Drawings B - 506-20-103.pdf

PDF 23 MB Posted

Attached to
Z1DA--Upgrade Primary Care Building 1E, 506-20-103
Solicitation number
36C25023B0057
Issued by

About this file

This document provides details of a pre-solicitation notice for a federal construction contract opportunity with the Department of Veterans Affairs. The project involves internal demolition and reconstruction of an existing primary care area at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The planned solicitation will be an invitation for bids issued on or about May 27, 2023 for project number 506-20-103. The total set-aside contract valued between $5-10 million will be awarded as a firm fixed price to a verified Service-Disabled Veteran Owned Small Business. Questions regarding this pre-solicitation notice should be directed to the specified contracting officer by email.

View the file

Other files

File Type Posted
Notice of Award Aug 22 - 506-20-103.pdf PDF
Wage Determination MI20230100 July 21 - 506-21-103.pdf PDF
36C25023B0057 0003.pdf PDF
34 AD121 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - 506-20-103.pdf PDF
Project Manual Volume 1 Updated through Addendum No 1 - 506-20-103.pdf PDF
AE Addendum 01 Write Up - 506-20-103.pdf PDF
36C25023B0057 0002.pdf PDF
01 GI000 Cover Sheet - 506-20-103.pdf PDF
Pre-Bid Site Visit Agenda signed - 506-20-103.pdf PDF
36C25023B0057 0001.pdf PDF
Pre Bid Site Visit Attendance Log signed - 506-20-103.pdf PDF
Drawings A2 - 506-20-103.pdf PDF
Drawings C - 506-20-103.pdf PDF
Wage Determination MI20230100 Apr 7 - 506-20-103.pdf PDF
Sole Source Justification Simplex KO signed - 506-20-103.pdf PDF
RFI Form - 506-20-103.pdf PDF
Specifications Volume 2 - 506-20-103.pdf PDF
Sole Source Justification Swisslog KO signed - 506-20-103.pdf PDF
Sole Source Justification Rauland R5 KO signed - 506-20-103.pdf PDF
Drawings D2 - 506-20-103.pdf PDF
Drawings D1 - 506-20-103.pdf PDF
36C25023B0057_1 cleared - 506-20-103.pdf PDF
EMR Certification Form - 506-20-103.pdf PDF
Specifications Volume 1 - 506-20-103.pdf PDF
Drawings A1 - 506-20-103.pdf PDF
Sole Source Justification Siemens Desigo KO signed - 506-20-103.pdf PDF
36C25023B0057.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WM

M

S

M

CHWS

CWV

CA

CD

CDR

CWR

CWS

CW

F-CW

H-CW

S-CW

HW

HW 140°

HW-R

HW-R 140°

GV

GW

HWR

HWS

G

OV

OW

PD

V

SS

SHWR

SHWS

STM

SD

OSD

(E)

CHWR CHILLED WATER RETURN

CHILLED WATER SUPPLY

COMBINATION WASTE & VENT

COMPRESSED AIR

CONDENSATE DRAINAGE

CONDENSATE RETURN

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

DOMESTIC COLD WATER

FILTERED COLD WATER

HARD COLD WATER

SOFT COLD WATER

HOT WATER

HOT WATER 140°

HOT WATER RECIRCULATION

HOT WATER RECIRCULATION 140°

GREASE VENT

GREASE WASTE

HEATING WATER RETURN

HEATING WATER SUPPLY

NATURAL GAS

OIL VENT

OIL WASTE

PUMP DISCHARGE

SANITARY VENT

SANITARY SEWER

SOLAR HOT WATER RETURN

SOLAR HOT WATER SUPPLY

STEAM

STORM DRAINAGE

OVERFLOW STORM DRAINAGE

REF-L

REF-S

REFRIGERANT-LIQUID

REFRIGERANT-SUCTION

2"

2"

4"

4"

REF-HG REFRIGERANT-HOT GAS

PLUMBING AND PIPING SYMBOLS

KEYNOTE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL SYMBOLS

ROOM NAME AND NUMBER

POINT WHERE DISCONNECT/DEMOLITION OCCURS

AT EXISTING

EXISTING PIPE TAG

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

DRAIN SIZE

PIPE RISE

PIPE DROP

PIPE TEE REDUCING 45

DEGREE TEE

45 DEGREE TEE

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

PG PROPANE GAS

TYPE (SEE SCHEDULE)

Room

INVERT: -105' - 1"

1/8" / 12" SLOPE

RO REVERSE OSMOSIS WATER

IW INDIRECT WASTE

4000 SF

6" SD-1

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION

EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER

HOUR

CAP CAPACITY

CB CATCH BASIN

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN OUT

CW COLD WATER

D DEGREE

DB DRY BULB

DIA DIAMETER

DN DOWN

DW DISTILLED WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

E/A EXHAUST AIR

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GF GAS-FIRED

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER

TEMPERATURE

M/A MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER

HOUR

MCF ONE THOUSAND CUBIC FEET

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MU/A MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

O/A OUTSIDE AIR

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH

GAUGE

PWR POWER

R DUCT RISER

R/A RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RH RELATIVE HUMIDITY

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SF SQUARE FOOT

S/A SUPPLY AIR

SAN SANITARY

SF SQUARE FOOT

SD SMOKE DAMPER

SM SURFACE MOUNT

SP STANDPIPE

SP STATIC PRESSURE

STM STEAM

T THERMOSTAT

TD TEMPERATURE DROP

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

ABBREVIATIONS

AC AIR CONDITIONING UNIT

ACCU AIR COOLING CONDENSING

UNIT

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CH CHILLER

CT COOLING TOWER

CUH CABINET UNIT HEATER

CHWP CHILLED WATER PUMP

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

DCP DOMESTIC WATER CIRCULATING

PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF

VENTILATOR

HWP HEATING WATER PUMP

HRU HEAT RECOVERY UNIT

PRV POWER ROOF VENTILATOR

RE RETURN/EXHAUST FAN

RTU ROOFTOP UNIT

SP SUMP PUMP

UH UNIT HEATER

WH WATER HEATER

EQUIPMENT ABBREVIATIONS

4" FD-1FLOOR DRAIN 4" AD-6 AREA DRAIN

4" FS-4FLOOR SINK

4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN

6 DFU

4" FD-13

HUB DRAIN

DRAIN TAGS

"P" - INDICATES

PRIMER

CONNECTION

FIXTURE

UNITS

FLOW

CONTROL

DRAIN

4" SD-12

COMBINATION

DRAINS

STORM DRAIN4" SD-15

ROOF AREA

SERVED BY

DRAIN

2" DOM. WM

PIPE ACCESSORY TAGS

DOMESTIC WATER METER

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

3-WAY MIXING VALVE

MOTORIZED CONTROL VALVE

3 WAY MOTORIZED CONTROL

VALVE

PRESSURE REDUCING VALVE

REFRIGERANT SOLENOID

VALVE

BUTTERFLY VALVE

2" BALANCING

2" SHUTOFF

2" CHECK

2" TMV

2" M-CNTRL

2" 3-WAY CNTRL

2" PRV

3/8" SOLENOID

2" BUTTERFLY

WATER CLOSET

- WALL HUNG -

ADA

WC-1

U-1

1 DFU

1E-L-1A

1.5 CWFU

1.5 HWFU

1E-L-1A

FIXTURE

UNITS

4" WCO

PIPE

ACCESORY

TAG

PLUMBING FIXTURE TAGS

4" WCO

TYPE (SEE SCHEDULE)

WC-1A

CAP

PLUG

GWR

GWS

GEOTHERMAL WATER RETURN

GEOTHERMAL WATER SUPPLY

GATE VALVE

P

3-WAY AIRMOTOR

CONTROLLER

ANGLE GLOBE VALVE

ANGLE HOSE VALVE

DIAPHRAGM VALVE

GLOBE VALVE

S

HOSE GLOBE VALVE

LOCK SHIELD VALVE

NEEDLE VALVE

PLUG VALVE

QUICK OPENING VALVE

SPRING CHECK VALVE

SWING GATE CHECK VALVE

TEMP PRESSURE RELIEF VALVE

* NOTE *

ALL GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS

IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR

MAY NOT BE USED IN THIS SET OF DRAWINGS.

POINT WHERE NEW CONNECTS TO EXISTING

(D)

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

PLUMBING GENERAL

INFORMATION & SYMBOL

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

P001

FULLY SPRINKLERED

GENERAL PLUMBING NOTES

1 FIELD VERIFY ALL NEW WATER, WASTE, AND VENT PIPING CONNECTIONS AND

PROVIDE NEW CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING

SYSTEMS.

2 PITCH UNDERFLOOR SANITARY WASTE PIPING AT 1/4" PER FOOT, UNLESS NOTED

OTHERWISE.

3 PITCH UNDERFLOOR STORM PIPING 3" AND GREATER AT 1/8" PER FOOT, UNLESS

NOTED OTHERWISE. PITCH ALL OTHER STORM PIPING AT 1/4" PER FOOT UNLESS

OTHERWISE NOTED.

4 FIELD VERIFY LOCATION AND INVERTS OF SITE UTILITIES PRIOR TO INSTALLATION.

5 ROUTE DOMESTIC WATER, FIRE PROTECTION, SANITARY SEWER, AND STORM

SEWER SERVICES TO SITE UTILITIES 5'-0" FROM BUILDING UNLESS NOTED

OTHERWISE. REFER TO CIVIL PLANS.

6 WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2"

MINIMUM.

7 PROVIDE CLEANOUT IN ACCESSIBLE LOCATION AT THE BASE OF ALL PLUMBING

RISERS.

8 THE VA PLUMBING DESIGN GUIDE DEFINES A DEAD LEG AS 2X(D), WHERE D IS THE

PIPE DIAMETER. DEAD LEGS ARE PROHIBITED. THIS IS RELEVANT FOR DEMOLITION

AND NEW WORK.

GENERAL PROJECT NOTES

1 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

2 THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING,

PRIOR TO FINAL BID, ALL EXISTING CONDITIONS FOR PLUMBING AND

MECHANICAL SYSTEMS WITHIN TENANT SPACE AND WITHIN CLOSE PROXIMITY OF

TENANT SPACE.

3 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT

CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN

OPENING PRIOR TO START OF WORK. UNSEAL DRAINS AT COMPLETION OF

CONSTRUCTION.

4 COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE

TRAY, STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.

5 THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING

AND THOSE ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN

BE REASONABLY ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL,

ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS

PROJECT.

6 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL

CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL

CODES, INCLUDING BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE

AND INTERNATIONAL MECHANICAL CODE.

7 LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.

8 ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT EDITION OF ALL

APPLICABLE CODES AND LOCAL CODES AS APPLIED BY THE AUTHORITY HAVING

JURISDICTION.

9 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE

SPACE ABOVE ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL

EQUIPMENT.

10 PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED. FIRE STOPPING

SHALL BE AN APPROVED MATERIAL AS PRESCRIBED IN CSFM STANDARD 43-1

AND SHALL BE U.L. LISTED.

11 PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH

FOUNDATIONS, FLOORS, WALLS, AND ROOF.

12 MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES

REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE

INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO

SUIT MATERIALS IN WHICH INSTALLED.

13 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL

EQUIPMENT.

14 REFER TO HVAC SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN

PIPING.

15 PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL

ANOTHER SIZE IS SHOWN.

16 FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE

SEGMENTS, REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.

17 INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE

MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY

AND WORKMANSHIP CONSISTENT WITH THE SPECIFICATIONS.

18 LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE

DRAWING, ARE APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE

FIELD. WORK SHALL BE COORDINATED WITH ALL OTHER TRADES TO AVOID

INTERFERENCE IN THE FIELD.

19 INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS

WITHOUT CEILINGS.

20 THE CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND APPROVED

BY THE OWNER.

21 PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL MECHANICAL

EQUIPMENT, PLUMBING FIXTURES, AND DIFFUSERS.

22 CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS AND SHALL

ARRANGE FOR ALL INSPECTIONS AS REQUIRED.

23 PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND MATERIALS AFTER

THE DATE OF FINAL ACCEPTANCE.

PLUMBING DEMOLITION NOTES

1 THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE

LOCAL, STATE AND/OR REGULATORY AGENCIES, CODES AND

REGULATIONS FOR NEW WORK.

2 CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION

OF THEIR WORK WITH OTHER TRADES AND WITH THE

CONSTRUCTION MANAGER.

3 VERIFY ALL CONDITIONS IN FIELD BEFORE START OF

CONSTRUCTION. NOTIFY ARCHITECT/ENGINEER OF

DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD

CONDITIONS.

4 COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5 COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR

EQUIPMENT WITH OWNER'S REPRESENTATIVE, MINIMIZE

INTERRUPTION OF EXISTING SERVICES. VERIFY ALL SYSTEMS

BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS WILL

NOT LOSE SERVICE.

6 COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC.

WITH ARCHITECTURAL TRADES.

7 COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES

BEFORE CUTTING.

8 HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED

WITH APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9 NO ITEMS TO BE ABANDONED IN PLACE.

10 ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING

OPEN SYSTEMS TO BE PATCHED, CAPPED AND SEALED TO

PROVIDE A FINISHED SYSTEM.

11 DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO

REMAIN OPEN, CAP AND PROTECT TO AVOID CONTAMINATION

TO AND FROM THE SURROUNDING AREAS.

12 ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED

AND RETURNED TO OPERATION BY END OF SHIFT, NO SYSTEMS

ALLOWED TO BE LEFT OPEN WHEN NOT BEING SUPERVISED BY

CONTRACTOR RESPONSIBLE FOR THAT WORK TRADE.

PLUMBING NOTES

1 THIS PLAN IS DIAGRAMMATIC IN NATURE AND SHALL NOT BE

SCALED TO DETERMINE THE LOCATION OR DIMENSION OF THE

WORK. CONTRACTOR SHALL VERIFY EXACT LOCATION OF

PIPING AND PENETRATIONS.

2 CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE LOCATION

OF EXISTING BELOW GRADE WASTE PIPING AND REFLECT ANY

DEVIATION GREATER THAN 1'-0" FROM THIS PLAN ON THE

AS-BUILT DRAWINGS.

3 CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE

NEW AND EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY

WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE

APPROVAL THE CONTRACTING OFFICER'S REPRESENTATIVE

(COR).

4 REPAIR WALL SURFACE AFTER INSTALLATION AND INSPECTION

OF EACH PLUMBING FIXTURE AND PIPING INSTALLED.

5 ALL WALL-MOUNTED ACCESS PANELS SHALL BE LOCKABLE TYPE.

6 ABOVE-GRADE WASTE PIPE SHALL BE RUN AT 2% GRADE.

BELOW-GRADE WASTE PIPE SHALL BE RUN AT 1% GRADE.

7 ALL CONDENSATE DRAIN PIPE SHALL BE RUN AT 1% GRADE.

8 MAINTAIN MINIMUM 10-0" SEPARATION BETWEEN FLUE AND

PLUMBING VENT OUTLETS AND ANY FRESH AIR INTAKE.

COORDINATE WITH HVAC CONTRACTOR.

9 FLOORS SHALL SLOPE TO DRAINS AT 1% MINIMUM SLOPE. SEE

ARCHITECTURAL PLANS FOR MORE INFORMATION.

10 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS, TRENCH DRAINS,

ETC. WITH TRAP GUARD DEVICES (ASSE 1072 COMPLIANT).

11 PROVIDE WALL CLEAN OUTS IN ALL VENT RISERS ON BRANCHES

LONGER THAN 5'-0" AND ON BRANCHES SERVING SINKS OR

URINALS.

12 SEE RISER DIAGRAMS FOR PIPE SIZING.

13 SHUT OFF VALVES SHALL BE ACCESSIBLE AND INSTALLED ON THE

SUPPLY TO EACH PLUMBING FIXTURE.

14 ALL ISOLATION VALVES ON DOMESTIC WATER SHALL BE 316L

STAINLESS STEEL BALL VALVES (TYP).

15 COORDINATE THE ROUTING OF ALL NEW SYSTEMS WITH

PNEUMATIC TUBE STATION AND PIPING.

DOMESTIC WATER NOTES

1 ROUTE ALL PIPING IN ABOVE CEILING LEVEL SPACE, EXCEPT

WHERE OTHERWISE INDICATED. COORDINATE ROUTING WITH

OTHER TRADES. SLOPED PIPING ELEVATIONS TAKE PRIORITY

OVER ALL OTHER SYSTEMS AND TRADES.

2 PROVIDE SLEEVED AND WATERTIGHT PENETRATIONS AT ALL PIPE

PENETRATIONS THROUGH: LOWER LEVEL FLOOR SLAB, UPPER

LEVEL FLOOR SLAB, MECHANICAL PENTHOUSE FLOOR SLAB,

ROOF STRUCTURES AND, PERIMETER WALLS BELOW GRADE.

3 PROVIDE WATERTIGHT INSTALLATIONS OF ALL FLOOR EMBEDDED

DEVICES INCLUDING BUT NOT LIMITED TO: FLOOR DRAINS,

FLOOR SINKS, SHOWER DRAINS, HUB DRAINS, FLOOR RECESSED

CLEANOUTS AND, FLUSH TO FLOOR ACCESS HOUSINGS.

4 COORDINATE WITH ARCHITECT TO MAINTAIN THE WATERTIGHT

INTEGRITY OF THE BUILDING ENVELOPE AND FLOOR SLABS.

5 PROVIDE LOCKABLE TYPE BALL VALVE AT TAP TO ALL SAFETY EYE

WASH AND SHOWER FIXTURES. ALL VALVES TO BE LOCKED IN THE

OPEN POSITION.

6 PROVIDE BALL VALVE FOR ISOLATION OF ALL DOMESTIC WATER

BRANCH LINES. TYPICAL UNLESS OTHERWISE NOTED.

SANITARY & VENT NOTES

1 ALL SANITARY DRAINAGE (SAN) PIPING IS LOCATED BELOW

SLAB, UNLESS OTHERWISE NOTED.

2 ROUTE ALL PIPING INTENDED FOR ABOVE CEILING LEVEL

INSTALLATION AS HIGH AS POSSIBLE. COORDINATE ROUTING

WITH OTHER TRADES. SLOPED PIPING ELEVATIONS TAKE PRIORITY

OVER ALL OTHER SYSTEMS AND TRADES.

3 PROVIDE SLEEVED AND WATERTIGHT PENETRATIONS AT ALL PIPE

PENETRATIONS THROUGH: LOWER LEVEL FLOOR SLAB, UPPER

LEVEL FLOOR SLAB, MECHANICAL PENTHOUSE FLOOR SLAB,

ROOF STRUCTURES AND, PERIMETER WALLS BELOW GRADE.

4 PROVIDE WATERTIGHT INSTALLATIONS OF ALL FLOOR EMBEDDED

DEVICES INCLUDING BUT NOT LIMITED TO: FLOOR DRAINS,

FLOOR SINKS, SHOWER DRAINS, HUB DRAINS, FLOOR RECESSED

CLEANOUTS AND, FLUSH TO FLOOR ACCESS HOUSINGS.

5 COORDINATE WITH ARCHITECT TO MAINTAIN THE WATERTIGHT

INTEGRITY OF THE BUILDING ENVELOPE AND FLOOR SLABS.

6 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS AND SHOWER

DRAINS WITH IN-LINE TRAP SEAL PROTECTION DEVICES, AS

MANUFACTURED BY "SURE SEAL MANUFACTURING", OR

APPROVED EQUAL. DEVICES TO MEET OR EXCEED ASSE -

1072AG-GW.

MEDICAL GAS NOTES

1 REFER TO ARCHITECTURAL SHEETS FOR EXACT MEDICAL GAS

OUTLET INSTALLATION LOCATION.

2 CONTRACTOR TO ENSURE MDEICAL GAS OUTLETS PROVIDED

MATCH OWNER'S EXISTING SYSTEM.

Revisions: Date:

1E-K

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-10 1E-10

1E-9 1E-9

1E-8 1E-8

1E-7 1E-7

1E-6 1E-6

1E-5 1E-5

1E-4 1E-4

1E-3.8 1E-3.8

1E-3.6 1E-3.6

1E-3.5 1E-3.5

1E-3.4 1E-3.4 1E-3.3 1E-3.3

1E-3 1E-3

S

(E) 4" SS (E) 4" SS

(E) 4" SS

(E) 4" SS

(E) 4" SS

PD100B

PD100CPD100C

PD100A

PD100BPD100B

PD100B

PD100CPD100C

PD100A

PD100BPD100B

(E) 4" SR CRP WP

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

BASEMENT PLUMBING

DEMOLITION PLAN

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD100

FULLY SPRINKLERED

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN

PLUMBING DEMOLITION NOTES

1 THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE

LOCAL, STATE AND/OR REGULATORY AGENCIES, CODES AND

REGULATIONS FOR NEW WORK.

2 CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION

OF THEIR WORK WITH OTHER TRADES AND WITH THE

CONSTRUCTION MANAGER.

3 VERIFY ALL CONDITIONS IN FIELD BEFORE START OF

CONSTRUCTION. NOTIFY ARCHITECT/ENGINEER OF

DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD

CONDITIONS.

4 COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5 COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR

EQUIPMENT WITH OWNER'S REPRESENTATIVE, MINIMIZE

INTERRUPTION OF EXISTING SERVICES. VERIFY ALL SYSTEMS

BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS WILL

NOT LOSE SERVICE.

6 COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC.

WITH ARCHITECTURAL TRADES.

7 COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES

BEFORE CUTTING.

8 HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED

WITH APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9 NO ITEMS TO BE ABANDONED IN PLACE.

10 ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING

OPEN SYSTEMS TO BE PATCHED, CAPPED AND SEALED TO

PROVIDE A FINISHED SYSTEM.

11 DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO

REMAIN OPEN, CAP AND PROTECT TO AVOID CONTAMINATION

TO AND FROM THE SURROUNDING AREAS.

12 ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED

AND RETURNED TO OPERATION BY END OF SHIFT, NO SYSTEMS

ALLOWED TO BE LEFT OPEN WHEN NOT BEING SUPERVISED BY

CONTRACTOR RESPONSIBLE FOR THAT WORK TRADE.

4/7/23

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-5 1E-5

1E-4 1E-4

1E-3.8 1E-3.8

1E-3.6 1E-3.6

1E-3.5 1E-3.5

1E-3.4 1E-3.4

1E-3.3 1E-3.3

1E-3 1E-3

S

?(D) 4" SS

?(D) 4" SS UP

?(D) 2" SS UP1 1

?(D) 2" SS UP

?(D) 2" SS UP

?(D) 4" SS UP

?(D) 4" SS

?(D) 4" SS

?(D) 2" SS UP ?(D) 2" SS UP ?(D) 2" SS UP

?(D) 4" SS?(D) 4" SS

?(D) 2" SS

1 1 1

?(D) 2" SS UP

?(D) 2" SS UP

?(D) 4" SS

?(D) 2" SS UP

?(D) 2" SS UP

?(D) 2" CW ?(D) 2" HW

?(D) 2" CW

?(D) 2" HW

?(D) 2" CW

?(D) 2" HW

?(D) 1" HW UP

?(D) 1" CW UP

?(D) 1" HW

?(D) 1" CW

?(D) 1" CW UP

?(D) 1" HW UP

?(D) 1" CW UP

?(D) 1" HW UP

?(D) 1" HW UP

?(D) 1" CW UP

(E) 4" SS

(E) 4" SR CRP WP

(E) 4"

(E) 4"

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED PLUMBING

DEMOLITION PLAN- AREA A

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD100A

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING DEMOLITION PLAN - AREA A

KEYNOTES

1 SLAB INFILL. REFER TO ARCHITECTURAL DRAWING AE100A.

2 REMOVE EXISTING SANITARY PIPING ROUTED THROUGH

BASEMENT CEILING, SERVING FIRST FLOOR FIXTURES. REMOVE

ALL ASSOCIATED PIPING, ACCESSORIES, AND SUPPORTS.

COORDINATE ACCESS TO BASEMENT AREAS WITH COR. WORK

SHALL BE PERFOREMD AFTER HOURS IN OCCUPIED SPACES.

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-7 1E-7

1E-6 1E-6

1E-5 1E-5

S

?(D) 4" SS

?(D) 3" SS UP

?(D) 4" SS UP

?(D) 4" SS UP

?(D) 4" SS

?(D) 1 1/2" SS UP ?(D) 1 1/2" SS UP

?(D) 4" SS ?(D) 1 1/2" SS ?(D) 1 1/2" SS

?(D) 1 1/2" SS UP

?(D) 4" SS

?(D) 4" SS?(D) 2" SS UP

?(D) 4" SS UP

?(D) 4" SS UP

?(D) 2" SS UP

?(D) 1 1/2" SS UP

?(D) 4" SS ?(D) 4" SS

?(D) 1 1/2" SS UP ?(D) 1 1/2" SS UP

?(D) 1 1/2" SS UP

?(D) 1 1/2" SS

?(D) 4" SS

(E) 4" SS

(E) 4" SS

(E) 4" SS

?(D) 4" SS

?(D) 4" SS

?(D) 2" SS UP

?(D) 1 1/2" SS UP

?(D) 2" SS UP

?(D) 2" SS UP

?(D) 1 1/2" SS UP

?(D) 4" SS

(D) 2"

?(D) 2" SS UP

?(D) 4" SS

?(D) 4" SS ?(D) 1 1/2" SS UP ?(D) 4" SS

?(D) 2" SS UP

?(D) 2" SS UP

(D)4" WCO

?(D) 4" SS

?(D) 2" SS UP

?(D) 2" SS UP?(D) 4" SS

?(D) 2" SS UP?(D) 4" SS

?(D) 2" SS UP ?(D) 2" SS UP

?(D) 4" SS?(D) 4" SS

?(D) 2" SS

?(D) 4" SS

(E) 4" SS

(E) 4" SS

(E) 4" SS

(E) 4" SS

1 1 1 1

1 1

1 1

?(D) 2" SS

?(D) 2" SS UP

?(D) 2" SS UP

?(D) 2" SS UP

?(D) 2" SS

(E) 4" SR CRP WP

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED PLUMBING

DEMOLITION PLAN- AREA B

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD100B

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING DEMOLITION PLAN - AREA B

KEYNOTES

1 SLAB INFILL. REFER TO ARCHITECTURAL DRAWING AE100A.

2 REMOVE EXISTING SANITARY PIPING ROUTED THROUGH

BASEMENT CEILING, SERVING FIRST FLOOR FIXTURES. REMOVE

ALL ASSOCIATED PIPING, ACCESSORIES, AND SUPPORTS.

COORDINATE ACCESS TO BASEMENT AREAS WITH COR. WORK

SHALL BE PERFOREMD AFTER HOURS IN OCCUPIED SPACES.

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-11 1E-11

1E-10 1E-10

1E-9 1E-9

1E-8 1E-8

1E-7 1E-7

S

(E) 4" SS

(E) 4" SS

?(D) 4" SS?(D) 4" SS

?(D) 4" SS

?(D) 4" SS ?(D) 4" SS

?(D) 4" SS UP?(D) 4" SS UP

?(D) 4" SS UP?(D) 2" SS UP

?(D) 4" SS

?(D) 2" SS UP

?(D) 2" SS

(E) 4" SS

(E) 4" SS (E) 4" SS

(E) 4" SS

(E) 4" SS (E) 4" SS ?(D) 4" SS

?(D) 4" SS UP

?(D) 4" SS?(D) 4" SS

?(D) 2" SS UP

?(D) 2" SS

?(D) 2" SS UP

?(D) 2" SS UP

?(D) 2" SS UP

(E) 4" SS

1 1 1

2 2 2

2 2

?(D) 2" SS

(E) 4" SR CRP WP

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED PLUMBING

DEMOLITION PLAN- AREA C

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD100C

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING DEMOLITION PLAN - AREA C

KEYNOTES

1 SLAB INFILL. REFER TO ARCHITECTURAL DRAWING AE100A.

2 REMOVE EXISTING SANITARY PIPING ROUTED THROUGH

BASEMENT CEILING, SERVING FIRST FLOOR FIXTURES. REMOVE

ALL ASSOCIATED PIPING, ACCESSORIES, AND SUPPORTS.

COORDINATE ACCESS TO BASEMENT AREAS WITH COR. WORK

SHALL BE PERFOREMD AFTER HOURS IN OCCUPIED SPACES.

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-10 1E-10

1E-9 1E-9

1E-8 1E-8

1E-7 1E-7

1E-6 1E-6

1E-5 1E-5

1E-4 1E-4

1E-3.8 1E-3.8

1E-3.6 1E-3.6

1E-3.5 1E-3.5

1E-3.4 1E-3.4 1E-3.3 1E-3.3

1E-3 1E-3

S

(E) 4" CW

(E) 2 1/2" HW 140°

(E) 1" HW-R 140°

(E) 2 1/2" MV

(E) 1 1/2" MA

(E) 3/4" O

(E) 1 1/2" LV

(E) 1" LA

(E) 1 1/2" G

(E) 4" CRP WP

(E) 3" CRP V

(E) 4" SS

(E) 4" V

(E) 4" SS

(E) 4" CRP WP

(E) 2" SR CRP WP

(E) 4" SS

(E) 4" CRP WP

(E) 2" SR CRP WP

PD101B

PD101CPD101C

PD101A

PD101BPD101B

PD101B

PD101CPD101C

PD101A

PD101BPD101B

(E) 2" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

FIRST FLOOR PLUMBING

DEMOLITION PLAN

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD101

FULLY SPRINKLERED

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN

PLUMBING DEMOLITION NOTES

1 THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE

LOCAL, STATE AND/OR REGULATORY AGENCIES, CODES AND

REGULATIONS FOR NEW WORK.

2 CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION

OF THEIR WORK WITH OTHER TRADES AND WITH THE

CONSTRUCTION MANAGER.

3 VERIFY ALL CONDITIONS IN FIELD BEFORE START OF

CONSTRUCTION. NOTIFY ARCHITECT/ENGINEER OF

DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD

CONDITIONS.

4 COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5 COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR

EQUIPMENT WITH OWNER'S REPRESENTATIVE, MINIMIZE

INTERRUPTION OF EXISTING SERVICES. VERIFY ALL SYSTEMS

BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS WILL

NOT LOSE SERVICE.

6 COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC.

WITH ARCHITECTURAL TRADES.

7 COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES

BEFORE CUTTING.

8 HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED

WITH APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9 NO ITEMS TO BE ABANDONED IN PLACE.

10 ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING

OPEN SYSTEMS TO BE PATCHED, CAPPED AND SEALED TO

PROVIDE A FINISHED SYSTEM.

11 DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO

REMAIN OPEN, CAP AND PROTECT TO AVOID CONTAMINATION

TO AND FROM THE SURROUNDING AREAS.

12 ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED

AND RETURNED TO OPERATION BY END OF SHIFT, NO SYSTEMS

ALLOWED TO BE LEFT OPEN WHEN NOT BEING SUPERVISED BY

CONTRACTOR RESPONSIBLE FOR THAT WORK TRADE.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-5 1E-5

1E-4 1E-4

1E-3.8 1E-3.8

1E-3.6 1E-3.6

1E-3.5 1E-3.5

1E-3.4 1E-3.4

1E-3.3 1E-3.3

1E-3 1E-3

S

?(D) 3/4" CW

?(D) 3/4" HW 140°

?(D) 3/4" HW-R 140°

(E) 4" CW

(E) 2 1/2" HW 140°

(E) 1" HW-R 140°

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 1 1/2" CW

?(D) 1" HW 140°

?(D) 1" HW-R 140°

?(D) 1 1/2" CW

?(D) 1 1/2" CW

?(D) 1/2" CW

?(D) 1/2" HW 140°

(E) 4" CW

(E) 2 1/2" HW 140°

(E) 1" HW-R 140°

(E) 4" CW

(E) 2 1/2" HW 140°

(E) 1" HW-R 140°

?(D) 1 1/2" CW

?(D) 1" HW 140°

?(D) 1/2" O

?(D) 1/2" MA

?(D) 1" MV

?(D) 3/4" MV

?(D) 1/2" MA

?(D) 1/2" O

?(D) 1/2" O

?(D) 1/2" MA

?(D) 3/4" MV (E) 4" SS

(E) 4" CRP WP (E) 2" SR CRP WP

(E) 1 1/2" LV

(E) 1" LA

(E) 1 1/2" G

(E) 4" SS

(E) 4" V

(E) 4" CRP WP

(E) 3" CRP V

1 11

?(D) 1/2" LA

?(D) 3/4" LV

?(D) 1/2" G

?(D) 1/2" LA

?(D) 1" LV

?(D) 1/2" G

3 4

(D)AREA DRAIN

?(D) 2" HW

?(D) 2" CW

?(D) 2" V

?(D) 2" V

?(D) 2" V

?(D) 2" V

?(D) 2" V

(E) 2" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED PLUMBING

DEMOLITION PLAN- AREA A

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD101A

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING DEMOLITION PLAN - AREA A

KEYNOTES

1 REMOVE EXISTING LAV OR SINK, ASSOCIATED PIPING AND

ACCESSORIES COMPLETELY. REMOVE EXISTING DOMESTIC

WATER, SANITARY, AND VENT PIPING BACK TO NEAREST MAIN

AND CAP.

2 REMOVE EXISTING DOMESTIC COLD WATER, HOT WATER, HOT

WATER RETURN AND VENT PIPING AND ACCESSORIES

COMPLETELY.

3 DISCONNECT AND REMOVE EXISTING MEDICAL GAS PIPING

BACK TO SOURCE AND CAP.

4 REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX, OUTLETS,

AND ALL MEDICAL AIR, OXYGEN, AND VACUUM PIPING BACK

TO NEAREST MAINS AND CAP WITH ISOLATION VALVE.

5 DEMOLISH THE WASTE PIPING UP THROUGH THE FLOOR, ANY

ASSOCIATED PLUMBING FIXTURE AND ANY ASSOCIATED

UNUSED BRANCH WASTE AND VENT PIPING BACK TO THE

MAIN AND CAP.

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-7 1E-7

1E-6 1E-6

1E-5 1E-5

S

?(D) 2" V?(D) 3/4" CW

?(D) 3/4" HW 140°

?(D) 3/4" HW-R 140°

?(D) 2" V

?(D) 3/4" CW

?(D) 1/2" HW 140°

?(D) 2" V

?(D) 3/4" CW

?(D) 1/2" HW 140°

?(D) 2" V

?(D) 1/2" HW-R 140°

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 3/4" HW-R 140°

?(D) 1" HW 140°

?(D) 1 1/4" CW

?(D) 1 1/2" CW

?(D) 2" V

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 2" V ?(D) 2" V

?(D) 3/4" HW-R 140°

?(D) 3/4" HW 140°

?(D) 3/4" CW

?(D) 2" V ?(D) 2" V?(D) 2" V

?(D) 1/2" HW-R 140°

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 2" V

?(D) 1/2" HW 140°

?(D) 2" V

?(D) 1/2" CW

?(D) 3/4" HW 140°

?(D) 3/4" HW-R 140°

?(D) 1/2" CW

?(D) 1/2" HW-R 140°

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 2" V

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 3/4" HW-R 140°

?(D) 1 1/4" HW 140°

?(D) 1 1/4" CW

?(D) 2" V

?(D) 1" CW

?(D) 1" HW 140°

?(D) 3/4" HW-R 140°

?(D) 2" V

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 2" CW

?(D) 1" HW 140°

?(D) 1/2" HW-R 140°

?(D) 2" V

(E) 4" CW

(E) 2 1/2" HW 140°

(E) 1" HW-R 140°

(E) 4" CW

(E) 2 1/2" HW 140°

(E) 1" HW-R 140°

?(D) 2" V ?(D) 2" V

?(D) 2" V ?(D) 2" V

?(D) 3/4" CW

?(D) 3/4" HW 140°

?(D) 3/4" HW-R 140°

?(D) 3/4" HW 140°

?(D) 3/4" CW

?(D) 1/2" HW 140° ?(D) 1/2" CW

?(D) 2" V

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 2" V

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 2" V

?(D) 1/2" CW

?(D) 3/4" CW

?(D) 1/2" HW 140°

?(D) 2" V

?(D) 3/4" HW-R 140°

?(D) 1" HW 140°

?(D) 2" CW

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 1 1/2" CW

?(D) 1" HW 140°

?(D) 2" V

?(D) 2" V

?(D) 1/2" HW 140°

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 1/2" CW

(E) 4" V

(E) 4" V

?(D) 1" MV

?(D) 1/2" MA

?(D) 1/2" O

?(D) 1" MV

?(D) 1/2" MA

?(D) 1/2" O

?(D) 2" V

?(D) 3/4" MV

?(D) 1/2" MA

?(D) 1/2" O

(E) 1 1/2" MA

(E) 3/4" O

(E) 1 1/2" LV

(E) 1" LA

(E) 1 1/2" G

(E) 4" SS

(E) 4" V

(E) 4" CRP WP

(E) 3" CRP V

(E) 4" SS

(E) 4" CRP WP

(E) 2" SR CRP WP

(E) 4" SS

(E) 2" SR CRP WP

(E) 4" CRP WP

?(D) 1/2" O

?(D) 1/2" MA

?(D) 3/4" MV?(D) 1 1/2" MV

?(D) 3/4" MA

?(D) 1/2" O

?(D) 1/2" O

?(D) 1/2" MA

?(D) 1" MV

2 1

1 1 1

4 4

?(D) 1" HW 140°

?(D) 1" HW 140°

?(D) 1" CW

?(D) 1" CW

?(D) 1" CW

?(D) 1" HW 140°

(E) 2" SR CRP WP

8 8 8

8 8

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED PLUMBING

DEMOLITION PLAN- AREA B

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD101B

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING DEMOLITION PLAN - AREA B

KEYNOTES

1 REMOVE EXISTING LAV OR SINK, ASSOCIATED PIPING AND

ACCESSORIES COMPLETELY. REMOVE EXISTING DOMESTIC

WATER, SANITARY, AND VENT PIPING BACK TO NEAREST MAIN

AND CAP.

2 REMOVE EXISTING WATER CLOSET, ASSOCIATED PIPING AND

ACCESSORIES COMPLETELY. REMOVE EXISTING COLD WATER,

SANITARY, AND VENT PIPING BACK TO NEAREST MAIN AND

CAP.

3 REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX, OUTLETS,

AND ALL MEDICAL AIR, OXYGEN, AND VACUUM PIPING BACK

TO NEAREST MAINS AND CAP WITH ISOLATION VALVE.

4 REMOVE EXISTING DOMESTIC COLD WATER, HOT WATER, HOT

WATER RETURN AND VENT PIPING AND ACCESSORIES

COMPLETELY.

5 DISCONNECT AND REMOVE EXISTING MEDICAL GAS PIPING

BACK TO SOURCE AND CAP.

6 EXISTING ZONE VALVE BOX TO BE RELOCATED PER PP2201

7 DISCONNECT AND REMOVE EXISTING MEDICAL GAS PIPING

AS SHOWN AND CAP.

8 DEMOLISH THE WASTE PIPING UP THROUGH THE FLOOR, ANY

ASSOCIATED PLUMBING FIXTURE AND ANY ASSOCIATED

UNUSED BRANCH WASTE AND VENT PIPING BACK TO THE

MAIN AND CAP.

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-11 1E-11

1E-10 1E-10

1E-9 1E-9

1E-8 1E-8

1E-7 1E-7

S

?(D) 3/4" HW-R 140°

?(D) 3/4" HW 140°

?(D) 1/2" CW

?(D) 2" V

?(D) 2 1/2" V

?(D) 2" CW

?(D) 1" HW 140°

?(D) 3/4" HW-R 140°

?(D) 1 1/4" CW ?(D) 3/4" HW 140°

?(D) 2" V

?(D) 1/2" CW

?(D) 2" V

?(D) 1/2" HW 140°

?(D) 2" V

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 1/2" CW

?(D) 1/2" HW 140°

?(D) 2" V

?(D) 1/2" CW

?(D) 1/2" HW 140° ?(D) 2" V

?(D) 2 1/2" V

?(D) 2 1/2" CW

?(D) 1 1/2" HW 140°

?(D) 3/4" HW-R 140°

?(D) 1/2" CW

?(D) 1/2" HW 140° ?(D) 2" V

?(D) 3/4" HW-R 140°

?(D) 3/4" HW 140°

?(D) 2" CW

?(D) 2" V

?(D) 1/2" CW

?(D) 2" V

?(D) 1/2" HW 140°

?(D) 2" V

?(D) 3/4" HW-R 140°

?(D) 3/4" HW 140° ?(D) 2" CW

?(D) 2" V ?(D) 2" V

?(E) 4" CW

?(E) 2 1/2" HW 140°

?(E) 1" HW-R 140°

?(E) 4" V

?(D) 2 1/2" V

(E) 4" CW

(E) 2 1/2" HW 140°

(E) 1" HW-R 140°

(E) 4" V

(E) 2 1/2" MV

(E) 1 1/2" MA

(E) 3/4" O

(E) 1 1/2" LV

(E) 1" LA

(E) 1 1/2" G

(E) 4" SS

(E) 4" V

(E) 4" CRP WP

(E) 3" CRP V

(E) 4" SS

(E) 4" CRP WP

(E) 2" SR CRP WP

(E) 4" SS

(E) 4" CRP WP

(E) 2" SR CRP WP

1 1 1 1 2

(E) 2" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED PLUMBING

DEMOLITION PLAN- AREA C

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PD101C

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING DEMOLITION PLAN - AREA C

KEYNOTES

1 REMOVE EXISTING LAV OR SINK, ASSOCIATED PIPING AND

ACCESSORIES COMPLETELY. REMOVE EXISTING DOMESTIC

WATER, SANITARY, AND VENT PIPING BACK TO NEAREST MAIN

AND CAP.

2 REMOVE EXISTING WATER CLOSET, ASSOCIATED PIPING AND

ACCESSORIES COMPLETELY. REMOVE EXISTING COLD WATER,

SANITARY, AND VENT PIPING BACK TO NEAREST MAIN AND

CAP.

3 REMOVE EXISTING DOMESTIC COLD WATER, HOT WATER, HOT

WATER RETURN AND VENT PIPING AND ACCESSORIES

COMPLETELY.

4 REMOVE EXISTING ELECTRIC WATER COOLER, ASSOCIATED

PIPING AND ACCESSORIES COMPLETELY. REMOVE EXISTING

DOMESTIC WATER, SANITARY, AND VENT PIPING BACK TO

NEAREST MAIN AND CAP.

5 DEMOLISH THE WASTE PIPING UP THROUGH THE FLOOR, ANY

ASSOCIATED PLUMBING FIXTURE AND ANY ASSOCIATED

UNUSED BRANCH WASTE AND VENT PIPING BACK TO THE

MAIN AND CAP.

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-10 1E-10

1E-9 1E-9

1E-8 1E-8

1E-7 1E-7

1E-6 1E-6

1E-5 1E-5

1E-4 1E-4

1E-3.8 1E-3.8

1E-3.6 1E-3.6

1E-3.5 1E-3.5

1E-3.4 1E-3.4 1E-3.3 1E-3.3

1E-3 1E-3

S

(E) 4" SS

(E) 4" SS

(E) 4" SS

(E) 4" SS

PL120B

PL120CPL120C

PL120A

PL120BPL120B

PL120B

PL120CPL120C

PL120A

PL120BPL120B

(E) 4" SR CRP WP

(E) 4" SR CRP WP

(E) 4" SS

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

BASEMENT SANITARY AND

VENT PLAN

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PL120

FULLY SPRINKLERED

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT SANITARY AND VENT PLAN

PLUMBING NOTES

1 THIS PLAN IS DIAGRAMMATIC IN NATURE AND SHALL NOT BE

SCALED TO DETERMINE THE LOCATION OR DIMENSION OF THE

WORK. CONTRACTOR SHALL VERIFY EXACT LOCATION OF

PIPING AND PENETRATIONS.

2 CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE LOCATION

OF EXISTING BELOW GRADE WASTE PIPING AND REFLECT ANY

DEVIATION GREATER THAN 1'-0" FROM THIS PLAN ON THE

AS-BUILT DRAWINGS.

3 CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE

NEW AND EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY

WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE

APPROVAL THE CONTRACTING OFFICER'S REPRESENTATIVE

(COR).

4 REPAIR WALL SURFACE AFTER INSTALLATION AND INSPECTION

OF EACH PLUMBING FIXTURE AND PIPING INSTALLED.

5 ALL WALL-MOUNTED ACCESS PANELS SHALL BE LOCKABLE TYPE.

6 ABOVE-GRADE WASTE PIPE SHALL BE RUN AT 2% GRADE.

BELOW-GRADE WASTE PIPE SHALL BE RUN AT 1% GRADE.

7 ALL CONDENSATE DRAIN PIPE SHALL BE RUN AT 1% GRADE.

8 MAINTAIN MINIMUM 10-0" SEPARATION BETWEEN FLUE AND

PLUMBING VENT OUTLETS AND ANY FRESH AIR INTAKE.

COORDINATE WITH HVAC CONTRACTOR.

9 FLOORS SHALL SLOPE TO DRAINS AT 1% MINIMUM SLOPE. SEE

ARCHITECTURAL PLANS FOR MORE INFORMATION.

10 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS, TRENCH DRAINS,

ETC. WITH TRAP GUARD DEVICES (ASSE 1072 COMPLIANT).

11 PROVIDE WALL CLEAN OUTS IN ALL VENT RISERS ON BRANCHES

LONGER THAN 5'-0" AND ON BRANCHES SERVING SINKS OR

URINALS.

12 SEE RISER DIAGRAMS FOR PIPE SIZING.

13 SHUT OFF VALVES SHALL BE ACCESSIBLE AND INSTALLED ON THE

SUPPLY TO EACH PLUMBING FIXTURE.

14 ALL ISOLATION VALVES ON DOMESTIC WATER SHALL BE 316L

STAINLESS STEEL BALL VALVES (TYP).

15 COORDINATE THE ROUTING OF ALL NEW SYSTEMS WITH

PNEUMATIC TUBE STATION AND PIPING.

SANITARY & VENT NOTES

1 ALL SANITARY DRAINAGE (SAN) PIPING IS LOCATED BELOW

SLAB, UNLESS OTHERWISE NOTED.

2 ROUTE ALL PIPING INTENDED FOR ABOVE CEILING LEVEL

INSTALLATION AS HIGH AS POSSIBLE. COORDINATE ROUTING

WITH OTHER TRADES. SLOPED PIPING ELEVATIONS TAKE PRIORITY

OVER ALL OTHER SYSTEMS AND TRADES.

3 PROVIDE SLEEVED AND WATERTIGHT PENETRATIONS AT ALL PIPE

PENETRATIONS THROUGH: LOWER LEVEL FLOOR SLAB, UPPER

LEVEL FLOOR SLAB, MECHANICAL PENTHOUSE FLOOR SLAB,

ROOF STRUCTURES AND, PERIMETER WALLS BELOW GRADE.

4 PROVIDE WATERTIGHT INSTALLATIONS OF ALL FLOOR EMBEDDED

DEVICES INCLUDING BUT NOT LIMITED TO: FLOOR DRAINS,

FLOOR SINKS, SHOWER DRAINS, HUB DRAINS, FLOOR RECESSED

CLEANOUTS AND, FLUSH TO FLOOR ACCESS HOUSINGS.

5 COORDINATE WITH ARCHITECT TO MAINTAIN THE WATERTIGHT

INTEGRITY OF THE BUILDING ENVELOPE AND FLOOR SLABS.

6 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS AND SHOWER

DRAINS WITH IN-LINE TRAP SEAL PROTECTION DEVICES, AS

MANUFACTURED BY "SURE SEAL MANUFACTURING", OR

APPROVED EQUAL. DEVICES TO MEET OR EXCEED ASSE -

1072AG-GW.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-5 1E-5

1E-4 1E-4

1E-3.8 1E-3.8

1E-3.6 1E-3.6

1E-3.5 1E-3.5

1E-3.4 1E-3.4

1E-3.3 1E-3.3

1E-3 1E-3

S

4" SS

3" SS

3" SS

4" SS4" SS

3" SS

3" SS

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

4" SS

3" SS

(E) 4" SS

(E) 4" SS

2" SS

2" SS

4" SS UP

2" V UP 1 1/2" V UP

4" SS

4" SS

3" SS 3" SS

3" SS

2" SS UP

4" SS UP

2" SS UP

2" SS UP

2" SS UP

3" WCO

(E) 4" SR CRP WP

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED SANITARY AND

VENT PLAN- AREA A

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PL120A

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED SANITARY AND VENT PLAN - AREA A

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-7 1E-7

1E-6 1E-6

1E-5 1E-5

S

4" SS

4" SS 4" SS

3" SS

4" SS

4" SS

4" SS

2" SS

3" SS

3" SS

3" SS

2" SS UP

4" SS

2" SS UP

2" SS UP

4" SS UP

2" SS UP

2" SS UP

4" SS UP

4" SS UP

2" SS UP

2" SS UP

2" V UP

2" SS UP

2" V UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

2" SS UP

3" SS

2" SS UP

2" SS UP

2" SS

2" SS UP

2" SS UP

2" SS UP

PLUG

4" SS UP

2" SS UP

2" SS UP

2" SS UP

(E) 4" SS

(E) 4" SS

(E) 4" SS

4" SS

4" SS

2" V UP

2" SS UP 2" SS UP

4" SS UP

2" SS UP

1 1/2" V UP

2" V UP

4" SS UP

2" SS UP

4" SS

4" SS

(E) 4" SS

2" SS UP

3" SS UP

2" SS

2" SS UP

2" SS UP

2" SS UP

4" SS

2" SS UP

2" SS UP

4" WCO

4" WCO

2" SS UP

4" SS UP

4" SS

4" WCO

2" SS

4" SS

2" SS

2" SS UP

2" SS

2" V UP

(E) 4" SR CRP WP

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED SANITARY AND

VENT PLAN- AREA B

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PL120B

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED SANITARY AND VENT PLAN - AREA B

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-11 1E-11

1E-10 1E-10

1E-9 1E-9

1E-8 1E-8

1E-7 1E-7

S

4" SS2" SS UP

2" V UP

4" SS UP

4" SS UP

2" SS UP

2" SS UP

4" SS

4" SS

2" V UP

4" SS UP

2" SS UP

(E) 4" SS

(E) 4" SS

(E) 4" SS

2" SS UP

(E) 4" SR CRP WP

(E) 4" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ENLARGED SANITARY AND

VENT PLAN- AREA C

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PL120C

FULLY SPRINKLERED

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED SANITARY AND VENT PLAN - AREA C

NOTE

1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED

THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON

FLOOR PLAN FOR CLARITY.

2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED

PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND

EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.

1E-J

1E-J

1E-H

1E-H

1E-G

1E-G

1E-F

1E-F

1E-E

1E-E

1E-10 1E-10

1E-9 1E-9

1E-8 1E-8

1E-7 1E-7

1E-6 1E-6

1E-5 1E-5

1E-4 1E-4

1E-3.8 1E-3.8

1E-3.6 1E-3.6

1E-3.5 1E-3.5

1E-3.4 1E-3.4 1E-3.3 1E-3.3

1E-3 1E-3

S

PROCEDURE 3

D129

PATIENT TOILET

D130

TOILET

D163

CORRIDOR

D134

CLEAN SUPPLY

D160

PASSAGE

C1-21

EXAM/ CONSULT

D128

EXAM/ CONSULT.

D126

PATIENT TOILET

D131

CORRIDOR

D122

PROCEDURE 2

D112

PATIENT TOILET

D113

PATIENT TOILET

D110

EXAM/ CONSULT.

D116

EXAM/ CONSULT.

D114

PROCEDURE 1

D109

EXAM/ CONSULT.

D104

CORRIDOR

D135A

INTAKE 1

D102

INTAKE 2

D103

TEAM 1 WORK

ROOM

D148

HEIGHT &

WEIGHT

D105

PRIVATE VIRTUAL

D147

EXAM/ CONSULT.

D106

EXAM/ CONSULT.

D107

EXAM/ CONSULT.

D115

EXAM/ CONSULT.

D117

EXAM/ CONSULT.

D119

MED ROOM

D121

EXAM/ CONSULT.

D123

EXAM/ CONSULT.

D125

SOILED UTILITY

D127 PROCEDURE 6

D156

EXAM/ CONSULT.

D154

EXAM/ CONSULT.

D152

OVERFLOW

STAFF WORK

ROOM

D159

TOILET

D158

HOUSEKEEPING

D157

CORRIDOR

D136

EXAM/ CONSULT.

D155

EXAM/ CONSULT.

D153

MED ROOM

D151

EXAM/ CONSULT.

D149

EXAM/ CONSULT.

D145

EXAM/ CONSULT.

D143

EXAM/ CONSULT.

D141

EXAM/ CONSULT.

D144

EXAM/ CONSULT.

D142

EXAM/ CONSULT.

D140

EXAM/ CONSULT.

D138

HEIGHT &

WEIGHT

D137

EXAM/ CONSULT.

D139

PATIENT TOILET

D146

TEAM 2 WORK

ROOM

D150

ELEC

D100A

CORRIDOR

D135

TEAM 2 WORK

ROOM

D150

CORRIDOR

D134

CORRIDOR

D135

PL121B

PL121CPL121C

PL121A

PL121BPL121B

PL121B

PL121CPL121C

PL121A

PL121BPL121B

(E) 4" SS

(E) 4" V

(E) 4" CRP WP

(E) 3" CRP V

(E) 4" SS

(E) 4" CRP WP

(E) 2" SR CRP WP

(E) 4" SS

(E) 4" CRP WP

(E) 2" SR CRP WP

PATIENT TOILET

D108

PT

D111A

(E) 2" SR CRP WP

B R A D E N

S .

C O X

6201070323

NO.

ENGINEER

S T

A

T E

O F M I C

H I

G A

N

R E

E N

I G

N

E L

ANOISSEFORP

D

E S

N E

C I

L

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

FIRST FLOOR SANITARY AND

VENT PLAN

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

1E

PROJECT DIRECTOR

APRIL 6, 2023 JDS SS

100% BID

DOCUMENTS

PL121

FULLY SPRINKLERED

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR SANTIARY AND VENT PLAN

PLUMBING NOTES

1 THIS PLAN IS DIAGRAMMATIC IN NATURE AND SHALL NOT BE

SCALED TO DETERMINE THE LOCATION OR DIMENSION OF THE

WORK. CONTRACTOR SHALL VERIFY EXACT LOCATION OF

PIPING AND PENETRATIONS.

2 CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE LOCATION

OF EXISTING BELOW GRADE WASTE PIPING AND REFLECT ANY

DEVIATION GREATER THAN 1'-0" FROM THIS PLAN ON THE

AS-BUILT DRAWINGS.

3 CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE

NEW AND EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY

WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE

APPROVAL THE CONTRACTING OFFICER'S REPRESENTATIVE

(COR).

4 REPAIR WALL SURFACE AFTER INSTALLATION AND INSPECTION

OF EACH PLUMBING FIXTURE AND PIPING INSTALLED.

5 ALL WALL-MOUNTED ACCESS PANELS SHALL BE LOCKABLE TYPE.

6 ABOVE-GRADE WASTE PIPE SHALL BE RUN AT 2% GRADE.

BELOW-GRADE WASTE PIPE SHALL BE RUN AT 1% GRADE.

7 ALL CONDENSATE DRAIN PIPE SHALL BE RUN AT 1% GRADE.

8 MAINTAIN MINIMUM 10-0" SEPARATION BETWEEN FLUE AND

PLUMBING VENT OUTLETS AND ANY FRESH AIR INTAKE.

COORDINATE WITH HVAC CONTRACTOR.

9 FLOORS SHALL SLOPE TO DRAINS AT 1% MINIMUM SLOPE. SEE

ARCHITECTURAL PLANS FOR MORE INFORMATION.

10 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS, TRENCH DRAINS,

ETC. WITH TRAP GUARD DEVICES (ASSE 1072 COMPLIANT).

11 PROVIDE WALL CLEAN OUTS IN ALL VENT RISERS ON BRANCHES

LONGER THAN 5'-0" AND ON BRANCHES SERVING SINKS OR

URINALS.

12 SEE RISER DIAGRAMS FOR PIPE SIZING.

13 SHUT OFF VALVES SHALL BE ACCESSIBLE AND INSTALLED ON THE

SUPPLY TO EACH PLUMBING FIXTURE.

14 ALL ISOLATION VALVES ON DOMESTIC WATER SHALL BE 316L

STAINLESS STEEL BALL VALVES (TYP).

15 COORDINATE THE ROUTING OF ALL NEW SYSTEMS WITH

PNEUMATIC TUBE STATION AND PIPING.

SANITARY & VENT NOTES

1 ALL SANITARY DRAINAGE (SAN) PIPING IS LOCATED BELOW

SLAB, UNLESS OTHERWISE NOTED.

2 ROUTE ALL PIPING INTENDED FOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .