This document is a Request for Information (RFI) for a federal contract opportunity to perform mental health safety improvements at the Richard L. Roudebush VA Medical Center in Indianapolis, IN. The RFI provides responses to questions submitted by the contractor related to project requirements, such as infection control barriers, door replacements, ceiling tile installation, HEPA filtration, furniture/fixture removal, and wall protection. The key details are:

The contract requires installing new flooring, wall protection, handrails, painting, acoustical ceiling tiles, and new ligature-resistant plumbing fixtures in the 5th Floor Inpatient Mental Health Unit to bring it into compliance with VHA standards. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Network 10. Contractors are required to thoroughly read all solicitation documents and cite the relevant section when submitting questions. Responses to this RFI will be provided through amendments posted to SAM.gov.

View the file

Other files

File Type Posted
Attachment XII - 10 26 00 - Wall and Door Protection Revised.pdf PDF
Amendment 6 - 36C25024B0040_1.pdf PDF
Attachment XI - Sole Source Justification - Staff Assist Station.pdf PDF
Amendment 5 - 36C25024B0040_1.pdf PDF
Attachment X - HW-MH5A.pdf PDF
RFI 11 - IMS.3.pdf PDF
Amendment 4 - 36C25024B0040_1.pdf PDF
RFI 6 - 583.3234_AS403R_5th Fl. Interior Elevations.pdf PDF
Attachment IX - AE Renovate-Relocate Psychiatry Fifth Floor - East Drawings.pdf PDF
RFI 7 - 583.3234_P102-R_5th Fl. Plumb. Piping Plan.pdf PDF
RFI 9 - Response BB.3.pdf PDF
RFI 6 - 583.3234_AS601-R2_Door-Window Typ Details.pdf PDF
Amendment 3 - 36C25024B0040_1.pdf PDF
RFI 8 - Response Industria.pdf PDF
RFI 6 - 583.3234_AS602-Door Heads Jambs-Window Det..pdf PDF
RFI 7 - 583.3234_P701R_Plumbing Schedules.pdf PDF
RFI 6 - Response IMS.pdf PDF
RFI 7 - Response - BB.2.pdf PDF
RFI 5 - 583.3234_AS501_Interior Wall Typ. and Details.pdf PDF
RFI 4 - Staff Assist Station.pdf PDF
RFI 5 - Submittal Register.pdf PDF
RFI 5 - Response BB.pdf PDF
RFI 5 - SD080000-01 - Door Schedule Legend Notes and Modifications.pdf PDF
RFI 5 - TDS008 Bathroom Door Technical Data Sheet.pdf PDF
RFI 4 - 5th Fl. Reflect. Ceiling Plan.pdf PDF
Amendment 2 - 36C25024B0040_1.pdf PDF
RFI 4 - 5th Fl. Fin. Plan and Schedule.pdf PDF
RFI 4 - Response Armcorp.pdf PDF
RFI 5 - 583.3234_AS502R_Interior Details.pdf PDF
RFI 3 Industria 10.22.pdf PDF
Site Visit Sign In Sheet.pdf PDF
RFI 1 TC Atlantic - 10.15.pdf PDF
Amendment 1 - 36C25024B0040_1.pdf PDF
RFI 2 Eagle 10.22.pdf PDF
Attachment VII - VA Notice of Limitations on Subcontracting - JAN 2023.docx DOCX document
Attachment III - EMR 583-24-201.docx DOCX document
Attachment II - RFI 583-24-201.doc DOC document
Attachment V - Combined Specifications - 583-24-201.pdf PDF
Attachment VI - Drawings - 583-24-201.pdf PDF
Attachment I - Wage Determination Marion County Oct 2024.txt TXT text file
Attachment VIII - Sole Source Justifications.pdf PDF
36C25024B0040_1.pdf PDF
Attachment IV - VHA Directive 1192-01.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C5024B0040

PROJECT NUMBER: 583-24-201 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE:

Mental Healthy Safety Improvements.

PROJECT LOCATION:

Richard L. Roudebush

VAMC

1481 W. 10th St Indianapolis IN 46202

TO:

Brian D. Rosciszewski, Contract Specialist Department of Veterans Affairs Network 10 Contracting Office Brian.Rosciszewski@va.gov

RFI NO.: 2 DATE:

SPEC/DWG. REFERENCE(s):

REPLY NEEDED BY:

INFORMATION NEEDED:

1. Ref amendment 3 RFI response- Are the temporary infection control barriers required to be 1hr rated as most modular wall systems do not meet a 1hr rating requirement? Are anterooms required at each patient room prior to beginning work in each room or can we install a barrier wall at the beginning of each of the 2 corridors and complete all work within each corridor and adjacent patient rooms simultaneously? If anterooms are required at each patient room prior to starting work, what type of infection control barrier will be required for corridor work? Will the corridors be closed for flooring and wall finish work? Where are temporary infection control barriers required?

2. Ref amendment 2 RFI 5 response #20 - to confirm, the only doors being replaced on this project is the two new doors that will swing into vestibule C-5019 and one new ligature resistant door at patient toilet C-5019A, correct?

3. Ref amendment 2 RFI 4 Reflected Ceiling Plan- Is all ACT being replaced to the outer most door pair in vestibule C5-9? Is there a specific tile required for the areas?

4. Ref ICRA Requirements- Can hepa filtered air exhaust within the space of work? If so is there any requirement for particulate monitoring and if so will the VA monitor particulates? If we can’t exhaust into space where should air be exhausted?

5. Ref statement of work- Who is responsible to remove & replace beds and furniture to accommodate new finishes? If the contractor, how are the beds anchored to floor?

6. Ref statement of work- Will all mirrors, soap dispensers and other wall mount items require removal and replacement for associated painting work?

7. Ref Statement of Work/ Corridors- The preferred vendor for flexible wall protection is Inpro Corporation.

Based on Inpro Flexible wall protection technical spec, the flexible wall protection cannot be installed over impact resistant drywall. Is the existing drywall in corridors a suitable substrate to install flexible wall protection? Or will the corridor drywall need to be replaced?

8. During the site visit it appeared patient toilet room C5013A has sealed concrete in the toilet/shower area and epoxy floor in the patient room area. Does the shower area currently have sealed concrete or is it actually epoxy flooring which would need to be shotblasted in preparation of new resinous epoxy?

SUBMITTED BY: Industrial Maintenance Services, Inc. CITY/STATE: Escanaba, MI.

PHONE: (906) 789-9021 Ext. 126

REPLY:

RFI’s will be answered by amendment(s) issued to SAM.gov.

1. Refer to NFPA 241 – 8.6.2 Temporary Separation Walls. Walls shall have at least a 1-hour fire resistance rating; however, they are permitted to be nonrated when an approved automatic sprinkler system is installed and operational. Setting up a barrier wall and working on an entire corridor at once is highly unlikely for this project while working on individual rooms, but may be required for corridor floor replacement, possibly over a weekend. The initial plan was to build a barrier to work on two rooms at one time. An anteroom may not be possible due to space limitations in the corridor. Infection prevention will determine final infection control requirements.

2. The only new door required is the ligature resistant door at patient toilet C-5019A. If the existing doors cannot be reused to swing into vestibule C-5019, then two new doors will be required. The contractor should plan to install new doors and provide a credit to the VA if the old doors can be reused.

3. The ACT is being replaced up to the first door pair in C5-9A Corridor, not in C5-9 Vestibule. The VA facility standard selection is USG Radar 2410 square edge color white.

4. Updated VA ICRA standards mandate outdoor exhaust; however, this can’t be achieved on this project. The contractor shall use HEPA filtration into the corridors. The VA will monitor particulates.

5. The contractor will be responsible for moving beds and furniture. It is unknown how the bed is anchored to the floor. The COR will attempt to get this information before the bid opening.

6. Yes

7. According to sheet AS501 the installed 5/8” GWB is abuse resistant not impact resistant. After reviewing

Inpro’s installation instructions the COR can’t find any mention of impact resistant GWB as a non-suitable substrate. The corridor drywall is not intended for replacement.

8. Sheet AF101R details the existing conditions according to the most recent renovation, indicating patient toilets with epoxy resinous floor and base. The contractor is responsible for verifying site conditions.

REPLY FROM: Eric Dodson

DATE: 11/06/2024