Updated Specifications 28 31 00 Page 4-VAJB-FireAlarm Updated 1-13-2021 173.pdf

PDF 10 KB Posted

Attached to
Z2DA--Replace Obsolete Fire Alarm Devices, 537-16-101
Solicitation number
36C25221B0003
Issued by

About this file

This pre-solicitation notice describes a federal contract opportunity to replace obsolete fire alarm devices at a Veterans Affairs medical center in Chicago, Illinois. The project involves providing all tools, materials, components, labor and supervision to construct a fully functional fire alarm system and exit signs in accordance with design documents. Work must be completed within 581 calendar days of receiving a notice to proceed. The competition is set aside for service-disabled veteran-owned small businesses. The solicitation will be issued on November 25, 2020 with bids due on January 14, 2021. The project value is estimated between $2,000,000 to $5,000,000. The selected contractor must be registered in the System for Award Management and listed as verified in the Vendor Information Pages database for service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
VHA Directive 1192.01 Seasonal Influenza Prevention Program for VHA Health Care Personnel.pdf PDF
Updated Specifications Section 28 31 00 1.2 Scope.docx DOCX document
36C25221B0003 0009.docx DOCX document
36C25221B0003 0008.docx DOCX document
Clarifications.docx DOCX document
Information Regarding Bidding Material Bid Guarantee and Bonds.docx DOCX document
36C25221B0003 0007.docx DOCX document
Final Responses to Consolidated RFI Sheet 3_36C25221B0003_2-1-2021.xlsx XLSX spreadsheet
537.16.101_G-004_updated 1-29-2021.pdf PDF
537.16.101_G-007.pdf PDF
FinalSpecifications-VAJB-FireAlarm Updated 2-03-2021-1.pdf PDF
537.16.101_G-008.pdf PDF
537.16.101_G-001.pdf PDF
36C25221B0003 0006.docx DOCX document
537.16.101_G-009.pdf PDF
36C25221B0003 0005.docx DOCX document
RFI SHEET_36C25221B0003.xlsx XLSX spreadsheet
Consolidated RFI Sheet 2_36C25221B0003_1-19-21.xlsx XLSX spreadsheet
36C25221B0003 0004.docx DOCX document
S15 RFI List with VA Responses_36C25221B0003_1-13-2021.xlsx XLSX spreadsheet
Updated Specifications Table of Contents Updated January 13 2021.pdf PDF
36C25221B0003 0003.docx DOCX document
Specifications Cover Sheet dated January 13 2021.pdf PDF
Updated Specifications 28 31 00 Page 3-VAJB-FireAlarm Updated 1-13-2021 172.pdf PDF
Updated Drawing Number G-002_updated 1-13-2021.pdf PDF
VAAR 852-219-10 NOV 2020.docx DOCX document
FinalSpecifications-Re-issue 2-VAJB-FireAlarm Part 1 of 1 Updated 12-29-2020.pdf PDF
Wage Determination IL20210009 Dated 1-1-2021.pdf PDF
36C25221B0003 0002.docx DOCX document
36C25221B0003 0001.docx DOCX document
36C25221B0003 0001 Attachments.zip ZIP file
36C25221B0003_1.docx DOCX document
36C25221B0003 Attachments.zip ZIP file
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28 31 00 - 4 construction meeting. The contractor shall be respo nsible for verifying all critical dimensions shown on the draw ings provided by

VA.

2. Floor plans: Provide locations of all devices (w ith device number at each addressable device corresponding to control un it programming), appliances, panels, equipment, junction/terminal ca binets/boxes, risers, electrical power connections, individual ci rcuits and raceway routing, system zoning; number, size, and t ype of raceways and conductors in each raceway; conduit fill calcul ations with cross section area percent fill for each type and size of conductor and raceway. Only those devices connected and incorpora ted into the final system shall be on these floor plans. Do not show any removed devices on the floor plans. Show all interfaces for all fire safety functions.

3. Provide a separate set of floor plans from above illustrating proposed fire alarm zoning and digitized voice mess ages, see section

4.1 below.

4. Riser diagrams: Provide, for the entire system, the number, size and type of riser raceways and conductors in each riser raceway and number of each type device per floor and zone. Show door holder interface, elevator control interface, HVAC shutdow n interface, fire extinguishing system interface, and all other fire safety interfaces. Show wiring Styles on the riser diagram for all circuits. Provide diagrams both on a per building a nd campus wide basis.

5. Detailed wiring diagrams: Provide for control pa nels, modules, power supplies, electrical power connections, auxiliary r elays and annunciators showing termination identifications, s ize and type conductors, circuit boards, LED lamps, indicators, adjustable controls, switches, ribbon connectors, wiring harne sses, terminal strips and connectors, spare zones/circuits. Diagra ms shall be drawn to a scale sufficient to show spatial relationships between components, enclosures and equipment configuration.

6. Two weeks prior to final inspection, the Contrac tor shall deliver to the COR 3 hard copy sets of as-built drawings, 1 se t of the as-built drawing computer files using AutoCAD 14 or later an d 1 set PDF computer files.

File details come from the government source that posted it. Updated .