This document is an Amendment (Standard Form 30) for Solicitation 36C25225B0014, issued by the Department of Veterans Affairs for renovations to Building 217 at Edward Hines Jr. VA Hospital in Hines, IL. The amendment provides responses to Request for Information (RFI) questions and includes three key attachments: Addendum1 Specifications, Addendum2, and a Contractor Parking Site Plan. The project involves comprehensive renovations to be completed within 330 calendar days from the Notice to Proceed, requiring the contractor to furnish all labor, materials, equipment, and qualified supervision in accordance with the statement of work, specifications, and drawings. The solicitation is for a construction project with a specific focus on upgrading Building 217 at the VA hospital facility, with the final RFI responses issued on 05/30/2025 and no further questions to be answered.

View the file

Other files

File Type Posted
HINES VA SITE PLAN - Contractor Parking.pdf PDF
578-20-002_Addendum2_06102025.pdf PDF
578-20-002_Addendum1_Specifications_060225.pdf PDF
RFI FINAL QUESTIONS AND RESPONSES -IFB SOLICITATION 36C25225B0014.docx DOCX document
36C25225B0014 0003.docx DOCX document
RFI QUESTIONS AND ANSWERS FOR PROJECT 578-20-002 IFB SOLICITATION 36C25225B0014.docx DOCX document
SOW Requirements for AC Shop 4-13-2023.docx DOCX document
36C25225B0014 0002.docx DOCX document
18- Building 217 - Clinic Details.pdf PDF
36C25225B0014 0001.docx DOCX document
P09 - 578-20-002 Construction SOW Rev2 5-12-25.docx DOCX document
16c- 578-20-002 Basis of Design -BOD Part 3.pdf PDF
16b- 578-20-002 Basis of Design -BOD Part 2.pdf PDF
14d- 578-20-002 100percent Bid Drawings -Part 4.pdf PDF
2- Contractor Badging - Fingerprint Request Form 2025.pdf PDF
1- Contractor Parking.pdf PDF
14c- 578-20-002 100percent Bid Drawings -Part 3.pdf PDF
12- Interim Life Safety Measures -ILSM.pdf PDF
13- VHA ICRA-1.3 -Dec 9 2024.pdf PDF
P07 Wage determination IL20250009 03-07-2025.pdf PDF
16- 578-20-002 Basis of Design -BOD Part 1.pdf PDF
14b- 578-20-002 100percent Bid Drawings -Part 2.pdf PDF
14e- 578-20-002 100percent Bid Drawings -Part 5.pdf PDF
36C25225B0014.docx DOCX document
16d- 578-20-002 Basis of Design -BOD Part 4.pdf PDF
6- Infection Control Barrier Sample.pdf PDF
9- OIT Horizontal Cable Requirements.pdf PDF
14f- 578-20-002 100percent Bid Drawings -Part 6.pdf PDF
4- No Smoking Policy 10-1-19.pdf PDF
3- Emergency Contact List - Template.docx DOCX document
17- Building 217 Colored Space Drawings.pdf PDF
P01 - 578-20-002 Construction SOW Rev1 5-1-25.docx DOCX document
5- Safety and Health During Construction Activities.pdf PDF
15- 57820002_100CD_Specifications_12092024 r1.pdf PDF
7- Cutting Welding and Other Hot Work.pdf PDF
11- VHA PCRA-1.1 -May 21 2024.pdf PDF
14- 578-20-002 100percent Bid Drawings -Part 1.pdf PDF
10- Pre-Construction Checklist.pdf PDF
8- Above Ceiling Entry and Wall Construction Permits.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 578-25-3-1071-0132 578-20-002 Department of Veterans Affairs 36C252 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs 36C252 Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25225B0014 05-05-2025

X X X Solicitation: 36C25225B0014 Project 578-20-002 (CON) Renovations to Building 217 at Edward Hines Jr. VA Hospital.

The purpose of this amendment is to incorporate the following:

1) Provide responses to RFI questions as of 05/30/2025. No further RFIs will be answered.

2) Provide copy of attachment "578-20-002_Addendum1_Specifications_060225" related to RFI responses.

3) Provide copy of attachment "578-20-002_Addendum2_06102025" related to RFI responses.

4) Provide copy of attachment "HINES VA SITE PLAN - Contractor Parking" related to RFI responses.

See Continuation page for details / attachments.

Juan C. Gaytan Contracting Officer

CONTINUATION PAGE

SOLICITATION 36C25225B0014

AMENDMENT 0004

06/10/2025

See attached document: RFI FINAL QUESTIONS AND RESPONSES -IFB SOLICITATION 36C25225B0014.

See attached document: 578-20-002_Addendum1_Specifications_060225.

See attached document: 578-20-002_Addendum2_06102025.

See attached document: HINES VA SITE PLAN - Contractor Parking.