Updated Specifications Section 28 31 00 1.2 Scope.docx

DOCX document 14 KB Posted

Attached to
Z2DA--Replace Obsolete Fire Alarm Devices, 537-16-101 Federal contract opportunity
Solicitation number
36C25221B0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document outlines a federal contract opportunity for replacing obsolete fire alarm devices at the Jesse Brown VA Medical Center in Chicago, Illinois. The contractor shall provide all tools, materials, components, labor and supervision to construct and remodel a fully functional fire alarm system and exit signs in accordance with design documents. Work must be completed within 581 calendar days of receiving a notice to proceed and include a one-year parts and labor warranty. Competition is restricted to Service-Disabled-Veteran-Owned-Small-Businesses. The solicitation will be posted on November 25, 2020 with bids due by January 14, 2021. The project magnitude ranges from $2,000,000 to $5,000,000. Offerors must represent that they are an eligible SDVOSB, small business, and verified in the Vendor Information Pages database prior to award.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Replace Obsolete Fire Alarm Devices, 537-16-101, newest first.
File Type Posted
VHA Directive 1192.01 Seasonal Influenza Prevention Program for VHA Health Care Personnel.pdf PDF
36C25221B0003 0009.docx DOCX document
36C25221B0003 0008.docx DOCX document
Clarifications.docx DOCX document
Information Regarding Bidding Material Bid Guarantee and Bonds.docx DOCX document
36C25221B0003 0007.docx DOCX document
537.16.101_G-008.pdf PDF
537.16.101_G-004_updated 1-29-2021.pdf PDF
537.16.101_G-007.pdf PDF
537.16.101_G-001.pdf PDF
FinalSpecifications-VAJB-FireAlarm Updated 2-03-2021-1.pdf PDF
537.16.101_G-009.pdf PDF
36C25221B0003 0006.docx DOCX document
Final Responses to Consolidated RFI Sheet 3_36C25221B0003_2-1-2021.xlsx XLSX spreadsheet
36C25221B0003 0005.docx DOCX document
RFI SHEET_36C25221B0003.xlsx XLSX spreadsheet
36C25221B0003 0004.docx DOCX document
Consolidated RFI Sheet 2_36C25221B0003_1-19-21.xlsx XLSX spreadsheet
36C25221B0003 0003.docx DOCX document
Updated Specifications 28 31 00 Page 3-VAJB-FireAlarm Updated 1-13-2021 172.pdf PDF
Specifications Cover Sheet dated January 13 2021.pdf PDF
Updated Specifications Table of Contents Updated January 13 2021.pdf PDF
S15 RFI List with VA Responses_36C25221B0003_1-13-2021.xlsx XLSX spreadsheet
Updated Drawing Number G-002_updated 1-13-2021.pdf PDF
Updated Specifications 28 31 00 Page 4-VAJB-FireAlarm Updated 1-13-2021 173.pdf PDF
VAAR 852-219-10 NOV 2020.docx DOCX document
FinalSpecifications-Re-issue 2-VAJB-FireAlarm Part 1 of 1 Updated 12-29-2020.pdf PDF
Wage Determination IL20210009 Dated 1-1-2021.pdf PDF
36C25221B0003 0002.docx DOCX document
36C25221B0003 0001 Attachments.zip ZIP file
36C25221B0003 0001.docx DOCX document
36C25221B0003_1.docx DOCX document
36C25221B0003 Attachments.zip ZIP file
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CHANGED: Section 28 31 00: 1.2 SCOPE A. A fully addressable fire alarm system shall be designed and installed in accordance with the specifications and drawings. Provide the devices as shown in plan.

B. Remove all old equipment and those conduits, wire molding, boxes and wiring that are readily accessible. Existing exposed conduit and conduit between drop-in tiles and the floor slab above is considered accessible. All fire alarm panels, initiation and indication devices shall be new. Except as outlined in Section 28 31 00 1.2C, D and E.

1. Conduit and boxes located in wall spaces shall be cut off inside the ceiling space, marked and left in place.

2. In locations where existing wall mounted devices have been removed the existing backbox shall be covered by a blank stainless-steel cover plate.

3. Where duct detectors have been removed the duct shall be repaired with screwed-on sheet metal, sealant and insulation.

4. After removal of existing wall mounted devices the old box shall be covered by a blank brushed stainless-steel cover plate.

5. Furnish and install new ceiling tiles where existing equipment has been removed as a result of this work.

File details come from the government source that posted it. Updated .