waterflow Switch 20 20 0 20 20
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Waterflow Switch 1st Flr riser rm bldg a
1st Flr system 1 49875112 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg a 1st Flr system 2
49875111 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg a 2nd Flr system 1
49875114 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg a 2nd Flr system 2
49875113 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Waterflow Switch 1st Flr riser rm bldg b 1st Flr system east
49875075 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Waterflow Switch 1st Flr riser rm bldg b 1st Flr system west
49875076 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Waterflow Switch 1st Flr riser rm bldg b 2nd Flr system east
49875077 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Waterflow Switch 1st Flr riser rm bldg b 2nd Flr system west
49875078 1 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Waterflow Switch 1st Flr riser rm bldg c 1st Flr system 1 west
49875003 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg c 1st Flr system 2 east
49875002 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg c 2nd Flr system 1 West
49875005 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg c 2nd Flr system 2 east
49875004 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg d 1st Flr system 1 West
49875039 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg d 1st Flr system 2 east
49875038 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg d 2nd Flr system 1 West
49875041 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st Flr riser rm bldg d 2nd Flr system 2 east
49875040 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st floor riser room bldg. a attic systems
49875125 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Waterflow Switch 1st floor riser room bldg. b attic systems
49875089 1 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Page of 10 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Waterflow Switch 1st floor riser room bldg. c attic systems 49875020 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Waterflow Switch 1st floor riser room bldg. d attic systems
49875052 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Device Total: 20 Return to Executive Summary
Page of 11 45Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 09
Annual test of main drains at system low point or at all system risers. NFPA 25-2011:
13.2.5; 13.3.3.4; Table 13.1.1.2; Table 13.8.1
A main drain test shall be conducted annually at each water-based fire protection system riser to determine whether there has been a change in the condition of the water supply piping and control valves. Auxiliary and low-point drains in preaction or deluge systems shall be operated after each system operation and before the onset of freezing conditions (and thereafter as needed). (2011 ed.) (NFPA 25 13.2.5; 13.4.4.3.2) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Drain 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Drain 1st Flr riser rm bldg a attic system 49875145 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Drain 1st Flr riser rm bldg b attic system
49875110 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Drain 1st Flr riser rm bldg c attic system
49875037 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Drain 1st Flr riser rm bldg d attic system
49875074 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 12 45Convergint Technologies - Central Texas Download Date: 12/07/2021
EC 02.03.05 EP 10
Quarterly inspection of all fire department water supply connections. NFPA 25-2011:
13.7; Table 13.1.1.2
Fire department connections shall be inspected quarterly to verify the following: Connections are visible and accessible, couplings or swivels are not damaged and rotate smoothly, plugs or caps are in place and undamaged, gaskets are in place and in good condition, identification signs are in place, the check valve is not leaking, the automatic drain valve is in place and operating properly and the clapper is in place and operating properly. (2011 ed.) (NFPA 25 13.7.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Fire Dep't Connection 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Fire Dep't Connection
1st Flr east side bldg c 49875022 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Fire Dep't Connection
1st Flr east side bldg d 49875054 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Fire Dep't Connection
1st Flr west side bldg a 49875127 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Fire Dep't Connection
1st Flr west side bldg b 49875091 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Page of 13 45Convergint Technologies - Central Texas Download Date: 12/07/2021
LS 02.01.35 EP 07
At least six spare sprinkler heads of each type and temperature rating installed in the facility, with associated wrenches, are kept in a cabinet that will not exceed 100 degrees
F. NFPA 25-2011: 5.4.1
A supply of spare sprinklers (never fewer than six) shall be maintained on the premises so that any sprinklers that have operated or been damaged in any way can be promptly replaced. (2011 ed.) (NFPA 25 5.4.1.4) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Sprinkler Box 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Sprinkler Box 1st Flr riser rm bldg a 49875129 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Sprinkler Box 1st Flr riser rm bldg b 49875093 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P Sprinkler Box 1st Flr riser rm bldg c 49875024 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Sprinkler Box 1st Flr riser rm bldg d 49875056 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 14 45Convergint Technologies - Central Texas Download Date: 12/07/2021
LS 02.01.35 EP 14
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Compressors used in conjunction with dry pipe sprinkler systems shall be maintained in accordance with the manufacturer's instructions. (2011 ed.) (NFPA 25 5.4.2.4) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Air Compressor 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Air Compressor 1st Flr riser rm bldg a attic system 49875123 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Air Compressor 1st Flr riser rm bldg b attic system
52280578 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Air Compressor 1st Flr riser rm bldg c attic system
49875018 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Air Compressor 1st Flr riser rm bldg d attic system
49875050 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 15 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
All backflow preventers installed in fire protection system piping shall be tested annually by conducting a forward flow test of the system at the designed flow rate, including hose stream demand, where hydrants or inside hose stations are located downstream of the backflow preventer. (2011 ed.) (NFPA 25 13.6.2.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Backflow Prevention 7 7 0 7 7
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Backflow Prevention
1st Flr riser rm bldg a 49875144 0 08/03-P 11/09-P 02/03-P
Backflow Prevention
1st Flr riser rm bldg b 49875108 0 08/03-P 11/09-P 02/03-P
Backflow Prevention
1st Flr riser rm bldg b 49875109 0 08/03-P 11/09-P 02/03-P
Backflow Prevention
1st Flr riser rm bldg c 49875035 0 08/03-P 11/09-P 02/04-P
Backflow Prevention
1st Flr riser rm bldg c 49875036 0 08/03-P 11/09-P 02/04-P
Backflow Prevention
1st Flr riser rm bldg d 49875073 0 08/03-P 11/09-P 02/04-P
Backflow Prevention
1st Flr riser rm bldg d 49875072 0 08/03-P 11/09-P 02/04-P
Device Total: 7 Return to Executive Summary
Page of 16 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Monthly: Alarm valves and system riser check valves shall be externally inspected monthly. Periodically: Internal components shall be cleaned/repaired as necessary in accordance with the manufacturer's instructions. (2011 ed.)
(NFPA 25 13.4.1.1)
Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Check Valve 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Check Valve 1st Flr 1a-116 storage room above ceiling 49875126 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Check Valve 1st Flr riser rm bldg b 49875090 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Check Valve 1st Flr riser rm bldg c 49875021 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Check Valve 1st Flr riser rm bldg d 49875053 1 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 17 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Monthly: Valves secured with locks or supervised in accordance with applicable NFPA standards shall be permitted to be inspected monthly. Periodically: Each control valve shall be operated annually through its full range and returned to its normal position. (2011 ed.) (NFPA 25 13.3.2.1.1; 13.3.3.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Control Valve 28 27 1 28 28
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Control Valve 1st Flr riser rm bldg a 62469000 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469001 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469002 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469003 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469006 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469004 1 02/04-P Control Valve 1st Flr riser rm bldg a 62469005 1 02/04-P Control Valve 1st Flr riser rm bldg b 57774984 1 02/03-P Control Valve 1st Flr riser rm bldg b 57774989 1 02/03-P Control Valve 1st Flr riser rm bldg c 57774988 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774987 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774986 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774990 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774991 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774992 1 02/04-P Control Valve 1st Flr riser rm bldg c 57774993 1 02/04-P Control Valve 1st floor riser room bldg. b attic systems 62468995 1 02/04-P
Control Valve 1st floor riser room bldg. b wet system
62468997 1 02/03-P
Control Valve 1st floor riser room bldg. b wet system
62468996 1 02/03-P
Control Valve 1st floor riser room bldg. d
57774999 1 02/04-P
Control Valve 1st floor riser room bldg. d
62469007 1 02/04-P
Control Valve 1st floor riser room bldg. d
57774994 1 02/04-P
Control Valve 1st floor riser room bldg. d
57774995 1 02/04-P
Control Valve 1st floor riser room bldg. d
57774996 1 02/04-P
Control Valve 1st floor riser room bldg. d
57774998 1 02/04-P
Control Valve 1st floor riser room bldg. d
57774997 1 02/04-P
Control Valve 2nd floor riser room 62468999 1 02/04-P
Page of 18 45Convergint Technologies - Central Texas Download Date: 12/07/2021 bldg. b wet system
Control Valve 2nd floor riser room bldg. b wet system
62468998 1 02/04-F
Device Total: 28 Return to Executive Summary
Page of 19 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Each dry pipe valve shall be trip tested annually during warm weather. (2011 ed.) (NFPA 25 13.4.4.2.2) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Dry Pipe Valve 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Dry Pipe Valve 1st Flr riser rm bldg a attic system 49875131 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Dry Pipe Valve 1st Flr riser rm bldg b attic system
49875095 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Dry Pipe Valve 1st Flr riser rm bldg c attic system
49875015 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Dry Pipe Valve 1st Flr riser rm bldg d attic system
49875058 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 20 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Waterflow alarm devices including, but not limited to, water motor gongs, shall be tested quarterly. (2011 ed.)
(NFPA 25 5.3.3.1)
Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Electric Bell 4 4 0 4 4
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Electric Bell 1st Flr riser rm bldg a 49875128 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Electric Bell 1st Flr riser rm bldg b 49875092 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P Electric Bell 1st Flr riser rm bldg c 49875023 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P Electric Bell 1st Flr riser rm bldg d 49875055 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 21 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Gauges are in good condition and normal pressure is being maintained. [Inspection frequency will depend on type of system gauge]; Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge. (2011 ed.) (NFPA 25 13.2.7.1; 5.3.2.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Gauge 24 24 0 24 24
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Gauge 1st Flr riser rm bldg a
1st Flr system 1 49875120 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg a 1st Flr system 2
49875119 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg a 2nd Flr system 1
49875122 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg a 2nd Flr system 2
49875121 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg a attic dry system
49875133 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg a attic dry system
49875132 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg b 1st Flr system West
49875084 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg b 1st Flr system east
49875083 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg b 2nd Flr system West
49875086 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg b 2nd Flr system east
49875085 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg b attic dry system
49875096 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg b attic dry system
49875097 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Gauge 1st Flr riser rm bldg c 1st Flr system 1 West
49875012 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg c 1st Flr system 2 east
49875013 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg c 2nd Flr system 1 West
49875010 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg c 2nd Flr system 2 east
49875011 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg c attic dry system
49875016 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg c attic dry system
49875017 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg d 1st Flr system 1 West
49875047 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg d 49875046 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 22 45Convergint Technologies - Central Texas Download Date: 12/07/2021
1st Flr system 2 east
Gauge 1st Flr riser rm bldg d 2nd Flr system 1 West
49875049 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg d 2nd Flr system 2 east
49875048 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg d attic dry system
49875059 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Gauge 1st Flr riser rm bldg d attic dry system
49875060 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Device Total: 24 Return to Executive Summary
Page of 23 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
Testing the waterflow alarms on wet pipe systems shall be accomplished by opening the inspector's test connection. (2011 ed.) (NFPA 25 5.3.3.3) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Inspector's Test 20 20 0 20 20
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Inspector's Test 1st Flr riser rm bldg a
1st Flr system 1 49875141 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg a 1st Flr system 2
49875140 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg a 2nd Flr system 1
49875139 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg a 2nd Flr system 2
49875138 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Inspector's Test 1st Flr riser rm bldg b 1st Flr system West
49875104 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Inspector's Test 1st Flr riser rm bldg b 1st Flr system east
49875105 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Inspector's Test 1st Flr riser rm bldg b 2nd Flr system West
49875102 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Inspector's Test 1st Flr riser rm bldg b 2nd Flr system east
49875103 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Inspector's Test 1st Flr riser rm bldg c 1st Flr system 1 West
49875031 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg c 1st Flr system 2 east
49875032 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg c 2nd Flr system 1 West
49875029 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg c 2nd Flr system 2 east
49875030 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg d 1st Flr system 1 West
49875067 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg d 1st Flr system 2 east
49875068 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg d 2nd Flr system 1 West
49875065 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test 1st Flr riser rm bldg d 2nd Flr system 2 east
49875066 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test attic attic middle between a&b
49875284 0 01/30-P 04/29-P 08/03-P 11/09-P 02/03-P
Inspector's Test attic attic middle between a&b
49875285 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test attic attic middle between c&d
49875249 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Inspector's Test attic attic middle between c&d
49875250 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Page of 24 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Device Total: 20 Return to Executive Summary
Page of 25 45Convergint Technologies - Central Texas Download Date: 12/07/2021
All other Life Safety Code automatic extinguishing requirements related to NFPA 101- 2012 18/19.3.5
A flow test shall be conducted every 5 years at the hydraulically most remote hose connections of each zone of an automatic standpipe system to verify the water supply still provides the design pressure at the required flow. (2011 ed.) (NFPA 25 6.3.1.1) Devices Tested Q1/21 Pass Q1/21 Fail Q1/21 Tested YTD (2021) Total Quantity Manifold 16 16 0 16 16
Device Type Location ScanID Address Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Manifold 1st Flr riser rm bldg a
1st Flr system 1 49875134 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg a 1st Flr system 2
49875135 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg a 2nd Flr system 1
49875136 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg a 2nd Flr system 2
49875137 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg b 1st Flr system 1 West
49875099 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Manifold 1st Flr riser rm bldg b 1st Flr system east
49875098 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Manifold 1st Flr riser rm bldg b 2nd Flr West
49875101 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Manifold 1st Flr riser rm bldg b 2nd Flr east
49875100 0 01/30-P 04/29-P 08/03-P 11/09-P 02/05-P
Manifold 1st Flr riser rm bldg c 1st Flr West
49875026 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg c 1st Flr east
49875025 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg c 2nd Flr West
49875028 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg c 2nd Flr east
49875027 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg d 1st Flr 1 west
49875062 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg d 1st Flr 2 east
49875061 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg d 2nd Flr 1 West
49875064 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Manifold 1st Flr riser rm bldg d 2nd Flr 2 east
49875063 0 01/30-P 04/29-P 08/03-P 11/09-P 02/04-P
Device Total: 16 Return to Executive Summary
Page of 26 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Service Summary Generated by: BuildingReports.com
Building: Temple VAMC Bldg. 221 The Service Summary section provides an overview of the services performed in this report.
Device Type Service Quantity
Failed/Other Control Valve Tested 1
Total 1
Passed Air Compressor Annual 1 Air Compressor Tested 3 Backflow Prevention Inspected 7 Check Valve Annual 1 Check Valve Inspected 3 Control Valve Inspected 4 Control Valve Tested 23 Drain Tested 4 Dry Pipe Valve Annual 1 Dry Pipe Valve Tested 3 Electric Bell Tested 4 Fire Dep't Connection Annual 1 Fire Dep't Connection Inspected 3 Gauge 'Inspected', 1 Gauge Inspected 23 Inspector's Test Tested 20 Manifold Tested 16 Pressure Switch Annual 1 Pressure Switch Tested 3 Sprinkler Box Inspected 4 Tamper Switch Tested 28 Waterflow Switch Tested 20
Total 174 Grand Total 175
Page of 27 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Wet Pipe Fire Sprinkler Systems Generated by: BuildingReports.com
Building: Temple VAMC Bldg. 221 This section lists out all the devices and components that have been associated with a Wet Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Tamper Switch
Type Description Location Number of Turns
Zone /Address
OK ScanID
Control Valve Supervisory 1st floor riser room bldg. b top of backflow
3 1 49875107
Control Valve Supervisory 1st floor riser room bldg. b bottom of backflow
3 1 49875106
Control Valve Supervisory 1st floor riser room bldg. a 1st floor system 1
3 1 49875116
Control Valve Supervisory 1st floor riser room bldg. a 1st floor system 2
3 1 49875115
Control Valve Supervisory 1st floor riser room bldg. a 2nd floor system 1
3 1 49875118
Control Valve Supervisory 1st floor riser room bldg. a 2nd floor system 2
3 1 49875117
Control Valve backflow 1st floor riser room bldg. c top of backflow
3 1 49875034
Control Valve Supervisory 1st floor riser room bldg. c bottom of backflow
3 1 49875033
Control Valve Supervisory 1st floor riser room bldg. c 2nd floor system 1 west
3 1 49875009
Control Valve Supervisory 1st floor riser room bldg. c 2nd floor system 2 east
3 1 49875008
Control Valve Supervisory 1st floor riser room bldg. c 1st floor system 1 west
3 1 49875007
Control Valve Supervisory 1st floor riser room bldg. c 1st floor system 2 east
3 1 49875006
Control Valve Supervisory 1st floor riser room bldg. d bottom of backflow
3 1 49875070
Control Valve Supervisory 1st floor riser room bldg. d top of backflow
3 1 49875071
Control Valve Supervisory 1st floor riser room bldg. d 1st floor system 2 east
