This document is a Request for Information (RFI) for the Mental Healthy Safety Improvements project (Project #583-24-201) at the Richard L. Roudebush VA Medical Center in Indianapolis, IN.

The RFI requests contractor responses to three questions: 1) Confirmation that there is electrical work required, including modifications to door frames, walls, and nurse call buttons, 2) A request for the existing reflected ceiling plan, and 3) Details on the existing nurse call system that the contractor must be compatible with. The RFI responses indicate that electrical work is required, provide the requested ceiling plan, and detail the existing nurse call system including a moisture-resistant version required for the shower area. The contractor is also required to perform a programming change after installation.

The related federal contract opportunity is for the installation of mental health safety improvements including new flooring, wall protection, handrails, paint/patching, acoustical ceiling tiles, and ligature-resistant plumbing fixtures. The work is required to bring the inpatient mental health unit into compliance with the Mental Health Environment of Care Checklist. The solicitation number is 36C25024B0040_1 and the agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 10.

View the file

Other files

File Type Posted
Attachment XII - 10 26 00 - Wall and Door Protection Revised.pdf PDF
Amendment 6 - 36C25024B0040_1.pdf PDF
Attachment XI - Sole Source Justification - Staff Assist Station.pdf PDF
Amendment 5 - 36C25024B0040_1.pdf PDF
Attachment X - HW-MH5A.pdf PDF
RFI 11 - IMS.3.pdf PDF
RFI 10 - IMS.2.pdf PDF
Amendment 4 - 36C25024B0040_1.pdf PDF
RFI 6 - 583.3234_AS403R_5th Fl. Interior Elevations.pdf PDF
Attachment IX - AE Renovate-Relocate Psychiatry Fifth Floor - East Drawings.pdf PDF
RFI 7 - 583.3234_P102-R_5th Fl. Plumb. Piping Plan.pdf PDF
RFI 9 - Response BB.3.pdf PDF
RFI 6 - 583.3234_AS601-R2_Door-Window Typ Details.pdf PDF
Amendment 3 - 36C25024B0040_1.pdf PDF
RFI 8 - Response Industria.pdf PDF
RFI 6 - 583.3234_AS602-Door Heads Jambs-Window Det..pdf PDF
RFI 7 - 583.3234_P701R_Plumbing Schedules.pdf PDF
RFI 6 - Response IMS.pdf PDF
RFI 7 - Response - BB.2.pdf PDF
RFI 5 - 583.3234_AS501_Interior Wall Typ. and Details.pdf PDF
RFI 4 - Staff Assist Station.pdf PDF
RFI 5 - Submittal Register.pdf PDF
RFI 5 - Response BB.pdf PDF
RFI 5 - SD080000-01 - Door Schedule Legend Notes and Modifications.pdf PDF
RFI 5 - TDS008 Bathroom Door Technical Data Sheet.pdf PDF
RFI 4 - 5th Fl. Reflect. Ceiling Plan.pdf PDF
Amendment 2 - 36C25024B0040_1.pdf PDF
RFI 4 - 5th Fl. Fin. Plan and Schedule.pdf PDF
RFI 5 - 583.3234_AS502R_Interior Details.pdf PDF
RFI 3 Industria 10.22.pdf PDF
Site Visit Sign In Sheet.pdf PDF
RFI 1 TC Atlantic - 10.15.pdf PDF
Amendment 1 - 36C25024B0040_1.pdf PDF
RFI 2 Eagle 10.22.pdf PDF
Attachment VII - VA Notice of Limitations on Subcontracting - JAN 2023.docx DOCX document
Attachment III - EMR 583-24-201.docx DOCX document
Attachment II - RFI 583-24-201.doc DOC document
Attachment V - Combined Specifications - 583-24-201.pdf PDF
Attachment VI - Drawings - 583-24-201.pdf PDF
Attachment I - Wage Determination Marion County Oct 2024.txt TXT text file
Attachment VIII - Sole Source Justifications.pdf PDF
36C25024B0040_1.pdf PDF
Attachment IV - VHA Directive 1192-01.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C5024B0040

PROJECT NUMBER: 583-24-201 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE:

Mental Healthy Safety Improvements.

PROJECT LOCATION:

Richard L. Roudebush

VAMC

1481 W. 10th St

Indianapolis IN 46202

TO:

Brian D. Rosciszewski, Contract Specialist Department of Veterans Affairs Network 10 Contracting Office Brian.Rosciszewski@va.gov

RFI NO.: DATE:

SPEC/DWG. REFERENCE(s):

REPLY NEEDED BY:

REPLY FROM: DATE:

ATTACHMENTS:

See 3x RFI 4 Response attachments

COPY TO:

SUBMITTED BY: CITY/STATE:

PHONE:

Armcorp Construction Inc. Celina OH

4197787024

2 10/22/20244 10/29/2024

Q1: There is no mention of electrical work on this project - no specs or plans. Please confirm there is no electrical work on this project.

Q2: At the site visit it was discussed with the COR that existing drawings of the acoustical ceilings could be provided with the request of an RFI. As directed, I am requesting the reflective ceiling panel plan of the existing area.

Q3: What is the existing nurse call system? If we are to install new nurse call stations compatabile with the existing system we need to know the existing system.

REPLY: RFI’s will be answered by amendment(s) issued to SAM.gov.

A1: There will be electrical work required on this project as required to modify the door frames and walls in the seclusion/restraint room to include rerouting existing conduit and wire as necessary, installing additional nurse call buttons, and wiring new sensor activated faucets. The contractor is responsible for providing electrical work as necessary to meet all items as detailed in the scope of work.

A2: See attached reflected ceiling plan and arch finishes plan from previous project.

A3: See attached TDS for the nurse call pushbutton station currently in use. A moisture-resistant version will be required in the patient shower area.

Note: a contractor must perform a programming change after the physical install is complete. The current contractor supporting the system is SWC.

Eric Dodson 10/29/2024