14- 578-20-002 100percent Bid Drawings -Part 1.pdf

PDF 19 MB Posted

Attached to
Z1DA--578-20-002 Renovations to Building 217 (CON) at Edward Hines Jr. VA Hospital, Hines, IL.
Solicitation number
36C25225B0014
Issued by

About this file

These architectural demolition and construction documents detail a comprehensive renovation project for Building 217 at Edward Hines Jr. VA Medical Center in Hines, Illinois. The 100% construction documents cover complete demolition and renovation of multiple areas including a primary care clinic, entrance lobby, dining rooms, library, dementia unit, bariatric rooms, high fall risk patient rooms, equipment storage, and an "Easy Street" rehabilitation area. The project involves selective demolition, infrastructure upgrades, and new construction across both first and second floors, with specific focus on improving patient care spaces, upgrading medical facilities, and modernizing the building's interior environments.

The project documents include detailed architectural plans, reflected ceiling demolition plans, life safety plans, and infection control protocols. Key renovation areas include creating 11 patient rooms in the dementia care unit, upgrading dining spaces, establishing a new primary care clinic, modifying conference and library spaces, and preparing specialized rooms for bariatric and high fall risk patients. The renovation is part of VA contract 36C25223C0071, with a project number 578-20-002, and is designed to be completed within 330 calendar days from the Notice to Proceed, maintaining full operational status of the medical center during construction.

View the file

Other files

File Type Posted
HINES VA SITE PLAN - Contractor Parking.pdf PDF
578-20-002_Addendum2_06102025.pdf PDF
578-20-002_Addendum1_Specifications_060225.pdf PDF
RFI FINAL QUESTIONS AND RESPONSES -IFB SOLICITATION 36C25225B0014.docx DOCX document
36C25225B0014 0004.docx DOCX document
36C25225B0014 0003.docx DOCX document
RFI QUESTIONS AND ANSWERS FOR PROJECT 578-20-002 IFB SOLICITATION 36C25225B0014.docx DOCX document
SOW Requirements for AC Shop 4-13-2023.docx DOCX document
36C25225B0014 0002.docx DOCX document
18- Building 217 - Clinic Details.pdf PDF
36C25225B0014 0001.docx DOCX document
P09 - 578-20-002 Construction SOW Rev2 5-12-25.docx DOCX document
16c- 578-20-002 Basis of Design -BOD Part 3.pdf PDF
16b- 578-20-002 Basis of Design -BOD Part 2.pdf PDF
14d- 578-20-002 100percent Bid Drawings -Part 4.pdf PDF
2- Contractor Badging - Fingerprint Request Form 2025.pdf PDF
1- Contractor Parking.pdf PDF
14c- 578-20-002 100percent Bid Drawings -Part 3.pdf PDF
12- Interim Life Safety Measures -ILSM.pdf PDF
13- VHA ICRA-1.3 -Dec 9 2024.pdf PDF
P07 Wage determination IL20250009 03-07-2025.pdf PDF
16- 578-20-002 Basis of Design -BOD Part 1.pdf PDF
14b- 578-20-002 100percent Bid Drawings -Part 2.pdf PDF
14e- 578-20-002 100percent Bid Drawings -Part 5.pdf PDF
36C25225B0014.docx DOCX document
16d- 578-20-002 Basis of Design -BOD Part 4.pdf PDF
6- Infection Control Barrier Sample.pdf PDF
9- OIT Horizontal Cable Requirements.pdf PDF
14f- 578-20-002 100percent Bid Drawings -Part 6.pdf PDF
4- No Smoking Policy 10-1-19.pdf PDF
3- Emergency Contact List - Template.docx DOCX document
17- Building 217 Colored Space Drawings.pdf PDF
P01 - 578-20-002 Construction SOW Rev1 5-1-25.docx DOCX document
5- Safety and Health During Construction Activities.pdf PDF
15- 57820002_100CD_Specifications_12092024 r1.pdf PDF
7- Cutting Welding and Other Hot Work.pdf PDF
11- VHA PCRA-1.1 -May 21 2024.pdf PDF
10- Pre-Construction Checklist.pdf PDF
8- Above Ceiling Entry and Wall Construction Permits.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EDWARD

HINES, JR.

VA HOSPITAL

ROOSEVELT ROAD

th

A V

E N

U E th

A V

E N

U E

CERMAK ROAD

NORTH PARKING

LOT A

ROOSEVELT ROAD

H

IN

E S

B

LV

D

VISITOR PARKING

NORTH LOT C

PROJECT

AREA

AREA OF WORK

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

PROJECT LOCATION:

PROJECT TITLE:

BUILDING NUMBER:

ARCHITECTS + ENGINEERS:

BANCROFT ARCHITECTS +

ENGINEERS

CONTRACT NUMBER:

STATION PROJECT NUMBER:

BANCROFT-AE PROJECT NUMBER:

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

PROJECT NUMBERS:

12/06/2024

100% CONSTRUCTION DOCUMENTS

12/06/2024

GENERAL - COVER SHEET RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

CZ CR

578-20-002

G001

RENOVATIONS TO BUILDING 217

578-20-002

36C25223C0071

23-009

5000 5th Ave, Hines, IL 60141

100% CONSTRUCTION

DOCUMENTS

EDWARD J. HINES JR. VAMC

3300 Dundee Rd Northbrook IL, 60062 T:847.952.9362 www.bancroft-ae.com

23-00936C25223C0071

N

1/16" = 1'-0"

REGIONAL MAP

N

1 1/2" = 1'-0"

VICINITY MAP

N

1/16" = 1'-0"

CAMPUS MAP

JOHNSON WILBUR ADAMS, INC.

STRUCTURAL ENGINEER OF RECORD:

330 S. Naperville Rd.. Suite 300 Wheaton, IL 60187 T: 630.653.9060 www.jwase.com

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12/06/2024

GENERAL - DRAWING INDEX RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

CZ CR

578-20-002

G002

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

DRAWING INDEX

SHEET NUMBER SHEET TITLE 30% 60% 90% 100%

00-GENERAL

G001 GENERAL - COVER SHEET X X X X

G002 GENERAL - DRAWING INDEX X X X X

G003 GENERAL - DRAWING INDEX X X

GI001 GENERAL - GENERAL PROJECT NOTES X X X X

GI002 GENERAL - GENERAL DEMOLITION NOTES X X X X

GI003 GENERAL - GENERAL CONSTRUCTION NOTES X X X

GI101 GENERAL - LIFE SAFETY PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

GI102 GENERAL - LIFE SAFETY PLAN - DINING 1A118 X X X

GI103 GENERAL - LIFE SAFETY PLAN - DINING 2A18 X X X

GI104 GENERAL - LIFE SAFETY PLAN - DEMENTIA UNIT X X X

GI105 GENERAL - LIFE SAFETY PLAN - EASY STREET X X X

GC201 GENERAL - PHASING PLAN - FIRST FLOOR X X X

GC202 GENERAL - PHASING PLAN - SECOND FLOOR X X X

GC400 GENERAL - INFECTION CONTROL GENERAL NOTES X X X

GC401 GENERAL - INFECTION CONTROL PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

GC402 GENERAL - INFECTION CONTROL PLAN - DINING ROOM 1A118 X X X

GC403 GENERAL - INFECTION CONTROL PLAN - DINING ROOM 2A18 X X X

GC404 GENERAL - INFECTION CONTROL PLAN - LIBRARY 2A12 X X X

GC405 GENERAL - INFECTION CONTROL PLAN - BARIATRIC ROOMS X X X

GC406 GENERAL - INFECTION CONTROL PLAN - SECOND FLOOR PATIO X X X

GC407 GENERAL - INFECTION CONTROL PLAN - DEMENTIA UNIT X X X

GC408 GENERAL - INFECTION CONTROL PLAN - HIGH FALL RISK ROOMS X X X

GC409 GENERAL - INFECTION CONTROL PLAN - EQUIPMENT STORAGE X X X

GC410 GENERAL - INFECTION CONTROL PLAN - EASY STREET X X X

GC501 GENERAL - INFECTION CONTROL TYPICAL CLASS IV X X X

GC502 GENERAL - INFECTION CONTROL - SAMPLE ICRA FORMS AND PERMITS X X X

GC503 GENERAL - INFECTION CONTROL - SAMPLE PCRA FORMS AND PERMITS X X X

02-ARCHITECTURAL

A001 ARCHITECTURAL - SYMBOLS, ABBREVIATIONS AND LEGENDS X X X X

A002 ARCHITECTURAL - SHEET NOTES X X X X

A003 ARCHITECTURAL - STANDARD MOUNTING HEIGHTS X X X

AD101 ARCHITECTURAL - FIRST FLOOR - OVERALL DEMOLITION PLAN X X X X

AD102 ARCHITECTURAL - SECOND FLOOR - OVERALL DEMOLITION PLAN X X X X

AD401 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X

AD402 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - DINING ROOM 1A118 X X X X

AD403 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - DINING ROOM 2A18 X X X X

AD404 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - LIBRARY 2A12 X X X X

AD405 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X X

AD406 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - SECOND FLOOR PATIO X X X X

AD407 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - DEMENTIA UNIT X X X X

AD408 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X X

AD409 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - EQUIPMENT STORAGE X X X X

AD410 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - EASY STREET X X X X

AD411 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - EASY STREET ROOF X X

AD412 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - PLAYGROUND X X X X

AD413 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - SMOKING SHELTER X X X X

ACD401 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - PRIMARY CARE CLINIC AND LOBBY X X X

ACD402 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - DINING ROOM 1A118 X X X

ACD403 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - DINING ROOM 2A26 X X X

ACD404 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - LIBRARY 2A12 X X X

ACD405 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - BARIATRIC ROOMS X X X

ACD406 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - DEMENTIA UNIT X X X

ACD407 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X

ACD408 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - EASY STREET X X X

ACD409 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - EQUIPMENT STORAGE X X X

AE101 ARCHITECTURAL - FIRST FLOOR - FLOOR PLAN X X X X

AE102 ARCHITECTURAL - SECOND FLOOR - FLOOR PLAN X X X X

AE401 ARCHITECTURAL - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X

AE401.1 ARCHITECTURAL - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X

AE401.2 ARCHITECTURAL - ELEVATIONS - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X

AE401.3 ARCHITECTURAL - ELEVATIONS - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X

AE401.4 ARCHITECTURAL - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X

AE402 ARCHITECTURAL - ENLARGED PLAN - DINING ROOM 1A118 X X X X

AE402.1 ARCHITECTURAL - ELEVATIONS - DINING ROOM 1A118 X X

AE403 ARCHITECTURAL - ENLARGED PLAN - DINING ROOM 2A18 X X X X

AE403.1 ARCHITECTURAL - ENLARGED PLAN - DINING ROOM 2A18 X X

AE404 ARCHITECTURAL - ENLARGED PLAN - CONFERENCE ROOMS X X X X

AE404.1 ARCHITECTURAL - ELEVATIONS - CONFERENCE ROOMS X X

AE405 ARCHITECTURAL - ENLARGED PLAN - BARIATRIC ROOMS X X X X

AE405.1 ARCHITECTURAL - ENLARGED PLAN - BARIATRIC ROOMS X X

AE406 ARCHITECTURAL - ENLARGED PLAN - SECOND FLOOR PATIO X X X X

AE407 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT X X X X

AE407.1 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT X X

AE407.2 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X

AE407.3 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X

AE407.4 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X

AE407.5 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X

AE407.6 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT X X

AE408 ARCHITECTURAL -ENLARGED PLAN - HIGH FALL RISK ROOMS X X X X

AE408.1 ARCHITECTURAL -ENLARGED PLAN - HIGH FALL RISK ROOMS X X

AE409 ARCHITECTURAL - ENLARGED PLAN - EQUIPMENT STORAGE X X X X

AE409.1 ARCHITECTURAL - ENLARGED PLAN - EQUIPMENT STORAGE X X

AE410 ARCHITECTURAL - ENLARGED PLAN - EASY STREET X X X X

AE410.1 ARCHITECTURAL - ELEVATION - EASY STREET X X

AE410.2 ARCHITECTURAL - ELEVATION - EASY STREET X X

AE410.3 ARCHITECTURAL - ELEVATION - EASY STREET X X

AE410.4 ARCHITECTURAL - ELEVATION - EASY STREET X X

AE410.5 ARCHITECTURAL - EASY STREET - ROOF PLAN X X

AE411 ARCHITECTURAL - ENLARGED PLAN - PLAYGROUND X X X X

AC401 ARCHITECTURAL - REFLECTED CEILING PLAN - PRIMARY CARE CLINIC AND ENTRANCE LOBBY X X X

AC402 ARCHITECTURAL - REFLECTED CEILING PLAN - DINING ROOM 1A118 X X X

AC403 ARCHITECTURAL - REFLECTED CEILING PLAN - DINING ROOM 2A26 X X X

AC404 ARCHITECTURAL - REFLECTED CEILING PLAN - LIBRARY 2A12 X X X

AC405 ARCHITECTURAL - REFLECTED CEILING PLAN - BARIATRIC ROOMS X X

AC406 ARCHITECTURAL - REFLECTED CEILING PLAN - DEMENTIA UNIT X X X

AC407 ARCHITECTURAL - REFLECTED CEILING PLAN - HIGH FALL RISK ROOMS X X X

AC408 ARCHITECTURAL - REFLECTED CEILING PLAN - EASY STREET X X X

DRAWING INDEX

SHEET NUMBER SHEET TITLE 30% 60% 90% 100%

AC409 ARCHITECTURAL - REFLECTED CEILING PLAN - EQUIPMENT STORAGE X X X

AE501 ARCHITECTURAL - PARTITION TYPES X X X

AE521 ARCHITECTURAL - EXTERIOR DETAILS X X

AE531 ARCHITECTURAL - CEILING DETAILS X X X

AE541 ARCHITECTURAL - CASEWORK DETAILS X X X

AE542 ARCHITECTURAL - CASEWORK DETAILS X X

AE543 ARCHITECTURAL - CASEWORK DETAILS X

AE551 ARCHITECTURAL - FINISH DETAILS X X X

AE552 ARCHITECTURAL - FINISH DETAILS X X

AE561 ARCHITECTURAL - MOUNTING DETAILS X X X

AE601 ARCHITECTURAL - DOOR SCHEDULE AND DETAILS X X X

AE602 ARCHITECTURAL - FOLDING GLASS PARTITION DETAILS X X

AE603 ARCHITECTURAL - FOLDING GLASS PARTITION DETAILS X X

AE611 ARCHITECTURAL - WINDOW SCHEDULE AND DETAILS X X

AF101 ARCHITECTURAL - FINISH PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

AF102 ARCHITECTURAL - FINISH PLAN - DINING 1A118 X X X

AF103 ARCHITECTURAL - FINISH PLAN - DINING 2A18 X X X

AF104 ARCHITECTURAL - FINISH PLAN - CONFERENCE ROOMS X X X

AF105 ARCHITECTURAL - FINISH PLAN - BARIATRIC ROOMS X X X

AF106 ARCHITECTURAL - FINISH PLAN - SECOND FLOOR PATIO X X X

AF107 ARCHITECTURAL - FINISH PLAN - DEMENTIA UNIT X X X

AF108 ARCHITECTURAL - FINISH PLAN - HIGH FALL RISK ROOMS X X X

AF109 ARCHITECTURAL - FINISH PLAN - EQUIPMENT STORAGE X X X

AF110 ARCHITECTURAL - FINISH PLAN - EASY STREET X X X

AF601 ARCHITECTURAL - FINISH LEGEND X X

AF611 ARCHITECTURAL - FINISH SCHEDULE X X

AW401 ARCHITECTURAL - WAYFINDING PLAN - PRIMARY CARE CLINIC AND ENTRANCE LOBBY X X

AW402 ARCHITECTURAL - WAYFINDING PLAN - DINING ROOM 1A118 X X

AW403 ARCHITECTURAL - WAYFINDING PLAN - DINING ROOM 2A18 X X

AW404 ARCHITECTURAL - WAYFINDING PLAN - LIBRARY 2A12 X X

AW405 ARCHITECTURAL - WAYFINDING PLAN - BARIATRIC ROOMS X X

AW406 ARCHITECTURAL - WAYFINDING PLAN - DEMENTIA UNIT X X

AW407 ARCHITECTURAL - WAYFINDING PLAN - HIGH FALL RISK ROOMS X X

AW408 ARCHITECTURAL - WAYFINDING PLAN - EQUIPMENT STORAGE X X

AW409 ARCHITECTURAL - WAYFINDING PLAN - EASY STREET X X

AW601 ARCHITECTURAL - WAYFINDING TYPES X X

AW611 ARCHITECTURAL - WAYFINDING SCHEDULE X X

QH401 ARCHITECTURAL - EQUIPMENT PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

QH402 ARCHITECTURAL - EQUIPMENT PLAN - DINING 1A118 X X X

QH403 ARCHITECTURAL - EQUIPMENT PLAN - DINING 2A18 X X X

QH404 ARCHITECTURAL - EQUIPMENT PLAN - LIBRARY 2A12 X X X

QH405 ARCHITECTURAL - EQUIPMENT PLAN - BARIATRIC ROOMS X X X

QH406 ARCHITECTURAL - EQUIPMENT PLAN - SECOND FLOOR PATIO X X X

QH407 ARCHITECTURAL - EQUIPMENT PLAN - DEMENTIA UNIT X X X

QH408 ARCHITECTURAL - EQUIPMENT PLAN - HIGH FALL RISK ROOMS X X X

QH409 ARCHITECTURAL - EQUIPMENT PLAN - EQUIPMENT STORAGE X X X

QH410 ARCHITECTURAL - EQUIPMENT PLAN - EASY STREET X X X

QH601 ARCHITECTURAL - EQUIPMENT SCHEDULE X X X

QH602 ARCHITECTURAL - EQUIPMENT SCHEDULE X X X

05-FIRE PROTECTION

FX001 FIRE PROTECTION - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS X X X

FX002 FIRE PROTECTION - FIRST FLOOR OVERALL PLAN X X X

FX003 FIRE PROTECTION - SECOND FLOOR OVERALL PLAN X X X

FXD401.1 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

FXD401.2 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - DINING ROOM 1A118 X X X

FXD401.3 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - DINING ROOM 2A18 X X X

FXD401.4 FIRE PROTECTION - ENLARGED NEW WORK PLAN - LIBRARY 2A12 X X X

FXD401.5 FIRE PROTECIONL - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X

FXD401.6 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - DEMENTIA UNITS X X X

FXD401.7 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X

FXD401.8 FIRE PROTECTIOIN - ENLARGED SPRINKLER DEMOLITION PLAN - EQUIPMENT STORAGE X X X

FXD401.9 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - EASY STREET X X X

FXD401.10 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - EASY STREET ROOF X X X

FX401.1 FIRE PROTECTION - ENLARGED NEW PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

FX401.2 FIRE PROTECTION - ENLARGED NEW PLAN - DINING ROOM 1A118 X X X

DRAWING INDEX

SHEET NUMBER SHEET TITLE 30% 60% 90% 100%

FX401.3 FIRE PROTECTION - ENLARGED NEW PLAN - DINING ROOM 2A18 X X X

FX401.4 FIRE PROTECTION - ENLARGED NEW PLAN - LIBRARY 2A12 X X X

FX401.5 FIRE PROTECTION - ENLARGED NEW PLAN - BARIATRIC ROOMS X X X

FX401.6 FIRE PROTECTION - ENLARGED NEW PLAN - DEMENTIA UNITS X X X

FX401.7 FIRE PROTECTION - ENLARGED NEW PLAN - HIGH FALL RISK ROOMS X X X

FX401.8 FIRE PROTECTION - ENLARGED NEW PLAN - EQUIPMENT STORAGE X X

FX401.9 FIRE PROTECTION - ENLARGED NEW PLAN - EASY STREET X X X

FX401.10 FIRE PROTECTION - ENLARGED NEW PLAN - EASY STREET ROOF X X

FX500 FIRE PROTECTION - DETAILS X X X

06 - PLUMBING

P001 PLUMBING - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS X X X X

P002 PLUMBING DEMOLITION - FIRST FLOOR OVERALL PLAN X X X

P003 PLUMBING DEMOLITION - SECOND FLOOR OVERALL PLAN X X X X

P004 PLUMBING NEW WORK - FIRST FLOOR OVERALL PLAN X X X X

P005 PLUMBING NEW WORK - SECOND FLOOR OVERALL PLAN X X X

PSD401.1 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE

LOBBY

X X X X

PSD401.2 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X X

PSD401.3 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - SECOND FLOOR PATIO X X X X

PSD401.4 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - DEMENTIA UNIT X X X X

PSD401.5 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X X

PSD401.6 PLUMBING - SAN & VENT ENLARGED DEMOLITION PLAN - EQUIPMENT STORAGE X X X X

PSD401.7 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - EASY STREET X X X X

PWD401.1 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE

LOBBY

X X X X

PWD401.2 PLUMBING -DOMESTIC WATER - ENLARGED DEMOLITION PLAN -DINING 1A118 X X

PWD401.3 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X X

PWD401.4 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - DEMENTIA UNIT X X X X

PWD401.5 PLUMBING - DOMESTIC WATER. - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X X

PWD401.6 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - EQUIPMENT STORAGE X X X X

PWD401.7 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - EASY STREET X X X X

PS401.1 PLUMBING - SAN & VENT - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X

PS401.2 PLUMBING - SAN & VENT - ENLARGED PLAN - BARIATRIC ROOMS X X X X

PS401.3 PLUMBING - SAN & VENT - ENLARGED PLAN - SECOND FLOOR PATIO X X X X

PS401.4 PLUMBING - SAN & VENT - ENLARGED PLAN - LIBRARY 2A12 X X

PS401.5 PLUMBING - SAN & VENT - ENLARGED PLAN - DEMENTIA UNIT X X X X

PS401.6 PLUMBING - SAN & VENT - ENLARGED PLAN - HIGH FALL RISK ROOMS X X X X

PS401.7 PLUMBING - SAN & VENT - ENLARGED PLAN - EQUIPMENT STORAGE X X X X

PS401.8 PLUMBING - SAN & VENT - ENLARGED PLAN - MULTI PURPOSE - EASY STREET 1A43 X

PW401.1 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X

PW401.2 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - DINING ROOM 1A118 X

PW401.3 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - BARIATRIC ROOMS X X X X

PW401.4 PLUMBING - DOMESTIC WATER - ENLARGE PLAN - DEMENTIA UNIT X X X X

PW401.5 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - LIBRARY 2A12 X X

PW401.6 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - HIGH FALL RISK ROOMS X X X X

PW401.7 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - EQUIPMENT STORAGE X X X X

PW401.8 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - MULTI PURPOSE - EASY STREET 1A43 X

PW401.9 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - DINING ROOM 2A18 X

P501 PLUMBING - DETAILS X X X X

P502 PLUMBING - DETAILS X X X X

P601 PLUMBING - RISER DIAGRAMS X X

P602 PLUMBING - RISER DIAGRAMS X X

P603 PLUMBING - RISER DIAGRAMS X X

P604 PLUMBING - RISER DIAGRAMS X X

P605 PLUMBING - RISER DIAGRAMS X X

Revisions: Date:

30% SCHEMATIC DESIGN 11/23/2023

60% DESIGN DEVELOPMENT 05/08/2024

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12/06/2024

GENERAL - DRAWING INDEX RENOVATIONS TO

BUILDING 217

EDWARD J. HINES JR. VAMC

CZ CR

578-20-002

G003

100% CONSTRUCTION

DOCUMENTS

23-00936C25223C0071

DRAWING INDEX

SHEET NUMBER SHEET TITLE 30% 60% 90% 100%

P701 PLUMBING - SCHEDULES X X X X

07-MECHANICAL

M001 MECHANICAL - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS • X X X

MVD401.1 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE

LOBBY

X X X

MVD401.2 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - DINING ROOM 1A118 X X X

MVD401.3 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - DINING ROOM 2A26 X X X

MVD401.4 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - LIBRARY 2A12 X X X

MVD401.5 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - BARIATRIC ROOMS X X X

MVD401.6 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - DEMENTIA UNIT X X X

MVD401.7 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X

MVD401.8 MECHANICAL - ENLARGED VENTILATION DEMOLITION PLAN - EQUIPMENT STORAGE X X X

MVD401.9 MECHANICAL - ENLARGED DEMOLITION PLAN - EASY STREET ROOF X X X

MVD401.10 MECHANICAL - EXHAUST FAN VENTILATION DEMOLITION PLAN - ROOF X X X

MPD402.1 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

MPD402.2 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - DINING ROOM 1A118 X X X

MPD402.3 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - DINING ROOM 2A26 X X X

MPD402.4 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - LIBRARY 2A12 X X X

MPD402.5 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - BARIATRIC ROOMS X X X

MPD402.6 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - DEMENTIA UNIT X X X

MPD402.7 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X

MPD402.8 MECHANICAL - ENLARGED PIPING DEMOLITION PLAN - EQUIPMENT STORAGE X X X

MPD402.9 MECHANICAL - ENLARGED DEMOLITION PLAN - SECOND FLOOR - EASY STREET X X X

MV401.1 MECHANICAL - ENLARGED VENTILATION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

MV401.2 MECHANICAL - ENLARGED VENTILATION PLAN - DINING ROOM 1A118 X X X

MV401.3 MECHANICAL - ENLARGED VENTILATION PLAN - DINING ROOM 2A26 X X X

MV401.4 MECHANICAL - ENLARGED VENTILATION PLAN - LIBRARY 2A12 X X X

MV401.5 MECHANICAL - ENLARGED VENTILATION PLAN - BARIATRIC ROOMS X X X

MV401.6 MECHANICAL - ENLARGED VENTILATION PLAN - DEMENTIA UNIT X X X

MV401.7 MECHANICAL - ENLARGED VENTILATION PLAN - HIGH FALL RISK ROOMS X X X

MV401.8 MECHANICAL - ENLARGED VENTILATION PLAN - EQUIPMENT STORAGE X X X

MV401.9 MECHANICAL - ENLARGED VENTILATION PLAN - EASY STREET X X X

MV401.10 MECHANICAL - ENLARGED PLAN - EASY STREET ROOF X X X

MV401.11 MECHANICAL - EXHAUST FAN VENTILATION PLAN - ROOF X X X

MP402.1 MECHANICAL - ENLARGED PIPING PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X

MP402.2 MECHANICAL - ENLARGED PIPING PLAN - DINING ROOM 1A118 X X X

MP402.3 MECHANICAL - ENLARGED PIPING PLAN - DINING ROOM 2A26 X X X

MP402.4 MECHANICAL - ENLARGED PIPING PLAN - LIBRARY 2A12 X X X

MP402.5 MECHANICAL - ENLARGED PIPING PLAN - BARIATRIC ROOMS X X X

MP402.6 MECHANICAL - ENLARGED PIPING PLAN - DEMENTIA UNIT X X X

MP402.7 MECHANICAL - ENLARGED PIPING PLAN - HIGH FALL RISK ROOMS X X X

MP402.8 MECHANICAL - ENLARGED PIPING PLAN - EQUIPMENT STORAGE X X X

MP402.9 MECHANICAL - ENLARGED PIPING PLAN - EASY STREET X X X

M501 MECHANICAL DETAILS X X X

M502 MECHANICAL DETAILS X X X

M503 MECHANICAL DETAILS X X X

M504 MECHANICAL DETAILS X X X

M505 MECHANICAL DETAILS X X X

M506 MECHANICAL DETAILS X X X

M507 MECHANICAL DETAILS X X X

M601 MECHANICAL SCHEDULES X X X

M602 MECHANICAL - SCHEDULES X X X

M701 MECHANICAL CONTROLS X X X

M702 MECHANICAL - CONTROLS X X

Revisions: Date:

90% CONSTRUCTION DOCUMENTS 08/23/2024

100% CONSTRUCTION DOCUMENTS 12/06/2024

DRAWING INDEX

SHEET NUMBER SHEET TITLE 30% 60% 90% 100%

M703 MECHANICAL - CONTROLS X X

8-ELECTRICAL

E001 ELECTRICAL - GENERAL NOTES X X X

E002 ELECTRICAL - SYMBOLS AND ABBREVIATIONS X X X

EPD101 ELECTRICAL - OVERALL DEMO PLAN, FIRST FLOOR X X X

EPD102 ELECTRICAL - OVERALL DEMO PLAN, SECOND FLOOR X X X

EPD401.1 ELECTRICAL - DEMOLITION PLAN, ENTRANCE LOBBY, VESTIBULE, RCC108R & 1A3 X X X

EPD401.2 ELECTRICAL - DEMOLITION PLAN, DINING ROOM X X X

EPD401.3 ELECTRICAL - DEMOLITION PLAN, DINING ROOM X X X

EPD401.4 ELECTRICAL - DEMOLITION PLAN, SECOND FLOOR CONFERANCE ROOMS X X X

EPD401.5 ELECTRICAL - DEMOLITION PLAN, BARIATRIC ROOMS X X X

EPD401.6 ELECTRICAL - POWER DEMOLITION PLAN, DEMENTIA UNIT X X X

EPD401.7 ELECTRICAL - LIGHTING DEMOLITION PLAN, DEMENTIA UNIT X X X

EPD401.8 ELECTRICAL - DEMOLITION PLAN, HIGH FALL-RISK PATIEN ROOMS X X X

EPD401.9 ELECTRICAL - DEMOLITION PLAN, EASY STREET X X X

EPD401.10 ELECTRICAL - POWER DEMOLITION PLAN, ELECTRICAL ROOMS X X X

EPD401.11 ELECTRICAL - DEMOLITION PLAN, SMOKE SHELTER X X X

EP101 ELECTRICAL - OVERALL PLAN, FIRST FLOOR X X X

EP102 ELECTRICAL - OVERALL PLAN, SECOND FLOOR X X X

EP401.1 ELECTRICAL - PLANS, PRIMARY & ENTRANCE LOBBY X X X

EP401.2 ELECTRICAL - PLANS, DINING ROOMS 1A118 X X X

EP401.3 ELECTRICAL - PLANS, DINING ROOM 2A26 X X X

EP401.4 ELECTRICAL - PLANS, LIBRARY X X X

EP401.5 ELECTRICAL - PLANS, BARIATRIC ROOMS X X X

EP401.6 ELECTRICAL - POWER PLAN, DEMENTIA UNIT X X X

ET401.7 ELECTRICAL - TELECOM PLAN, DEMENTIA UNIT X X X

EL401.8 ELECTRICAL - LIGHTING PLAN, DEMENTIA UNIT X X X

EP401.9 ELECTRICAL - PLANS, HIGH FALL-RISK ROOMS X X X

EP401.10 ELECTRICAL - PLANS, EQUIPMENT STORAGE X X X

EP401.11 ELECTRICAL - POWER PLAN, ELECTRICAL ROOMS X X X

EP401.12 ELECTRICAL - PLANS, EASY STREET X X X

EP401.13 ELECTRICAL - POWER PLAN, ROOF X X X

E501 ELECTRICAL - DETAILS X X X

E502 ELECTRICAL - DETAILS X X X

E503 ELECTRICAL - DETAILS X X X

E504 ELECTRICAL - DETAILS X X X

E505 ELECTRICAL - DETAILS X X X

E601 ELECTRICAL - LUMINAIRE AND CONTROLS SCHEDULES X X X

E602 ELECTRICAL - SCHEDULES X X X

E701 ELECTRICAL - DEMOLITION NORMAL POWER SINGLE LINE DIAGRAM X X X

E702 ELECTRICAL - DEMOLITION EMERGENCY POWER SINGLE LINE DIAGRAM X X X

E703 ELECTRICAL - NEW WORK NORMAL POWER SINGLE LINE DIAGRAM X X X

E704 ELECTRICAL - NEW WORK EMERGENCY POWER SINGLE LINE DIAGRAM X X X

E801 ELECTRICAL - PANEL SCHEDULES X X X

E802 ELECTRICAL - PANEL SCHEDULES X X

E803 ELECTRICAL - PANEL SCHEDULES X X

E804 ELECTRICAL - PANEL SCHEDULES X X

E805 ELECTRICAL - PANEL SCHEDULES X X

E806 ELECTRICAL - PANEL SCHEDULES X X

1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL PUBLISHED APPLICABLE LOCAL / STATE / FEDERAL / NATIONAL CODES, ORDINANCES AND REGULATIONS ALONG WITH ALL RELATED VA DIRECTIVES, DESIGN GUIDES AND MANUALS, SPECIFICATIONS AND STANDARDS PLUS ALL VA REQUIREMENTS (FEDERAL AND LOCAL) THAT ARE PROJECT

SPECIFIC TO THE DOCUMENTED SCOPE OF WORK ON THIS SITE.

2. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE AND WORKMAN'S COMPENSATION INSURANCE AS REQUIRED BY THE VA IN THE BIDDING DOCUMENTATION. CONTACT THE VA/CO DURING THE BIDDING PHASE WITH ANY QUESTIONS, VERIFICATIONS, AND DOCUMENTATION NECESSARY CONCERNING ALL REQUIREMENTS FOR PROJECT

INSURANCE COVERAGE.

3. BEFORE SUBMITTING A BID, ALL CONTRACTORS WILL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS SO AS TO BE THOROUGHLY FAMILIAR WITH ALL THE CONTRACT REQUIREMENTS. EACH BIDDER SHOULD THEN VISIT THE SITE OF THE WORK TO BECOME ACQUAINTED WITH ALL VISIBLE FIELD CONDITIONS AFFECTING THE CONTRACT, SUCH AS OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL OTHER CONDITIONS RELATIVE TO WHAT COULD AFFECT/IMPACT

THE WORK OR BE AFFECTED BY THE PERFORMANCE OF THE WORK.

4. IF AWARDED THE CONTRACT, THE CONTRACTORS SHALL NOT BE ALLOWED ANY EXTRA COMPENSATION BY REASON OF ANY UNFORESEEN DIFFICULTIES OR OBSTACLES WHICH THE BIDDER COULD HAVE REASONABLY ANTICIPATED PRIOR TO BIDDING. SHOULD ANY DISCREPANCIES, ERRORS, CONFLICT OR ITEMS NEEDING CLARIFICATION BE DISCOVERED IN THE PLANS AND/OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE VA/CO PRIOR TO SUBMITTING A BID AND THE

VA/COR BEFORE STARTING ANY OF THE WORK.

5. CONTRACTORS SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS OF WORK FOR FULLY DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES AND COORDINATE SAME WITH THE GENERAL/PRIME CONTRACTOR. SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS IN

OTHER SECTIONS OF THE DRAWINGS AND THE COMPLETE SET OF CONTRACT DOCUMENTS.

6. ALL ENGINEERING SYSTEMS WORK INCLUDED IN THE CONTRACT DRAWINGS SHALL BE TAKEN IN A SENSE AS A DIAGRAMMATIC REPRESENTATION OF ITS INTENDED PLACEMENT AND DISTRIBUTION WITHIN THE GENERAL PROXIMITY WHERE SHOWN. THE SIZE AND THE MEANS OF RUNNING DISTRIBUTION SYSTEMS ARE SHOWN BUT IT IS NOT INTENDED TO SHOW EVERY CONNECTION, FITTING, OFFSET, SUPPORT ELEMENT, OR EVERY STRUCTURAL DIFFICULTY THAT CAN BE

ENCOUNTERED DURING THE INSTALLATION OF THE WORK.

7. PROJECT LIMIT LINES ARE SHOWN ON THE DRAWINGS FOR ORIENTATION PURPOSES ONLY AND SHOULD NOT BE

CONSTRUED TO INDICATE THE FULL EXTENT OR LIMITS OF THE AREA(S) OF WORK.

8. EACH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK SHALL FULLY COORDINATE AND VERIFY WITH ALL OTHER CONTRACTORS, OTHER TRADES AND THE VA/COR CONCERNING ALL SPACE REQUIREMENTS FOR THIS PROJECT. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COMMUNICATING, DOCUMENTING AND COORDINATING ALL

SPACE REQUIREMENTS WITH THE VA/COR TO AVOID CONFLICTS AND MISCOMMUNICATION.

9. ALL EXISTING BUILDING UTILITIES AND INFRASTRUCTURE SERVICES SYSTEMS THAT FEED OTHER SPACES OUTSIDE THE DEMISED PROJECT AREA AND THAT ARE LOCATED WITHIN THE AREA OF WORK, THEREBY INTERFERING WITH THE NEW CONSTRUCTION, SHALL BE REROUTED AND RELOCATED AS REQUIRED TO MAINTAIN FULL SERVICE TO THE AFFECTED

AREAS.

10. ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE OCCUPIED AREA PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS SECTION AND COORDINATE ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH THE VA/COR.

11. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS.

12. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL SHOP DRAWING REQUIREMENTS

WITH ALL OF THE AFFECTED TRADES, THE VA/COR AND WITH THE AE.

13. OBTAIN ALL REQUIRED VA/COR AUTHORIZATIONS BEFORE BEGINNING ANY DEMOLITION WORK OR NEW CONSTRUCTION, INCLUDING TEMPORARY BARRICADES AND PROTECTION WORK.

14. EACH CONTRACTOR SHALL MAINTAIN A COMPETENT OSHA-30 FOREMAN OR EQUALLY QUALIFIED DIRECT

REPRESENTATIVE ON THE JOB SITE AT ALL TIMES.

15. EACH CONTRACTOR SHALL COOPERATE AND COORDINATE WITH THE GENERAL/PRIME CONTRACTOR’S

SUPERINTENDENT AND WITH THE FOREMAN OF ALL OTHER TRADES IN ORDER THAT THERE BE NO DELAYS IN THE

EXECUTION AND COMPLETION OF THE WORK.

16. DURING CONSTRUCTION EACH CONTRACTOR SHALL KEEP ON SITE ACCURATE FIELD RECORDS OF ALL CONCEALED AND VISUALLY ACCESSIBLE WORK THAT DIFFERS FROM THE CONTRACT DRAWINGS/DOCUMENTS. THESE AS-BUILT MARKED- UP RECORD DRAWINGS/DOCUMENTS WILL BE KEPT UP TO DATE BY THE GENERAL/PRIME CONTRACTOR AND PROVIDED

TO THE VA/COR FOR DISTRIBUTION AT THE COMPLETION OF THE PROJECT.

17. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE DEMOLITION AND CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE VA/COR'S

ACCEPTANCE OF THAT WORK.

18. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.

19. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF

WORK.

20. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPING, CONDUITS OR OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING OR PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF THE INTENDED AREAS AND DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH INTERFERENCES. COORDINATE WITH AND OBTAIN VA/COR APPROVAL BEFORE PROCEED WITH ANY SUCH REQUIRED PENETRATIONS WORK.

21. RELOCATIONS OF ANY INFRASTRUCTURE DISTRIBUTION SYSTEMS OR EQUIPMENT, WHICH MAY ALTER THE ARCHITECTURAL OR STRUCTURAL CONSTRUCTION, MUST BE APPROVED FIRST BY THE VA/COR PRIOR TO STARTING ITS

RELOCATION.

22. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS SPECIFICALLY REFERENCED

OTHERWISE IN THE PROJECT SPECIFIC LOGISTICAL SEQUENCING REQUIREMENTS.

23. CONTRACTORS TO ENSURE ALL FIRE RESISTIVE RATINGS ARE MAINTAINED PER LOCATIONS SHOWN ON THE DRAWINGS AND AS DISCOVERED IN THE FIELD. ALL PENETRATIONS ARE TO BE SEALED BY AN APPROVED UL FIRESTOPPING SYSTEM. SEAL ALL EXISTING PENETRATIONS EXPOSED DURING CONSTRUCTION AS PER THE APPROVED UL FIRESTOPPING SYSTEM INSTALLATION REQUIREMENTS. FOLLOW THE MANUFACTURER'S DESIGN RECOMMENDATIONS

FOR THE PROPER FIRE STOPPING MATERIAL TO BE USED IN EACH SPECIFIC APPLICATION.

24. ALL FIRESTOPS SHALL MATCH THE FIRE RATING OF THE CONSTRUCTION BEING PENETRATED, SUCH AS WALLS, FLOORS, CEILINGS, PARTITIONS ETC. AND SHALL COMPLY WITH ALL CODE REQUIREMENTS. USE ONLY A SINGLE (FMRC)

APPROVED MANUFACTURERS LINE OF PRODUCTS FOR ALL PROJECT FIRESTOPPING.

25. THE BASIS OF DESIGN FOR ALL FIRE STOPPING WILL BE PRODUCTS AS MANUFACTURED BY THE 3M COMPANY.

26. PROVIDE AN HOURLY RATED FIRESTOP AT ALL PENETRATIONS OF RATED CONSTRUCTION AND/OR ASSEMBLIES, WHETHER NEW OR EXISTING, AND AS A DIRECT RESULT OF THE PROJECT DEMOLITION WORK OR NEW CONSTRUCTION.

WHERE COMBUSTIBLE PENETRANTS OCCUR USE A FIRE RATED INTUMESCENT MATERIAL AND WHERE NONCOMBUSTIBLE PENETRANTS OCCUR USE A FIRE RATED ENDOTHERMIC MATERIAL. ALL FIRESTOPPING WORK MUST BE APPROVED BY

THE VA/COR BEFORE CONCEALED BY CONSTRUCTION.

1. ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR TO AND DURING THE COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE SAFETY OF THEIR EMPLOYEES, ALL

OTHERS AND ARE TO BE IN CARE OF THE PROPERTY.

2. EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HAZARD ACT, ALONG WITH ALL OTHER APPLICABLE

GOVERNING REGULATIONS AND VA REQUIREMENTS.

3. THE BEGINNING OF WORK ON SITE BY A CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE HIS/HER SATISFACTION AND FULL ACCEPTANCE OF THE CURRENT SITE CONDITIONS REGARDING SAFETY AND THE NECESSARY COMPLIANCE WITH ALL CONTRACT REQUIREMENTS REGARDING SAME. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR ANY ACCIDENTS, INJURIES, AND/OR DAMAGES INCURRED AS A RESULT OF ANY VISIBLE OR KNOWN UNSAFE CONDITIONS THAT

EXIST.

4. IF UNSATISFIED WITH THE CURRENT SITE SAFETY CONDITIONS AND/OR THE NECESSARY COMPLIANCE, THE CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE THE ACTIONS AND/OR DEVICES NECESSARY TO RENDER THE JOB- SITE SAFE. IF THE WORK OF OTHER PARTIES, UPON INSPECTION, IS FOUND AT ANY TIME TO BE UNSAFE THE CONTRACTOR OR SUBCONTRACTOR SHALL IMMEDIATELY STOP ALL WORK AND NOTIFY THE GENERAL/PRIME CONTRACTOR AND THE VA/COR. THE SUBMISSION OF A BID FOR ANY PORTION OF WORK INCLUDED IN THIS CONTRACT

SHALL ALSO INDICATE ACKNOWLEDGMENT AND ACCEPTANCE OF THESE REQUIREMENTS.

1. THE BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS ARE TO BE FOLLOWED FOR ALL CONTRACTOR PROPOSED

EQUIVALENT SUBSTITUTIONS OR DEVIATIONS FROM THE BASE BID/CONSTRUCTION DOCUMENTS.

2. AN EQUIVALENT SUBSTITUTION REPRESENTS ANY DEVIATION FROM THE CONTRACT DOCUMENTS ORIGINAL DESIGN

INTENT, SCOPE OF WORK REQUIREMENTS, THE DETAILING OR SPECIFICATIONS.

3. NO SUCH EQUIVALENT SUBSTITUTION OR DEVIATION WILL BE ALLOWED WITHOUT FIRST GOING THROUGH THE BOD

COMPLIANCE PROTOCOLS PROCESS AND OBTAINING VA APPROVAL.

4. ONCE VA APPROVAL OF THE EQUIVALENT SUBSTITUTION OR DEVIATION REQUEST HAS BEEN OBTAINED, THE FORMAL

SHOP DRAWING PREPARATION AND SUBMITTAL PROCESS MAY BEGIN FOR THAT WORK.

5. THE FOLLOWING BOD COMPLIANCE PROTOCOLS DEFINE IN DETAIL THE RESPONSIBILITIES AND THE EVALUATION PROCESS ALONG WITH THE REQUIREMENTS AND PROCEDURES TO BE FOLLOWED WHEN REQUESTING VA

CONSIDERATION OF ANY PROPOSED EQUIVALENT SUBSTITUTION OR DEVIATION.

1. BIDDING PHASE

A. ALL BOD PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS AND ASSOCIATED IMPACTS SHALL BE FULLY

IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR(S) DURING THE BIDDING PROCESS SUCH THAT THE COST OF ALL ASSOCIATED BOD SUBSTITUTION MODIFICATIONS, REQUIRED DEVIATIONS AND SCOPE OF WORK IMPACTS DIRECTLY AFFECTING OTHER TRADES SHALL BE INCLUDED IN THE BASE BIDS OF ALL AFFECTED

CONTRACTORS.

2. GENERAL/PRIME CONTRACTOR RESPONSIBLE FOR COORDINATION

A. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY, DOCUMENT, MAKE

SUBMISSIONS, TRACK, COORDINATE, OBTAIN APPROVALS AND INCLUDE THE COST OF ALL SUCH EQUIVALENT SUBSTITUTIONS, VARIANCE MODIFICATIONS AND ALL IMPACT SCOPE OF WORK IN THEIR BASE BID COST OF

CONSTRUCTION AS WELL AS ALLOWED FOR WITHIN THEIR PROJECT SCHEDULE.

B. THE GENERAL/PRIME CONTRACTOR SHORTLY AFTER CONTRACT AWARD/EXECUTION SHALL NOTIFY AND COORDINATE WITH THE VA/COR, ALL SUCH KNOWN EQUIVALENT SUBSTITUTION DEVIATION REQUESTS AND POSSIBLE IMPACTS FROM THE SPECIFIC BOD REQUIREMENTS PROVIDED IN THE DRAWINGS AND SPECIFICATIONS.

C. ALL SUCH DEVIATIONS, VARIANCES AND IMPACTS WILL BE FULLY IDENTIFIED, DOCUMENTED AND SUBMITTED TO

THE VA/COR FOR REVIEW, EVALUATION AND DIRECTION(S) ON HOW TO PROCEED.

D. DOCUMENTATION BEFORE STARTING THE WORK. THEY WILL ALSO BE RESPONSIBLE TO FULLY IDENTIFY AND COORDINATE SAME WITH ALL AFFECTED SUBCONTRACTORS TO BE SURE THAT ALL SUCH WORK IS INCLUDED IN

THEIR BASE BID SCOPE OF WORK.

3. CONTRACTORS IDENTIFY PROPOSED EQUIVALENT SUBSTITUTION(S)

A. ALL CONTRACTORS, BEFORE SUBMITTING THEIR REQUEST FOR EQUIVALENT SUBSTITUTION SHALL BE

RESPONSIBLE TO HAVE FULLY VERIFIED AND CERTIFIED IN WRITING THAT THE DESIGN CHARACTERISTICS OF THE ITEMS THEY WILL BE SUBMITTING FOR BOD COMPLIANCE REVIEW MEETS OR EXCEEDS THE DESIGN INTENT AND

PERFORMANCE REQUIREMENTS AS DESIGNED, DETAILED AND SPECIFIED.

4. CONTRACTORS PREPARE DETAILED COMPARISONS

A. THE REQUESTING CONTRACTOR SHALL PREPARE AND PROVIDE TO THE GENERAL/PRIME CONTRACTOR A FULL

LINE ITEM, SIDE-BY-SIDE COMPARISON LISTING OF ALL BOD DESIGN AND MANUFACTURED CHARACTERISTICS

VERSUS THE SAME FOR THE EQUIVALENT SUBSTITUTION BEING PROPOSED.

B. ALL EQUIPMENT, MATERIALS OR ASSEMBLY EQUIVALENT SUBSTITUTIONS SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED LISTING PER EACH REQUESTED SUBSTITUTION WITH A FULL AND DETAILED COMPARATIVE DESCRIPTION OF ALL SPECIFICATIONS, PERFORMANCE CHARACTERISTICS, CAPACITIES, WEIGHT, DIMENSIONAL

LOGISTICS AND KNOWN DEVIATIONS FROM THE ORIGINAL BOD.

5. CONTRACTORS IDENTIFY RELATED IMPACTS AND DEVIATIONS

A. THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY AND DOCUMENT ALL PROPOSED

EQUIVALENT SUBSTITUTION CAUSED IMPACTS, DEVIATIONS AND MODIFICATIONS FROM THE ORIGINAL BOD REQUIREMENTS WITH THE GENERAL/PRIME CONTRACTOR AS WELL AS ALL AFFECTED CONTRACTORS.

B. SEE THE DETAILED PROTOCOL REQUIREMENTS FOR THE EXTENT OF RESPONSIBILITIES AND DOCUMENTATION

REQUIRED FOR THIS CRITICAL ITEM.

6. CONTRACTOR'S DOCUMENTATION TO GENERAL/PRIME CONTRACTOR

A. CONTRACTORS SHALL COORDINATE WITH THE GENERAL/PRIME CONTRACTOR AS TO THE SPECIFIC DATE THAT

EACH IS REQUIRED FOR THE COMPLETION OF THEIR EQUIVALENT SUBSTITUTION SUBMISSION REQUEST

DOCUMENTATION AND DELIVERY OF THE COMPLETED PACKAGE(S) TO THEM.

B. THE GENERAL/PRIME CONTRACTOR HAVING BEEN MADE FULLY AWARE OF THESE POTENTIAL EQUIVALENCY SUBSTITUTIONS AND IMPACTS DURING THE BIDDING PROCESS SHALL INCLUDE AND DOCUMENT THIS BOD PROCESS IN THEIR DETAILED PROJECT SCHEDULE ALLOWING A SEPARATE TASK ITEM TIMELINE WITH CRITICAL

DATES AND PERFORMANCE TARGETS IDENTIFIED AND TRACKED.

7. TRACKING LIST OF PROPOSED EQUIVALENT SUBSTITUTIONS AND IMPACTS

A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL PREPARE A COMPLETE MASTER LISTING, BY

SPECIFICATION AND/OR DRAWING SECTIONS, OF ALL PROPOSED EQUIVALENT SUBSTITUTION REQUESTS.

B. THIS MASTER LISTING WILL CONSIST OF A SUMMARY DESCRIPTION OF EACH REQUEST ALONG WITH A BULLET

POINT LISTING OF THE MAJOR IMPACTS AND DEVIATIONS RESULTING FROM IT.

C. THIS DOCUMENT WILL BE PREPARED AS A SPREAD SHEET AND UTILIZED AS A TRACKING TOOL FOR DOCUMENTING

ALL SIGNIFICANT ASSOCIATED DATES, ACTION ITEMS, CURRENT STATUS, REJECTIONS/APPROVALS AND ADDITIONAL PERTINENT ISSUES AND ITEMS TO BE RECORDED AND TRACKED AS REQUIRED BY THE VA/COR.

8. EQUIVALENCY REQUEST(S) SUBMITTED TO VA

A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL SUBMIT TO THE VA/COR FOR PRELIMINARY REVIEW A

MASTER SUMMARY LISTING OF ALL EQUIVALENT SUBSTITUTION REQUESTS WITH ANY/ALL IMPACTS IDENTIFIED.

B. A SEPARATE FULLY DETAILED SUBMISSION DOCUMENTATION PACKAGE SHALL BE PREPARED FOR EACH

SUBSTITUTION REQUEST AND WILL CONSIST OF SEQUENCE ITEMS NUMBER 3, 4, 5 & 6 ALONG WITH ANY ADDITIONAL PERTINENT INFORMATION DEEMED NECESSARY SUCH AS SKETCHES, DETAILED DRAWINGS, ENGINEERING DESIGN AND CALCULATIONS, MORE DETAILED DESCRIPTIONS, ETC.

9. VA REVIEW AND ACTION NOTIFICATION

A. THE VA/COR SHALL REVIEW EACH SUBSTITUTION REQUEST PACKAGE AND TAKE SUCH ACTION AS DEEMED

NECESSARY ON EACH. SUCH ACTION COULD CONSIST OF REJECTION, APPROVAL OR DIRECTION ON PROVIDING MORE DETAILED INFORMATION AND/OR CLARIFICATION(S) ON EACH SUBMISSION AND/OR EACH IMPACT.

B. AS PART OF THE VA'S REVIEW PROCESS THE AE WILL ALSO BE INCLUDED IN A SIMILAR FASHION TO THE SHOP DRAWING REVIEW PROCESS AND SHALL CONSULT WITH THE VA/COR AND PROVIDE A RECOMMENDATION FOR THE

VA'S CONSIDERATION.

C. THE AE WILL REJECT IMMEDIATELY WITHOUT REVIEWING ANY SUBMITTAL THAT IS DEEMED INCOMPLETE AND NOT

IN COMPLIANCE WITH THE BOD PROTOCOLS COMPLIANCE REQUIREMENTS.

D. IT SHOULD BE NOTED THAT IT IS NOT THE AE'S RESPONSIBILITY TO RESEARCH, DOCUMENT AND PROVE EQUIVALENCE, THAT IS THE REQUESTING/SUBMITTING CONTRACTOR'S RESPONSIBILITY AS PER THESE PROTOCOLS. THE AE'S RESPONSIBILITY IS TO REVIEW AND ANALYZE THE DETAILED COMPARATIVE

DOCUMENTATION PROVIDED AND ADVISE THE VA/COR ON WHAT WAS SUBMITTED.

10. VA APPROVAL ALLOWS SHOP DRAWING PROCESS TO BEGIN

A. PRIOR TO THE CONTRACTOR(S) BEING ALLOWED TO PROCEED WITH SHOP DRAWING PREPARATION AND THE

OFFICIAL SHOP DRAWING SUBMISSION(S) PROCESS, THEY WILL FIRST NEED TO OBTAIN THE VA/COR APPROVAL(S) ON EACH EQUIVALENT SUBSTITUTION REQUEST THAT WILL AFFECT THE SHOP DRAWING PROCESS

FOR THAT.

11. IMPLEMENTATION OF SUBSTITUTION(S) AND IMPACT(S)

A. ONCE APPROVED BY THE VA/COR THE CONTRACTORS SHALL PERFORM THEIR FINAL COORDINATION EFFORTS

AND BEGIN THE NORMAL SHOP DRAWING PREPARATION AND SUBMITTAL PROCESS INCLUDING PROVIDING ANY

ADDITIONAL ENGINEERING WORK NECESSITATED BY THE EQUIVALENT SUBSTITUTION.

B. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK ASSOCIATED WITH AND IMPACTED BY ANY EQUIVALENT SUBSTITUTION ALONG WITH THE COMPLETE COORDINATION AND MANAGEMENT

OF THE WORK.

VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE PROVIDED FOR EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR, BEFORE BEGINNING ANY WORK. WHEN PERFORMING CONSTRUCTION WORK (DEMOLITION OR NEW) IN OCCUPIED SPACES, THE FOLLOWING PROTECTION PROTOCOLS WILL BE FOLLOWED ON A DAILY BASIS

UNLESS MODIFIED IN WRITING BY THE VA/COR ON A CASE BY CASE BASIS:

1. CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS, BLINDS, CURTAINS, ETC. THAT ARE WITHIN THE AREA/ZONE WHERE THE WORK IS TO BE ACCOMPLISHED AND IN DANGER OF BEING DAMAGED BY THE PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN BE CAUSED BY FALLING OBJECTS, DUST OR MOISTURE. NOTE: THIS ALSO APPLIES TO THE DIRECT ACCESS ROUTE(S) THRU THE OCCUPIED AREA(S) TO AND FROM THE ACTUAL WORK AREA/ZONE.

NOTE: THE VA/COR WILL BE RESPONSIBLE TO MOVE/RELOCATE ANY FURNITURE, EQUIPMENT, BOXES, FILES, USER BELONGINGS, ETC. THAT WOULD BE IN THE AREA OF WORK AND OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF

THE CONTRACTOR'S WORK. COORDINATE ALL REQUIRED VA RELOCATIONS WITH VA/COR.

2. CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE PREVENTION BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED ABOVE INCLUDING THE ADDITIONAL PROTECTION OF ALL WALL SURFACES/FINISHES, WINDOWS/GLAZING, DOORS, FRAMES, HARDWARE, CARPETING, FLOOR COVERINGS, WALL BASE, ELECTRICAL DEVICES, WALL/CEILING MOUNTED EQUIPMENT & CONTROLS, CEILING CONSTRUCTION, TILE, GRID, WALL ANGLES, LIGHT FIXTURES, DIFFUSERS, GRILLES, LIFE SAFETY DEVICES, FIRE SPRINKLER HEADS, ETC.

3. ALL MAIN TRAFFIC AREAS TO AND INSIDE THE WORK ZONE/AREAS SHALL HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY STRING REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING (VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16” TEMPERED HARDBOARD (MASONITE) 4'X8' PANELS. ALL MASONITE PANELS SHALL BE FIRMLY HELD TOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY APPROVED 2" HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR THIS APPLICATION. NOTE: ALL BOARD TO BOARD JOINTS WILL BE FULLY TAPED THE LENGTH OF THE JOINT AND ALL BOARD TO VISQUEEN JOINTS WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8” LENGTH OF TAPE. PAINTERS TAPE AND/OR MASKING TAPE ARE NOT CONSIDERED EQUIVALENTS TO THE HEAVY DUTY CONSTRUCTION ADHESIVE TAPE BEING SPECIFIED. PLASTIC BARRIER SHEETING SHALL HAVE "FIRE

RETARDANT" PRINTED AND VISIBLE ON THE SHEETING.

4. CONSTRUCT A TEMPORARY FULL HEIGHT, TO BOTTOM OF INTERSTITIAL DECKING, FULLY SEALED, CONTAINMENT ENCLOSURE AROUND ALL CONSTRUCTION AREAS/ZONES IN ORDER TO CONTAIN AS MUCH DUST AND DEBRIS AS POSSIBLE DURING THE PERFORMANCE OF ANY DEMOLITION, CONSTRUCTION AND CLEAN-UP WORK.

5. THE TEMPORARY FULL HEIGHT CONTAINMENT ENCLOSURES SHOULD BE CONSTRUCTED OF A MINIMUM 6 MIL HEAVY DUTY STRING REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING (VISQUEEN) WITH THE USE OF THE APPROPRIATE TELESCOPICALLY ADJUSTABLE ALUMINUM OR METAL VERTICAL SPRING LOADED SUPPORT STUDS/POLES.

FULL HEIGHT FOAM PADDED RAILS, PRESSURE FIT AT ALL PERIMETER WALL/PARTITION CONNECTION CONDITIONS ARE TO BE UTILIZED IN ORDER TO MINIMIZE THE USE OF TAPE SEALS ON ALL FINISHED WALL SURFACES. PLASTIC BARRIER

SHEETING SHALL HAVE "FIRE RETARDANT" PRINTED AND VISIBLE ON THE SHEETING.

6. WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC LOCATION(S), SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME THE ENTIRE AREA IS TO BE FULLY CLEANED-UP, ALL TEMPORARY CONTAINMENT ENCLOSURES AND PROTECTION REMOVED WITH ALL ITEMS IDENTIFIED IN NOTE #1 RETURNED TO THEIR PRIOR FUNCTIONING POSITIONS.

NOTE: FULLY CLEANED-UP MEANS COMMERCIALLY VACUUM CLEANED WITH ALL SURFACES BEING FULLY WIPED DOWN AND DUST FREE AS THE CONTRACTOR ACCEPTED THE AREA/SPACE PRIOR TO PERFORMING THE WORK.

7. ALL SPACES WILL BE RETURNED TO THE USER, BY THE CONTRACTOR, AS A COMMERCIALLY CLEAN ENVIRONMENT WITH ALL OPEN CONSTRUCTION SURFACES SEALED WITH TEMPORARY CONSTRUCTION MATERIALS INCLUDING THE USE OF 6 MIL HEAVY DUTY STRING REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING (VISQUEEN), IN ORDER TO AVOID DUST PARTICLES FROM THE CONSTRUCTION AREA MIGRATING INTO THE OCCUPIED USER’S AREA/SPACE/ROOM(S).

PLASTIC BARRIER SHEETING SHALL HAVE "FIRE RETARDANT" PRINTED AND VISIBLE ON THE SHEETING.

8. UNLESS DIRECTLY SPECIFIED AND CONFIRMED BY THE VA/COR OTHERWISE, ALL TEMPORARY PROTECTION AND ENCLOSURES ARE TO BE SET-UP AND KNOCKED-DOWN ON A DAILY BASIS SUCH THAT THE USERS OF THE OCCUPIED AREAS ARE NOT TO BE INCONVENIENCED AND PREVENTED FROM FUNCTIONING WITHIN THEIR SPACE/AREA/ROOM(S)

DURING THEIR NORMAL BUSINESS HOURS OF OPERATION.

9. THE BASIS OF DESIGN FOR ALL 6 MIL HEAVY DUTY STRING REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING WILL BE IN FULL COMPLIANCE WITH NFPA 701-04, ASTM E84 AND CPAI 84 SECTION 6. IT SHALL BE MANUFACTURED WITH 3 PLY CONSTRUCTION CONSISTING OF FIRE RETARDANT VIRGIN POLYETHYLENE IN THE (2) OUTER LAYERS OF PLASTIC WITH A DIAMOND SCRIM REINFORCING MESH PLACED BETWEEN. PLASTIC BARRIER SHEETING SHALL HAVE "FIRE

RETARDANT" PRINTED AND VISIBLE ON THE SHEETING.

10. MOBILE CONTAINMENT SYSTEMS MAY BE UTILIZED WHERE APPLICABLE, IF APPROVED FOR USE BY THE VA/COR. MOBILE UNITS SHALL BE FULLY EQUIPPED WITH A NEGATIVE AIR HEPA FILTRATION SYSTEM THAT IS IN COMPLIANCE WITH THE INFECTION CONTROL REQUIREMENTS OF EACH SPECIFIC AREA OF WORK AND TASK BEING PERFORMED.

1. THE CONTRACTOR WILL BE REQUIRED TO PROVIDE A CONSTRUCTION PHASING AND SCHEDULE OF ACTIVITIES. REFER TO SPECIFICATION SECTION 01 01 00 (SN) SPECIAL NOTES AND SECTION 01 12 16 WORK SCHEDULE FOR ADDITIONAL

INFORMATION/REQUIREMENTS.

2. THE CONTRACTOR WILL COORDINATE WITH THE VA/COR TO DEVELOP A CRITICAL PATH METHOD (CPM) SCHEDULE, CONSTRUCTION ACTIVITY SEQUENCING AND ASSOCIATED COMPLETION DATES FOR THE COMPLETE PROJECT.

3. THE VA HEALTH MEDICAL CENTER (VAMC) MUST REMAIN IN FULL OPERATION DURING CONSTRUCTION ACTIVITIES WITH MINIMAL INTERRUPTION DUE TO ALL RELATED CONSTRUCTION ACTIVITIES AND RELATED COMPONENTS OF THE PROJECT, INCLUDING MATERIAL DELIVERIES, NOISE, DUST, VIBRATION, ETC., BY CONSTRUCTION ACTIVITIES RELATED TO THIS

PROJECT.

4. THE CONTRACTORS SCHEDULES SHOULD INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING:

A. CONSTRUCTION ACTIVITIES WHICH MAY AFFECT THE CONTINUAL OPERATIONS OF THE VAMC.

B. SCHEDULES FOR EXISTING SYSTEMS SHUT DOWN.

C. SCHEDULES FOR CONSTRUCTION ACTIVITIES OCCURRING AFTER NORMAL BUSINESS HOURS.

5. PROVIDE TEMPORARY CONSTRUCTION FENCING/BARRIERS WITH DOORS AND FRAMES AS REQUIRED TO SEPARATE CONSTRUCTION ACTIVITIES FROM PUBLIC AREAS AND AREAS REQUIRING ACCESS DURING CONSTRUCTION.

6. IF THE VAMC ACCESS/EGRESS ROUTES IDENTIFIED ON THE PHASING PLANS ARE REQUIRED TO BE BLOCKED TEMPORARILY TO ACCOMMODATE CONSTRUCTION, COORDINATE ALTERNATE ACCESS/EGRESS ROUTES WITH THE VA/COR AND PROVIDE TEMPORARY SIGNAGE AND TEMPORARY PROTECTIVE BARRIERS TO CREATE ALTERNATIVE ACCESS/EGRESS ROUTES AS REQUIRED. COORDINATE AND SCHEDULE ANY DOWNTIME FOR THESE ROUTES WITH THE

VA/COR.

7. THE CONTRACTOR SHALL REVIEW LOCATIONS OF TEMPORARY CONSTRUCTION BARRIERS AND INFECTION CONTROL BARRIERS, CONTRACTOR SITE ACCESS AND DEBRIS AND MATERIAL DELIVERY AND DELIVERY ROUTES WITH THE VA/COR.

8. MAINTAIN ACCESS TO EXISTING BUILDINGS WITHIN THE LIMITS OF CONSTRUCTION.

9. COORDINATE SHUT DOWNS OF UTILITIES OR ANY CONSTRUCTION ACTIVITIES WHICH MAY POTENTIALLY AFFECT THE EXISTING OPERATIONS OF THE VAMC WITH THE VA/COR. MAINTAIN UNINTERRUPTED OPERATION OF THE EXISTING FACILITIES FOR ALL EXISITNG UTILITIES TIE-INS. SCHEDULE THESE EVENTS AFTER-NORMAL BUSINESS HOURS OR AS

10. THE CONTRACTOR WILL REVIEW WITH THE VA/COR FOR THE LOCATION OF THE REVIEWED AND APPROVED BY THE

VA/COR. SAFETY SIGN AND CONSTRUCTION SIGN.

11. ALL PERSONNEL ENTERING RENOVATION AREAS WITHIN OCCUPIED FLOORS OF THE VAMC SHALL WEAR SHOE COVERS, AND THESE MUST BE CHANGED EACH TIME THE WORKER EXITS THE RESPECTIVE WORK AREA. PROVIDE ADHESIVE WALK- OFF MATS AT ENTRY POINTS AT ALL WORK AREAS. REPLACE WALK-OFF MATS DAILY OR WHEN THEY NO LONGER ARE ABLE TO CONTAIN DUST AND DIRT. WET MOP AND/OR VACUUM WORK AREA WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREAS. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS PRIOR TO TRANSPORTING.

REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE THE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED

AND INSPECTED BY VA/COR.

12. A DETAILED LIFT PLAN FOR ALL LIFTS SHALL BE SUBMITTED TO THE PROJECT MANAGER AND/OR FACILITY SAFETY MANAGER 14 DAYS PRIOR TO THE SCHEDULED LIFT COMPLETE WITH ROUTE FOR TRUCK CARRYING LOAD, CRANE LOAD ANALYSIS, SITING OF CRANE AND PATH OF SWING AND ALL OTHER ELEMENTS OF A CRITICAL LIFT PLAN WHERE THE LIFT MEETS THE DEFINITION OF A CRITICAL LIFT. CRITICAL LIFTS REQUIRE A MORE COMPREHENSIVE LIFT PLAN TO MINIMIZE THE POTENTIAL OF CRANE FAILURE AND/OR CATASTROPHIC LOSS. THE PLAN MUST BE REVIEWED AND ACCEPTED BY THE GENERAL CONTRACTOR BEFORE BEING SUBMITTED TO THE VA FOR REVIEW. THE LIFT WILL NOT BE ALLOWED TO PROCEED WITHOUT PRIOR ACCEPTANCE OF THIS DOCUMENT. REFER TO SPECIFICATION SECTION 01 35 26.

1. MAINTAINING INTEGRITY OF FIRE AND SAFETY SYSTEMS IN PLACE IN MEDICAL CENTER AND OF ITS OUT BUILDINGS

DURING CONSTRUCTION SHALL BE RESPONSIBILITY OF GENERAL CONTRACTOR.

2. IN ADDITION TO VA MEDICAL CENTER POLICIES, NATIONAL, STATE, AND LOCAL CODES AND ORDINANCES SHALL APPLY TO

OF THEIR CONTRACTORS AND SUB-CONTRACTORS.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING PERTINENT OSHA AND ORLANDO VA SAFETY REQUIREMENTS.

4. PROVIDE LOCKOUT-TAGOUT AND CONFINED SPACE ENTRY POLICIES AS APPLICABLE AND AS REQUIRED BY OSHA AND ORLANDO VA. THESE POLICIES SHALL BE SUBMITTED FOR PRIOR APPROVAL BY VA SAFETY OFFICER/MANAGER.

5. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS OF NON-COMBUSTIBLE MATERIALS WHICH PROVIDE A SMOKE TIGHT SEPARATION BETWEEN CONSTRUCTION AREAS AND OTHER OCCUPIED AREAS. MAINTAIN INTEGRITY OF

ENCLOSURE DURING CONSTRUCTION.

6. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER SYSTEMS SHALL NOT BE IMPAIRED DURING CONSTRUCTION. WHEN A CEILING SYSTEM IS SCHEDULED TO BE REMOVED THE EXISTING SPRINKLER HEAD IN THIS AREA SHALL BE REMOVED AND A NEW SPRINKLER SHALL BE INSTALLED UPRIGHT UNTIL THE FINISH CEILING IS BACK IN PLACE AND THEN FINAL NEW SPRINKLERS SHALL BE INSTALLED AS INDICATED ON FIRE PROTECTION DRAWINGS. SMOKE DETECTOR DISABLE REQUESTS: OUTAGE REQUESTS TO BE SUBMITTED TO FM ENGINEER FOR APPROVAL FOR SPECIFIC DATE AND TIME. ALARMS WILL ONLY BE TURNED OFF FOR SPECIFIC SHIFTS REQUESTED AND WHEN CONTRACTORS ARE IN CONSTRUCTION AREA. ALARMS WILL BE RESTORED AT END OF WORK DAY BY CALLING SAME EXTENSION.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .