About this file

This document includes a clarification file and a federal contract opportunity solicitation. The clarification file provides updates to the fire alarm system scope of work, including that all fire alarm panels, devices, and wiring shall be new except as outlined. It also confirms general carpentry and finish work is required to support the fire alarm installation.

The federal contract opportunity solicitation is for replacement of obsolete fire alarm devices at a VA medical center. The contractor shall provide all tools, materials, labor and supervision for a fully functional fire alarm system in accordance with construction documents. The project range is $2-5 million and work must be completed within 581 days of notice to proceed. The solicitation will be issued on November 25, 2020 with bids due January 14, 2021. The NAICS code is 238210 and the opportunity is restricted to SDVOSB firms. Offerors must be registered in SAM.gov and VIP database to be eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Replace Obsolete Fire Alarm Devices, 537-16-101, newest first.
File Type Posted
VHA Directive 1192.01 Seasonal Influenza Prevention Program for VHA Health Care Personnel.pdf PDF
Updated Specifications Section 28 31 00 1.2 Scope.docx DOCX document
36C25221B0003 0009.docx DOCX document
36C25221B0003 0008.docx DOCX document
Information Regarding Bidding Material Bid Guarantee and Bonds.docx DOCX document
36C25221B0003 0007.docx DOCX document
537.16.101_G-008.pdf PDF
537.16.101_G-004_updated 1-29-2021.pdf PDF
537.16.101_G-007.pdf PDF
537.16.101_G-001.pdf PDF
FinalSpecifications-VAJB-FireAlarm Updated 2-03-2021-1.pdf PDF
537.16.101_G-009.pdf PDF
36C25221B0003 0006.docx DOCX document
Final Responses to Consolidated RFI Sheet 3_36C25221B0003_2-1-2021.xlsx XLSX spreadsheet
36C25221B0003 0005.docx DOCX document
RFI SHEET_36C25221B0003.xlsx XLSX spreadsheet
36C25221B0003 0004.docx DOCX document
Consolidated RFI Sheet 2_36C25221B0003_1-19-21.xlsx XLSX spreadsheet
Updated Specifications 28 31 00 Page 3-VAJB-FireAlarm Updated 1-13-2021 172.pdf PDF
Specifications Cover Sheet dated January 13 2021.pdf PDF
Updated Specifications Table of Contents Updated January 13 2021.pdf PDF
S15 RFI List with VA Responses_36C25221B0003_1-13-2021.xlsx XLSX spreadsheet
36C25221B0003 0003.docx DOCX document
Updated Drawing Number G-002_updated 1-13-2021.pdf PDF
Updated Specifications 28 31 00 Page 4-VAJB-FireAlarm Updated 1-13-2021 173.pdf PDF
VAAR 852-219-10 NOV 2020.docx DOCX document
FinalSpecifications-Re-issue 2-VAJB-FireAlarm Part 1 of 1 Updated 12-29-2020.pdf PDF
Wage Determination IL20210009 Dated 1-1-2021.pdf PDF
36C25221B0003 0002.docx DOCX document
36C25221B0003 0001.docx DOCX document
36C25221B0003 0001 Attachments.zip ZIP file
36C25221B0003_1.docx DOCX document
36C25221B0003 Attachments.zip ZIP file
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CHANGED: Section 28 31 00: 1.2 SCOPE A. A fully addressable fire alarm system shall be designed and installed in accordance with the specifications and drawings. Provide the devices as shown in plan.

B. Remove all old equipment and those conduits, wire molding, boxes and wiring that are readily accessible. Existing exposed conduit and conduit between drop-in tiles and the floor slab above is considered accessible. All fire alarm panels, initiation and indication devices shall be new. Except as outlined in Section 28 31 00 1.2C, D and E.

2. RFI 66 Response Updated:

RFI: Please confirm that there are no carpentry/finish requirements for this project? The last time this project was bid the intent was to move several of the panels into new/FA/Electrical closets adjacent to the stairwells. We have 08 11 13 hollow metal doors and frames, 08 14 00 interior wood doors, 08 71 00 hardware, 09 29 00 gypsum board in addition to the current specifications. Please confirm these are requirements are no longer required.

UPDATED RESPONSE: The project requires general carpentry work and finish requirements as it relates to supporting the fire alarm work. Examples include and are not limited to: fire stopping any new / abandoned fire alarm cable / conduit openings in rated walls for this work, painting and patching as required for demolition / new fire alarm work. Replace any ceiling tiles that are damaged or made dirty by this fire alarm work.