This Statement of Work (SOW) details a renovation project for Building 217 at the Edward Hines Jr. VA Hospital in Hines, Illinois, funded through a donation from the Serwa family. The project consists of four separate Contract Line-Item Numbers (CLINs) to be potentially executed independently or concurrently: (1) Easy Street rehabilitation therapy room renovation, (2) entrance lobby and primary care clinic renovation, (3) second floor patio renovation, and (4) first floor dining room renovation. The total project duration is 330 calendar days, with individual requirement timeframes ranging from 30-90 calendar days, and each CLIN having specific demolition and construction requirements.
The renovation aims to address facility condition assessment deficiencies, enhance the healing environment, and modernize spaces for patients, visitors, and staff. Key requirements include strict infection control measures, comprehensive documentation submissions, security badging protocols, and adherence to VA technical specifications. The project emphasizes minimal operational disruption to the 24/7 Community Living Center, requires OSHA-certified site management, and mandates use of American-made materials where possible. The solicitation (36C25225B0014) is issued by the Department of Veterans Affairs Veterans Health Administration and seeks a contractor to complete the renovations in accordance with detailed drawings, specifications, and performance standards.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
578-20-002 Donation Renovations to Building 217
May 12, 2025
Attachments:
1. Contractor Parking
2. Contractor Badging - Fingerprint Request Form 2025
3. Emergency Contact List - Template
4. No Smoking Policy 10-1-19
5. Safety and Health during Construction Activities A. Pre-construction/Safety Risk Assessment (PCRA) B. National Environmental Protection Act Assessment (NEPA) C. Construction Safety Checklist D. GEMS Awareness Competent Person Training E. Construction Project Waste Minimization Report F. Hines VAH Contractor Safety Disciplinary Procedure G. Hines VAH COR Letter of Concern for Safety Non-Compliance H. OSHA Required Competent Person Inspections I. Crane Operation & Minimum Criteria Inspection Checklist J. Hines VA Hospital Planned Critical Lift Plan & Crane Permit
6. Infection Control Barrier Sample
7. Cutting Welding and Other Hot Work
8. Above Ceiling Entry and Wall Construction Permits
9. OIT Horizontal Cable Requirements
10. Pre-Construction Checklist
11. PCRA - Pre-Construction Risk Assessment
12. ILSM - Interim Life Safety Measures
13. ICRA - Infection Control Risk Assessment
14. 578-20-002 100% Bid Drawings (Part 1)
| 14b. | 578-20-002 100% Bid Drawings (Part 2) | |
| 14c. | 578-20-002 100% Bid Drawings (Part 3) | |
| 14d. | 578-20-002 100% Bid Drawings (Part 4) | |
| 14e. | 578-20-002 100% Bid Drawings (Part 5) | |
| 14f. | 578-20-002 100% Bid Drawings (Part 6) |
15. 578-20-002 Specifications Book
16. 578-20-002 Basis of Design (BOD Part 1)
| 16b. | 578-20-002 Basis of Design (BOD Part 2) | |
| 16c. | 578-20-002 Basis of Design (BOD Part 3) | |
| 16d. | 578-20-002 Basis of Design (BOD Part 4) |
17. Building 217 Colored Space Drawings
18. Building 217 – Clinic Details
References:
1. VA’s Technical Information Library (TIL)
2. Master Construction Specifications (PG-18-1)
3. Standard Details (PG-18-4)
4. Environmental Planning Guidance (PG-18-17)
5. 2011 Asbestos Survey for EHVAH Edward Hines Veterans Affairs Hospital
6. 2013 Historic Preservation Plan for the EHVAH
7. 2020 Statement of Conditions Survey for the EHVAH
A) Mission
Engineering Service’s mission is the total oversight and management of the environment of care, as it pertains to the physical infrastructure and base plant operations, at the Edward Hines Jr.VA Hospital. Engineering support is for customers that include, but are not limited to, patients, visitors, clinic staff, and administrative employees.
B) Goals
The goal of this project is to procure a standalone construction contract with a Base bid price and multiple Options that will renovate portions of the Community Living Center (CLC), Building 217 at the Hines VA Hospital.
C) Current Conditions
Building 217 is a 120,137 SF, two (2) story brick building. Constructed in 1983, the building has only had minor renovations since it first opened. Services in the building have evolved since its construction and patients and staff have expressed a desire for an update, as the existing spaces are no longer optimized for their needs.
D) Justification
Building 217 is a long-term facility and renovations will enhance the healing environment of the facility for patients, visitors, and staff. The Edward Hines Jr. VA Hospital received a donation from the Serwa family for the benefit of the veterans of the United States Armed Services.
This project will correct the following FCA deficiencies:
1) Record No. 414626 for Station reports main entrance lobby finishes in poor condition and require replacement.
2) Record No. 365116 for Interior finishes in common/ Dining areas are beyond their useful life which was graded as a “D”.
E) Objectives
The objectives of this project are to:
1) Renovate portions of the Community Living Center (Building 217) at the Hines VA Hospital.
1. Construct a new multi-Purpose Room, 1A43.
2. Renovate the Entrance Lobby and construct a new Primary Care Suite, Rooms A104-A109, A141, and A142.
3. Repair of 2nd Floor outdoor patio.
4. Renovate the 1st Floor Dining Room.
2) Phase the construction work in a manner least likely to interfere with the daily operations of the CLC.
F) Acronyms and Definitions
The following is a listing of acronyms and/or definitions to terms that may be used in this document.
| ABAAS | Architectural Barriers Act Accessibility Standards |
| AHA | Activity Hazard Analyses |
| A/E | Architect and Engineer (firm) |
| AHU | Air Handling Unit |
| APP | Accident Prevention Plan |
| CCD | Contract Completion Date |
| CLC | Community Living Center |
| CLIN | Contract Line-Item Number |
| CO | Contracting Officer |
| COR | Contracting Officers Representative as delegated by the CO |
| CS | Contracting Specialist assigned by the CO |
| EHVAH | Edward Hines Veterans Affairs Hospital |
| FCA | Facilities Condition Assessment |
| GC | General Contractor (firm) |
| GFE | Government Furnished Equipment |
| GFI | Government Furnished Information |
| GLAC | Great Lakes Acquisition Center |
| HEFP | Healthcare Environment and Facilities Program |
| HVAC | Heating/Ventilation/Air Conditioning |
| ICB | Infection Control Barrier |
| ICP | Infection Control Plan |
| ICRA | Infection Control Risk Assessment |
| ILSM | Interim Life Safety Measures |
| IPPS | Invoice Payment Processing System |
| MEP | Mechanical/Electrical/Plumbing |
| NEPA | National Environmental Protection Act Assessment |
| NTP | Notice to Proceed |
| OIT | Office of Information & Technology |
| PAO | Public Affairs Officer |
| PCAC | VHA Program Contracting Activity Central |
| PDT | Project Delivery Team – Typically CO/CS, COR, and EHVAH staff |
| PCRA | Pre-Construction Risk Assessment |
| PIV | Personal Identity Verification |
| PO | Purchase Order |
| POP | Period of Performance |
| QCM | Quality Control Manager |
| OSHA | Occupational Safety and Health Administration |
| QCP | Quality Control Plan |
| RFI | Request for Information |
| SOW | Statement of Work |
| TIL | Technical Information Library |
| VA | Department of Veteran Affairs |
| VA-SEPS | VA Space and Equipment Planning Systems |
| WAP | Wireless Access Point |
| WBS | Work Breakdown Structure |
G) Requirements
Where a conflict exists between the Statement of Work (SOW) requirements and the requirements of other associated contract documents, the SOW requirements shall prevail.
This SOW presumes the Contractor will not need access to any VA Sensitive Information to execute the contract.
The awarded Contractor will adhere to all codes, standards, guidelines, and design requirements found in the VA’s Technical Information Library (TIL) including but not limited to the following:
1) Pre-bid site visit:
a. A pre-bid site walk is encouraged and should be coordinated by the CO. The intent of this walkthrough is to give the Contractor access to the project site so that an accurate evaluation of the project requirements and site assessment can be made.
b. The Contractor shall coordinate with the COR to schedule the site visit seven (7) calendar days prior to the requested date.
c. Exploratory demolition is permitted but must be coordinated with the COR.
2) RFI Submittals:
a. The Contractor shall submit any RFI’s resulting from the site visit to the CO per the solicitation instructions.
b. Unless otherwise stated in the solicitation instructions the Contractor shall allow the COR and CO ten (10) working days to respond to an RFI.
3) Infection Control Barrier (ICB):
a. Temporary construction partitions shall be smoke-tight and built of noncombustible materials that will not contribute to the development or spread of fire.
b. Barriers shall not obstruct access to emergency services and for fire, police, and other emergency forces.
c. The Contractor shall provide and install a rigid infection control panel system manufactured by Edge Guard out of Bement, Illinois or an approved equal. http://www.edge-guard.com/home.html. Salient details of the infection control barrier are:
i. The ICB must be fire-resistant.
ii. The barrier must be water resistant; capable of being cleaned and sanitized.
iii. Installation of the barrier shall not:
1. Generate dust outside the barrier.
2. Generate excess noise outside the barrier.
3. Generates excess fumes outside the barrier.
iv. Demobilization of the barrier shall not:
1. Generate dust outside the barrier.
2. Generate excess noise outside the barrier.
3. Generates excess fumes outside the barrier.
4. Require floor, wall, or ceiling repairs upon removal.
v. The barrier should be environmentally responsible.
1. The materials should be reusable.
2. The materials should not contribute to unnecessary waste to our landfills.
d. Fire-resistant plastic sheeting may be used to supplement the rigid infection control panel system. COR approval is required.
i. The Contractor shall submit an RFI requesting approval during the bid period.
e. Wood studs, plywood, OSB, particle board, pressboard, or other flammable materials are not allowed at Hines.
f. Manometers shall be installed on the ICB adjacent to every entrance of the work zone to monitor negative pressure within the work zone. See Attachment 6.
g. All doors to rooms inside the work zone but directly impacted by the work shall have their doors shut and the perimeters taped to prevent the migration of dust and debris into these rooms.
h. Cover all sprinkler heads (daily), signs, data transmitters, and light fixtures. Cover the supply and return diffusers within the work zone to prevent the spread of dust and fumes to other areas outside the work zone.
i. Rigid infection control panel system and manometers are to be submitted and approved by the COR prior to installation.
j. The following is a manner acceptable to Hines Infection Control to maintain negative pressure inside an infection control barrier with no reasonable access to discharge air to the exterior.
i. Install a floor-to-ceiling infectious control barrier (ICB) meeting the fire-rating required.
ii. Cover all sprinkler heads (daily), signs, data transmitters, and light fixtures. Cover the supply and return diffusers within the work zone to prevent the spread of dust and fumes to other areas outside the work zone.
iii. Place the air scrubber inside the ICB with a HEPA filter. The air scrubber will draw air from inside the ICB.
iv. Place a flapper valve connection on the ICB near to the ceiling.
v. Route the filtered air from the scrubber via a collapsible duct to the flapper valve thus maintaining negative pressure inside the ICB.
vi. If the power should accidently get cutoff, the flapper valve will swing close thereby maintaining the integrity of the ICB.
4) The Contractor shall post and maintain the final signed PCRA, ICRA, ILSM and Emergency Contact Information (when issued) at the entrance to the ICB for the duration of the project. See Attachment 6. The Contractor will update the postings when new documents are issued.
5) Equipment Lead time:
a. Equipment lead times shall be incorporated into the project schedule and used in conjunction with the baseline for the project start date.
b. The contractor shall make an informed bid submission by working with suppliers and considering all potential long-lead items involved with the project reasonably known or considered to impact the start, performance, and completion of the project.
c. For delays in equipment delivery not caused by the government, the contractor shall bear the cost of temporary materials, equipment, labor, and services for the time period between the end of the period of performance and the final installation of the contract’s specified materials and equipment.
6) EHVAH Permits:
a. Unless otherwise stated the Contractor shall submit for all required VA permits (i.e. above ceiling or dig) fourteen (14) calendar days prior to the event based on the approved project schedule with the COR.
7) Project Pay Applications:
a. Pay applications shall be initiated by the contractor in the form of a draft “pencil draw” submission to the COR.
i. Prior to submission the contractor will review the amounts, date of the application, the application number, and the purchase order (PO) for the project are correct.
ii. The COR may question the pencil draw and request revisions.
iii. Upon approval by the COR, the application will be reviewed by the CO.
iv. Upon approval by the CO, the application will be submitted into the electronic Invoice Payment Processing System (IPPS). Approval within IPPS can take days or sometime weeks to be processed.
b. All submitted project pay applications require certified payroll and waste report documents to be current with each pay submission.
i. Certified payroll documents shall be submitted to the COR weekly.
ii. Waste reports shall be submitted even when no waste has been produced. The contractor shall validate this by submitting a quantity of zero on the waste report.
iii. Approval of all invoices will require documents to be current.
c. With each invoice submission an updated, full schedule shall be submitted noting any changes in non-critical and critical paths, modifications approved, delays by the government, delays by the contractor, issuance dates for Letters of Concern and Letters of Cure, and other elements that impact the project completion date.
d. Submission of a 3-week look ahead schedule will not be accepted.
8) Work outside of normal business hours or weekends:
a. All work performed after hours or on weekends requires coordination with the COR and shall be requested fourteen (14) calendar days prior in writing or e-mail to the COR for approval.
b. No work shall take place without written or e-mail confirmation from the project COR.
9) Utility Shutdowns:
a. The Contractor shall provide twenty-one (21) calendar days’ advance notice for any planned utility shutdowns to all allow the station to notify staff/visitors and prepare contingency plans if necessary.
b. Failure to submit the shutdown requests in a timely manner is not justification for a claim of delay on the part of the government.
c. Planned utility shutdowns should be indicated on the project schedule.
10) Submittals and Shop Drawings:
a. Unless otherwise stated the Contractor shall provide shop drawings and equipment submittals for review and approval by the COR seven (7) calendar days prior to the start of construction.
b. No work shall be started prior to review and approval by the COR.
11) Certifications:
a. When applicable, the Contractor shall provide certifications for all personnel performing any welding and shall certify all welds prior to the start-up of any of the units.
b. These certifications shall be supplied to the COR and retained as a permanent record of the project folder.
c. Personnel certifications shall be provided to the COR prior to the start of construction.
d. All weld certifications shall be provided to the COR at the end of every work week when applicable.
12) OSHA Certification:
a. The Contractor shall have an OSHA 30 certified site superintendent on site whenever any work is being performed.
b. A copy of the OSHA 30 certification shall be supplied to the COR prior to the start of any work and retained as part of the project folder.
13) Post-Award meeting:
a. The meeting shall be coordinated through the COR and CS/CO.
b. The meeting shall take place after the Notice to Proceed has been issued but prior to the start of demolition/construction.
c. The Contractor shall schedule and attend a “Page-Turn” meeting in which the Designer of Record will be in attendance. The goal of this meeting is to clarify any confusion the Contractor may have regarding the contract documents in advance of commencing construction activities, delivery of project submittals, submission of the project schedule, the coordination of project phasing, etc.
H) Scope of Work
The Scope of Work for this project includes all labor, management, equipment, and materials for renovation of the Community Living Center, Building 217. This renovation is made up of 4 separate CLINs, each to be priced and phased separately. All measurements/dimensions are approximate. The Contractor must verify all measurements/dimensions.
The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval.
Any deviation from this scope of work requires the express authorization of the Contracting Officer. The Contracting Officer Representative (COR) does not hold the authority to authorize changes to this scope of work.
1) Continued Use – The Community Living Center maintains operations 24 hours a day, 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
2) Requirements – This project consists of four (4) separate requirements, broken into 4 Contract Line-Item Numbers (CLINs). Each CLIN is to be phased and executed independently:
a. CLIN1, Requirement 1 – Easy Street, Room 1A43.
b. CLIN2, Requirement 2 – Entrance Lobby and Primary Care, Rooms A104-A109, A141, A142, and Front Lobby.
c. CLIN3, Requirement 3 – 2nd Floor Patio.
d. CLIN4, Requirement 4 – 1st Floor Dining.
e. The remaining Requirements (5-11) are not a part of this solicitation.
The contractor’s proposal shall provide pricing for each CLIN, with the expectation that they will be executed separately. If multiple CLINs are awarded, the VA may choose to execute them concurrently. The contractor may assign 1 superintendent and 1 project manager for the entire project.
3) CLIN 1: Requirement 1 – Easy Street Renovation
a. Demolish existing Easy Street rehabilitation therapy Room 1A43 including all walls, doors, lights, fixtures, flooring, curbs, stairs, car, etc.
b. Demolish existing rooftop Air Handling Unit (AHU) and associated ductwork.
c. Install new flooring, walls, wall and column protection, fire protection, electrical and data drops, projector, A/V equipment, acoustic panels, ceiling baffles, etc.
d. Install new rooftop AHU and associated distribution.
e. See Attachment 14, 578-20-002 100% Bid Drawings, for details. All drawings associated with this requirement are titled “Easy Street”.
4) CLIN 2: Requirement 2 – Primary Care Clinic and Entrance Lobby Renovation
a. Demolish existing offices, storage, toilet, reception, conference, and rehab recreation rooms.
b. Install new front lobby and patient clinic.
c. See Attachment 14, 578-20-002 100% Bid Drawings, for details. All drawings associated with this requirement are titled “Primary Care Clinic & Entrance Lobby”.
d. In addition to the 100% bid drawings, the new clinic exam rooms will have sheet metal installed along the perimeters of each room. For Rooms 1A105 – 1A109:
1. Remove the lower 2 feet of drywall on the exterior walls, including radiator and all wall hung fixtures. Assume one wall outlet and one data drop per Exam Room.
2. Vacuum out behind all exposed exteriors walls.
3. Install at least 18 gauge sheet metal behind the drywall and cut to less than 3/16” gap around any pipe penetrations. Caulk remaining gaps with heavy durability caulk. Ensure 2’ (AFF) of sheet metal along the exterior walls, and 1’ (AFF) of sheet metal along all interior walls.
4. Install new drywall.
5. Install new radiator cover as necessary.
6. Install/reinstall fixtures as necessary.
7. Patch and paint walls as specified in finish schedule.
8. See Attachment 18, Building 217 – Clinic Details, for details.
5) CLIN 3: Requirement 3 – 2nd Floor Patio Renovation
a. Demolish existing roof covering and concrete topping.
b. Install new planters, deck ramp, and engineered decking.
c. See Attachment 14, 578-20-002 100% Bid Drawings, for details. All drawings associated with this requirement are titled “Second Floor Patio”.
6) CLIN 4: Requirement 4 – 1st Floor Dining Room Renovation
a. Demolish existing 1st floor dining room including all walls, doors, ceiling, lights, diffusers, etc.
b. Install new flooring, walls, wall protection, doors, fire protection, electrical and data drops, ductwork, ceiling, lumicor paneling, etc. in the dining area.
c. Install new kitchen support area and associated MEP connections.
d. See Attachment 14, 578-20-002 100% Bid Drawings, for details. All drawings associated with this requirement are titled “Dining Room 1A118”.
Note: Attachments 14, 15, and 16, the drawings, specifications, and Basis of Design (BOD) include 11 total Requirements. This solicitation is only for the 4 requirements listed in this SOW. Any questions regarding the extents of each Requirement should be resolved during the pre-bid RFI phase.
I) Constraints
1) Work hours for EHVAH staff are from 7:30 am until 4:00 pm, Monday through Friday.
2) Photographs may be taken of the work performed at the jobsite. However, photographs containing patients and/or staff are a violation of the Patient Privacy and hospital policy. Both violations are subject to penalties and dismissal. Permission from the EHVAH Public Affairs Officer (PAO) is required and should be coordinated with the project COR.
3) VHA Directive 1085 implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities.
4) Maximizing Use of American-Made Goods, Products, and Materials
a. The Buy American Act required the United States government to prefer U.S.-made products in its purchases.
b. It is the policy of the United States to buy American and to maximize, consistent with law, the use of goods, products, and materials produced in the United States.
c. Material purchases should adhere to this policy to the greatest extent possible.
1) The contractor badging process is a required security procedure of all VA stations. It is the responsibility of the general or prime contractors to notify their subcontractors of this requirement. All contracted workers visiting the jobsite will need to receive a contractor’s Flash badge. This is to be done before any construction or demolition work is started on the project. Failure to obtain and display the proper badge could result in the worker being removed from the station by Hines Police.
The procedure to follow is:
a. The Contractor shall have 2 weeks’ notice from award to Notice to Proceed (NTP) to on-board team members with the necessary badging.
b. The Contractor shall fill out Contractor Badging Form – See Attachment 2.
c. Two (2) forms are personal identification are needed. Valid (unexpired) forms of ID include:
1. Current Driver’s License. Real ID is required.
2. An original social security card (not laminated). Substitutes may include:
i. Current Passport
ii. Original birth certificate (not a copy) Additional forms of identification can be found on Page 2 of the Contractor Badging Form – See Attachment 2.
d. The Contractor shall coordinate with COR and bring the completed Contractor Badging Form to Mikel Jones (Bldg. 2, Rm 119) to coordinate for fingerprints (Phone: 708 202-8387, ext. 21322; Email: mikel.jones@va.gov).
e. Once the form is approved by Mikel Jones, contractors shall take a copy of the form to Human Resources located in Building 17 for fingerprinting. The hours for fingerprinting are 8:00 AM to 3:00 PM. The other copy will stay with Hines Engineering.
f. Upon a favorable fingerprint adjudication, the contractor will schedule an appointment with HR to receive a Flash badge. The link to schedule this appointment will be provided by Mikel Jones upon notification of successful fingerprint adjudication.
J) Tasks and Responsibilities
A pre-construction (kick-off) meeting between the Contracting Officer (CO) or Contracting Specialist (CS), the Contracting Officers Representative (COR), and key GC team members will be conducted to review project objectives, scope, deliverables, communication, site access, schedule, and responsibilities. During this meeting the Notice to Proceed (NTP) should be signed. After this meeting the awarded GC firm shall provide their services according to the approved project schedule.
1) Preconstruction Period: The Contractor shall provide the following:
a. Logistics Plan: A comprehensive narrative describing the chronological planned development of the project. The Logistics Plan includes an organizational chart, hourly rates, staging plan, description of means and methods, and hours of work.
b. Construction Security Plan: Defines both physical and administrative security.
c. Construction Phasing Plan: It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
d. Submittal Registry: The Submittal Registry shall include a listing of all documentation required for pre-approved submissions including shop drawings, technical data, product performance information, calculations, and samples.
e. Accident Prevention Plan: The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program.
f. Activity Hazard Analyses: AHAs are also known as Job Hazard Analyses, Job Safety Analyses, and Activity Safety Analyses.
g. Construction Schedule: WBS schedule including start/end dates, duration, and sequencing, preferably in MS Project or Primavera format (include floats).
h. Schedule of Values: A detailed Breakdown for Payment, of work performed and work invoiced per Progress Payment submission.
1. The Schedule of Value is a representative breakdown of the contractor’s firm, fixed-price bid. Each portion of the Schedule of Values represents the amount the government paid to the contractor for that portion of the work.
2. Because the contractor’s bid was fixed, so too is the Schedule of Values. It is not fluid and does not change after submission and approval. The Schedule of Values can only be modified through a bi-lateral agreement between the government and the contractor.
3. The government will utilize the Schedule of Values as a basis of negotiations for contract modifications. This is especially true when a credit is due to the government for all or measurable parts of certain portions of the firm, fixed-price contract.
i. Existing Conditions Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of the buildings or areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer.
j. Infection Control Plan (ICP): Narrative description of the dust control and debris disposal process including disposal destination and methodology.
k. Quality Control Plan (QCP): Describes the methods by which the Contractor will ensure all work is being accomplished in accordance with specifications and this SOW.
l. Environmental Protection Plan: The Contractor shall meet with the COR to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental protection.
m. Document Submissions. All documents included as Attachments to this SOW that are required to be filled out and signed or jointly signed by the Contractor.
n. Demolition Debris Management Plan.
o. Certificates, Licenses, and Training Documents.
p. Obtain PIV badges.
q. RFI’s: Other than those resulting directly from demolition or construction.
2) Construction Period: Along coordinating the construction of the project, the Contractor shall provide the following during construction services:
a. Display the signed PCRA, ICRA, ILSM and Emergency Contact Information in a location coordinated with the COR.
b. Submit RFI’s during construction as necessary.
c. Attending and run weekly construction meetings.
1. Take notes and attendance, produce, and distribute minutes. Note – Failure to produce fair, unbiased meeting minutes will result in CO disciplinary action.
2. Track and RFI’s, submittals, and modifications through various logs.
3. Request permits and shutdowns.
4. Request inspections, reviews, and punch list.
5. Address any obstacles and work to coordinate resolutions.
d. Attend site visits, field inspections, and punch list inspections as requested by the COR.
3) Construction Close-out Period:
a. The Contractor shall provide the following:
1. Inspection and Approval by the COR and/or the CO.
2. Final Approval and Beneficial Occupancy when applicable.
3. Warranties documents and O&M Manuals.
4. As-built drawings and record submittals.
5. Staff training when applicable.
6. Contractor Release of Claims.
7. All Waste Reports submitted per Safety and Health during Construction Activities.
8. Existing Conditions Re-survey.
b. The COR shall review the Contractor’s close-out submissions for thoroughness and conformance with the contract document requirements. The COR shall also review field-marked as-built drawings for conformance with final installations.
c. The COR shall utilize these as-built drawings and specifications from the Contractor and generate as recorded drawings and specifications.
K) Deliverables
1) The Contractor shall provide all submittals required by the Specifications Book.
L) Time Frames
1) This project has four (4) separate requirements, each with individual time frames. If executed consecutively, all requirements shall be completed within Three Hundred Thirty (330) calendar days once NTP is issued.
a. Phasing – Each Requirement shall be executed in one single, uninterrupted phase, except for Requirement 2 (Entrance Lobby and Primary Care) and Requirement 7 (High Fall Risk Rooms):
1. Requirement 1 - 90 calendar days.
2. Requirement 2 - 90 calendar days (2 Phases, 45 calendar days each).
3. Requirement 3 - 30 calendar days.
4. Requirement 4 - 60 calendar days.
b. Pre-construction (kick-off) Meeting is when the Notice to Proceed (NTP) is signed.
c. Pre-Construction Period duration is NTP + 30 calendar days. Within this period the Contractor shall provide all materials included under Tasks and Responsibilities and the following:
1. Logistics Plan.
2. Construction Security Plan.
3. Construction Phasing Plan.
4. Submittal Registry.
5. Accident Prevention Plan.
6. Activity Hazard Analyses.
7. Construction Schedule.
8. Schedule of Values.
9. Existing Conditions Survey.
10. Infection Control Plan.
11. Quality Control Plan.
12. Environmental Protection Plan.
13. Document Submissions.
14. Demolition Debris Management Plan.
15. Certificates, Licenses, and Training Documents.
16. Obtain PIV badges.
d. Construction Period - To be determined based upon the approved schedule for construction. If executed consecutively, the estimated construction period is 270 calendar days with all product submittals to be delivered prior to the start of construction to the COR for review and approval. No demolition or construction shall be started without the review and approval from the COR for those items listed in the Pre-Construction Period unless authorized in writing by the COR or the CO.
e. Construction Closeout Period duration is NTP + 270 calendar days, if executed consecutively. The Contractor shall submit within 30 calendar days from EHVAH acceptance the completed punch list items and commissioning reports (if applicable). Within this period the Contractor shall provide all materials included under Tasks and Responsibilities and the following:
1. Inspection and Approval by the COR and/or the CO.
2. Final Approval and Beneficial Occupancy when applicable.
3. Warranties documents and O&M Manuals.
4. As-built drawings and record submittals.
5. Staff training when applicable.
6. Contractor Release of Claims.
7. Waste Reports.
8. Existing Conditions Re-survey.
M) Performance Monitoring
The Government will periodically evaluate the Contractor’s performance by appointing a representative(s) to monitor such performance and ensure services are received. The Government representative will evaluate the Contractor’s performance through intermittent on-site inspections of the Contractor's performance.
N) Other Pertinent Information or Special Considerations.
1) All Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements as applicable. All licenses, permits, and welding certifications shall be kept current throughout the period of performance of the contract. The Contractor shall provide the Government copies of such certificates.
2) Per VA Information Security Program policy – VA Directive and Handbook 6500 and 6500.6, Appendix A, contractor storage, generation, transmission or exchanging of VA sensitive information during this construction project is not acceptable.
3) All work shall be scheduled to meet requirements of EHVAH. All work shall be coordinated through the Contracting Officer. Local coordination shall be routed through the Contracting Officer’s Representative.
4) The Contractor shall provide to the Contracting Officer record of work certifications for all trade’s relative to this contract 5 calendar days prior to beginning work. Certifications shall include welders, pipe installers, machine operators, etc.
5) The Contractor is responsible for repairing any damages to existing utilities incurred during construction or demolition.
6) Utilities within the area and identified on existing drawings are not to be interpreted as the exact location, or as the only existing site conditions. The Contractor shall verify all existing conditions and proceed with caution around any anticipated obstructions.
7) Where any work disturbs the grass areas, sod, walls, ceilings, floors, windows, entrances or building structures, etc. or where new and old work join, the Contractor shall restore, repair, or refinish affected areas or surfaces to their original condition, or as existed before the commencement of this project. Upon completion of the contract, the Contractor shall deliver all work complete and undamaged. Any damage that may be caused by the Contractor or his work crews or subcontractors to any existing structure, grounds and utilities shall be repaired or replaced to their original condition.
8) Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the Contracting Officer. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure system-wide consistency. All work conducted under this scope of work shall comply with the Department of Veterans Affairs Master Specifications and all applicable state and federal regulations and codes.
O) Risk Control
1) Refer to the attached ICRA form.
P) Government Furnished Equipment (GFE)/Government Furnished Information (GFI)
1) GFE.
a. N/A
2) GFI.
a. No additional information is intended to be supplied other than information that is requested by the Contractor.
Q) Point of Contact at the EHVAH
1) Aaron Walsh Engineer, Project Planning Section Engineering Service Edward Hines Jr. VA Hospital 5000 S. Fifth Avenue Building 228, Room 4092 Hines, IL 60141 Aaron.walsh@va.gov Phone: 708-202-8387 ext. 21152
FAX: 708-202-2167
| 578-20-002 Donation Renovations to Building 217 | 2 | |
| 578-20-002 Donation Renovations to Building 217 | 2 |
image1.jpeg
File details come from the government source that posted it. Updated .