14d- 578-20-002 100percent Bid Drawings -Part 4.pdf
PDF 6 MB Posted
- Attached to
- Z1DA--578-20-002 Renovations to Building 217 (CON) at Edward Hines Jr. VA Hospital, Hines, IL.
- Solicitation number
- 36C25225B0014
About this file
This document is a comprehensive set of plumbing design drawings for renovations to Building 217 at Edward Hines Jr. VA Hospital in Hines, Illinois. The drawings, marked as 100% Construction Documents, detail extensive plumbing system modifications across multiple floors, including primary care clinic, entrance lobby, bariatric rooms, dementia unit, high-risk patient rooms, and various support spaces.
The drawings include detailed demolition and new work plans for sanitary, vent, and domestic water systems, with specific focus on replacing fixtures, rerouting piping, and upgrading plumbing infrastructure. Specific fixture types include wall-mounted water closets, lavatories, clinical sinks, floor drains, and shower fixtures, with many designed for specialized areas like dementia and bariatric patient rooms. The project involves comprehensive modifications to existing plumbing systems, ensuring compliance with VA specifications and incorporating features like programmable electronic faucets, ADA-compliant fixtures, and specialized equipment for different healthcare environments.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING GENERAL NOTES PLUMBING MATERIALS AND PROCEDURES NOTES
SYMBOL
CW
FD
HWC
HW
VENT
VENT THRU ROOF
BFP
FBO
BACKFLOW PREVENTER
VTR
V
LAVATORY
FLOOR DRAIN
HOT WATER CIRCULATION
FURNISHED BY OTHERS, INSTALLED
DOMESTIC COLD WATER
BY PLUMBING CONTRACTOR
DESCRIPTION
LAV
SAN SANITARY
SK SINK
CO CLEANOUT
CI CAST IRON
RD ROOF DRAIN
ST STORM
DT DRAIN TILE
FCO FLOOR CLEANOUT
(D) DEMOLISH AND REMOVE
(E) EXISTING TO REMAIN
DOMESTIC HOT WATER
HB HOSE BIBB
DI DEIONIZATION
GLY GLYCOL
HUM HUMIDIFIER
RO REVERSE OSMOSIS
AS AIR SEPERATOR
CD CONDENSATE DRAIN
DN DOWN
BOD BASIS OF DESIGN
VACUUM BREAKER (ATMOSPHERIC)VB
WALL CLEANOUTWCO
MOP BASINMB
WATER CLOSETWC
DIRECTION OF FLOW
SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL REQUIREMENTS LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT
PART OF THIS SECTION AND AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED BELOW.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) PROTOCOLS” ARE TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS AND ASSEMBLIES SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE FULL
BOD EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/COR AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL
BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTS EXIST.
3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER, REQUIREMENTS AND LOCATION OF THE WORK SHOWN AND INCLUDED. THE WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY OMITTED, SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE VA.
4. THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK SHOWN ON THE DRAWINGS AND PROVIDED IN THE SPECIFICATIONS WITHOUT DEVIATION, WITH THE EXCEPTION OF ANY BASIS OF DESIGN (BOD) EQUIVALENCY SUBSTITUTIONS. THESE REQUESTED SUBSTITUTIONS WILL NEED TO BE IDENTIFIED, SUBMITTED AND APPROVED BY THE VA/CO DURING THE BIDDING PHASE AND IF DURING CONSTRUCTION BY THE VA/COR AND THE VA/CO RESPECTIVELY.
CONTRACTOR IS REQUIRED TO PREPARE A DETAILED LIST OF THE PROPOSED EQUIVALENCY SUBSTITUTION ITEMS ALONG WITH THE DOCUMENTED COMPARATIVE ANALYSIS AND THE LISTING OF ALL VARIANCE IMPACTS TO THE PROJECT FOR EACH REQUESTED ITEM OF WORK. EQUIVALENCY SUBSTITUTIONS REQUESTS FOR VA CONSIDERATION WILL FIRST NEED TO BE APPROVED BY THE VA BEFORE PROCEEDING WITH ANY BIDDING AND ANY OF THE WORK. ALL REQUESTED BOD EQUIVALENCY SUBSTITUTIONS WILL FIRST NEED TO BE FULLY REVIEWED, EVALUATED AND APPROVED BY THE VA/CO PRIOR TO BID SUBMISSION AND IF OCCURRING DURING CONSTRUCTION BY THE VA/COR AND IN TURN THE VA/CO BEFORE ANY
WORK CAN BE PERFORMED.
5. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL LABOR AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. WHERE THERE IS NO MENTION OF THE RESPONSIBLE PARTY FOR A SPECIFIC ITEM TO BE FURNISHED OR INSTALLED ON THE DRAWINGS, THE DRAWING'S TRADE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ALL RELATED PURCHASES AND LABOR FOR PROVIDING A COMPLETE OPERATING SYSTEM FOR THIS ITEM.
6. WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL STATE) ALL BUILDING MATERIALS AND FINISHES AS REQUIRED TO PROVIDE A FINISHED PRODUCT THAT IS LIKE NEW AND DOESN'T STAND OUT AS BEING DIFFERENT OR
DISTINGUISHABLE AS A PATCH OR REPAIR.
7. THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN AS REQUIRED BY THE VA DESIGN GUIDES/MANUALS ALONG WITH THE EXPRESSED DESIGN INTENT PRESENTED
WITHIN THESE DOCUMENTS.
8. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU WALLS AND THROUGH FLOORS, INCLUDING CORING IF
REQUIRED.
9. PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL EXISTING SANITARY, STORM AND WATER SUPPLY ON THE
SITE PRIOR TO THE PERFORMANCE OF ANY WORK
10. PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH SERVICE VALVES SHALL BE AS PER THE SPECIFICATIONS
AND IN KEEPING WITH THE VA STANDARDS AND REQUIREMENTS.
11. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT GOVERNING LOCAL, COUNTY, STATE, AND FEDERAL BUILDING CODE REQUIREMENTS AND REGULATIONS PLUS COMPLIANCE WITH LOCAL UTILITY COMPANY REQUIREMENTS.
12. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY WORKMANSHIP.
13. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF ALL PERSONNEL THRU ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W. WASHINGTON, D.C.
14. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING OF ALL NEW EQUIPMENT AND MATERIALS FURNISHED BY THIS CONTRACTOR ALONG WITH EQUIPMENT FURNISHED BY THE VA AND INSTALLED BY THIS CONTRACTOR. PROVIDE PROTECTION FROM DAMAGE BY THE CONSTRUCTION, HANDLING, VANDALISM AND WEATHER DURING ALL PHASES OF
CONSTRUCTION UNTIL COMPLETION OF THE WORK.
15. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS REQUIRED BY THE SPECIFICATIONS PRIOR TO THE START OF INSTALLATION FOR VA/COR APPROVAL AND A SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER.
16. THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS TO THE VA/COR BEFORE FINAL PROJECT CLOSE-OUT CAN OCCUR. THE CONTRACT RECORD AS-BUILT DOCUMENTS SHALL BE PROVIDED IN ELECTRONIC REPRODUCIBLE FORM.
17. BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL PLUMBING CODES ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL. WHEN PROPERLY COMPLETED AND APPROVED BY THE VA/COR
PROVIDE THE SPECIFIED CERTIFICATION(S).
18. ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE TEST. METHOD OF TEST AND REQUIREMENTS TO BE MET SHALL BE AS PER THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL CODE
REQUIREMENTS ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL.
19. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING AND DRAINING OF TRENCHES OR PITS NECESSARY FOR
THE INSTALLATION OF THEIR WORK.
20. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF THEIR WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE PROPERTY, LEAVE THE WORK IN NEAT AND CLEAN ORDER, AND PROVIDE A COMPLETED SYSTEM(S) THAT HAS BEEN FULLY TESTED AND IS IN GOOD WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS.
21. THROUGH PENETRATIONS SHALL BE PROTECTED BY AN APPROVED PENETRATION FIRESTOP SYSTEM PER VA SPECIFICATION
PLUMBING INSULATION 22 07 11 AND FIRE STOPPING SPECIFICATION 07 84 00.
22. ALL EQUIPMENT/DEVICES SHALL BE AND OF FIRST RATE QUALITY (UNLESS OTHERWISE SPECIFIED) AND IS TO BEAR THE APPROPRIATE AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE SPECIFIC DESIGN PURPOSE.
23. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE BASIS FOR DIMENSIONAL DESIGN. IF THE CONTRACTOR PURCHASES EQUIPMENT FROM A SPECIFIED ACCEPTABLE MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT SUBMITTED FOR REVIEW DOES NOT MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED, CONTRACTOR SHALL PAY FOR ANY AND ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO THE VA.
CONTRACTOR WILL ALSO PAY ALL COSTS FOR ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS, THE VA, ARCHITECT OR ENGINEER OF RECORD TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE AND FUNCTION
AS INTENDED.
24. GENERAL CONTRACTOR MUST FIELD VERIFY SIZES, CAPACITIES, WEIGHTS, ETC. ON ALL EQUIPMENT. DISCREPANCIES ON DRAWINGS WILL NOT CONSTITUTE A BASIS FOR CHANGE ORDERS. VERIFY WITH ARCHITECT/ENGINEER AND COR IF ANY
DISCREPANCIES EXIST.
25. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
26. UNLESS INDICATED OTHERWISE, THE ARCHITECT/ENGINEER MAKES NO REPRESENTATION AS TO WHETHER OR NOT ANY HAZARDOUS OR CONTAMINATED MATERIALS (INCLUDING BUT NOT LIMITED TO ASBESTOS, PCB'S, LEAD, CONTAMINATED SOILS, ETC.) ARE PRESENT WITHIN THE EXISTING BUILDING OR ON THE SITE. WORK SHOWN ON THE DRAWINGS AND/OR INDICATED IN THE SPECIFICATIONS SHALL NOT BE CONSTRUED TO CALL FOR CONTACT WITH ANY OF THESE MATERIALS. IF THESE MATERIALS ARE ENCOUNTERED OR SUSPECTED, THE CONTRACTOR SHALL NOT DISTURB THEM AND SHALL CONTACT
THE VA/COR IMMEDIATELY.
1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER THAN 8' - 0" APART. NO
PIPING SHALL BE SELF-SUPPORTING NOR BE SUPPORTED FROM EQUIPMENT CONNECTIONS.
2. ALL PARALLEL PIPES (TWO(2) OR MORE) SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE HANGER.
3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND CONTRACTION IN PIPING SYSTEMS
UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL.
4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT AND SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM. ALL CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8" BENDS. NO LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES
SHALL BE PROTECTED FROM FREEZING.
5. HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW POINTS IN THE SYSTEM WHERE DRAINS SHALL BE
INSTALLED.
6. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT 90° CHANGES OF DIRECTION, AT 50'-0" INTERVALS ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC. WHERE CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH EXTENSIONS TO FLOOR ABOVE OR TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE
BASE OF EACH STACK.
7. VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED WITH SIX POUND SHEET LEAD. FLASHING SHALL EXTEND 12" IN ALL DIRECTIONS FROM THE VENT, CARRIED OVER AND TURNED DOWN THE INSIDE OF THE VENT. ALL SEAMS AND JOINTS OF FLASHING SHALL BE SOLDERED AND PROVEN WEATHERTIGHT. EXTEND VENTS A MIN. OF 12" ABOVE ROOF, AND 30" AWAY FROM PARAPET.
8. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE.
9. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA.
10. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER.
11. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES.
12. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS.
13. BURIED SANITARY AND WASTE LINES WILL BE A MINIMUM OF 4" DIA.
14. ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS.
15. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS AND SLOPED UP TOWARD MAIN STACK.
16. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR THROUGH FIRE RATED ASSEMBLIES.
17. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND CAUSING MAJOR PIPING REVISIONS.
18. ALL CONNECTIONS BETWEEN DISSIMILAR METALS SHALL BE MADE WITH DIELECTRIC UNIONS OR COUPLINGS.
1. THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, SPECIFIES THE PLUMBING FIXTURES, EQUIPMENT AND DEVICES: HOWEVER, UNLESS NOTED OTHERWISE, ALL FIXTURES SHALL BE PROVIDED WITH APPLICABLE ACCESSORIES (SUCH AS SUPPLY STOPS, WASTE TRAPS, FIXTURE MOUNTING SUPPORTS, BOLT CAPS, WATER CLOSET SEATS, ETC., AS
REQ'D TO COMPLETE THE INSTALLATION.)
2. ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ADJUSTED FOR THE SPECIFIED DESIGN PURPOSE (UNLESS
OTHERWISE SPECIFIED).
3. ALL EQUIPMENT AND DEVICES SHALL BEAR AGA, NSF, ASME, ANSI, CSA OR UL APPROVED LABELS AND CERTIFICATIONS FOR
THE SPECIFIED DESIGN PURPOSE.
4. PLUMBING CONTRACTOR SHALL VERIFY IN FIELD AND ARCHITECT ALL FINAL FIXTURE AND EQUIPMENT LOCATIONS AND
MOUNTING HEIGHTS REQUIRED FOR THE DESIGN PURPOSE.
5. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF EACH CATALOG CUT, FOR EACH ITEM, TO BE APPROVED BY THE OWNER AND SUCCESSFULLY REVIEWED BY THE ARCHITECT/ENGINEER (PRIOR TO THE BEGINNING OF
CONSTRUCTION) FOR ALL NEW ITEMS SPECIFIED HEREAFTER.
6. THE CONTRACTOR SHALL SUBMIT EQUIPMENT CUTS FOR EACH PIECE OF EQUIPMENT PRIOR TO ORDERING. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES FOR APPROVAL BY THE OWNER AND SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER. THIS CONTRACTOR SHALL ALSO ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND CONTROL WIRING DIAGRAMS.
7. FIXTURES NOTED TO BE FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING CONTRACTOR, ALL OTHER FIXTURES SHALL
BE PROVIDED BY PLUMBING CONTRACTOR.
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
PROCEDURES
PLUMBING SYMBOL LIST
PLUMBING FIXTURE SCHEDULE
SCW SOFT COLD WATER
SHW SOFT HOT WATER
SHWC SOFT HOT WATER CIRCULATION
KSAN KITCHEN SANITARY
(A) ABANDON IN PLACE
FS FLOOR SINK
TD TRENCH DRAIN
UR URINAL
GI GREASE INTERCEPTOR
SEP SEWAGE EJECTOR PUMP
A/E ARCHITECT / ENGINEER
AFF ABOVE FINISH FLOOR
EL ELEVATION
TYP TYPICAL
FT FLOOR TROUGH
X
X
CONNECT TO EXISTING (NEW CONNECTION)
UNION
BALL VALVE
VALVE
CHECK VALVE (DIRECTION OF FLOW)
EQUIPMENT TAG
EXISTING RISER TAG
POINT OF DEMOLITION
HOSE BIBB
VACUUM BREAKER
CLEANOUT
RISER UP
EQUIPMENT (PROVIDED BY OTHERS)
BALANCING VALVE
RISER DOWN
UGSAN UNDERGROUND SANITARY
AREA NOT IN CONTRACT
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12/06/2024
PLUMBING - GENERAL NOTES, SYMBOLS
AND ABBREVIATIONS
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
P001
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
PLUMBING LEGEND
S
J
K
H
M
L
N
O
P
Q
S
R
G
F1
E
D
C
B
A
23456789
1010.11111.111.21213141515.11617
181920212223242526
S16
S15
S14
S13
S12
S11
S10
S9
S8
S7
S6
S5
S4
S3
S2
S1
N19
N17
N15.1 N14.1
N16
N15
S19
S18
S17
S16.1
S15.1
S14.1
N14
N13
N12
N11
N10
N9
N8
N7
N6
N5
N4
N3
N2
N1
PSD401.2
PSD401.4
PWD401.3
PWD401.4
PSD401.5
PWD401.5
PSD401.5
PWD401.5
PSD401.1
PWD401.1
PSD401.7
PWD401.7
PSD401.2
PWD401.3
PSD401.6
PWD401.6
PWD401.2
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12/06/2024
PLUMBING DEMOLITION - FIRST FLOOR
OVERALL PLAN
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
P002
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/16" = 1'-0"
PLUMBING - FIRST FLOOR OVERALL VIEW - DEMOLITION
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
90% CONSTRUCTION DOCUMENTS 08/23/2024
DN
J
K
H
M
L
N
O
P
Q
S
R
G
F1
E
D
C
B
A
23456789
1010.11111.111.21213141515.11617
181920212223242526
S16
S15
S14
S13
S12
S11
S10
S9
S8
S7
S6
S5
S4
S3
S2
S1
N19
N17
N15.1 N14.1
N16
N15
S19
S18
S17
S16.1
S15.1
S14.1
N14
N13
N12
N11
N10
N9
N8
N7
N6
N5
N4
N3
N2
N1
PSD401.6
PSD401.6
PWD401.5
PSD401.5
PSD401.5
PWD401.5
PSD401.3
THERE IS NO PLUMBING WORK
AT EASY STREET CEILING AREA
PWD401.6
PWD401.6
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12/06/2024
PLUMBING DEMOLITION - SECOND FLOOR
OVERALL PLAN
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
P003
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/16" = 1'-0"
PLUMBING - SECOND FLOOR OVERALL VIEW - DEMOLITION
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
T V
J
K
H
M
L
N
O
P
Q
S
R
G
F1
E
D
C
B
A
23456789
1010.11111.111.21213141515.11617
181920212223242526
S16
S15
S14
S13
S12
S11
S10
S9
S8
S7
S6
S5
S4
S3
S2
S1
N19
N17
N15.1 N14.1
N16
N15
S19
S18
S17
S16.1
S15.1
S14.1
N14
N13
N12
N11
N10
N9
N8
N7
N6
N5
N4
N3
N2
N1
PW401.3
PS401.5
PS401.2
PW401.4
PS401.6
PW401.6
PS401.6
PW401.6
PS401.1
PW401.1
PS401.7
PW401.8
PS401.2
PW401.3
PW401.7
PS401.7
PW401.2
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12/06/2024
PLUMBING NEW WORK - FIRST FLOOR
OVERALL PLAN
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
P004
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
N 1/16" = 1'-0"
PLUMBING - FIRST FLOOR OVERALL VIEW - NEW WORK
J
K
H
M
L
N
O
P
Q
S
R
G
F1
E
D
C
B
A
23456789
1010.11111.111.21213141515.11617
181920212223242526
S16
S15
S14
S13
S12
S11
S10
S9
S8
S7
S6
S5
S4
S3
S2
S1
N19
N17
N15.1 N14.1
N16
N15 S19
S18
S17
S16.1
S15.1
S14.1
N14
N13
N12
N11
N10
N9
N8
N7
N6
N5
N4
N3
N2
N1
PS401.7
PW401.6
PS401.6
PW401.6
PS401.6
PW401.6
PS401.3
THERE IS NO PLUMBING WORK
AT EASY STREET CEILING AREA
PW401.7
PS401.7
PS401.4
PW401.5
PW401.9
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12/06/2024
PLUMBING NEW WORK - SECOND FLOOR
OVERALL PLAN
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
P005
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
N 1/16" = 1'-0"
PLUMBING - SECOND FLOOR OVERALL VIEW - NEW WORK
R e fr ig e ra to r
K
M
L
N
O
P
Q
S
R
1515.11617
(E) 4" SAN
(E) 6" SAN
(E) 6" SAN
(E) 4" SAN
(E) 10" SAN
(E) 8" SAN
(E) 10" SAN
(E) 4" SAN
(E) 4" SAN
(E) 8" SAN
1 1
(E) 6" SAN
2 2
(E) FCO
(D) FCO
(D) 4" SAN UP
3 3
(D) WC
(D) UR
(D) LAV
4 4 4
5(D) 4" SAN
(D) 2" V
EXISTING 2" VENT PIPING
UP TO FLOOR ABOVE
(D)LAV
(D)UR (D)WC
(D)LAV
(D)WC
(E)WC (E)LAV
(D) EWC
3 (D) SS
(D) 2" SAN
(D) 2" V
(D) 2" V
(E) 6" STW
(E)4"STW RISER UP TO
FLOOR ABOVE
(E) 4" STW
(E) 6" STW
(E) 6" STW
(E) 6" STW
(D) 6" STW
ELEVATOR
1C268
ELEVATOR
MACHINE
RM.
1A40
ELECTRICAL
1A39
LAUNDRY
1A110
NURSING
HOME
SUPERVISOR
1A105
LOUNGE
1A104
OFFICE
1A106
OFFICE
1A107
CONFERENCE
& CLASS
1A109
WOMEN
1A142
MEN
1A141
RECREATION
ROOM
1A108
WOMEN
1A113
MEN
1A112
H.A.C.
1A111
NOURISH.
KITCHEN
1A115
TOILET
B103
STORAGE
1A108A
1. EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING TO REMAIN IN ITS ENTIRETY.
2. EXISTING PIPING TO REMAIN IN ITS ENTIRETY.
3. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN. CUT AND REMOVE EXISTING UNDERGROUND PIPING SHOWN IN DASHED BACK TO MAIN AND CAP EXISTING REMAINING PIPING TO BE ABANDONED.
4. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN AND CUT BACK PIPING BEHIND WALL. READY
EXISTING SANITARY AND VENT PIPING TO BE RECONNECTED TO NEW.
5. CUT AND REMOVE EXISTING UNDERGROUND SANITARY PIPING SHOWN IN DASHED AND READY EXISTING
PIPING FOR RECONNECTION TO NEW.
6. DISCONNECT AND REMOVE EXISTING VENT PIPING SHOWN IN DASHED BACK TO MAIN AND READY VENT
PIPING RISER TO BE RECONNECTED TO NEW.
7. CUT AND REMOVE DISCONNECT EXISTNG 6" STORM PIPING BELOW CEILING AND READY FOR
RECONNECTION TO NEW.
8. CUT AND REMOVE EXISTING 6" UNDERGROUND STORM PIPING SHOWN IN DASHED AND READY EXISTING
PIPING FOR RECONNECTION TO NEW.
PLUMBING DEMOLITION KEYNOTESX
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND RE-INSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
E. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED TO RECEIVE
THE NEW FLOOR FINISHES.
H. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - SAN & VENT - ENLARGED
DEMOLITION PLAN - PRIMARY CARE CLINIC &
ENTRANCE LOBBY
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PSD401.1
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
PLUMBING - FIRST FLOOR - SAN & VENT DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
E
D
S19
S18
S17
N9N8
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN(E) 4" SAN
(E) 4" SAN
(E) 6" SAN
(E) 4" SAN
(E) 4" SAN UP
(E) 2" SAN UP
(E) 2" V UP
W
W
W
(D) 2" V5
(E)WC
(E)LAV
(D)SINK
(D)BT
(D)WC
(D)LAV
(E)SINK
(E)FCO
(E)2"V UP 2
(E) 2" V 2
TOILET
1B132
TOILET
1B148
BEDROOM
1B149
TOILET
1B150
SOILED
UTILITY
1B151
E
DS9 S8
N19
N17
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
(E) 6" SAN
(E) 6" SAN
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
4 (E) 4" SAN UP
(E) 2" SAN UP
(E) 2" V UP
(D) 2" V
(E) 6" SAN
W
W
W
(E)WC
(E)LAV
(D)SINK
(D)BT
(D)LAV
(D)WC
(E)WC
(E)LAV
(E)SINK
(E)SINK
(E)FCO
2 (E)2"V UP
(E)FCO
TOILET
1C132
BEDROOM
1C149
TOILET
1C148
TOILET
1C150
1. EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING TO REMAIN IN ITS ENTIRETY.
2. EXISTING PIPING TO REMAIN IN ITS ENTIRETY.
3. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN AND CUT BACK PIPING BEHIND WALL. READY
EXISTING SANITARY AND VENT PIPING TO BE RECONNECTED TO NEW.
4. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN AND CUT BACK PIPING TO MAIN. READY
EXISTING PIPING TO BE RECONNECTED TO NEW.
5. CUT AND REMOVE EXISTING VENT PIPING SHOWN IN DASHED BACK TO MAIN RISER AND READY RISER TO
BE CONNECTED TO NEW.
PLUMBING DEMOLITION KEYNOTESX
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND RE-INSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
E. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED TO RECEIVE
THE NEW FLOOR FINISHES.
H. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - SAN & VENT - ENLARGED
DEMOLITION PLAN - BARIATRIC ROOMS
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PSD401.2
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N
1/4" = 1'-0"
PLUMBING - FIRST FLOOR - SAN AND VENT DEMOLITION PLAN - BARIATRIC B149
N 1/4" = 1'-0"
PLUMBING - FIRST FLOOR - SAN AND VENT DEMOLITION PLAN - BARIATRIC C149
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
M
N
1515.116
(D)RD
(D)RD
PATIO
2APATIO
NOURISHMENT
KITCHEN
2A31
1. DISCONNECT AND REMOVE EXISTING AREA DRAIN LOCATED ON SECOND FLOOR PATIO AND READY TO BE
RECONNECTED TO NEW.
PLUMBING DEMOLITION KEYNOTESX
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND RE-INSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
E. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED TO RECEIVE
THE NEW FLOOR FINISHES.
H. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - SAN & VENT - ENLARGED
DEMOLITION PLAN - SECOND FLOOR PATIO
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PSD401.3
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
PLUMBING - SAN AND VENT DEMOLITION PLAN - 2ND FLOOR PATIO
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
H
G
F1
E
D
C
B
A
1515.11617
N16 N15
S19
S18
S17
S16.1
S15.1
S14.1
N14
N13
N12
N11
N10
N9
N8
N7
N6
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
(E) 6" SAN
(E) 4" SAN
(E) 4" SAN
(E) 6" SAN
(E) 4" SAN
(D) 4" SAN
(D) 4" SAN
(D) 4" SAN
(E) 4" SAN
(D) 4" SAN
(D) 4" SAN
(D) 4" SAN
(D) 4" SAN UP
TO 2" SAN
(D) 4" SAN UP
TO 2" SAN
(D) 4" SAN UP
TO 2" SAN
(E) 2" V UP
(E) 2" V UP
(E) 2" V UP
(E) 2" V UP
(E) 2" V UP
(E) 2" V UP
(E) 2" V UP
(D) 2" V 6
(D) 2" V
(D) 2" V
(D) 2" V
(D) 2" V
(D) 2" V
(D) 2" V
(E) 4" SAN UP
(E) 4" SAN UP
(E) 2" SAN UP
(E) 4" SAN UP
(E) 4" SAN UP
(E) 4" SAN UP
(E) 4" SAN UP
(D) 4" SAN UP
TO 2" SAN 3
7(E) 4" SAN UP
(D) 4" SAN UP
TO 2" SAN UP 3
W
W
W
W
W
W
(E) 4" SAN 3
W
W
W
W
W
W
W
W
(D)FCO
(D) 2" V
REFER TO SHEET
1/PSD401.2 FOR
ENLARGED PLAN
(D)FD 5
(E)FD 8
(E) 4" SAN 2
(E) 2" V 6
REFER TO SHEET
2/PSD401.6 FOR
ENLARGED PLAN
(D)SINK
(D)SINK
(E)MB
(D)WC
(D)LAV
(D)LAV
(D)LAV
(D)LAV
(D)WC
(D)WC
(D)LAV
(D)LAV (D)WC
(D)LAV
(D)LAV
4 4
(D)LAV
(D)WC
(D)LAV (D)WC
(D)LAV
(D)LAV
4 4
(D)LAV (D)WC
(D)LAV (D)WC
(D)LAV 4
(D)LAV
(D)WC
(D)LAV
(D)WC
(D)LAV
(E)LAV
(E)WC
(D)LAV
(D)WC
(D)LAV
(D)LAV
(D)LAV
(D)LAV
(D)WC
(D)WC
(E) 4" SAN
BEDROOM
1B162
BATH
1B163
PANTRY
1B136
SOILED
UTILITY
1B146
HAC
1B147
SHOWER
1B135
CONFERENCE
ROOM
1B133
BEDROOM
1B131
TOILET
1B148
BEDROOM
1B149
TOILET
1B150
BEDROOM
1B152
TOILET
1B153
BEDROOM
1B155
BEDROOM
1B156
TOILET
1B157
BEDROOM
1B159
TOILET
1B161
BEDROOM
1B160
BEDROOM
1B164
TOILET
1B165
BATH
1B166
BEDROOM
1B167
BEDROOM
1B168
TOILET
1B169
BEDROOM
1B171
BEDROOM
1B172
BEDROOM
1B175
BEDROOM
1B176
TOILET
1B177
BEDROOM
1B178
TOILET
1B179
TOILET
1B173
TOILET
1B174
TOILET
1B170
TOILET
1B158
TOILET
1B154
EQUIP.
ROOM
1B151A
OFFICE
1B139
OFFICE
1B141
MEDS
1B138
ELECT.
1B143
SUPPLY
1B142
STORAGE
1B145
EMS
1B145A
LOUNGE
1B80
1. EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING TO REMAIN IN ITS ENTIRETY.
2. EXISTING PIPING TO REMAIN IN ITS ENTIRETY.
3. DISCONNECT AND REMOVE EXISTING FIXTURE AND ALL ASSOCIATED HANGERS AND PIPING. CUT BACK PIPING TO MAIN RISER AND CAP BEHIND WALL. EXISTING SAN RISER SERVING FIXTURES ON SECOND FLOOR SHALL REMAIN IN PLACE. CUT EXISTING VENT PIPING BACK TO MAIN AND READY VENT PIPING TO
BE RECONNECTED TO NEW.
4. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN. CUT AND REMOVE EXISTING SAN AND VENT
PIPING SHOWN IN DASHED BACK TO MAIN AND READY PIPING FOR RECONNECTION TO NEW.
5. CUT AND REMOVE EXISTING UNDERGROUND SANITARY PIPING SHOWN IN DASHED AND READY EXISTING
PIPING FOR RECONNECTION TO NEW.
6. DISCONNECT AND REMOVE EXISTING VENT PIPING SHOWN IN DASHED BACK TO MAIN AND READY PIPING
TO BE RECONNECTED TO NEW.
7. DISCONNECT AND REMOVE EXISTING UNDERGROUND SANITARY PIPING SHOWN IN DASHED. READY
EXISTING SANITARY RISER PIPING SERVING SECOND FLOOR TO BE RECONNECTED TO NEW.
8. EXISTING SHOWER FLOOR DRAIN TO REMAIN AS IS.
PLUMBING DEMOLITION KEYNOTESX
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND RE-INSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
E. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED TO RECEIVE
THE NEW FLOOR FINISHES.
H. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - SAN & VENT - ENLARGED
DEMOLITION PLAN - DEMENTIA UNIT
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PSD401.4
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
PLUMBING - FIRST FLOOR - SAN AND VENT DEMOLITION PLAN - DEMENTIA UNIT
(E) FCO
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
11.212
(D) 2" V
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
(E) 2" V (E) 2" V
2 2
(D)4"SAN RISER UP
(D)2"V RISER UP 4
(E)FCO
(D) 4" SAN
4" SAN
4" SAN
(E) 2" V UP2
(E)SINK(D)LAV
(E)WC
(D)WC
(D)LAV
(D)SINK
K
M
L
N14.1
(E) 4" SAN
(E) 2" V
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
(E) 2" V
(E) 4" SAN
(D) 2" V
(D) 2" V
(E)FCO
3(D)2"V RISER UP
(D)4"SAN RISER UP 4
(D)LAV
(D)WC
(D)SK
(E)LAV
(E)WC
(E)SK
H
G
11.212
(D) 2" V UP AND
DOWN TO 4"VTR
(D)4"SAN DOWN
2" V UP
(D)LAV
(D)WC
(D)SK
(E)WC
(E)LAV
(E)SK
K
M
L
N14.1
(D)4" SAN DOWN
AND 2" V UP
(D) 2" V UP AND
DOWN TO 4" VTR
(E)LAV
(D)LAV
(D)WC
(E)WC
(E)SK
(E)SK
TOILET
2C79
TOILET
2C77
PATIENT
ROOM
2C78
PATIENT
ROOM
2C4
TOILET
2C5
TOILET
2C3
MECHANICAL
1A121
TOILET
1C103
PATIENT
ROOM
1C104
TOILET
1C105
BEDROOM
1C176
TOILET
1C177
TOILET
1C179
PATIENT
ROOM
1C178
1. EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING TO REMAIN IN ITS ENTIRETY.
2. EXISTING PIPING TO REMAIN IN ITS ENTIRETY.
3. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN. CUT AND CAP EXISTING SANITARY AND VENT
PIPING BACK TO MAIN LEAVING NO DEAD LEGS.
4. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN AND ALL ASSOCIATED HANGERS. CUT AND REMOVE EXISTING SANITARY AND VENT PIPING AND REFER TO NEW WORK FOR NEW LOCATION OF SAN
AND VENT RISERS SERVING SECOND FLOOR.
PLUMBING DEMOLITION KEYNOTESX
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND RE-INSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
E. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED TO RECEIVE
THE NEW FLOOR FINISHES.
H. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - SAN & VENT - ENLARGED
DEMOLITION PLAN - HIGH FALL RISK ROOMS
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PSD401.5
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
PLUMBNG - FIRST FLOOR - SAN & VENT DEMOLITION PLAN - HIGH RISK 1C104N
1/4" = 1'-0"
PLUMBING - FIRST FLOOR - SAN & VENT DEMOLITION PLAN - HIGH RISK 1C178
N 1/4" = 1'-0"
PLUMBING - SECOND FLOOR - SAN & VENT DEMOLITION PLAN - HIGH RISK 2C4
N 1/4" = 1'-0"
PLUMBING - SECOND FLOOR - SAN & VENT DEMOLITION PLAN - HIGH RISK 2C78
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
Refrigerator e fr ig e ra to r
G
F1
S15.1
3(D)SINK
H
G
1515.116
S14.1
(E)LAV
(E)WC
(D)SINK
(E)SINK
NOURISH.
2B41
PHARMACY
2A23
TOILET
2B77
TOILET
2B79
FAMILY
ROOM
2B78
1. EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING TO REMAIN IN ITS ENTIRETY.
2. EXISTING PIPING TO REMAIN IN ITS ENTIRETY.
3. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN. READY EXISTING SANITARY AND VENT PIPING
TO BE RECONNECTED TO NEW.
4. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN. CUT AND REMOVE EXISTING SAN AND VENT
PIPING SHOWN IN DASHED BACK TO MAIN.
5. CUT AND REMOVE EXISTING UNDERGROUND SANITARY PIPING SHOWN IN DASHED AND READY PIPING TO
BE RECONNECTED TO NEW.
6. DISCONNECT AND REMOVE EXISTING 4"SAN IN WALL AND CUT BELOW FIRST FLOOR CEILING AND READY
EXISTING SAN PIPING FOR RECONNENTION TO NEW.
7. DISCONNECT AND REMOVE EXISTING VENT PIPING SHOWN IN DASHED. READY VENT PIPING RISER TO BE
RECONNECTED TO NEW.
PLUMBING DEMOLITION KEYNOTESX
H
G
1515.116
S14.1
(E)2"V UP 2
(E) 4" SAN
(D) 2" V
(E) 4" SAN2
(D) 2" V
(D) 4" SAN
(D) 4" SAN UP6
(D)LAV
(D)WC
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND RE-INSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
E. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED TO RECEIVE
THE NEW FLOOR FINISHES.
H. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
O.T.
OFFICE
1A116
BEDROOM
1B178
TOILET
1B179
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - SAN & VENT ENLARGED
DEMOLITION PLAN - EQUIPMENT STORAGE
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PSD401.6
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
PLUMBING - SECOND FLOOR - SAN & VENT DEMOLITION PLAN - NOURISHMENT 2B41
N 1/4" = 1'-0"
PLUMBING - SECOND FLOOR - SAN & VENT DEMOLITION PLAN - FAMILY 2B78
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
N 1/4" = 1'-0"
PLUMBING - FIRST FLOOR - SAN AND VENT DEMOLITION PLAN - EQUIPMENT 1B178
Range
M
N
O
121314151
(E) 8" SAN
(E) 6" SAN
(E) 8" SAN
(E) 2" V
(D)EWC
(D)SINK
(D)LAV
(D)WC
(D)SINK
(E)WC
(E)LAV
NON
FOOD
STORAGE
1A135
STORAGE
1A108A
REHABILITATION
THERAPY
ROOM
1A43
1. EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING TO REMAIN IN ITS ENTIRETY.
2. EXISTING PIPING TO REMAIN IN ITS ENTIRETY.
3. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN. CUT AND CAP EXISTING SANITARY AND VENT
PIPING BACK TO MAIN LEAVING NO DEAD LEGS.
4. DISCONNECT AND REMOVE EXISTING TRAINING KITCHEN SINK AS SHOWN. IF DEEMED THAT EXISTING SANITARY, VENT AND DOMESTIC WATER IS SERVING THIS SINK, CONTRACTOR SHALL CUT EXISTING
PIPING BACK TO MAIN AND CAP PIPING LEAVING NO DEAD LEGS.
PLUMBING DEMOLITION KEYNOTESX
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND RE-INSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
E. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED TO RECEIVE
THE NEW FLOOR FINISHES.
H. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - SAN & VENT - ENLARGED
DEMOLITION PLAN - EASY STREET
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PSD401.7
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
PLUMBING - FIRST FLOOR - SAN & VENT DEMOLITION PLAN - REHAB 1A108
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
e fr ig e ra to r
K
M
L
N
O
P
Q
S
R
1515.11617
(E) 1 1/4" HWC
(E) 4" CW
(E) 2 1/2" HW
(E) 1 1/4" HWC
(E) 4" CW
(E) 2 1/2" HW
(D) 1/2" CW
(D) 1/2" HW
(E) 2" CW
(E) 3/4" HW
3 3
1 1
(E) 1 1/4" HWC
(D) 4" CW
(D) 2 1/2" HW
(D)EWC
(D)SS
(E)WC (E)LAV
(D)UR(D)LAV
(D)WC
ELEVATOR
1C268
ELEVATOR
MACHINE
RM.
1A40
ELECTRICAL
1A39
LAUNDRY
1A110
NURSING
HOME
SUPERVISOR
1A105
LOUNGE
1A104
OFFICE
1A106
OFFICE
1A107
CONFERENCE
& CLASS
1A109
WOMEN
1A142
MEN
1A141
RECREATION
ROOM
1A108
WOMEN
1A113
MEN
1A112
H.A.C.
1A111 NOURISH.
KITCHEN
1A115
TOILET
B103
STORAGE
1A108A
1. EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING TO REMAIN IN ITS ENTIRETY.
2. EXISTING PIPING TO REMAIN IN ITS ENTIRETY.
3. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN AND ALL ASSOCIATED HANGERS. CUT EXISTING DOMESTIC PIPING BACK SHOWN IN DASHED TO MAIN AND CAP REMAINING EXISTING PIPING
LEAVING NO DEAD LEGS.
4. DISCONNECT AND REMOVE EXISTING FIXTURE AS SHOWN AND ALL ASSOCIATED HANGERS AND ALL
ASSOCIATED PIPING BEHIND WALL. CUT BACK PIPING BEHIND WALL AND READY PIPING FOR
RECONNECTION TO NEW.
5. DISCONNECT AND REMOVE EXISTING CW AND HW MAIN SHOWN IN DASHED AND READY PIPING TO BE
RECONNECTED TO NEW.
6. DISCONNECT AND REMOVE EXISTING ELECTRIC WATER COOLER AS SHOWN AND ALL ASSOCIATED HANGERS. CUT AND CAP PIPING SERVING ELECTRIC WATER COOLER BACK TO MAIN LEAVING NO DEAD
LEGS.
7. DISCONNECT AND REMOVE EXISTING SERVCE SINK AS SHOWN AND ALL ASSOCIATED HANGERS. CUT AND
CAP PIPING SERVING SERVICE SINK BACK TO MAIN LEAVING NO DEAD LEGS.
PLUMBING DEMOLITION KEYNOTESX
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND REINSTALLED IN SAME LOCATION. COORDINATE WITH OTHER
TRADES.
D. ABANDONED AND/OR DEAD LEG DOMESTIC WATER PIPING WILL NOT BE ALLOWED AND SHALL BE
REMOVED EVEN IF NOT SHOWN ON DRAWINGS.
E. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
F. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD END
PIPING MUST BE CAPPED.
G. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
H. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
I. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED, SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE. THE CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID PIPING OR EQUIPMENT, NOTIFY THE COR AND ENGINEER AND WAIT FOR FURTHER INSTRUCTIONS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLAN
12/06/2024
PLUMBING - DOMESTIC WATER - ENLARGED
DEMOLITION PLAN - PRIMARY CARE CLINIC &
ENTRANCE LOBBY
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
RH HS
578-20-002
PWD401.1
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/8" = 1'-0"
PLUMBING - FIRST FLOOR - DOMESTIC WATER DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY
Revisions: Date:
60% DESIGN DEVELOPMENT 05/08/2024
PLUMBING DEMOLITION GENERAL NOTES
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 3 WEEKS ADVANCE NOTICE. CONTRACTOR TO
COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED
FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.