3 1 49875042
Control Valve Supervisory 1st Flr riser rm bldg d 1st Flr system 1 West
3 1 49875043
Control Valve Supervisory 1st floor riser room bldg. d 2nd floor system 2 east
3 1 49875044 javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875107');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875106');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875116');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875115');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875118');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875117');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875034');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875033');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875009');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875008');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875007');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875006');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875070');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875071');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875042');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875043');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875044');
Page of 28 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Control Valve Supervisory 1st floor riser room bldg. d 2nd floor system 1 west
3 1 49875045
Control Valve Supervisory 1st floor riser room bldg. a top of backflow
3 1 49875143
Control Valve Supervisory 1st floor riser room bldg. a bottom of backflow
3 1 49875142
Control Valve Supervisory 1st floor riser room bldg. b 2nd floor system east
3 1 49875081
Control Valve Supervisory 1st floor riser room bldg. b 2nd floor system west
3 1 49875082
Control Valve Supervisory 1st floor riser room bldg. b 1st floor system west
3 1 49875080
Control Valve Supervisory 1st floor riser room bldg. b 1st floor system east
3 1 49875079
Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Vane Potter Electric VSR 39 4 1 49875113 Vane Potter Electric VSC 30 4 1 49875005 Vane Potter Electric VSC 34 4 1 49875004 Vane Potter Electric VSC 27 4 1 49875003 Vane Potter Electric VSC 29 4 1 49875002 Vane Potter Electric VSR 32 4 inch 1 49875038 Vane Potter Electric VSR 29 4 1 49875039 Vane Potter Electric VSR 30 4 1 49875040 Vane Potter Electric VSR 34 4 1 49875041 Vane Potter Electric VSR 34 4 1 49875112 Vane Potter Electric VSR 32 4 1 49875111 Vane Potter Electric VSR 27 4” 1 49875114 Vane Potter Electric VSR 25 4 1 49875077 Vane Potter Electric VSR 38 4 1 49875078 Vane Potter Electric VSR 23 4 1 49875076 Vane Potter Electric VSR 22 4 1 49875075
Components Check Valve
Type Location Internal Date Size OK ScanID Grooved 1st Flr riser rm bldg c 08/22/2018 4" 49875021 Grooved 1st Flr riser rm bldg d 08/22/2018 4" 49875053
Grooved 1st Flr 1a-116 storage room above ceiling
08/22/2018 4" 49875126
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV-N 1st floor riser room bldg. b wet system
4" Open Supervised 62468997
Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875045');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875143');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875142');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875081');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875082');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875080');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875079');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875113');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875005');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875004');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875003');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875002');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875038');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875039');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875040');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875041');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875112');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875111');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875114');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875077');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875078');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875076');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875075');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875021');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875053');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875126');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468997');
Page of 29 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV-N 1st floor riser room bldg. b wet system
4" Open Supervised 62468996
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg b
4" Open Supervised 57774984
Description Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg b
4" Open Supervised 57774989
Description Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg c
4" Open Supervised 57774988
Description Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg c
4" Open Supervised 57774987
Description Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV 1st Flr riser rm bldg c
4" Open Supervised 57774986
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV 1st Flr riser rm bldg c
4" Open Supervised 57774990
Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468996');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774984');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774989');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774988');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774987');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774986');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774990');
Page of 30 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV 1st Flr riser rm bldg c
4" Open Supervised 57774991
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV 1st Flr riser rm bldg c
4" Open Supervised 57774992
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV 1st Flr riser rm bldg c
4" Open Supervised 57774993
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st floor riser room bldg. d
4" Open Supervised 57774994
Description Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st floor riser room bldg. d
4" Open Supervised 57774995
Description Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV-N 1st floor riser room bldg. d
4" Open Supervised 57774998
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV-N 1st floor riser room bldg. d
4" Open Supervised 57774997
Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774991');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774992');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774993');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774994');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774995');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774998');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','57774997');
Page of 31 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg a
4" Open Supervised 62469000
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg a
4" Open Supervised 62469001
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg a
4" Open Supervised 62469002
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg a
4" Open Supervised 62469003
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg a
4" Open Supervised 62469006
Description Isolation
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg a
4" Open Supervised 62469004
Description Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Victaulic 702 1st Flr riser rm bldg a
4" Open Supervised 62469005
Description javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469000');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469001');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469002');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469003');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469006');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469004');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','62469005');
Page of 32 45Convergint Technologies - Central Texas Download Date: 12/07/2021
Main Control
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Tyco BFV-N 2nd floor riser room bldg. b wet system
4" Open Supervised 62468998
Description Isolation
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID test and drain
65 27 27 49875138
Location 1st Flr riser rm bldg a 2nd Flr system 2
65 30 30 49875029
Location 1st Flr riser rm bldg c 2nd Flr system 1 West
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 34 34 49875030
Location 1st Flr riser rm bldg c 2nd Flr system 2 east
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 27 27 49875031
Location 1st Flr riser rm bldg c 1st Flr system 1 West
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 29 29 49875032
Location 1st Flr riser rm bldg c 1st Flr system 2 east
65 32 32 49875068
Location 1st Flr riser rm bldg d 1st Flr system 2 east
Inspector's Test javascript:openEditDevice('load-edit-p2-device','771929','2060510','62468998');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875138');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875029');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875030');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875031');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875032');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875068');
Page of 33 45Convergint Technologies - Central Texas Download Date: 12/07/2021
65 20 29 49875067
Location 1st Flr riser rm bldg d 1st Flr system 1 West
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 30 30 49875066
Location 1st Flr riser rm bldg d 2nd Flr system 2 east
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 34 34 49875065
Location 1st Flr riser rm bldg d 2nd Flr system 1 West
65 34 34 49875141
Location 1st Flr riser rm bldg a 1st Flr system 1
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID 65 32 32 49875140
Location 1st Flr riser rm bldg a 1st Flr system 2
65 33 33 49875139
Location 1st Flr riser rm bldg a 2nd Flr system 1
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID test and drain 65 25 25 49875103
Location 1st Flr riser rm bldg b 2nd Flr system east
Inspector's Test Manufacturer Model # Pressure psi Valve Trip Time sec Water Flow Time sec OK ScanID test and drain 38 3865 49875102
Location 1st Flr riser rm bldg b 2nd Flr system West javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875067');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875066');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875065');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875141');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875140');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875139');
javascript:openEditDevice('load-edit-p2-device','771929','2060510','49875103…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .