Attach II - RFI - Cornerstone.doc

DOC document 56 KB Posted

Attached to
Z1DA--Upgrade Campus Electrical Systems. Project No. 610A4-23-101.
Solicitation number
36C25026B0006_1
Issued by

About this file

This is a Request for Information (RFI) with government responses regarding Solicitation 36C25026B0006, Project 610A4-23-101, for an Upgrade Campus Electrical System at VA Northern Indiana Healthcare System in Fort Wayne, Indiana. The RFI document contains seven contractor questions and corresponding government answers addressing technical specifications and design clarifications for the electrical upgrade project.

Key clarifications provided by the government include: (1) new generator exhaust stacks require lightning protection per drawing SE507; (2) demo and rework in existing buildings may occur during regular hours, but cutover work must be bid as after-hours with coordination required with the Contracting Officer's Representative regarding noise and infection control risk assessment (ICRA) due to the hospital setting; (3) concrete encased Schedule 40 PVC is specified for underground ductbanks with rigid turn-ups, with no EP108 drawing referenced; (4) contractors should refer to distribution schedules for feeder sizes rather than requesting feeder tags on drawing E211; (5) the 96-hour onsite fuel requirement for temporary generators cannot be modified with external refueling services or external fuel tanks; (6) temporary generators must have critical grade sound attenuated housing; and (7) there is no nurse call system or new mass notification system on this project, with speakers tied into existing circuits per Plan Note 4 on Sheet T201. The RFI was submitted by Cornerstone Contracting Inc and responded to by Matt Graham of HEAPY on January 19, 2026.

View the file

Other files

File Type Posted
Attach I - RFI CM Buck 3.pdf PDF
36C25026B0006 0010.pdf PDF
36C25026B0006 0009.pdf PDF
Attach I - VAAR 852.236-92.pdf PDF
Attach I - Addendum 1 - Summary.docx DOCX document
Attach III - Addendum 1 - Drawings.zip ZIP file
Attach V - RFI CMBuck Rd. 2 - Revised.pdf PDF
36C25026B0006 0008.pdf PDF
Attach IV - Revised Bid Schedule 2.24.2026.pdf PDF
Attach II - Addendum 1 - Specs.zip ZIP file
36C25026B0006 0007.pdf PDF
36C25026B0006 0006.pdf PDF
Attach II - Bid Schedule Revised 2.11.2026.pdf PDF
36C25026B0006 0005.pdf PDF
Attach I - RFI Response CMBuck 2.pdf PDF
36C25026B0006 0004.pdf PDF
Attach IV - RFI - IMS.doc DOC document
Attach V - RFI - Powergen.pdf PDF
Attach VII - RFI Valiant.docx DOCX document
Attach I - RFI - CMBuck.doc DOC document
36C25026B0006 0003.pdf PDF
Attach III - RFI - Geotech.pdf PDF
Attach VI - RFI Richards.docx DOCX document
Attach I - Wage Determination 1.30.2026.txt TXT text file
Attach III - Notice to Bidders on Bid Depth for Piles.docx DOCX document
Attach VI - 3W Data Closet Example.pdf PDF
Attach VII - IT standards ver 3.0 21 Aug 20.pdf PDF
Attach IV - Fort Wayne Generator Information.pdf PDF
Attach VIII - Fort Wayne PA information.pdf PDF
36C25026B0006 0002.pdf PDF
Attach II - Final Geotechnical Report - 610A4-23-101.pdf PDF
Attach V - Fort Wayne ATS information.pdf PDF
Attach I - Sign in Sheet.pdf PDF
Attach II - Site Visit Notes.pdf PDF
36C25026B0006 0001.pdf PDF
Attach I - SOW - 610A4-23-101.pdf PDF
Attach IV - Appendix C.pdf PDF
Attach VI - Drawings Combined 610A4-23-101.pdf PDF
Attach II - Appendix A.pdf PDF
Attach III - Appendix B.pdf PDF
Attach VII - Specs Combined 610A4-23-101.pdf PDF
Attach IX - Wage Determination - Allen County 12.5.25.txt TXT text file
Attach X - VAAR 852.219-75 - 610A4-23-101.pdf PDF
IFB 36C25026B0006_1.pdf PDF
Attach V - Appendix D.pdf PDF
Attach VIII - VHA Directive 1192-01.pdf PDF
Attach XI - RFI 610A4-23-101.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C25026B0006

PROJECT NUMBER:
610A4-23-101
Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE:
Upgrade Campus Electrical System
PROJECT LOCATION:
VA Northern Indiana Healthcare System

2121 Lake Ave

Fort Wayne IN 46805-5100

Contractor Name Contact Info (Phone & Address)

TO: Brian Rosciszewski, Contract Specialist Department of Veterans Affairs Network 10 Contracting Office

Brian.Rosciszewski@VA.gov INFORMATION NEEDED: Write each in the form of a question. Use one document for all questions. Specify any referenced specs/drawings. Submit all questions on one document only to Brian.Rosciszewski@VA.gov. Subject of the email must be: “RFI – {Solicitation #} – Firm Name”

1. Does the new generator exhaust stacks shown on SE507 require lightning protection?

2. Can the demo and rework in the existing building be done during regular hours?

3. Is PVC schedule 40 allowed for under slab duct banks with GRC/RMC stub ups, drawing EP108?

4. Drawing E211 EM one line shows feeders without feeder tags. Can the VA please provide feeder tags?

5. In temporary power plan, rental generator requirements shown as 96-hour sub base tank. Under normal load, industry standard size is rated for 24 hours. Can refueling service be used or an external fuel tank be supplied?

6. What is the sound rating for the two pad-mounted temporary generators shown on ES100.1?

7. Is there a preferred manufacturer or basis of design for the Nurse Call/PA & Mass Notification Systems (275116)?

Government Response: RFI’s will be answered by amendment(s) issued to SAM.gov or via email.

1. Yes.

2. Yes, however cutover work needs to be bid as after-hours. Contractor will need to coordinate with COR regarding noise and ICRA as the work site is a hospital. - VA

3. Concrete encased Schedule 40 is what is specified for underground ductbanks with rigid turn ups. There is no sheet EP108.

4. No, refer to distribution schedules for feeder sizes. If some are still found to be missing, please be specific.

5. No. VA design criteria requires 96 hours of onsite fuel.

6. Critical grade sound attenuated housing.

7. There is no nurse call on this project. Plan note 4, Sheet T201 has speakers tied into the existing speaker circuit. There is no new mass notification system required for this project. Note 4 on T201 shown in a corridor junction box.

Matt Graham, HEAPY, 2/3/26

REPLY FROM:
DATE: 01/19/2026

ATTACHMENTS:

COPY TO:

Cornerstone Contracting Inc

500 W Algonquin Rd

Mount Prospect, IL 60056

847-593-0001

File details come from the government source that posted it. Updated .