578-20-002_Addendum2_06102025.pdf
PDF 6 MB Posted
- Attached to
- Z1DA--578-20-002 Renovations to Building 217 (CON) at Edward Hines Jr. VA Hospital, Hines, IL.
- Solicitation number
- 36C25225B0014
About this file
This document is Addendum 2 for the Renovations to Building 217 project at Edward J. Hines Jr. VA Medical Center, dated 06/10/2025. The addendum provides comprehensive updates to multiple drawing sets and specifications, including structural, architectural, electrical, and mechanical documents. Key modifications include new and updated drawings for various areas such as bariatric rooms, dementia units, dining rooms, and the primary care clinic, with specific changes like added panel details, updated elevation drawings, revised ceiling plans, and modifications to electrical and mechanical system layouts.
The addendum introduces several new specification sections including deck covering (07 14 21), pedestal systems (07 76 00), folding glass doors (08 43 33), and manufactured planters (12 93 33). These additions cover technical requirements for materials, installation methods, performance characteristics, and warranty terms for specific project components. The updates reflect detailed design refinements across multiple building systems, suggesting a comprehensive renovation approach for Building 217 that addresses structural, architectural, mechanical, and electrical infrastructure improvements.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME: Renovations to Building 217
A/E PROJECT NO: 23-009 | 578-20-002
Addendum 2
ISSUE DATE: 06/10/2025
The purpose of this addendum is in response to pre-bid RFIs.
DRAWINGS:
1. GI002 – DRAWING INDEX
a. Update to drawing index with structural drawings
2. S001 – GENERAL NOTES
a. New drawing
3. SF101 – FRAMING PLAN AND DETAILS – BARIATRIC ROOMS
a. New drawing
4. SF102 – ROOF FRAMING PLAN AND DETAILS – FOLDING PARTITIONS
a. New drawing
5. AE401.4 – ARCHITECTURAL – ENLARGED PLAN – PRIMARY CARE CLINIC & ENTRANCE
LOBBY
a. Update to detail 2 with panels indicated.
6. AE402.1 – ARCHITECTURAL – ELEVATIONS – DINING ROOM 1A118
a. Panel types called out and section details called out on detail 1.
7. AE403.1 – ARCHITECTURAL – ELEVATIONS – DINING ROOM 1A118
a. Panel types called out and section details called out on detail 1.
8. AE406 – ARCHITECTURAL – ENLARGED PLAN – SECOND FLOOR PATIO
a. Revisions to planters with dimensions.
9. AE407.3 – ARCHITECTURAL – ELEVATIONS – DEMENTIA
a. Dimensions added to existing windows for FLM-1 installation.
10. AE407.4 – ARCHITECTURAL – ELEVATIONS – DEMENTIA UNIT
a. Dimensions added to existing windows for FLM-1 installation.
11. AE407.5 – ARCHITECTURAL – ELEVATIONS – DEMENTIA UNIT
a. Dimensions added to existing windows for FLM-1 installation.
12. AC402 – ARCHITECTURAL – REFLECTED CEILING PLAN – DINING ROOM 1A118
a. Linear metal ceiling added to legend with basis of design
13. AC403 – ARCHITECTURAL – REFLECTED CEILING PLAN – DINING ROOM 1A118
a. Linear metal ceiling added to legend with basis of design
14. AE521 – ARCHITECTURAL – EXTERIOR DETAILS
a. Added detail 8 – Roof Deck Drain Detail
Construction/Replace Building 50 MEP Systems
ASI 001
15. AE552 – ARCHITECTURAL – FINISH DETAILS
a. Added detail 11 – PNL-2 @ Dining Room
16. AE561 – ARCHITECTURAL – MOUNTING DETAILS
a. Added information on steel tube to detail 6.
17. AF601 – ARCHITECTURAL – FINISH LEGEND
a. Updates to PNL-1, PNL-2, and PNL-3 information
18. EP101 ELECTRICAL – OVERALL PLAN, FIRST FLOOR
a. Added cable tray.
b. Approximate panel feeder routes.
c. Added call out for Tele Room 1C145
19. EP401.1 ELECTRICAL – PLANS, PRIMARY & ENTRANCE LOBBY
a. Added nurse call head-end unit at Work Room 1A141 to serve “A” wing.
20. EP401.2 ELECTRICAL – POWER PLAN, DINING ROOMS 1A118
a. Added access controls panel and power supplies to serve “A” Wing. Relocated fire alarm control module.
21. EP401.6 ELECTRICAL – POWER PLAN, DEMENTIA UNIT
a. Added access controls panel and power supplies to serve “B” wing. Relocated fire alarm control module.
22. EP401.11 ELECTRICAL – POWER PLAN, ELECTRICAL ROOMS
a. Added access controls panel and power supplies to serve “C” wing. Relocated fire alarm control module.
SPECIFICATIONS:
1. 00 01 10
a. Added additional specification sections
i. 07 14 21
ii. 07 76 00
iii. 08 43 33
iv. 12 93 33
2. 00 01 15
a. Added structural drawings to drawing list.
3. 07 14 21
a. Added specification for Deck covering at 2nd floor patio
4. 07 76 00
a. Added specification for Pedestal mounted decking system at 2nd floor patio.
5. 08 43 33
a. Added specification for Folding Glass doors in dining room/easy street.
6. 12 93 33
a. Added specification for premanufactured planters.
END OF ADDENDUM 2
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
Date 7
GENERAL - DRAWING INDEX RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
G002
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
DRAWING INDEX
SHEET NUMBER SHEET TITLE 30% 60% 90% 100%
00-GENERAL
G001 GENERAL - COVER SHEET X X X X
G002 GENERAL - DRAWING INDEX X X X X
G003 GENERAL - DRAWING INDEX X X
GI001 GENERAL - GENERAL PROJECT NOTES X X X X
GI002 GENERAL - GENERAL DEMOLITION NOTES X X X X
GI003 GENERAL - GENERAL CONSTRUCTION NOTES X X X
GI101 GENERAL - LIFE SAFETY PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X
GI102 GENERAL - LIFE SAFETY PLAN - DINING 1A118 X X X
GI103 GENERAL - LIFE SAFETY PLAN - DINING 2A18 X X X
GI104 GENERAL - LIFE SAFETY PLAN - DEMENTIA UNIT X X X
GI105 GENERAL - LIFE SAFETY PLAN - EASY STREET X X X
GC201 GENERAL - PHASING PLAN - FIRST FLOOR X X X
GC202 GENERAL - PHASING PLAN - SECOND FLOOR X X X
GC400 GENERAL - INFECTION CONTROL GENERAL NOTES X X X
GC401 GENERAL - INFECTION CONTROL PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X
GC402 GENERAL - INFECTION CONTROL PLAN - DINING ROOM 1A118 X X X
GC403 GENERAL - INFECTION CONTROL PLAN - DINING ROOM 2A18 X X X
GC404 GENERAL - INFECTION CONTROL PLAN - LIBRARY 2A12 X X X
GC405 GENERAL - INFECTION CONTROL PLAN - BARIATRIC ROOMS X X X
GC406 GENERAL - INFECTION CONTROL PLAN - SECOND FLOOR PATIO X X X
GC407 GENERAL - INFECTION CONTROL PLAN - DEMENTIA UNIT X X X
GC408 GENERAL - INFECTION CONTROL PLAN - HIGH FALL RISK ROOMS X X X
GC409 GENERAL - INFECTION CONTROL PLAN - EQUIPMENT STORAGE X X X
GC410 GENERAL - INFECTION CONTROL PLAN - EASY STREET X X X
GC501 GENERAL - INFECTION CONTROL TYPICAL CLASS IV X X X
GC502 GENERAL - INFECTION CONTROL - SAMPLE ICRA FORMS AND PERMITS X X X
GC503 GENERAL - INFECTION CONTROL - SAMPLE PCRA FORMS AND PERMITS X X X
01 - STRUCTURAL
S001 STRUCTURAL - GENERAL NOTES X
SF101 STRUCTURAL - FRAMING PLAN AND DETAILS - BARIATRIC ROOMS X
SF102 STRUCTURAL - ROOF FRAMING PLAN AND DETAILS - FOLDING PARTITIONS X
02-ARCHITECTURAL
A001 ARCHITECTURAL - SYMBOLS, ABBREVIATIONS AND LEGENDS X X X X
A002 ARCHITECTURAL - SHEET NOTES X X X X
A003 ARCHITECTURAL - STANDARD MOUNTING HEIGHTS X X X
AD101 ARCHITECTURAL - FIRST FLOOR - OVERALL DEMOLITION PLAN X X X X
AD102 ARCHITECTURAL - SECOND FLOOR - OVERALL DEMOLITION PLAN X X X X
AD401 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X
AD402 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - DINING ROOM 1A118 X X X X
AD403 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - DINING ROOM 2A18 X X X X
AD404 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - LIBRARY 2A12 X X X X
AD405 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X X
AD406 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - SECOND FLOOR PATIO X X X X
AD407 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - DEMENTIA UNIT X X X X
AD408 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X X
AD409 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - EQUIPMENT STORAGE X X X X
AD410 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - EASY STREET X X X X
AD411 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - EASY STREET ROOF X X
AD412 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - PLAYGROUND X X X X
AD413 ARCHITECTURAL - ENLARGED DEMOLITION PLAN - SMOKING SHELTER X X X X
ACD401 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - PRIMARY CARE CLINIC AND LOBBY X X X
ACD402 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - DINING ROOM 1A118 X X X
ACD403 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - DINING ROOM 2A26 X X X
ACD404 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - LIBRARY 2A12 X X X
ACD405 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - BARIATRIC ROOMS X X X
ACD406 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - DEMENTIA UNIT X X X
ACD407 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X
ACD408 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - EASY STREET X X X
ACD409 ARCHITECTURAL - REFLECTED CEILING DEMOLITION PLAN - EQUIPMENT STORAGE X X X
AE101 ARCHITECTURAL - FIRST FLOOR - FLOOR PLAN X X X X
AE102 ARCHITECTURAL - SECOND FLOOR - FLOOR PLAN X X X X
AE401 ARCHITECTURAL - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X
AE401.1 ARCHITECTURAL - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X
AE401.2 ARCHITECTURAL - ELEVATIONS - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X
AE401.3 ARCHITECTURAL - ELEVATIONS - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X
AE401.4 ARCHITECTURAL - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X
AE402 ARCHITECTURAL - ENLARGED PLAN - DINING ROOM 1A118 X X X X
AE402.1 ARCHITECTURAL - ELEVATIONS - DINING ROOM 1A118 X X
AE403 ARCHITECTURAL - ENLARGED PLAN - DINING ROOM 2A18 X X X X
AE403.1 ARCHITECTURAL - ENLARGED PLAN - DINING ROOM 2A18 X X
AE404 ARCHITECTURAL - ENLARGED PLAN - CONFERENCE ROOMS X X X X
AE404.1 ARCHITECTURAL - ELEVATIONS - CONFERENCE ROOMS X X
AE405 ARCHITECTURAL - ENLARGED PLAN - BARIATRIC ROOMS X X X X
AE405.1 ARCHITECTURAL - ENLARGED PLAN - BARIATRIC ROOMS X X
AE406 ARCHITECTURAL - ENLARGED PLAN - SECOND FLOOR PATIO X X X X
AE407 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT X X X X
AE407.1 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT X X
AE407.2 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X
AE407.3 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X
AE407.4 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X
AE407.5 ARCHITECTURAL - ELEVATIONS - DEMENTIA UNIT X X
AE407.6 ARCHITECTURAL - ENLARGED PLAN - DEMENTIA UNIT X X
AE408 ARCHITECTURAL -ENLARGED PLAN - HIGH FALL RISK ROOMS X X X X
AE408.1 ARCHITECTURAL -ENLARGED PLAN - HIGH FALL RISK ROOMS X X
AE409 ARCHITECTURAL - ENLARGED PLAN - EQUIPMENT STORAGE X X X X
AE409.1 ARCHITECTURAL - ENLARGED PLAN - EQUIPMENT STORAGE X X
AE410 ARCHITECTURAL - ENLARGED PLAN - EASY STREET X X X X
AE410.1 ARCHITECTURAL - ELEVATION - EASY STREET X X
AE410.2 ARCHITECTURAL - ELEVATION - EASY STREET X X
AE410.3 ARCHITECTURAL - ELEVATION - EASY STREET X X
AE410.4 ARCHITECTURAL - ELEVATION - EASY STREET X X
AE410.5 ARCHITECTURAL - EASY STREET - ROOF PLAN X X
AE411 ARCHITECTURAL - ENLARGED PLAN - PLAYGROUND X X X X
AC401 ARCHITECTURAL - REFLECTED CEILING PLAN - PRIMARY CARE CLINIC AND ENTRANCE LOBBY X X X
AC402 ARCHITECTURAL - REFLECTED CEILING PLAN - DINING ROOM 1A118 X X X
AC403 ARCHITECTURAL - REFLECTED CEILING PLAN - DINING ROOM 2A26 X X X
AC404 ARCHITECTURAL - REFLECTED CEILING PLAN - LIBRARY 2A12 X X X
DRAWING INDEX
SHEET NUMBER SHEET TITLE 30% 60% 90% 100%
AC405 ARCHITECTURAL - REFLECTED CEILING PLAN - BARIATRIC ROOMS X X
AC406 ARCHITECTURAL - REFLECTED CEILING PLAN - DEMENTIA UNIT X X X
AC407 ARCHITECTURAL - REFLECTED CEILING PLAN - HIGH FALL RISK ROOMS X X X
AC408 ARCHITECTURAL - REFLECTED CEILING PLAN - EASY STREET X X X
AC409 ARCHITECTURAL - REFLECTED CEILING PLAN - EQUIPMENT STORAGE X X X
AE501 ARCHITECTURAL - PARTITION TYPES X X X
AE521 ARCHITECTURAL - EXTERIOR DETAILS X X
AE531 ARCHITECTURAL - CEILING DETAILS X X X
AE541 ARCHITECTURAL - CASEWORK DETAILS X X X
AE542 ARCHITECTURAL - CASEWORK DETAILS X X
AE543 ARCHITECTURAL - CASEWORK DETAILS X
AE551 ARCHITECTURAL - FINISH DETAILS X X X
AE552 ARCHITECTURAL - FINISH DETAILS X X
AE561 ARCHITECTURAL - MOUNTING DETAILS X X X
AE601 ARCHITECTURAL - DOOR SCHEDULE AND DETAILS X X X
AE602 ARCHITECTURAL - FOLDING GLASS PARTITION DETAILS X X
AE603 ARCHITECTURAL - FOLDING GLASS PARTITION DETAILS X X
AE611 ARCHITECTURAL - WINDOW SCHEDULE AND DETAILS X X
AF101 ARCHITECTURAL - FINISH PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X
AF102 ARCHITECTURAL - FINISH PLAN - DINING 1A118 X X X
AF103 ARCHITECTURAL - FINISH PLAN - DINING 2A18 X X X
AF104 ARCHITECTURAL - FINISH PLAN - CONFERENCE ROOMS X X X
AF105 ARCHITECTURAL - FINISH PLAN - BARIATRIC ROOMS X X X
AF106 ARCHITECTURAL - FINISH PLAN - SECOND FLOOR PATIO X X X
AF107 ARCHITECTURAL - FINISH PLAN - DEMENTIA UNIT X X X
AF108 ARCHITECTURAL - FINISH PLAN - HIGH FALL RISK ROOMS X X X
AF109 ARCHITECTURAL - FINISH PLAN - EQUIPMENT STORAGE X X X
AF110 ARCHITECTURAL - FINISH PLAN - EASY STREET X X X
AF601 ARCHITECTURAL - FINISH LEGEND X X
AF611 ARCHITECTURAL - FINISH SCHEDULE X X
AW401 ARCHITECTURAL - WAYFINDING PLAN - PRIMARY CARE CLINIC AND ENTRANCE LOBBY X X
AW402 ARCHITECTURAL - WAYFINDING PLAN - DINING ROOM 1A118 X X
AW403 ARCHITECTURAL - WAYFINDING PLAN - DINING ROOM 2A18 X X
AW404 ARCHITECTURAL - WAYFINDING PLAN - LIBRARY 2A12 X X
AW405 ARCHITECTURAL - WAYFINDING PLAN - BARIATRIC ROOMS X X
AW406 ARCHITECTURAL - WAYFINDING PLAN - DEMENTIA UNIT X X
AW407 ARCHITECTURAL - WAYFINDING PLAN - HIGH FALL RISK ROOMS X X
AW408 ARCHITECTURAL - WAYFINDING PLAN - EQUIPMENT STORAGE X X
AW409 ARCHITECTURAL - WAYFINDING PLAN - EASY STREET X X
AW601 ARCHITECTURAL - WAYFINDING TYPES X X
AW611 ARCHITECTURAL - WAYFINDING SCHEDULE X X
QH401 ARCHITECTURAL - EQUIPMENT PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X
QH402 ARCHITECTURAL - EQUIPMENT PLAN - DINING 1A118 X X X
QH403 ARCHITECTURAL - EQUIPMENT PLAN - DINING 2A18 X X X
QH404 ARCHITECTURAL - EQUIPMENT PLAN - LIBRARY 2A12 X X X
QH405 ARCHITECTURAL - EQUIPMENT PLAN - BARIATRIC ROOMS X X X
QH406 ARCHITECTURAL - EQUIPMENT PLAN - SECOND FLOOR PATIO X X X
QH407 ARCHITECTURAL - EQUIPMENT PLAN - DEMENTIA UNIT X X X
QH408 ARCHITECTURAL - EQUIPMENT PLAN - HIGH FALL RISK ROOMS X X X
QH409 ARCHITECTURAL - EQUIPMENT PLAN - EQUIPMENT STORAGE X X X
QH410 ARCHITECTURAL - EQUIPMENT PLAN - EASY STREET X X X
QH601 ARCHITECTURAL - EQUIPMENT SCHEDULE X X X
QH602 ARCHITECTURAL - EQUIPMENT SCHEDULE X X X
05-FIRE PROTECTION
FX001 FIRE PROTECTION - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS X X X
FX002 FIRE PROTECTION - FIRST FLOOR OVERALL PLAN X X X
FX003 FIRE PROTECTION - SECOND FLOOR OVERALL PLAN X X X
FXD401.1 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X
FXD401.2 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - DINING ROOM 1A118 X X X
FXD401.3 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - DINING ROOM 2A18 X X X
FXD401.4 FIRE PROTECTION - ENLARGED NEW WORK PLAN - LIBRARY 2A12 X X X
FXD401.5 FIRE PROTECIONL - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X
FXD401.6 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - DEMENTIA UNITS X X X
FXD401.7 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X
FXD401.8 FIRE PROTECTIOIN - ENLARGED SPRINKLER DEMOLITION PLAN - EQUIPMENT STORAGE X X X
DRAWING INDEX
SHEET NUMBER SHEET TITLE 30% 60% 90% 100%
FXD401.9 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - EASY STREET X X X
FXD401.10 FIRE PROTECTION - ENLARGED DEMOLITION PLAN - EASY STREET ROOF X X X
FX401.1 FIRE PROTECTION - ENLARGED NEW PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X
FX401.2 FIRE PROTECTION - ENLARGED NEW PLAN - DINING ROOM 1A118 X X X
FX401.3 FIRE PROTECTION - ENLARGED NEW PLAN - DINING ROOM 2A18 X X X
FX401.4 FIRE PROTECTION - ENLARGED NEW PLAN - LIBRARY 2A12 X X X
FX401.5 FIRE PROTECTION - ENLARGED NEW PLAN - BARIATRIC ROOMS X X X
FX401.6 FIRE PROTECTION - ENLARGED NEW PLAN - DEMENTIA UNITS X X X
FX401.7 FIRE PROTECTION - ENLARGED NEW PLAN - HIGH FALL RISK ROOMS X X X
FX401.8 FIRE PROTECTION - ENLARGED NEW PLAN - EQUIPMENT STORAGE X X
FX401.9 FIRE PROTECTION - ENLARGED NEW PLAN - EASY STREET X X X
FX401.10 FIRE PROTECTION - ENLARGED NEW PLAN - EASY STREET ROOF X X
FX500 FIRE PROTECTION - DETAILS X X X
06 - PLUMBING
P001 PLUMBING - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS X X X X
P002 PLUMBING DEMOLITION - FIRST FLOOR OVERALL PLAN X X X
P003 PLUMBING DEMOLITION - SECOND FLOOR OVERALL PLAN X X X X
P004 PLUMBING NEW WORK - FIRST FLOOR OVERALL PLAN X X X X
P005 PLUMBING NEW WORK - SECOND FLOOR OVERALL PLAN X X X
PSD401.1 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE
LOBBY
X X X X
PSD401.2 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X X
PSD401.3 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - SECOND FLOOR PATIO X X X X
PSD401.4 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - DEMENTIA UNIT X X X X
PSD401.5 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X X
PSD401.6 PLUMBING - SAN & VENT ENLARGED DEMOLITION PLAN - EQUIPMENT STORAGE X X X X
PSD401.7 PLUMBING - SAN & VENT - ENLARGED DEMOLITION PLAN - EASY STREET X X X X
PWD401.1 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - PRIMARY CARE CLINIC & ENTRANCE
LOBBY
X X X X
PWD401.2 PLUMBING -DOMESTIC WATER - ENLARGED DEMOLITION PLAN -DINING 1A118 X X
PWD401.3 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - BARIATRIC ROOMS X X X X
PWD401.4 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - DEMENTIA UNIT X X X X
PWD401.5 PLUMBING - DOMESTIC WATER. - ENLARGED DEMOLITION PLAN - HIGH FALL RISK ROOMS X X X X
PWD401.6 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - EQUIPMENT STORAGE X X X X
PWD401.7 PLUMBING - DOMESTIC WATER - ENLARGED DEMOLITION PLAN - EASY STREET X X X X
PS401.1 PLUMBING - SAN & VENT - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X
PS401.2 PLUMBING - SAN & VENT - ENLARGED PLAN - BARIATRIC ROOMS X X X X
PS401.3 PLUMBING - SAN & VENT - ENLARGED PLAN - SECOND FLOOR PATIO X X X X
PS401.4 PLUMBING - SAN & VENT - ENLARGED PLAN - LIBRARY 2A12 X X
PS401.5 PLUMBING - SAN & VENT - ENLARGED PLAN - DEMENTIA UNIT X X X X
PS401.6 PLUMBING - SAN & VENT - ENLARGED PLAN - HIGH FALL RISK ROOMS X X X X
PS401.7 PLUMBING - SAN & VENT - ENLARGED PLAN - EQUIPMENT STORAGE X X X X
PS401.8 PLUMBING - SAN & VENT - ENLARGED PLAN - MULTI PURPOSE - EASY STREET 1A43 X
PW401.1 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - PRIMARY CARE CLINIC & ENTRANCE LOBBY X X X X
PW401.2 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - DINING ROOM 1A118 X
PW401.3 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - BARIATRIC ROOMS X X X X
PW401.4 PLUMBING - DOMESTIC WATER - ENLARGE PLAN - DEMENTIA UNIT X X X X
PW401.5 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - LIBRARY 2A12 X X
PW401.6 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - HIGH FALL RISK ROOMS X X X X
PW401.7 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - EQUIPMENT STORAGE X X X X
PW401.8 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - MULTI PURPOSE - EASY STREET 1A43 X
PW401.9 PLUMBING - DOMESTIC WATER - ENLARGED PLAN - DINING ROOM 2A18 X
P501 PLUMBING - DETAILS X X X X
P502 PLUMBING - DETAILS X X X X
P601 PLUMBING - RISER DIAGRAMS X X
P602 PLUMBING - RISER DIAGRAMS X X
P603 PLUMBING - RISER DIAGRAMS X X
P604 PLUMBING - RISER DIAGRAMS X X
P605 PLUMBING - RISER DIAGRAMS X X
P701 PLUMBING - SCHEDULES X X X X
Revisions: Date:
30% SCHEMATIC DESIGN 11/23/2023
60% DESIGN DEVELOPMENT 05/08/2024
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
ADDENDUM #2 Date 7
1 GENERAL NOTES
1.1. CODES AND DESIGN CRITERIA
a BUILDING CODE: INTERNATIONAL EXISTING BUILDING CODE b RISK CATEGORY IV
THE FOLLOWING STRUCTURAL IMPROVEMENTS TO THE EXISTING STRUCTURE
ARE CONSIDERED A LEVEL 2 ALTERATION. THE EXISTING STRUCTURAL
FRAMING SHOWN IS BASED ON THE ORIGINAL STRUCTURAL DESIGN
DRAWINGS DATED 1980 AND THE 2ND FLOOR ADDITION DATED 1984.
ALL EXISTING FRAMING IS TO BE VERIFIED BY THE GENERAL
CONTRACTOR.
1.2. DESIGN LOADS
a ROOF LOAD
DEAD LOAD 27.7 PSF
LIVE LOAD 30 PSF
b SECOND FLOOR LOAD
DEAD LOAD 54.2 PSF
LIVE LOAD 100 PSF
c SNOW LOAD GROUND SNOW LOAD Pg 25 PSF IMPORTANCE FACTOR Is 1.2 SNOW EXPOSURE FACTOR Ce 1.0 SNOW THERMAL FACTOR Ct 1.0 FLAT ROOF SNOW LOAD Pf 30 PSF d WIND LOADS (ASCE7-16)
MWFRS
BASIC WIND SPEED 119 mph (3 SEC GUST)
RISK CATEGORY IV
WIND EXPOSURE C
INTERNAL PRESSURE COEFFICIENT +/- .18
e SEISMIC LOADS
RISK CATEGORY II
SEISMIC IMPORTANCE FACTOR 1.0
Ss .123 Sds .131 S .064 Sd1 .102
SITE CLASS D
SEISMIC DESIGN CATEGORY C
ap = 1 Rp = 2.5 lp = 1
1.3 GENERAL REQUIREMENTS
a DEFINITIONS
PRIMARY STRUCTURAL SYSTEM IS THE COMPLETED
COMBINATION OF ELEMENTS WHICH SERVE TO
SUPPORT THE BUILDING'S SELF-WEIGHT, THE
APPLICABLE LIVE LOAD, AND THE ENVIRONMENTAL LOADS SUCH AS
WIND, SEISMIC.
PRE-ENGINEERED STRUCTURAL ELEMENTS ARE
STRUCTURAL ELEMENTS WHICH ARE SPECIFIED BY THE OWNER AS
DESIGN DELEGATED ITEMS TO BE THE DESIGN RESPONSIBILITY OF A
SPECIALTY STRUCTURAL ENGINEER (SSE)
SPECIAL INSPECTION IS INSPECTION PERFORMED BY A QUALIFIED
PERSON, APPROVED BY THE BUILDING OFFICIAL, FOR THE TYPES OF
WORK REQUIRING INSPECTION PER THE GOVERNING CODES AND
CONTRACT DOCUMENTS.
SPECIALTY STRUCTURAL ENGINEER (SSE) IS A
LICENSED PROFESSIONAL/STRUCTURAL ENGINEER, NOT THE SER, WHO
IS RESPONSIBLE FOR SEALING PLANS AND DESIGNS FOR
PRE-ENGINEERED STRUCTURAL ELEMENTS WHICH ARE NECESSARY FOR
THE STRUCTURE TO BE COMPLETED AND THE OWNER HAS DESIGNATED
AS DESIGN DELEGATED ITEMS.
STRUCTURAL ENGINEER OF RECORD (SER) IS THE STRUCTURAL
ENGINEER WHO IS LEGALLY ELIGIBLE TO SEAL THE STRUCTURAL
DOCUMENTS FOR A BUILDING PROJECT. THE SER IS RESPONSIBLE FOR
THE DESIGN OF THE PRIMARY STRUCTURAL SYSTEM.
GENERAL CONTRACTOR FOR CONSTRUCTION (CONTRACTOR) IS
OWNERS REPRESENTATIVE RESPONSIBLE FOR THE OVERALL
CONSTRUCTION OF THE PROJECT INCLUDING PROJECT SCHEDULING,
JOB SITE SAFETY AND MEANS AND METHODS OF CONSTRUCTION.
CONTRACTING OFFICER'S REPRESENTATIVE (COR)
SPECIAL INSPECTOR: A QUALIFIED PERSON EMPLOYED OR RETAINED BY
AN APPROVED AGENCY AND APPROVED BY THE BUILDING OFFICIAL AS
HAVING THE COMPETENCE NECESSARY TO INSPECT A PARTICULAR TYPE
OF CONSTRUCTION REQUIRING SPECIAL INSPECTION.
b THE STRUCTURAL DRAWINGS ARE TO BE USED IN CONJUNCTION WITH
THE SPECIFICATIONS AND ARCHITECTURAL AND MEP DRAWINGS.
c THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE
MECHANICAL AND ARCHITECTURAL DRAWINGS AND WITH THE
MECHANICAL CONTRACTOR, THE LOCATION OF ALL MECHANICAL
EQUIPMENT.
d THE GENERAL CONTRACTOR SHALL NOTIFY COR IF THE WEIGHTS OF
MECHANICAL UNITS ETC. ARE DIFFERENT FROM THE WEIGHTS POSTED
ON THE DESIGN DRAWINGS. DISCREPANCIES SHALL BE RESOLVED
BEFORE PROCEEDING WITH CONSTRUCTION.
e THE GENERAL CONTRACTOR SHALL NOTIFY COR IMMEDIATELY OF ANY
DISCREPANCIES TO AVOID THE POSSIBILITY OF UNNECESSARY FUTURE
PROBLEMS AND POSSIBLE FIELD ORDERS. FAILURE TO DO SO WILL PUT
THE FULL RESPONSIBILITY OF CORRECTION ON THE CONTRACTOR.
f THE CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES AND
MAKE NECESSARY INVESTIGATIONS AND FIELD MEASUREMENTS.
g DO NOT SCALE DRAWINGS.
h THE SER HAS NO SUPERVISORY RESPONSIBILITY, HAS NO CONTROL OF
OR RESPONSIBILITY FOR THE MEANS, METHODS, TECHNIQUES,
PROCEDURES OR SEQUENCE OF CONSTRUCTION, HAS NO
RESPONSIBILITY FOR THE FAILURE OF ANY CONTRACTOR TO PERFORM
THE WORK IN ACCORDANCE WITH THE DESIGN DOCUMENTS AND NO
RESPONSIBILITY TO DEVISE, IMPLEMENT OR ENFORCE ANY SAFETY
PRECAUTIONS OR PROGRAMS FOR THE PROJECT.
1.4 SLEEVES, ANCHORAGES, OPENINGS, ETC.
a IN GENERAL, STRUCTURAL DRAWINGS DO NOT SHOW EQUIPMENT
PADS, DRAINS, HOLES, ANCHORAGES, INSERTS AND SLEEVES FOR
ITEMS PASSING THROUGH OR ATTACHED TO CONCRETE OR FRAMING.
REFER TO ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS
AND PROJECT SPECIFICATIONS. ADJUST EQUIPMENT PADS AND SUB
FRAMING TO FIT EQUIPMENT FURNISHED.
b PROVIDE SUB FRAMING FOR EQUIPMENT SUPPORTED ON OR
SUSPENDED FROM THE STRUCTURE.
1.9 STRUCTURAL TESTS AND INSPECTIONS (IBC 2021)
a AN INDEPENDENT APPROVED AGENCY SHALL PROVIDE SPECIAL INSPECTIONS AND TESTS
DURING CONSTRUCTION IN ACCORDANCE WITH CHAPTER 17 OF IBC 2021.
b THE APPROVED AGENCY'S SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR
CONFORMANCE TO THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS.
c THE APPROVED AGENCY SHALL KEEP RECORDS OF ALL SPECIAL INSPECTIONS AND TESTS
AND SUBMIT REPORTS TO THE BUILDING OFFICIAL AND THE SER.
d ALL DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR
FOR CORRECTION. IF UNCORRECTED, THE APPROVED AGENCY SHALL NOTIFY THE
BUILDING OFFICIAL AND COR.
e REFER TO IBC 2021 1704.5 FOR SUBMITTALS TO THE BUILDING OFFICIAL IN ADDITION TO
THE REPORTS.
f THE APPROVED AGENCY SHALL SUBMIT A FINAL REPORT STATING WHETHER THE WORK
REQUIRING SPECIAL INSPECTION WAS IN CONFORMANCE WITH THE APPROVED CONTRACT
DOCUMENTS AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THIS CODE.
g QUALITY CONTROL SHALL BE THE RESPONSIBILITY OF THE FABRICATOR/ERECTOR IN
ACCORDANCE WITH AISC360-10 CHAPTER N.
h JOB SITE VISITS BY THE SER DO NOT CONSTITUTE AN OFFICIAL SPECIAL INSPECTION.
STATEMENT OF SPECIAL INSPECTIONS:
a REFER TO THE REFERENCED DOCUMENTS (IBC 2021 CHAPTER 17, AISC 360-16 CHAPTER N, ACI530-13 CHAPTER 3) FOR ADDITIONAL DESCRIPTIONS OF REQUIREMENTS.
b STRUCTURAL OBSERVATIONS FOR SEISMIC NOT REQUIRED c STRUCTURAL OBSERVATIONS FOR WIND NOT REQUIRED d THE FOLLOWING LIST OF MATERIALS AND WORK REQUIRE SPECIAL INSPECTIONS (P)
PERIODIC; (C) CONTINUOUS
STRUCTURAL STEEL (1705.2 - AISC360-16 CHAPTER N)
1 INSPECTION TASKS PRIOR TO WELDING SHOP/FIELD (AISC360-16 TABLE N5.4-1 & AWS
D1.1) a REVIEW WELDING PROCEDURE SPECIFICATIONS (WPS) & WELDING CONSUMABLES (C) b FIT UP GROOVE AND FILLET WELDS (P) c CONFIGURATION OF ACCESS HOLES (P)
2 INSPECTION TASKS DURING WELDING SHOP/FIELD (AISC360-16 TABLE N5.4-2 & AWS
D1.1) a QUALIFIED WELDERS (C) b CONTROL AND HANDLING OF CONSUMABLES (C) c NO WELDING OVER TACK WELDS (C) d ENVIRONMENTAL CONDITIONS (C) e WPS FOLLOWED (C) f WELDING TECHNIQUES (C)
3 INSPECTION TASKS AFTER WELDING SHOP/FIELD (AISC360-16 TABLE N5.4-3 & AWS D1.1)
a WELDS CLEANED (C) b SIZE, LENGTH, LOCATION OF WELDS (C) c WELDS MEET VISUAL ACCEPTANCE CRITERIA (C) d CJP GROOVE WELD NDT PER AWS D1.1 (C)
4 INSPECTION TASKS PRIOR TO BOLTING (AISC360-16 TABLE N5.6-1)
a BOLT MATERIAL GRADE b PROPER FASTENERS USED PER CONTRACT DOCUMENTS (P) c PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL (P) d CONNECTION ELEMENTS INCLUDING FAYING SURFACES MEET REQUIREMENTS (P) e PROPER STORAGE OF FASTENER COMPONENTS (P)
5 INSPECTION TASKS DURING BOLTING (AISC360-16 TABLE N5..6-2)
a FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND
POSITIONED AS REQUIRED (P).
b JOINT BROUGHT TO SNUG TIGHT CONDITION (P) c FASTENER COMPONENT NOT TURNED BY WRENCH PREVENTED FROM ROTATING (P) d FASTENERS PRETENSIONED PER RCSC SPECIFICATION (P)
6 INSPECTION TASKS AFTER BOLTING (AISC360-16 TABLE N5.6-3)
a DOCUMENT ACCEPTED OR REJECTED BOLTED CONNECTIONS (C)
7 INSPECTION OF ANCHOR RODS IN CONFORMANCE WITH CONTRACT DOCUMENTS. (P)
8 INSPECTION OF STEEL FRAME/CONNECTION DETAILS IN CONFORMANCE WITH CONTRACT
DOCUMENTS. (P)
9 INSPECTION OF STEEL ELEMENTS OF COMPOSITE CONSTRUCTION PRIOR TO CONCRETE
PLACEMENT (AISC360-16 TABLE N6.1)
a PLACEMENT OF STEEL DECK (C) b PLACEMENT OF STEEL HEADED STUD (C) c DOCUMENT ACCEPTANCE OR REJECTION (C)
10 INSPECTION OF METAL DECK DIAPHRAGM CONNECTIONS TO STEEL FRAMING. (P)
5 METALS
5.1 STRUCTURAL STEEL
a GENERAL
ALL STRUCTURAL STEEL WORK SHALL CONFORM TO THE AISC
360-16 "SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS",
"SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR
A490 BOLTS" 2014, "CODE OF STANDARD PRACTICE FOR STEEL
BUILDINGS AND BRIDGES," AISC 303-16 AND AWS D1.1 2020.
THE PROVISIONS OF THE ALLOWABLE STRENGTH DESIGN METHOD
(ASD) WAS USED AS A BASIS FOR DESIGN. ALL
FORCES/REACTIONS INDICATED ON THE DESIGN DOCUMENTS
ARE THEREFORE NON-FACTORED ASD FORCES/REACTIONS.
THE CONTRACTOR'S STRUCTURAL STEEL DETAILER SHALL
PREPARE STEEL ERECTION AND SHOP DRAWINGS IN
ACCORDANCE WITH THE GUIDELINES AND GOOD PRACTICES
NOTED IN THE AISC “DETAILING FOR STEEL CONSTRUCTION.”
THIRD EDITION
STEEL CONNECTIONS ARE DESIGNATED AS A DESIGN DELEGATED
COMPONENT TO BE DESIGNED BY THE CONTRACTOR'S SSE.
SUBMITTALS
CHECKED STEEL SHOP DRAWINGS: PREPARED IN ACCORDANCE
WITH AISC DETAILING FOR STEEL CONSTRUCTION 3RD ED.
CONNECTION CALCULATIONS PREPARED, SIGNED AND SEALED BY
CONTRACTOR'S SSE.
MATERIAL CERTIFICATES (UPON REQUEST)
WELDING CERTIFICATES (UPON REQUEST)
b MATERIALS ALL STRUCTURAL STEEL SHAPES SHALL BE ASTM A992 (Fy=50 ksi)
ALL STRUCTURAL STEEL PLATES AND ANGLES SHALL BE ASTM A36
(Fy=36 KSI).
ALL STRUCTURAL TUBES SHALL BE ASTM A500 GRADE B (Fy=46
KSI).
ALL STRUCTURAL PIPES SHALL BE ASTM A53 GRADE B (Fy=35
KSI).
ALL ANCHOR RODS ASTM F1554-36
ALL WELDING SHALL CONFORM TO AMERICAN WELDING SOCIETY
"STRUCTURAL WELDING CODE", AWS D1.1.
ALL WELD ELECTRODES SHALL BE E70XX AND ALL WELDING
SHALL BE PERFORMED BY CERTIFIED WELDERS. ALL WELDING
SHALL BE TO CLEAN BARE STEEL.
ERECT ALL MEMBERS WITH NATURAL CAMBER UP, EXCEPT FOR
CERTAIN CANTILEVERED MEMBERS.
ALL STEEL SHALL BE SHOP COATED WITH FABRICATOR'S
STANDARD PRIME PAINT MEETING MPI#79 AS A MINIMUM. MASK
SURFACES TO BE FIELD WELDED AND AT BOLT HOLES IN FAYING
SURFACES OF SLIP CRITICAL BOLTED CONNECTIONS.
CONNECTIONS
CONNECTIONS SHOWN ON THE DESIGN DRAWINGS ARE
CONCEPTUAL ONLY.
CONNECTIONS ARE A DELEGATED DESIGN ITEM TO BE DESIGNED
BY CONTRACTOR'S SSE.
CONNECTIONS SHALL BE IN ACCORDANCE WITH AISC 360-16
USING ALLOWABLE STRENGTH (ASD) DESIGN BASIS. POSTED
CONNECTION FORCES ARE ASD.
DESIGN SHEAR CONNECTIONS FOR THE LARGER OF POSTED
FORCES ON THE DESIGN DRAWINGS AND 50% (75% FOR
COMPOSITE BEAMS) OF THE MAXIMUM TOTAL LOAD FOR THE
SPECIFIED BEAM AND SPAN IN AISC “STEEL CONSTRUCTION
MANUAL” TABLE 3-6.
DESIGN MOMENT CONNECTIONS FOR FULL MOMENT CAPACITY OF
THE MEMBER OR THE POSTED MOMENT ALONG WITH THE SHEAR
LOADS NOTED ABOVE.
AXIALLY LOADED MEMBERS SHALL BE DESIGNED USING THE
POSTED LOADS AND THE AISC UNIFORM FORCE METHOD.
ALL SHEAR CONNECTIONS SHALL BE AS A MINIMUM FULL DEPTH
OF MEMBER.
ALL BOLTS SHALL BE ASTM A325 FULLY TENSIONED BEARING
BOLTS WITH SHORT SLOTTED HOLES UNLESS NOTED. A325 SLIP
CRITICAL BOLTS SHALL BE USED FOR ALL MOMENT CONNECTIONS
AND AXIALLY LOADED MEMBERS.
ALL WELD SIZES SHOWN ARE SIZED FOR LOAD ONLY. WELDS
SHALL BE INCREASED IN SIZE AS REQUIRED TO MEET AISC
MINIMUMS.
ALL GROOVE WELDS SHOWN ARE FULL PENETRATION WELDS
UNLESS NOTED OTHERWISE.
WELDS NOTED AS PARTIAL PENETRATION GROOVE WELDS SHOW
"EFFECTIVE" SIZE OF WELD.
WELD JOINTS SHALL BE DETAILED BASED ON PROCESS USED AND
POSITION OF WELD TO MEET THE "EFFECTIVE" SIZE SHOWN ON
THE DRAWINGS.
c EXECUTION
VERIFY THAT FIELD CONDITIONS ARE ACCEPTABLE AND ARE
READY TO RECEIVE WORK.
STEEL ERECTION TOLERANCES SHALL BE IN ACCORDANCE WITH
THE CODE OF STANDARD PRACTICE.
5.5 STRUT CHANNELS
a ALL STRUT SYSTEM COMPONENTS SHALL BE AS MANUFACTURED
BY UNISTRUT CORPORATION OR APPROVED EQUAL.
b COMPLY WITH AMERICAN IRON AND STEEL INSTITUTE
SPECIFICATION FOR DESIGN OF COLD FORMED STEEL
STRUCTURAL MEMBERS.
c ALL CHANNEL MEMBERS SHALL BE FABRICATED FROM
STRUCTURAL GRADE STEEL COMFORMING TO ONE OF THE
FOLLOWING ASTMS: A1011SS GR 33, A653 GR 33.
d ALL FITTINGS SHALL BE FABRICATED FROM STEEL CONFORMING TO THE FOLLOWING ASTMs: A575, A576, A36 OR A635.
e STRUT CHANNELS SHALL BE 1-5/8" WIDE IN VARYING HEIGHTS
AND WELDED COMBINATIONS AS REQUIRED TO MEET LOAD
CAPACITIES AND DESIGNS INDICATED ON THE DRAWINGS.
f STRUT SYSTEMS SHALL BE FINISHED WITH ONE OF THE
FOLLOWING: ELECTRO-GALVANIZED ASTM B633 TYPE III SC1,
PRE-GALVANIZED HOT-DIPPED PROCESS PRIOR TO FORMING G90
ASTM S654, HOT-DIPPED GALVANIZED AFTER ALL
MANUFACTURING OPERATIONS ARE COMPLETE PER ASTM A123 OR
A153.
g SET STRUT SYSTEM COMPONENTS INTO FINAL POSITION TRUE TO
LINE, LEVEL AND PLUMB IN ACCORDANCE WITH SHOP DRAWINGS.
ANCHOR MATERIAL FIRMLY IN PLACE. TIGHTEN ALL
CONNECTIONS TO THEIR RECOMMENDED TORQUES.
STRUCTURAL ABBREVIATIONS LEGEND:
A.B.S. - ANCHOR BOLTS
ARCH - ARCHITECTURAL DRAWINGS
B/ - BOTTOM OF
BOTT. - BOTTOM
CGF - COMPACTED GRANULAR FILL
CL - CENTERLINE
CMU - CONCRETE MASONRY UNITS
CONT. - CONTINUOUS
CONC - CONCRETE
E - EXISTING MATERIAL
FT - FOOT
GC - GENERAL CONTRACTOR
HD - HOLD DOWN
HKD - HOOKED
k - KIP
LBS - POUNDS
MEP - MECHANICAL, ELECTRICAL, PLUMBING DRAWINGS
N - NEW MATERIAL
O.C. - ON CENTER
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PCF - POUNDS PER CUBIC FOOT
RD - ROOF DRAIN
STL - STEEL
SOG - SLAB ON GRADE
T/ - TOP OF
U.N. - UNLESS NOTED
VB - VAPOR BARRIER
VIF - VERIFY IN FIELD
W/ - WITH
# - POUNDS OR NUMBER
SSE - SPECIALTY STRUCTURAL ENGINEER
SER - STRUCTURAL ENGINEER OF RECORD
CONTRACTOR - DESIGNATED REPRESENTATIVE FOR CONSTRUCTION
COR - CONTRACTING OFFICER'S REPRESENTATIVE
1.5 STRUCTURAL STABILITY AND CONSTRUCTION
a INDIVIDUAL STRUCTURAL COMPONENTS ARE DESIGNED TO
SUPPORT LOADS IN THEIR FINAL ERECTED POSITION AS PART OF
THE TOTAL COMPLETED STRUCTURE.
b GENERAL CONTRACTOR TO PROVIDE TEMPORARY GUYING AND
BRACING AS REQUIRED UNTIL ALL CONSTRUCTION AFFECTING
LATERAL STABILITY IS COMPLETED.
c GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
STABILITY OF STRUCTURE, ITS PARTS BY USE OF GUYING, BRACING,
SHORING, BARRICADES, SAFETY RAILINGS AND DEVICES DURING
THE ENTIRE PERIOD OF CONSTRUCTION.
d GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
JOB SITE SAFETY AND MEANS AND METHOD OF CONSTRUCTION.
1.6 SHOP DRAWINGS AND TEST REPORTS
a GENERAL CONTRACTOR SHALL CHECK ALL SHOP DRAWINGS BEFORE
SUBMITTAL TO SER FOR REVIEW.
b GENERAL CONTRACTOR SHALL PREPARE A SHOP DRAWING
SUBMITTAL SCHEDULE WITH A MINIMUM OF TWO WEEKS INCLUDED
FOR THE SER'S REVIEW OF EACH SUBMITTAL LISTED BELOW.
c REVIEW BY SER WILL BE FOR CONFORMANCE TO GENERAL LAYOUT
AND DESIGN INTENT ONLY.
d GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
ACCURACY OF DIMENSIONS, FABRICATION, FIT UP OF PARTS AND
BILLS OF MATERIALS.
e GENERAL CONTRACTOR SHALL COORDINATE WORK OF VARIOUS
TRADES AND MAKE NECESSARY FIELD MEASUREMENTS.
f THE CONTRACT SPECIFICATIONS PROVIDE A COMPLETE LISTING OF
SUBMITTALS.
1.7 DEFERRED SUBMITTALS - OWNER SPECIFIED DESIGN DELEGATED
COMPONENTS TO BE PROVIDED BY CONTRACTOR'S ENGINEER
a CERTAIN COMPONENTS OF THE COMPLETED
CONSTRUCTION ARE DESIGN DELEGATED TO THE
MANUFACTURER OF THE COMPONENT. THE
MANUFACTURER'S SSE SHALL BE RESPONSIBLE FOR
THE DESIGN OF THE COMPONENT. THE FOLLOWING
ARE DESIGNATED TO BE DESIGN DELEGATED
COMPONENTS ON THIS PROJECT:
b STRUCTURAL STEEL CONNECTIONS c TEMPORARY SHORING AND BRACING d OTHER WORK AS LISTED ON DRAWINGS, SPECIFICATIONS AND CUSTOMARY INDUSTRY
STANDARDS. WHERE DELEGATION OF DESIGN IS
SPECIFIED,
e THE MANUFACTURER SHALL BE RESPONSIBLE FOR RETAINING THE
SERVICES OF A LICENSED SPECIALTY STRUCTURAL ENGINEER (SSE)
IN THE STATE HAVING JURISDICTION. THE SSE SHALL DESIGN AND
DETAIL COMPONENTS TO MEET GOVERNING BUILDING CODES,
STANDARDS AND THE SPECIFIED PERFORMANCE CRITERIA. SIGNED
AND SEALED CALCULATIONS SHALL BE SUBMITTED FOR RECORD.
THE DESIGN DELEGATED SSE SHALL BE SOLELY RESPONSIBLE FOR
THE DESIGN OF THE COMPONENT.
f SSE SUBMITTALS WILL BE REVIEWED BY THE SER FOR LOADING
CRITERIA AND GENERAL CONFORMANCE TO THE PRIMARY
STRUCTURAL SYSTEM.
1.8 DEMOLITION
a THE ARCHITECTURAL DEMOLITION DRAWINGS INDICATE THE
GENERAL AREAS OF DEMOLITION. THE GENERAL CONTRACTOR
SHALL VERIFY IN THE FIELD ALL ITEMS TO BE REMOVED TO MEET
THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
b THE GENERAL CONTRACTOR SHALL CAREFULLY REMOVE ONLY THE
EXISTING ITEMS IDENTIFIED ON THE ARCHITECTURAL AND
STRUCTURAL DRAWINGS.
c IN NO CASE SHALL THE REMOVAL OF ANY PORTION OF THE
EXISTING STRUCTURE BE PERFORMED IN SUCH A WAY AS TO
AFFECT THE STRUCTURAL INTEGRITY OF THE REMAINING PORTION
OF THE BUILDING.
d THE GENERAL CONTRACTOR SHALL NOTIFY COR IMMEDIATELY OF
ANY STRUCTURAL ITEMS WHICH NEED TO BE DEMOLISHED BUT ARE
NOT CLEARLY IDENTIFIED ON THE STRUCTURAL OR ARCHITECTURAL
DRAWINGS.
e THE GENERAL CONTRACTOR SHALL MINIMIZE THE EXTENT OF THE
DEMOLITION TO THE EXISTING STRUCTURE TO ONLY THAT
REQUIRED TO INSTALL THE NEW BUILDING MODIFICATIONS.
ADDENDUM #1 05/28/2025
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No.VA CONTRACT NO. 05/28/2025
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
mw pw
578-20-002
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071 Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
STRUCTURAL - GENERAL NOTES
S001
E
D
S19
S18
S17
N9N8
BARIATRIC
PATIENT
ROOM
B149
TOILET
B148
(E) W16x26
(E ) W x2
(E ) W x2
(E ) W x2
(E) W16x26
(E ) W x1
(E ) W x1
(E ) W x1
P1001-3
P1001-3
P1
P1
P1001-3
P1001-3
P1001-3
P1
P1
BR
AC
E
P1
BR
AC
E
P1
BR
AC
E
P1
BR
AC
E
P1
BR
AC
E
P1000 BRACE
P1000 BRACE
P1000 BRACE
P1000 BRACE
SF101
SF101
SF101
P1000 BRACE
SF101
E
DS9 S8
N19
N17
BARIATRIC
PATIENT
ROOM
C149
TOILET
C148
(E) W16x26
(E ) W x1
(E ) W x1
(E ) W x1
(E ) W x2
(E ) W x2
(E ) W x2
(E) W16x26
P1001-3
P1001-3
P1001-3
P1
P1
BR
AC
E
P1
BR
AC
E
P1000 BRACE
P1000 BRACE
P1000 BRACE
P1001-3
P1001-3
P1
P1
P1
BR
AC
E
P1
BR
AC
E
P1
BR
AC
E
P1000 BRACE
SF101
SF101
SF101
SF101
3/
4" (V
.I.
F.
T/ EXIST. SLAB
EL. 113'-4" (V.I.F.)
T/ EXIST. CEILING
EL. 113'-4" (V.I.F.)
EXIST. COMP. DECK SLAB (V.I.F.)
EXIST. COMP. DECK (V.I.F.)
EXIST. W16 (V.I.F.)
ADJUSTABLE UNISTRUT ANGLE
CONN., TYP. EACH END
UNISTRUT P1000 BRACE
UNISTRUT (3) P1001 , TYP.
1/2"Ø HANGER, TYP.
EXIST. W16 (V.I.F.)
3/
4" (V
.I.
F.
T/ EXIST. SLAB
EL. 113'-4" (V.I.F.)
T/ EXIST. CEILING
EL. 113'-4" (V.I.F.)
UNISTRUT (3) P1001 , TYP.
1/2"Ø HANGER, TYP.
UNISTRUT P1001
ADJUSTABLE UNISTRUT ANGLE
CONN., TYP. EACH END
PATIENT LIFT RAIL BY OTHERS
UNISTRUT BEAM CLAMP, TYP.
EACH SIDE OF BEAM
EXIST. W16 (V.I.F.)
UNISTRUT BEAM CLAMP, TYP.
EACH SIDE OF BEAM
EXIST. W10 (V.I.F.)
3/
4" (V
.I.
F.
T/ EXIST. SLAB
EL. 113'-4" (V.I.F.)
T/ EXIST. CEILING
EL. 113'-4" (V.I.F.)
EXIST. W10 (V.I.F.)EXIST. W10 (V.I.F.)
UNISTRUT (3) P1001 , TYP.
1/2"Ø HANGER, TYP.
ADJUSTABLE UNISTRUT ANGLE
CONN., TYP. EACH END
UNISTRUT P1001
UNISTRUT P1000 BRACE
UNISTRUT P1000 BRACE
PATIENT LIFT RAIL BY OTHERS
EXIST. COMP. DECK SLAB (V.I.F.)
EXIST. COMP. DECK (V.I.F.)
EXIST. COMP. DECK SLAB (V.I.F.)
EXIST. COMP. DECK (V.I.F.)
3/
4" (V
.I.
F.
T/ EXIST. SLAB
EL. 113'-4" (V.I.F.)
T/ EXIST. CEILING
EL. 113'-4" (V.I.F.)
UNISTRUT P1000
3/16" TAPCONS IN 2 LOW
CELLS MIN.
EXIST. COMP. DECK SLAB (V.I.F.)
EXIST. COMP. DECK (V.I.F.)
ADJUSTABLE UNISTRUT ANGLE
CONN., TYP. EACH END
UNISTRUT P1000 BRACE
UNISTRUT (3) P1001 , TYP.
1/2"Ø HANGER, TYP.
PATIENT LIFT RAIL BY OTHERS
PATIENT LIFT RAIL BY OTHERS
UNISTRUT P1000 BRACE
ADJUSTABLE UNISTRUT ANGLE
CONN., TYP. EACH END
PATIENT LIFT RAIL BY OTHERS
BUILDING 217 KEY PLANN
N 1/4" = 1'-0"
1 STRUCTURAL - FIRST FLOOR - REFLECTED CEILING PLAN - BARIATRIC ROOM B149
N
1/4" = 1'-0"
2 STRUCTURAL - FIRST FLOOR - REFLECTED CEILING PLAN - BARIATRIC ROOM C149
ADDENDUM #1 05/28/2025
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No.VA CONTRACT NO. 05/28/2025
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
mw pw
578-20-002
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071 Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
3/4" = 1'-0"
3 FRAMING SECTION
3/4" = 1'-0"
4 FRAMING SECTION
3/4" = 1'-0"
5 FRAMING SECTION
3/4" = 1'-0"
6 FRAMING SECTION
STRUCTURAL - FRAMING PLAN AND DETAILS
- BARIATRIC ROOMS
SF101
N
O
P
Q
S
R
1010.11111.111.21213141515.1
(E ) W x3
(E) W12
(E) W12
(E) W12
(E) W12
(E) W12
(E ) W x3
(E ) W x5
(E) W12
(E) W12
(E) W12
(E) W12
(E) W12
(E) W12
(E) W12
(E) W12
(E ) W x3
(E ) W x3
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12
(E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E) W12 (E) W12
(E ) W x3
(E ) W x3
(E ) W x3
(E ) W x3
(N ) W x2
(1
'-5
(N) W8x24 (125'-5")
(N) W16x36 (126'-5")
(N) W8x10 (126'-5")
EX
IST
. M
ET
AL
R
OO
F
DE
CK
(V .I.F
(N) W8x21
(N) W16x36 (126'-5")
(N) W8x10 (126'-5")
(125'-5")
(N) W10x22 (125'-5")
ACCU-1 (6,423#)
AHU-1 (6,838#)
EQ
UA
L W
T4 x1
5.
5x
'-0
" B
EA
M
RE
IN
FO
RC
IN
G
EQ
UA
L
(V .I.
F.
(V .I.
F.
EQ
UA
L W
T4 x1
5.
5x
'-0
" B
EA
M
RE
IN
FO
RC
IN
G
EQ
UA
L
(V .I.
F.
(V .I.
F.
EXIST. METAL ROOF DECK (V.I.F.)
L4x4x3/8x0'-6"
L4x4x3/8 FRAME
EXIST. WF (V.I.F.)
NOTE A:
VERIFY MECHANICAL ROOF CURB
LOCATIONS W/ MECHANICAL
CONTRACTOR. ALIGN L4x4 BELOW ALL
ROOF TOP CURBS. COORDINATE
LOCATIONS W/ MECHANICAL DWGS.
NOTE A
NO
TE
A
L4x4x3/8
L4x4x3/8
L4x4x3/8x0'-6", TYP.
1/8
TYP.
3/16
TYP.
TYPICAL ROOF OPENING FRAME @ GIRDER
SF102
L4 x4 x3 /8
ROOF TOP UNIT, SEE EQUIP. MFR. DWGS.
ROOF TOP UNIT CURB, SEE EQUIP.
MFR. DWGS.
3/16
12" CONT.
2-8 AT ENDS
3/16 2-8
EXIST. METAL ROOF DECK (V.I.F.)
EXIST. WF (V.I.F.)
NEW WT5 BEAM REINF., SEE PLAN
BUILDING 217 KEY PLANN
N 1/8" = 1'-0"
1 STRUCTURAL - ROOF FRAMING PLAN - FOLDING PARTITIONS
ADDENDUM #1 05/28/2025
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No.VA CONTRACT NO. 05/28/2025
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
mw pw
578-20-002
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071 Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
STRUCTURAL - ROOF FRAMING PLAN AND
DETAILS - FOLDING PARTITIONS
SF102
SHEET KEY NOTES
GENERAL SHEET NOTES
1 PROVIDE STEEL ROOF OPENING FRAME PER 2/SF102 FOR ALL MECHANICAL OPENINGS
AND UNDER ROOF TOP UNIT CURBS. REFER TO MECHANICAL SHEETS FOR SIZE AND
LOCATIONS.
2 PROVIDE STEEL BEAM REINFORCING PER 4/SF102.
CONTRACTOR NOTE:
CONTRACTOR TO VERIFY EXISTING CONDITIONS PRIOR TO BID TO ENSURE
ALL CONFLICTS FOR INSTALLATION OF NEW WORK HAS BEEN IDENTIFIED
AND ANY WORK REQUIRED TO MODIFY EXISTING IS INCLUDED IN BID PRICE.
NTS
2 ROOF FRAME OPENING DETAIL
NTS
3 ROOF FRAME OPENING DETAIL
NTS
4 ROOF FRAME OPENING DETAIL
AutoCAD SHX Text
O
15.116 /2 AE401.4
/3 AE401.4
A E
.4
A E
.4 RECEPTION
1A104A
A
E .4
/7 AE401.4
A E
.4
/9 AE401.4
2'
- 1
1"
2'
- 7
2' - 2 3/4"
1' - 0"
R 2' - 7"
R 2'
- 7
105.00°
R 1' - 0"
9'
- 4
/1
6"
2' - 1"
9' - 7 1/16"
R 1'
- 7"
2' - 6 3/16"
2"
2' - 10 3/16" 2' - 9 7/8" 2' - 2 3/16"
2"
2' - 0 3/16" 1"
2'
- 0
/1
6"
2"
2'
- 0
/1
6"
2"
2'
- 0
/1
6"
3/
8"
1'
- 6
/1
6"
TY
P.2'
- 0
4"
15.00°
AE542
Sim
SS-3
PL-1
SS-3
AE542
Sim
PNL-3 PNL-3 PNL-3 PNL-3 PNL-3
AE542
Sim
SS-3
M1801
PNL-1 PNL-1
4'
- 1
0"
AE542
Sim
WP-2
RB-1WP-3
SS-3
PL-1
RB-1
PNL-3 PNL-3 PNL-3
WP-11
AE542
Sim
SS-3
PL-1
RB-1
PNL-3PNL-3 PNL-3 PNL-3 PNL-3 PNL-3
8" 2'
- 1 0"
SS-3
PL-1
M1801
F0280
M1840
2'
- 1
0"
SS-3
M1840
M1801
F0280
AE542
Sim
3'
- 6
2'
- 1
0"
SS-3
PL-1
RB-1
SS-3
M1801
F0280 F0280
SS-3
PL-1
SS-3
PL-1
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
Date 7
ARCHITECTURAL - ENLARGED PLAN -
PRIMARY CARE CLINIC & ENTRANCE LOBBY
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
AE401.4
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
ARCHITECTURAL - ENLARGED PLAN - RECEPTION 1A104A
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - EXTERIOR - WEST
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - EXTERIOR - EAST
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - EXTERIOR - SOUTH
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - EXTERIOR - NORTH
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - INTERIOR - NORTH
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - INTERIOR - EAST
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - INTERIOR - SOUTH
1/2" = 1'-0"
ELEVATION - RECEPTION DESK - INTERIOR - WEST
Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
F0780
F0225
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0780
WP-1
RB-1
WP-1
RB-1
RB-1
WP-12 WP-12
PNL-2 PNL-2 PNL-2 PNL-2 PNL-2 PNL-2 PNL-2 PNL-2
SS-3
5'
- 0
EQ EQ EQ EQ EQ EQ EQ EQ
AE552
Sim
AE551
Sim
RB-1
WP-6
WP-12
F0225
F0225
F0225
F0225
F0225
RB-1
WP-1
AE531
Typ.
AE541
Typ.3
AE541
Typ.
2'
- 1
0"
WP-12SS-3
WP-12
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
Date 7
ARCHITECTURAL - ELEVATIONS - DINING
ROOM 1A118
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
AE402.1
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
1/2" = 1'-0"
ELEVATION - 1A118 EAST
1/2" = 1'-0"
ELEVATION - 1A118 NORTH
1/2" = 1'-0"
ELEVATION - 1A118 WEST
Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
AE551
Sim
RB-1
WP-1
RB-1 RB-1
WP-1
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0780
WP-13 WP-13 WP-13
PNL-2 PNL-2 PNL-2 PNL-2 PNL-2 PNL-2 PNL-2 PNL-2
SS-3
EQ EQ EQ EQ EQ EQ EQ EQ
5'
- 0
AE552
Sim
AE551
Sim
RB-1
WP-1
RB-1
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0780
F0225
F0225 F0225
F0225
F0225 F0780
F0225WP-1
WP-13
AE551
Sim
AE551
Sim
F0225
F0225
F0780
F0225
F0225 F0225 F0225 F0225 F0225
SS-3
WP-1
WP-1
WP-1
F0225 F0225 F0225
RB-1WP-13
SS-3
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
Date 7
ARCHITECTURAL - ENLARGED PLAN - DINING
ROOM 2A18
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
AE403.1
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
1/2" = 1'-0"
ELEVATION - 2A18 EAST
1/2" = 1'-0"
ELEVATION - 2A18 NORTH
1/2" = 1'-0"
ELEVATION - 2A18 WEST
1/2" = 1'-0"
ELEVATION - 2A18 SOUTH
Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
DN
FEC
N
O
1515.116
PEDASTAL MOUNTED
ENGINEERED WOOD
DECKING
PLANTER BOX
PLANTER BOX
AE521
4' - 0" 4' - 0"
2'
- 0
4' - 0" 4' - 0"
2'
- 0
A. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK –
GENERAL NOTES” REGARDING THE VA’S DISCRETION IN SELECTING
WORK TO BE DONE AFTERHOURS/OFF-HOURS.
B. REFER TO GI002 “CONSTRUCTION PERIOD SCHEDULING OF WORK
C. REFER TO GENERAL NOTES ON GI001 AND GI002.
D. REFER TO SHEET SERIES AF AND QH FOR FINISHES AND EQUIPMENT.
E. REFER TO SHEET ANNN FOR DETAILS FOR WALL GUARDS, CRASH
RAILS, HANDRAILS, INTEGRAL COVE BASE, CORNER GUARDS.
F. REVIEW THIS DRAWING IN CONJUNCTION WITH CORRESPONDING
FIRE PROTECTION, PLUMBING, MECHANICAL AND ELECTRICAL
DRAWINGS FOR FULL SCOPE OF CONSTRUCTION WORK.
G. UNLESS OTHERWISE NOTED ALL WALLS TO BE TYPE '1'. REFER TO
SHEET AE501 FOR PARTITION TYPES.
H. REFER TO SHEET AE601 FOR DOOR AND WINDOW SCHEDULES.
I. ALL DIMENSIONS ARE TO THE FINISHED FACE.
J. SEAL/FIRESTOP ALL OPENINGS IN ALL FIRE RATED WALLS TO
CREATE A CONTINUOUS SYSTEM. INCLUDES ALL EXPOSED CONDUIT
AND PIPING.
K. EACH PARTITION NOTED TO CARRY AN ACOUSTIC RATING SHALL
CARRY THAT RATING IN THE ENTIRETY OF ITS CONSTRUCTION TO
CREATE A CONTINUOUS SYSTEM. INCLUDES PLACEMENT AND
SEALING OF PENETRATIONS, JUNCTION BOXES, ETC. UNLESS NOTED
OTHERWISE, PARTITIONS SHALL EXTEND TO THE STRUCTURE ABOVE
AND ACCOMMODATE ITS PROFILE.
L. NEW DOOR INSTALLATIONS SHALL COMPLY WITH THE FOLLOWING
UNLESS OTHERWISE NOTED: (A) ON THE PUSH SIDE OF DOORS:
PROVIDE A MINIMUM CLEARANCE OF 12" AT THE LOCK/LATCH SIDE
FACE OF DOOR FRAME OPENING TO ANY FIXED CONSTRUCTION
THAT WOULD BE ADJACENT TO THE FACE OF PARTITION. (B) ON THE
PULL SIDE OF DOORS: PROVIDE A MINIMUM CLEARANCE OF 18" AT
THE LOCK/LATCH SIDE FACE OF DOOR FRAME OPENING TO ANY
FIXED CONSTRUCTION THAT WOULD BE ADJACENT TO THE FACE OF
PARTITION. (C) IN METAL FRAMED GYPSUM BOARD PARTITIONS
TYPICALLY ON THE PULL SIDE OF DOORS WHERE THE HINGE SIDE OF
A DOOR FRAME IS PLACED ADJACENT TO ANY FIXED CONSTRUCTION,
LOCATE THE DOOR SIDE FRAME OPENING 4" FROM THE FIXED
CONSTRUCTION.
M. PROVIDE METAL BACKING PLATE AT ALL WALL MOUNTED ITEMS, SEE
EQUIPMENT PLANS AND SCHEDULES.
N. NEW SUBSURFACE FLOOR PREPARATION: THE EXISTING CONCRETE
FLOOR SUB-SURFACES RESULTING FROM THE REMOVAL OF OLD
FLOOR FINISHES (I.E., CERAMIC TILE, VCT, MASTICS, VINYL SHEETS,
ABATEMENTS, CARPETING, ETC.) OR GOING OVER CONCRETE FLOOR
REPAIRS OR INFILLS SHALL BE ENTIRELY SKIM COATED TO A
SMOOTH AND LEVEL FINISH, TO BE LEVEL WITH ALL ADJACENT
FLOOR SURFACES REQUIRING EXISTING FLOOR FINISH REMOVALS
AND/OR NEW FLOOR FINISHES, SUCH THAT THE FINAL FINISHED
FLOORS ARE SMOOTH AND LEVEL AND HAVE FINISH TRANSITIONS AS
SHOWN AND INTENDED. FOR BIDDING PURPOSES, FLOOR SKIM
COATING SHALL BE FIGURED AT 3/4” THICKNESS AVERAGE
O. FURRED PARTITIONS EXTEND TO STRUCTURE ABOVE, UNLESS
NOTED OTHERWISE.
GENERAL NOTES FLOOR PLAN
EXISTING
CONSTRUCTION
TO REMAIN
NEW PARTITION
WALL
MATCHLINE
LIMITS OF NEW
CONSTRUCTION
FIRE
EXTINGUISHER
CABINET - REFER
TO DETAIL AE561
FLOOR PLAN LEGEND
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
BUILDING 217 KEY PLANN
Date 7
ARCHITECTURAL - ENLARGED PLAN -
SECOND FLOOR PATIO
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
AE406
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
N 1/4" = 1'-0"
ARCHITECTURAL - ENLARGED PLAN - SECOND FLOOR PATIO
Revisions: Date:
30% SCHEMATIC DESIGN 11/23/2023
60% DESIGN DEVELOPMENT 05/08/2024
90% CONSTRUCTION DOCUMENTS 08/23/2024
F0780
F0225 F0225
F0780
PT-9
M0506
SS-5
PL-1
AE542
FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1
FLM-1
FLM-1 FLM-1 FLM-15'
- 3
4' - 9"4' - 7 5/16" 4' - 6 1/4" 3' - 10 7/8" 3' - 10 7/8" 3' - 10 7/8" 3' - 10 7/8" 3' - 10 7/8" 3' - 8 11/16" 3' - 8 11/16" 5' - 0 1/4" 2' - 3"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
Date 7
ARCHITECTURAL - ELEVATIONS - DEMENTIA
UNIT
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
AE407.3
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
1/2" = 1'-0"
ELEVATION - DEMENTIA UNIT COMMUNITY SPACE - SOUTH
Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
F0780
SS-5
PL-1
FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-15'
- 3
2' - 1 9/16" 4' - 1 9/16" 4' - 1 9/16" 4' - 1 9/16" 4' - 1 9/16" 3' - 5 7/16" 3' - 5 7/16" 3' - 5 7/16" 3' - 5 7/16" 3' - 5 11/16" 3' - 4 11/16"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
Date 7
ARCHITECTURAL - ELEVATIONS - DEMENTIA
UNIT
RENOVATIONS TO
BUILDING 217
EDWARD J. HINES JR. VAMC
CZ CR
578-20-002
AE407.4
100% CONSTRUCTION
DOCUMENTS
23-00936C25223C0071
1/2" = 1'-0"
ELEVATION - DEMENTIA UNIT COMMUNITY SPACE - NORTH
Revisions: Date:
90% CONSTRUCTION DOCUMENTS 08/23/2024
100% CONSTRUCTION DOCUMENTS 12/06/2024
SS-5
PL-1
FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1 FLM-1FLM-1
5'
- 3
3' - 4 11/16" 3' - 5 11/16" 3' - 5 7/16" 3' - 5 7/16" 3' - 5 7/16" 3' - 5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .