RFI 6 - Response IMS.pdf

PDF 105 KB Posted

Attached to
Install Mental Health Safety Improvements -- Project #583-24-201
Solicitation number
36C25024B0040_1
Issued by

About this file

This document is a Request for Information (RFI) related to a federal contract opportunity for the installation of mental health safety improvements at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. The RFI covers various aspects of the project, including removing and replacing wall cladding in patient toilets, the basis of design for new shower curtain tracks and flexible wall protection panels, details on seclusion/restraint rooms, and whether casework and countertop replacement are included in the scope of work. The government's responses provide clarification on these items and refer the contractor to the relevant drawings, specifications, and previous RFI responses. The overall contract opportunity is for a project to update room finishes and install new ligature-resistant plumbing fixtures in the 5th Floor Inpatient Mental Health Unit, in order to bring the unit into compliance with the Mental Health Environment of Care Checklist.

View the file

Other files

File Type Posted
Attachment XII - 10 26 00 - Wall and Door Protection Revised.pdf PDF
Amendment 6 - 36C25024B0040_1.pdf PDF
Attachment XI - Sole Source Justification - Staff Assist Station.pdf PDF
Amendment 5 - 36C25024B0040_1.pdf PDF
Attachment X - HW-MH5A.pdf PDF
RFI 11 - IMS.3.pdf PDF
RFI 10 - IMS.2.pdf PDF
Amendment 4 - 36C25024B0040_1.pdf PDF
RFI 6 - 583.3234_AS403R_5th Fl. Interior Elevations.pdf PDF
Attachment IX - AE Renovate-Relocate Psychiatry Fifth Floor - East Drawings.pdf PDF
RFI 7 - 583.3234_P102-R_5th Fl. Plumb. Piping Plan.pdf PDF
RFI 9 - Response BB.3.pdf PDF
RFI 6 - 583.3234_AS601-R2_Door-Window Typ Details.pdf PDF
Amendment 3 - 36C25024B0040_1.pdf PDF
RFI 8 - Response Industria.pdf PDF
RFI 6 - 583.3234_AS602-Door Heads Jambs-Window Det..pdf PDF
RFI 7 - 583.3234_P701R_Plumbing Schedules.pdf PDF
RFI 7 - Response - BB.2.pdf PDF
RFI 5 - 583.3234_AS501_Interior Wall Typ. and Details.pdf PDF
RFI 4 - Staff Assist Station.pdf PDF
RFI 5 - Submittal Register.pdf PDF
RFI 5 - Response BB.pdf PDF
RFI 5 - SD080000-01 - Door Schedule Legend Notes and Modifications.pdf PDF
RFI 5 - TDS008 Bathroom Door Technical Data Sheet.pdf PDF
RFI 4 - 5th Fl. Reflect. Ceiling Plan.pdf PDF
Amendment 2 - 36C25024B0040_1.pdf PDF
RFI 4 - 5th Fl. Fin. Plan and Schedule.pdf PDF
RFI 4 - Response Armcorp.pdf PDF
RFI 5 - 583.3234_AS502R_Interior Details.pdf PDF
RFI 3 Industria 10.22.pdf PDF
Site Visit Sign In Sheet.pdf PDF
RFI 1 TC Atlantic - 10.15.pdf PDF
Amendment 1 - 36C25024B0040_1.pdf PDF
RFI 2 Eagle 10.22.pdf PDF
Attachment VII - VA Notice of Limitations on Subcontracting - JAN 2023.docx DOCX document
Attachment III - EMR 583-24-201.docx DOCX document
Attachment II - RFI 583-24-201.doc DOC document
Attachment V - Combined Specifications - 583-24-201.pdf PDF
Attachment VI - Drawings - 583-24-201.pdf PDF
Attachment I - Wage Determination Marion County Oct 2024.txt TXT text file
Attachment VIII - Sole Source Justifications.pdf PDF
36C25024B0040_1.pdf PDF
Attachment IV - VHA Directive 1192-01.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C5024B0040

PROJECT NUMBER: 583-24-201 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE:

Mental Healthy Safety Improvements.

PROJECT LOCATION:

Richard L. Roudebush

VAMC

1481 W. 10th St Indianapolis IN 46202

TO:

Brian D. Rosciszewski, Contract Specialist Department of Veterans Affairs Network 10 Contracting Office Brian.Rosciszewski@va.gov

RFI NO.: 1 DATE: 10/31/2024

SPEC/DWG. REFERENCE(s):

REPLY NEEDED BY:

INFORMATION NEEDED:

1. Ref Scope of Work, Patient Toilets note 7- Scope indicates to remove solid surface wall cladding to 4’ in the patient toilet area. The 1 patient toilet shown during walk-thru did not have cladding in the toilet area. We were told all toilet room are typical. What rooms require cladding to be removed to 4’ in the toilet area? and if room does not have cladding in the toilet area currently, is new cladding required to 4’ in the toilet area?

2. Ref Scope of Work, Patient Toilets note 7- How thick is the new wall cladding? What is the height of existing switches and nurse call boxes? Are they above 4’ or will the wall cladding extend above the boxes? Will box extension be required?

3. Ref Scope of Work, Patient Toilets note 7- What is the basis of design for the solid surface wall panels? Are both windowsills being replaced or shall they remain? If being replaced can sizes be provided since drawings do not provide detail for sills?

4. Ref Scope of Work, Patient Toilets note 4- What is the basis of design for the new flush mount shower curtain tracks?

5. Ref scope of Work, Corridors note 4- Do the existing fiber reinforced laminate panels mount from finish floor to underside of hard ceiling? Or does the panel extend above the hard ceiling? If so will hard ceilings require removal? Will both dayrooms 1 and 2 require new flexible wall protective panels?

6. Ref scope of work, Seclusion/Restrain Rms- Will a door schedule be provided to identify size, hardware, frame and door type? Will head and jamb detail be provided to identify mounting?

7. Ref scope of work, Seclusion rm Note 5- Does ceiling padding exist in the seclusion room as it appeared to a hard ceiling?

8. Ref spec section 12 31 00 & 12 36 00- Are casework and countertop replacement part of this project as the scope of work does not indicate replacing or adding casework or counters?

SUBMITTED BY: Industrial Maintenance Services, Inc. CITY/STATE: Escanaba, MI.

PHONE: (906) 789-9021 Ext. 126

REPLY:

RFI’s will be answered by amendment(s) issued to SAM.gov.

1. The contractor is responsible for verifying existing site conditions, as conditions change. Refer to AS403R interior elevations sheet for details of typical patient toilet room. The SOW states to remove all solid surface wall cladding from the walls and install new paneling from floor to ceiling in the shower area, with new SS paneling from base to 4’ in the in the remainder of the toilet area. Refer to the VA finishes guide on the TIL for the finishes requirements of a patient toilet room in mental health units, room code TLTP1.

2. Refer to AF101 finishes plan for thicknesses according to renovation drawing. The contractor shall remove and install like kind in terms of thickness, size, quality, etc. AS403 provides some elevation information. It should be expected that wall cladding will need to be cut for installation around boxes. Boxes, fixtures, equipment to be watertight upon reinstallation.

3. Windowsills are to remain. SS wall cladding is to be installed up to existing windowsill if sill is below 4’ AFF.

4. Refer to specification 10 21 23.

5. Refer to attached interior detail sheet AS502R. FRL sheet wall panel installed to underside of ceiling. No hard ceilings to be removed for installation of sheet wall panels. Refer to SOW II.A..4.d.

6. Refer to attached door schedule from previous renovation project including head and jam detail sheet, AS601R2 and AS602. If new doors are required, they will follow VA guidelines for room finishes, and was answered in a previous RFI.

7. See attached finish schedule AF101R and interior detail sheet AS502R for wall padding information.

8. This solicitation has been revised to no longer include casework or countertop replacement.

The contractor is responsible for verifying all existing site conditions prior to bid. Responses to existing conditions are not to be taken as 100% accurate, and the contractor should plan as such for bidding purposes if existing site conditions were not verified.

REPLY FROM: Eric Dodson

DATE: 11/4/2024

ATTACHMENTS:

RFI 6 - 583.3234_AS403R_5th Fl. Interior Elevations See RFI 5 - 583.3234_AS502R_Interior Details RFI 6 - 583.3234_AS601-R2_Door-Window Typ Details RFI 6 - 583.3234_AS602-Door Heads Jambs-Window Det.

See RFI 4 - 583.3234_AF101R_5th Fl. Fin. Plan & Schedule

COPY TO: