This is a Request for Information (RFI) issued by the Department of Veterans Affairs Network 10 Contracting Office for the Upgrade Campus Electrical System project at VA Northern Indiana Healthcare System in Fort Wayne, Indiana. The RFI number is 36C25026B0006, and the project number is 610A4-23-101. The document was issued on 1/9/2026 and responses will be provided by amendment(s) to SAM.gov or via email.
Geotech Services, Inc submitted three questions requesting: (1) availability of a geotechnical report for the project; (2) the elevation of the top of the sheet pile wall; and (3) a bid length for the helical piles for the sheet pile wall. The Government's responses indicate that structural engineering design was previously performed based on geotechnical information available at the time of design, with any updated or revised geotechnical report to be provided by the Geotechnical Engineer of Record for review. Sheet pile wall elevations are identified on drawing sheet CG101. Final/bid helical pile lengths will be determined by the Geotechnical Engineer and the helical pile specialty contractor based on soil conditions, installation criteria, and required capacities. Contractors submitting questions are required to reference specific specification and/or solicitation sections or drawing numbers to ensure timely Government responses.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C25026B0006
PROJECT NUMBER: 610A4-23-101 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Upgrade Campus Electrical System
PROJECT LOCATION:
VA Northern Indiana Healthcare System 2121 Lake Ave Fort Wayne IN 46805-
Contractor Name Contact Info (Phone & Address)
TO: Brian Rosciszewski, Contract Specialist Department of Veterans Affairs Network 10 Contracting Office Brian.Rosciszewski@VA.gov
INFORMATION NEEDED: Write each in the form of a question. Use one document for all questions. Specify any referenced specs/drawings. Submit all questions on one document only to Brian.Rosciszewski@VA.gov.
Subject of the email must be: “RFI – {Solicitation #} – Firm Name”
2.
3.
Government Response: RFI’s will be answered by amendment(s) issued to SAM.gov or via email.
REPLY FROM:
ATTACHMENTS:
DATE:
COPY TO:
Geotech Services, Inc 350 Golden Oak Parkway, Cleveland, Ohio 44146 Robert Modic 216-276-4953
Is there a geotechnical report available for this project?
Can the elevation of the top of the sheet pile wall be provided?
Can a bid length for the helical piles for the sheet pile wall be provided?
chelsey.gallion Text Box
1. Is there a geotechnical report available for this project?
Structural engineering design was performed based on the geotechnical report available at the time of design (attached). Any updated or revised geotechnical report shall be provided by the Geotechnical Engineer of Record for review and confirmation of design assumptions.
2. Can the elevation of the top of the sheet pile wall be provided?
The top of sheet pile wall elevations are called out on sheet CG101.
3. Can a bid length for the helical piles for the sheet pile wall be provided?
Structural design requirements for the sheet pile wall and supporting helical piles were based on the available geotechnical information at the time of design and the assumed maximum wall height. Final/bid helical pile lengths shall be determined by the Geotechnical Engineer and the helical pile specialty contractor based on soil conditions, installation criteria, and required capacities.
~AES Group, Inc.
VHADAYRosciB Typewritten Text
CG, FFE
VHADAYRosciB Typewritten Text 1/9/2026
VHADAYRosciB Text Box Responses posted as amendment no. three to the solicitation.