Drawings B - 506-20-103.pdf
PDF 23 MB Posted
- Solicitation number
- 36C25023B0057
About this file
This document provides details of a pre-solicitation notice for a federal construction contract opportunity with the Department of Veterans Affairs. The project involves internal demolition and reconstruction of an existing primary care area at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The planned solicitation will be an invitation for bids issued on or about May 27, 2023 for project number 506-20-103. The total set-aside contract valued between $5-10 million will be awarded as a firm fixed price to a verified Service-Disabled Veteran Owned Small Business. Questions regarding this pre-solicitation notice should be directed to the specified contracting officer by email.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WM
M
S
M
CHWS
CWV
CA
CD
CDR
CWR
CWS
CW
F-CW
H-CW
S-CW
HW
HW 140°
HW-R
HW-R 140°
GV
GW
HWR
HWS
G
OV
OW
PD
V
SS
SHWR
SHWS
STM
SD
OSD
(E)
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
COMBINATION WASTE & VENT
COMPRESSED AIR
CONDENSATE DRAINAGE
CONDENSATE RETURN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DOMESTIC COLD WATER
FILTERED COLD WATER
HARD COLD WATER
SOFT COLD WATER
HOT WATER
HOT WATER 140°
HOT WATER RECIRCULATION
HOT WATER RECIRCULATION 140°
GREASE VENT
GREASE WASTE
HEATING WATER RETURN
HEATING WATER SUPPLY
NATURAL GAS
OIL VENT
OIL WASTE
PUMP DISCHARGE
SANITARY VENT
SANITARY SEWER
SOLAR HOT WATER RETURN
SOLAR HOT WATER SUPPLY
STEAM
STORM DRAINAGE
OVERFLOW STORM DRAINAGE
REF-L
REF-S
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
2"
2"
4"
4"
REF-HG REFRIGERANT-HOT GAS
PLUMBING AND PIPING SYMBOLS
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE DISCONNECT/DEMOLITION OCCURS
AT EXISTING
EXISTING PIPE TAG
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
DRAIN SIZE
PIPE RISE
PIPE DROP
PIPE TEE REDUCING 45
DEGREE TEE
45 DEGREE TEE
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
PG PROPANE GAS
TYPE (SEE SCHEDULE)
Room
INVERT: -105' - 1"
1/8" / 12" SLOPE
RO REVERSE OSMOSIS WATER
IW INDIRECT WASTE
4000 SF
6" SD-1
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION
EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER
HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GF GAS-FIRED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER
TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER
HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH
GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING
UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING
PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF
VENTILATOR
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
4" FD-1FLOOR DRAIN 4" AD-6 AREA DRAIN
4" FS-4FLOOR SINK
4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN
6 DFU
4" FD-13
HUB DRAIN
DRAIN TAGS
"P" - INDICATES
PRIMER
CONNECTION
FIXTURE
UNITS
FLOW
CONTROL
DRAIN
4" SD-12
COMBINATION
DRAINS
STORM DRAIN4" SD-15
ROOF AREA
SERVED BY
DRAIN
2" DOM. WM
PIPE ACCESSORY TAGS
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID
VALVE
BUTTERFLY VALVE
2" BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY CNTRL
2" PRV
3/8" SOLENOID
2" BUTTERFLY
WATER CLOSET
- WALL HUNG -
ADA
WC-1
U-1
1 DFU
1E-L-1A
1.5 CWFU
1.5 HWFU
1E-L-1A
FIXTURE
UNITS
4" WCO
PIPE
ACCESORY
TAG
PLUMBING FIXTURE TAGS
4" WCO
TYPE (SEE SCHEDULE)
WC-1A
CAP
PLUG
GWR
GWS
GEOTHERMAL WATER RETURN
GEOTHERMAL WATER SUPPLY
GATE VALVE
P
3-WAY AIRMOTOR
CONTROLLER
ANGLE GLOBE VALVE
ANGLE HOSE VALVE
DIAPHRAGM VALVE
GLOBE VALVE
S
HOSE GLOBE VALVE
LOCK SHIELD VALVE
NEEDLE VALVE
PLUG VALVE
QUICK OPENING VALVE
SPRING CHECK VALVE
SWING GATE CHECK VALVE
TEMP PRESSURE RELIEF VALVE
* NOTE *
ALL GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS
IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR
MAY NOT BE USED IN THIS SET OF DRAWINGS.
POINT WHERE NEW CONNECTS TO EXISTING
(D)
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
PLUMBING GENERAL
INFORMATION & SYMBOL
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
P001
FULLY SPRINKLERED
GENERAL PLUMBING NOTES
1 FIELD VERIFY ALL NEW WATER, WASTE, AND VENT PIPING CONNECTIONS AND
PROVIDE NEW CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING
SYSTEMS.
2 PITCH UNDERFLOOR SANITARY WASTE PIPING AT 1/4" PER FOOT, UNLESS NOTED
OTHERWISE.
3 PITCH UNDERFLOOR STORM PIPING 3" AND GREATER AT 1/8" PER FOOT, UNLESS
NOTED OTHERWISE. PITCH ALL OTHER STORM PIPING AT 1/4" PER FOOT UNLESS
OTHERWISE NOTED.
4 FIELD VERIFY LOCATION AND INVERTS OF SITE UTILITIES PRIOR TO INSTALLATION.
5 ROUTE DOMESTIC WATER, FIRE PROTECTION, SANITARY SEWER, AND STORM
SEWER SERVICES TO SITE UTILITIES 5'-0" FROM BUILDING UNLESS NOTED
OTHERWISE. REFER TO CIVIL PLANS.
6 WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2"
MINIMUM.
7 PROVIDE CLEANOUT IN ACCESSIBLE LOCATION AT THE BASE OF ALL PLUMBING
RISERS.
8 THE VA PLUMBING DESIGN GUIDE DEFINES A DEAD LEG AS 2X(D), WHERE D IS THE
PIPE DIAMETER. DEAD LEGS ARE PROHIBITED. THIS IS RELEVANT FOR DEMOLITION
AND NEW WORK.
GENERAL PROJECT NOTES
1 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
2 THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING,
PRIOR TO FINAL BID, ALL EXISTING CONDITIONS FOR PLUMBING AND
MECHANICAL SYSTEMS WITHIN TENANT SPACE AND WITHIN CLOSE PROXIMITY OF
TENANT SPACE.
3 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN
OPENING PRIOR TO START OF WORK. UNSEAL DRAINS AT COMPLETION OF
CONSTRUCTION.
4 COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE
TRAY, STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.
5 THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING
AND THOSE ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN
BE REASONABLY ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL,
ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS
PROJECT.
6 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL
CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL
CODES, INCLUDING BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE
AND INTERNATIONAL MECHANICAL CODE.
7 LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
8 ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT EDITION OF ALL
APPLICABLE CODES AND LOCAL CODES AS APPLIED BY THE AUTHORITY HAVING
JURISDICTION.
9 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE
SPACE ABOVE ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL
EQUIPMENT.
10 PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED. FIRE STOPPING
SHALL BE AN APPROVED MATERIAL AS PRESCRIBED IN CSFM STANDARD 43-1
AND SHALL BE U.L. LISTED.
11 PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH
FOUNDATIONS, FLOORS, WALLS, AND ROOF.
12 MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES
REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE
INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO
SUIT MATERIALS IN WHICH INSTALLED.
13 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL
EQUIPMENT.
14 REFER TO HVAC SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN
PIPING.
15 PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL
ANOTHER SIZE IS SHOWN.
16 FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE
SEGMENTS, REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
17 INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE
MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY
AND WORKMANSHIP CONSISTENT WITH THE SPECIFICATIONS.
18 LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE
DRAWING, ARE APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE
FIELD. WORK SHALL BE COORDINATED WITH ALL OTHER TRADES TO AVOID
INTERFERENCE IN THE FIELD.
19 INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS
WITHOUT CEILINGS.
20 THE CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND APPROVED
BY THE OWNER.
21 PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL MECHANICAL
EQUIPMENT, PLUMBING FIXTURES, AND DIFFUSERS.
22 CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS AND SHALL
ARRANGE FOR ALL INSPECTIONS AS REQUIRED.
23 PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND MATERIALS AFTER
THE DATE OF FINAL ACCEPTANCE.
PLUMBING DEMOLITION NOTES
1 THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE
LOCAL, STATE AND/OR REGULATORY AGENCIES, CODES AND
REGULATIONS FOR NEW WORK.
2 CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION
OF THEIR WORK WITH OTHER TRADES AND WITH THE
CONSTRUCTION MANAGER.
3 VERIFY ALL CONDITIONS IN FIELD BEFORE START OF
CONSTRUCTION. NOTIFY ARCHITECT/ENGINEER OF
DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD
CONDITIONS.
4 COORDINATE ALL WORK WITH APPROPRIATE TRADES.
5 COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR
EQUIPMENT WITH OWNER'S REPRESENTATIVE, MINIMIZE
INTERRUPTION OF EXISTING SERVICES. VERIFY ALL SYSTEMS
BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS WILL
NOT LOSE SERVICE.
6 COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC.
WITH ARCHITECTURAL TRADES.
7 COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES
BEFORE CUTTING.
8 HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED
WITH APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.
9 NO ITEMS TO BE ABANDONED IN PLACE.
10 ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING
OPEN SYSTEMS TO BE PATCHED, CAPPED AND SEALED TO
PROVIDE A FINISHED SYSTEM.
11 DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO
REMAIN OPEN, CAP AND PROTECT TO AVOID CONTAMINATION
TO AND FROM THE SURROUNDING AREAS.
12 ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED
AND RETURNED TO OPERATION BY END OF SHIFT, NO SYSTEMS
ALLOWED TO BE LEFT OPEN WHEN NOT BEING SUPERVISED BY
CONTRACTOR RESPONSIBLE FOR THAT WORK TRADE.
PLUMBING NOTES
1 THIS PLAN IS DIAGRAMMATIC IN NATURE AND SHALL NOT BE
SCALED TO DETERMINE THE LOCATION OR DIMENSION OF THE
WORK. CONTRACTOR SHALL VERIFY EXACT LOCATION OF
PIPING AND PENETRATIONS.
2 CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE LOCATION
OF EXISTING BELOW GRADE WASTE PIPING AND REFLECT ANY
DEVIATION GREATER THAN 1'-0" FROM THIS PLAN ON THE
AS-BUILT DRAWINGS.
3 CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE
NEW AND EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY
WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE
APPROVAL THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
4 REPAIR WALL SURFACE AFTER INSTALLATION AND INSPECTION
OF EACH PLUMBING FIXTURE AND PIPING INSTALLED.
5 ALL WALL-MOUNTED ACCESS PANELS SHALL BE LOCKABLE TYPE.
6 ABOVE-GRADE WASTE PIPE SHALL BE RUN AT 2% GRADE.
BELOW-GRADE WASTE PIPE SHALL BE RUN AT 1% GRADE.
7 ALL CONDENSATE DRAIN PIPE SHALL BE RUN AT 1% GRADE.
8 MAINTAIN MINIMUM 10-0" SEPARATION BETWEEN FLUE AND
PLUMBING VENT OUTLETS AND ANY FRESH AIR INTAKE.
COORDINATE WITH HVAC CONTRACTOR.
9 FLOORS SHALL SLOPE TO DRAINS AT 1% MINIMUM SLOPE. SEE
ARCHITECTURAL PLANS FOR MORE INFORMATION.
10 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS, TRENCH DRAINS,
ETC. WITH TRAP GUARD DEVICES (ASSE 1072 COMPLIANT).
11 PROVIDE WALL CLEAN OUTS IN ALL VENT RISERS ON BRANCHES
LONGER THAN 5'-0" AND ON BRANCHES SERVING SINKS OR
URINALS.
12 SEE RISER DIAGRAMS FOR PIPE SIZING.
13 SHUT OFF VALVES SHALL BE ACCESSIBLE AND INSTALLED ON THE
SUPPLY TO EACH PLUMBING FIXTURE.
14 ALL ISOLATION VALVES ON DOMESTIC WATER SHALL BE 316L
STAINLESS STEEL BALL VALVES (TYP).
15 COORDINATE THE ROUTING OF ALL NEW SYSTEMS WITH
PNEUMATIC TUBE STATION AND PIPING.
DOMESTIC WATER NOTES
1 ROUTE ALL PIPING IN ABOVE CEILING LEVEL SPACE, EXCEPT
WHERE OTHERWISE INDICATED. COORDINATE ROUTING WITH
OTHER TRADES. SLOPED PIPING ELEVATIONS TAKE PRIORITY
OVER ALL OTHER SYSTEMS AND TRADES.
2 PROVIDE SLEEVED AND WATERTIGHT PENETRATIONS AT ALL PIPE
PENETRATIONS THROUGH: LOWER LEVEL FLOOR SLAB, UPPER
LEVEL FLOOR SLAB, MECHANICAL PENTHOUSE FLOOR SLAB,
ROOF STRUCTURES AND, PERIMETER WALLS BELOW GRADE.
3 PROVIDE WATERTIGHT INSTALLATIONS OF ALL FLOOR EMBEDDED
DEVICES INCLUDING BUT NOT LIMITED TO: FLOOR DRAINS,
FLOOR SINKS, SHOWER DRAINS, HUB DRAINS, FLOOR RECESSED
CLEANOUTS AND, FLUSH TO FLOOR ACCESS HOUSINGS.
4 COORDINATE WITH ARCHITECT TO MAINTAIN THE WATERTIGHT
INTEGRITY OF THE BUILDING ENVELOPE AND FLOOR SLABS.
5 PROVIDE LOCKABLE TYPE BALL VALVE AT TAP TO ALL SAFETY EYE
WASH AND SHOWER FIXTURES. ALL VALVES TO BE LOCKED IN THE
OPEN POSITION.
6 PROVIDE BALL VALVE FOR ISOLATION OF ALL DOMESTIC WATER
BRANCH LINES. TYPICAL UNLESS OTHERWISE NOTED.
SANITARY & VENT NOTES
1 ALL SANITARY DRAINAGE (SAN) PIPING IS LOCATED BELOW
SLAB, UNLESS OTHERWISE NOTED.
2 ROUTE ALL PIPING INTENDED FOR ABOVE CEILING LEVEL
INSTALLATION AS HIGH AS POSSIBLE. COORDINATE ROUTING
WITH OTHER TRADES. SLOPED PIPING ELEVATIONS TAKE PRIORITY
OVER ALL OTHER SYSTEMS AND TRADES.
3 PROVIDE SLEEVED AND WATERTIGHT PENETRATIONS AT ALL PIPE
PENETRATIONS THROUGH: LOWER LEVEL FLOOR SLAB, UPPER
LEVEL FLOOR SLAB, MECHANICAL PENTHOUSE FLOOR SLAB,
ROOF STRUCTURES AND, PERIMETER WALLS BELOW GRADE.
4 PROVIDE WATERTIGHT INSTALLATIONS OF ALL FLOOR EMBEDDED
DEVICES INCLUDING BUT NOT LIMITED TO: FLOOR DRAINS,
FLOOR SINKS, SHOWER DRAINS, HUB DRAINS, FLOOR RECESSED
CLEANOUTS AND, FLUSH TO FLOOR ACCESS HOUSINGS.
5 COORDINATE WITH ARCHITECT TO MAINTAIN THE WATERTIGHT
INTEGRITY OF THE BUILDING ENVELOPE AND FLOOR SLABS.
6 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS AND SHOWER
DRAINS WITH IN-LINE TRAP SEAL PROTECTION DEVICES, AS
MANUFACTURED BY "SURE SEAL MANUFACTURING", OR
APPROVED EQUAL. DEVICES TO MEET OR EXCEED ASSE -
1072AG-GW.
MEDICAL GAS NOTES
1 REFER TO ARCHITECTURAL SHEETS FOR EXACT MEDICAL GAS
OUTLET INSTALLATION LOCATION.
2 CONTRACTOR TO ENSURE MDEICAL GAS OUTLETS PROVIDED
MATCH OWNER'S EXISTING SYSTEM.
Revisions: Date:
1E-K
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-10 1E-10
1E-9 1E-9
1E-8 1E-8
1E-7 1E-7
1E-6 1E-6
1E-5 1E-5
1E-4 1E-4
1E-3.8 1E-3.8
1E-3.6 1E-3.6
1E-3.5 1E-3.5
1E-3.4 1E-3.4 1E-3.3 1E-3.3
1E-3 1E-3
S
(E) 4" SS (E) 4" SS
(E) 4" SS
(E) 4" SS
(E) 4" SS
PD100B
PD100CPD100C
PD100A
PD100BPD100B
PD100B
PD100CPD100C
PD100A
PD100BPD100B
(E) 4" SR CRP WP
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
BASEMENT PLUMBING
DEMOLITION PLAN
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD100
FULLY SPRINKLERED
NORTH
SCALE: 1/8" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN
PLUMBING DEMOLITION NOTES
1 THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE
LOCAL, STATE AND/OR REGULATORY AGENCIES, CODES AND
REGULATIONS FOR NEW WORK.
2 CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION
OF THEIR WORK WITH OTHER TRADES AND WITH THE
CONSTRUCTION MANAGER.
3 VERIFY ALL CONDITIONS IN FIELD BEFORE START OF
CONSTRUCTION. NOTIFY ARCHITECT/ENGINEER OF
DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD
CONDITIONS.
4 COORDINATE ALL WORK WITH APPROPRIATE TRADES.
5 COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR
EQUIPMENT WITH OWNER'S REPRESENTATIVE, MINIMIZE
INTERRUPTION OF EXISTING SERVICES. VERIFY ALL SYSTEMS
BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS WILL
NOT LOSE SERVICE.
6 COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC.
WITH ARCHITECTURAL TRADES.
7 COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES
BEFORE CUTTING.
8 HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED
WITH APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.
9 NO ITEMS TO BE ABANDONED IN PLACE.
10 ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING
OPEN SYSTEMS TO BE PATCHED, CAPPED AND SEALED TO
PROVIDE A FINISHED SYSTEM.
11 DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO
REMAIN OPEN, CAP AND PROTECT TO AVOID CONTAMINATION
TO AND FROM THE SURROUNDING AREAS.
12 ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED
AND RETURNED TO OPERATION BY END OF SHIFT, NO SYSTEMS
ALLOWED TO BE LEFT OPEN WHEN NOT BEING SUPERVISED BY
CONTRACTOR RESPONSIBLE FOR THAT WORK TRADE.
4/7/23
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-5 1E-5
1E-4 1E-4
1E-3.8 1E-3.8
1E-3.6 1E-3.6
1E-3.5 1E-3.5
1E-3.4 1E-3.4
1E-3.3 1E-3.3
1E-3 1E-3
S
?(D) 4" SS
?(D) 4" SS UP
?(D) 2" SS UP1 1
?(D) 2" SS UP
?(D) 2" SS UP
?(D) 4" SS UP
?(D) 4" SS
?(D) 4" SS
?(D) 2" SS UP ?(D) 2" SS UP ?(D) 2" SS UP
?(D) 4" SS?(D) 4" SS
?(D) 2" SS
1 1 1
?(D) 2" SS UP
?(D) 2" SS UP
?(D) 4" SS
?(D) 2" SS UP
?(D) 2" SS UP
?(D) 2" CW ?(D) 2" HW
?(D) 2" CW
?(D) 2" HW
?(D) 2" CW
?(D) 2" HW
?(D) 1" HW UP
?(D) 1" CW UP
?(D) 1" HW
?(D) 1" CW
?(D) 1" CW UP
?(D) 1" HW UP
?(D) 1" CW UP
?(D) 1" HW UP
?(D) 1" HW UP
?(D) 1" CW UP
(E) 4" SS
(E) 4" SR CRP WP
(E) 4"
(E) 4"
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED PLUMBING
DEMOLITION PLAN- AREA A
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD100A
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING DEMOLITION PLAN - AREA A
KEYNOTES
1 SLAB INFILL. REFER TO ARCHITECTURAL DRAWING AE100A.
2 REMOVE EXISTING SANITARY PIPING ROUTED THROUGH
BASEMENT CEILING, SERVING FIRST FLOOR FIXTURES. REMOVE
ALL ASSOCIATED PIPING, ACCESSORIES, AND SUPPORTS.
COORDINATE ACCESS TO BASEMENT AREAS WITH COR. WORK
SHALL BE PERFOREMD AFTER HOURS IN OCCUPIED SPACES.
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-7 1E-7
1E-6 1E-6
1E-5 1E-5
S
?(D) 4" SS
?(D) 3" SS UP
?(D) 4" SS UP
?(D) 4" SS UP
?(D) 4" SS
?(D) 1 1/2" SS UP ?(D) 1 1/2" SS UP
?(D) 4" SS ?(D) 1 1/2" SS ?(D) 1 1/2" SS
?(D) 1 1/2" SS UP
?(D) 4" SS
?(D) 4" SS?(D) 2" SS UP
?(D) 4" SS UP
?(D) 4" SS UP
?(D) 2" SS UP
?(D) 1 1/2" SS UP
?(D) 4" SS ?(D) 4" SS
?(D) 1 1/2" SS UP ?(D) 1 1/2" SS UP
?(D) 1 1/2" SS UP
?(D) 1 1/2" SS
?(D) 4" SS
(E) 4" SS
(E) 4" SS
(E) 4" SS
?(D) 4" SS
?(D) 4" SS
?(D) 2" SS UP
?(D) 1 1/2" SS UP
?(D) 2" SS UP
?(D) 2" SS UP
?(D) 1 1/2" SS UP
?(D) 4" SS
(D) 2"
?(D) 2" SS UP
?(D) 4" SS
?(D) 4" SS ?(D) 1 1/2" SS UP ?(D) 4" SS
?(D) 2" SS UP
?(D) 2" SS UP
(D)4" WCO
?(D) 4" SS
?(D) 2" SS UP
?(D) 2" SS UP?(D) 4" SS
?(D) 2" SS UP?(D) 4" SS
?(D) 2" SS UP ?(D) 2" SS UP
?(D) 4" SS?(D) 4" SS
?(D) 2" SS
?(D) 4" SS
(E) 4" SS
(E) 4" SS
(E) 4" SS
(E) 4" SS
1 1 1 1
1 1
1 1
?(D) 2" SS
?(D) 2" SS UP
?(D) 2" SS UP
?(D) 2" SS UP
?(D) 2" SS
(E) 4" SR CRP WP
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED PLUMBING
DEMOLITION PLAN- AREA B
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD100B
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING DEMOLITION PLAN - AREA B
KEYNOTES
1 SLAB INFILL. REFER TO ARCHITECTURAL DRAWING AE100A.
2 REMOVE EXISTING SANITARY PIPING ROUTED THROUGH
BASEMENT CEILING, SERVING FIRST FLOOR FIXTURES. REMOVE
ALL ASSOCIATED PIPING, ACCESSORIES, AND SUPPORTS.
COORDINATE ACCESS TO BASEMENT AREAS WITH COR. WORK
SHALL BE PERFOREMD AFTER HOURS IN OCCUPIED SPACES.
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-11 1E-11
1E-10 1E-10
1E-9 1E-9
1E-8 1E-8
1E-7 1E-7
S
(E) 4" SS
(E) 4" SS
?(D) 4" SS?(D) 4" SS
?(D) 4" SS
?(D) 4" SS ?(D) 4" SS
?(D) 4" SS UP?(D) 4" SS UP
?(D) 4" SS UP?(D) 2" SS UP
?(D) 4" SS
?(D) 2" SS UP
?(D) 2" SS
(E) 4" SS
(E) 4" SS (E) 4" SS
(E) 4" SS
(E) 4" SS (E) 4" SS ?(D) 4" SS
?(D) 4" SS UP
?(D) 4" SS?(D) 4" SS
?(D) 2" SS UP
?(D) 2" SS
?(D) 2" SS UP
?(D) 2" SS UP
?(D) 2" SS UP
(E) 4" SS
1 1 1
2 2 2
2 2
?(D) 2" SS
(E) 4" SR CRP WP
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED PLUMBING
DEMOLITION PLAN- AREA C
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD100C
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING DEMOLITION PLAN - AREA C
KEYNOTES
1 SLAB INFILL. REFER TO ARCHITECTURAL DRAWING AE100A.
2 REMOVE EXISTING SANITARY PIPING ROUTED THROUGH
BASEMENT CEILING, SERVING FIRST FLOOR FIXTURES. REMOVE
ALL ASSOCIATED PIPING, ACCESSORIES, AND SUPPORTS.
COORDINATE ACCESS TO BASEMENT AREAS WITH COR. WORK
SHALL BE PERFOREMD AFTER HOURS IN OCCUPIED SPACES.
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-10 1E-10
1E-9 1E-9
1E-8 1E-8
1E-7 1E-7
1E-6 1E-6
1E-5 1E-5
1E-4 1E-4
1E-3.8 1E-3.8
1E-3.6 1E-3.6
1E-3.5 1E-3.5
1E-3.4 1E-3.4 1E-3.3 1E-3.3
1E-3 1E-3
S
(E) 4" CW
(E) 2 1/2" HW 140°
(E) 1" HW-R 140°
(E) 2 1/2" MV
(E) 1 1/2" MA
(E) 3/4" O
(E) 1 1/2" LV
(E) 1" LA
(E) 1 1/2" G
(E) 4" CRP WP
(E) 3" CRP V
(E) 4" SS
(E) 4" V
(E) 4" SS
(E) 4" CRP WP
(E) 2" SR CRP WP
(E) 4" SS
(E) 4" CRP WP
(E) 2" SR CRP WP
PD101B
PD101CPD101C
PD101A
PD101BPD101B
PD101B
PD101CPD101C
PD101A
PD101BPD101B
(E) 2" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
FIRST FLOOR PLUMBING
DEMOLITION PLAN
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD101
FULLY SPRINKLERED
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION PLAN
PLUMBING DEMOLITION NOTES
1 THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE
LOCAL, STATE AND/OR REGULATORY AGENCIES, CODES AND
REGULATIONS FOR NEW WORK.
2 CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION
OF THEIR WORK WITH OTHER TRADES AND WITH THE
CONSTRUCTION MANAGER.
3 VERIFY ALL CONDITIONS IN FIELD BEFORE START OF
CONSTRUCTION. NOTIFY ARCHITECT/ENGINEER OF
DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD
CONDITIONS.
4 COORDINATE ALL WORK WITH APPROPRIATE TRADES.
5 COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR
EQUIPMENT WITH OWNER'S REPRESENTATIVE, MINIMIZE
INTERRUPTION OF EXISTING SERVICES. VERIFY ALL SYSTEMS
BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS WILL
NOT LOSE SERVICE.
6 COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC.
WITH ARCHITECTURAL TRADES.
7 COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES
BEFORE CUTTING.
8 HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED
WITH APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.
9 NO ITEMS TO BE ABANDONED IN PLACE.
10 ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING
OPEN SYSTEMS TO BE PATCHED, CAPPED AND SEALED TO
PROVIDE A FINISHED SYSTEM.
11 DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO
REMAIN OPEN, CAP AND PROTECT TO AVOID CONTAMINATION
TO AND FROM THE SURROUNDING AREAS.
12 ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED
AND RETURNED TO OPERATION BY END OF SHIFT, NO SYSTEMS
ALLOWED TO BE LEFT OPEN WHEN NOT BEING SUPERVISED BY
CONTRACTOR RESPONSIBLE FOR THAT WORK TRADE.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-5 1E-5
1E-4 1E-4
1E-3.8 1E-3.8
1E-3.6 1E-3.6
1E-3.5 1E-3.5
1E-3.4 1E-3.4
1E-3.3 1E-3.3
1E-3 1E-3
S
?(D) 3/4" CW
?(D) 3/4" HW 140°
?(D) 3/4" HW-R 140°
(E) 4" CW
(E) 2 1/2" HW 140°
(E) 1" HW-R 140°
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 1 1/2" CW
?(D) 1" HW 140°
?(D) 1" HW-R 140°
?(D) 1 1/2" CW
?(D) 1 1/2" CW
?(D) 1/2" CW
?(D) 1/2" HW 140°
(E) 4" CW
(E) 2 1/2" HW 140°
(E) 1" HW-R 140°
(E) 4" CW
(E) 2 1/2" HW 140°
(E) 1" HW-R 140°
?(D) 1 1/2" CW
?(D) 1" HW 140°
?(D) 1/2" O
?(D) 1/2" MA
?(D) 1" MV
?(D) 3/4" MV
?(D) 1/2" MA
?(D) 1/2" O
?(D) 1/2" O
?(D) 1/2" MA
?(D) 3/4" MV (E) 4" SS
(E) 4" CRP WP (E) 2" SR CRP WP
(E) 1 1/2" LV
(E) 1" LA
(E) 1 1/2" G
(E) 4" SS
(E) 4" V
(E) 4" CRP WP
(E) 3" CRP V
1 11
?(D) 1/2" LA
?(D) 3/4" LV
?(D) 1/2" G
?(D) 1/2" LA
?(D) 1" LV
?(D) 1/2" G
3 4
(D)AREA DRAIN
?(D) 2" HW
?(D) 2" CW
?(D) 2" V
?(D) 2" V
?(D) 2" V
?(D) 2" V
?(D) 2" V
(E) 2" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED PLUMBING
DEMOLITION PLAN- AREA A
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD101A
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING DEMOLITION PLAN - AREA A
KEYNOTES
1 REMOVE EXISTING LAV OR SINK, ASSOCIATED PIPING AND
ACCESSORIES COMPLETELY. REMOVE EXISTING DOMESTIC
WATER, SANITARY, AND VENT PIPING BACK TO NEAREST MAIN
AND CAP.
2 REMOVE EXISTING DOMESTIC COLD WATER, HOT WATER, HOT
WATER RETURN AND VENT PIPING AND ACCESSORIES
COMPLETELY.
3 DISCONNECT AND REMOVE EXISTING MEDICAL GAS PIPING
BACK TO SOURCE AND CAP.
4 REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX, OUTLETS,
AND ALL MEDICAL AIR, OXYGEN, AND VACUUM PIPING BACK
TO NEAREST MAINS AND CAP WITH ISOLATION VALVE.
5 DEMOLISH THE WASTE PIPING UP THROUGH THE FLOOR, ANY
ASSOCIATED PLUMBING FIXTURE AND ANY ASSOCIATED
UNUSED BRANCH WASTE AND VENT PIPING BACK TO THE
MAIN AND CAP.
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-7 1E-7
1E-6 1E-6
1E-5 1E-5
S
?(D) 2" V?(D) 3/4" CW
?(D) 3/4" HW 140°
?(D) 3/4" HW-R 140°
?(D) 2" V
?(D) 3/4" CW
?(D) 1/2" HW 140°
?(D) 2" V
?(D) 3/4" CW
?(D) 1/2" HW 140°
?(D) 2" V
?(D) 1/2" HW-R 140°
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 3/4" HW-R 140°
?(D) 1" HW 140°
?(D) 1 1/4" CW
?(D) 1 1/2" CW
?(D) 2" V
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 2" V ?(D) 2" V
?(D) 3/4" HW-R 140°
?(D) 3/4" HW 140°
?(D) 3/4" CW
?(D) 2" V ?(D) 2" V?(D) 2" V
?(D) 1/2" HW-R 140°
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 2" V
?(D) 1/2" HW 140°
?(D) 2" V
?(D) 1/2" CW
?(D) 3/4" HW 140°
?(D) 3/4" HW-R 140°
?(D) 1/2" CW
?(D) 1/2" HW-R 140°
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 2" V
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 3/4" HW-R 140°
?(D) 1 1/4" HW 140°
?(D) 1 1/4" CW
?(D) 2" V
?(D) 1" CW
?(D) 1" HW 140°
?(D) 3/4" HW-R 140°
?(D) 2" V
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 2" CW
?(D) 1" HW 140°
?(D) 1/2" HW-R 140°
?(D) 2" V
(E) 4" CW
(E) 2 1/2" HW 140°
(E) 1" HW-R 140°
(E) 4" CW
(E) 2 1/2" HW 140°
(E) 1" HW-R 140°
?(D) 2" V ?(D) 2" V
?(D) 2" V ?(D) 2" V
?(D) 3/4" CW
?(D) 3/4" HW 140°
?(D) 3/4" HW-R 140°
?(D) 3/4" HW 140°
?(D) 3/4" CW
?(D) 1/2" HW 140° ?(D) 1/2" CW
?(D) 2" V
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 2" V
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 2" V
?(D) 1/2" CW
?(D) 3/4" CW
?(D) 1/2" HW 140°
?(D) 2" V
?(D) 3/4" HW-R 140°
?(D) 1" HW 140°
?(D) 2" CW
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 1 1/2" CW
?(D) 1" HW 140°
?(D) 2" V
?(D) 2" V
?(D) 1/2" HW 140°
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 1/2" CW
(E) 4" V
(E) 4" V
?(D) 1" MV
?(D) 1/2" MA
?(D) 1/2" O
?(D) 1" MV
?(D) 1/2" MA
?(D) 1/2" O
?(D) 2" V
?(D) 3/4" MV
?(D) 1/2" MA
?(D) 1/2" O
(E) 1 1/2" MA
(E) 3/4" O
(E) 1 1/2" LV
(E) 1" LA
(E) 1 1/2" G
(E) 4" SS
(E) 4" V
(E) 4" CRP WP
(E) 3" CRP V
(E) 4" SS
(E) 4" CRP WP
(E) 2" SR CRP WP
(E) 4" SS
(E) 2" SR CRP WP
(E) 4" CRP WP
?(D) 1/2" O
?(D) 1/2" MA
?(D) 3/4" MV?(D) 1 1/2" MV
?(D) 3/4" MA
?(D) 1/2" O
?(D) 1/2" O
?(D) 1/2" MA
?(D) 1" MV
2 1
1 1 1
4 4
?(D) 1" HW 140°
?(D) 1" HW 140°
?(D) 1" CW
?(D) 1" CW
?(D) 1" CW
?(D) 1" HW 140°
(E) 2" SR CRP WP
8 8 8
8 8
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED PLUMBING
DEMOLITION PLAN- AREA B
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD101B
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING DEMOLITION PLAN - AREA B
KEYNOTES
1 REMOVE EXISTING LAV OR SINK, ASSOCIATED PIPING AND
ACCESSORIES COMPLETELY. REMOVE EXISTING DOMESTIC
WATER, SANITARY, AND VENT PIPING BACK TO NEAREST MAIN
AND CAP.
2 REMOVE EXISTING WATER CLOSET, ASSOCIATED PIPING AND
ACCESSORIES COMPLETELY. REMOVE EXISTING COLD WATER,
SANITARY, AND VENT PIPING BACK TO NEAREST MAIN AND
CAP.
3 REMOVE EXISTING MEDICAL GAS ZONE VALVE BOX, OUTLETS,
AND ALL MEDICAL AIR, OXYGEN, AND VACUUM PIPING BACK
TO NEAREST MAINS AND CAP WITH ISOLATION VALVE.
4 REMOVE EXISTING DOMESTIC COLD WATER, HOT WATER, HOT
WATER RETURN AND VENT PIPING AND ACCESSORIES
COMPLETELY.
5 DISCONNECT AND REMOVE EXISTING MEDICAL GAS PIPING
BACK TO SOURCE AND CAP.
6 EXISTING ZONE VALVE BOX TO BE RELOCATED PER PP2201
7 DISCONNECT AND REMOVE EXISTING MEDICAL GAS PIPING
AS SHOWN AND CAP.
8 DEMOLISH THE WASTE PIPING UP THROUGH THE FLOOR, ANY
ASSOCIATED PLUMBING FIXTURE AND ANY ASSOCIATED
UNUSED BRANCH WASTE AND VENT PIPING BACK TO THE
MAIN AND CAP.
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-11 1E-11
1E-10 1E-10
1E-9 1E-9
1E-8 1E-8
1E-7 1E-7
S
?(D) 3/4" HW-R 140°
?(D) 3/4" HW 140°
?(D) 1/2" CW
?(D) 2" V
?(D) 2 1/2" V
?(D) 2" CW
?(D) 1" HW 140°
?(D) 3/4" HW-R 140°
?(D) 1 1/4" CW ?(D) 3/4" HW 140°
?(D) 2" V
?(D) 1/2" CW
?(D) 2" V
?(D) 1/2" HW 140°
?(D) 2" V
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 1/2" CW
?(D) 1/2" HW 140°
?(D) 2" V
?(D) 1/2" CW
?(D) 1/2" HW 140° ?(D) 2" V
?(D) 2 1/2" V
?(D) 2 1/2" CW
?(D) 1 1/2" HW 140°
?(D) 3/4" HW-R 140°
?(D) 1/2" CW
?(D) 1/2" HW 140° ?(D) 2" V
?(D) 3/4" HW-R 140°
?(D) 3/4" HW 140°
?(D) 2" CW
?(D) 2" V
?(D) 1/2" CW
?(D) 2" V
?(D) 1/2" HW 140°
?(D) 2" V
?(D) 3/4" HW-R 140°
?(D) 3/4" HW 140° ?(D) 2" CW
?(D) 2" V ?(D) 2" V
?(E) 4" CW
?(E) 2 1/2" HW 140°
?(E) 1" HW-R 140°
?(E) 4" V
?(D) 2 1/2" V
(E) 4" CW
(E) 2 1/2" HW 140°
(E) 1" HW-R 140°
(E) 4" V
(E) 2 1/2" MV
(E) 1 1/2" MA
(E) 3/4" O
(E) 1 1/2" LV
(E) 1" LA
(E) 1 1/2" G
(E) 4" SS
(E) 4" V
(E) 4" CRP WP
(E) 3" CRP V
(E) 4" SS
(E) 4" CRP WP
(E) 2" SR CRP WP
(E) 4" SS
(E) 4" CRP WP
(E) 2" SR CRP WP
1 1 1 1 2
(E) 2" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED PLUMBING
DEMOLITION PLAN- AREA C
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PD101C
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING DEMOLITION PLAN - AREA C
KEYNOTES
1 REMOVE EXISTING LAV OR SINK, ASSOCIATED PIPING AND
ACCESSORIES COMPLETELY. REMOVE EXISTING DOMESTIC
WATER, SANITARY, AND VENT PIPING BACK TO NEAREST MAIN
AND CAP.
2 REMOVE EXISTING WATER CLOSET, ASSOCIATED PIPING AND
ACCESSORIES COMPLETELY. REMOVE EXISTING COLD WATER,
SANITARY, AND VENT PIPING BACK TO NEAREST MAIN AND
CAP.
3 REMOVE EXISTING DOMESTIC COLD WATER, HOT WATER, HOT
WATER RETURN AND VENT PIPING AND ACCESSORIES
COMPLETELY.
4 REMOVE EXISTING ELECTRIC WATER COOLER, ASSOCIATED
PIPING AND ACCESSORIES COMPLETELY. REMOVE EXISTING
DOMESTIC WATER, SANITARY, AND VENT PIPING BACK TO
NEAREST MAIN AND CAP.
5 DEMOLISH THE WASTE PIPING UP THROUGH THE FLOOR, ANY
ASSOCIATED PLUMBING FIXTURE AND ANY ASSOCIATED
UNUSED BRANCH WASTE AND VENT PIPING BACK TO THE
MAIN AND CAP.
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-10 1E-10
1E-9 1E-9
1E-8 1E-8
1E-7 1E-7
1E-6 1E-6
1E-5 1E-5
1E-4 1E-4
1E-3.8 1E-3.8
1E-3.6 1E-3.6
1E-3.5 1E-3.5
1E-3.4 1E-3.4 1E-3.3 1E-3.3
1E-3 1E-3
S
(E) 4" SS
(E) 4" SS
(E) 4" SS
(E) 4" SS
PL120B
PL120CPL120C
PL120A
PL120BPL120B
PL120B
PL120CPL120C
PL120A
PL120BPL120B
(E) 4" SR CRP WP
(E) 4" SR CRP WP
(E) 4" SS
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
BASEMENT SANITARY AND
VENT PLAN
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PL120
FULLY SPRINKLERED
NORTH
SCALE: 1/8" = 1'-0"
BASEMENT SANITARY AND VENT PLAN
PLUMBING NOTES
1 THIS PLAN IS DIAGRAMMATIC IN NATURE AND SHALL NOT BE
SCALED TO DETERMINE THE LOCATION OR DIMENSION OF THE
WORK. CONTRACTOR SHALL VERIFY EXACT LOCATION OF
PIPING AND PENETRATIONS.
2 CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE LOCATION
OF EXISTING BELOW GRADE WASTE PIPING AND REFLECT ANY
DEVIATION GREATER THAN 1'-0" FROM THIS PLAN ON THE
AS-BUILT DRAWINGS.
3 CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE
NEW AND EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY
WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE
APPROVAL THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
4 REPAIR WALL SURFACE AFTER INSTALLATION AND INSPECTION
OF EACH PLUMBING FIXTURE AND PIPING INSTALLED.
5 ALL WALL-MOUNTED ACCESS PANELS SHALL BE LOCKABLE TYPE.
6 ABOVE-GRADE WASTE PIPE SHALL BE RUN AT 2% GRADE.
BELOW-GRADE WASTE PIPE SHALL BE RUN AT 1% GRADE.
7 ALL CONDENSATE DRAIN PIPE SHALL BE RUN AT 1% GRADE.
8 MAINTAIN MINIMUM 10-0" SEPARATION BETWEEN FLUE AND
PLUMBING VENT OUTLETS AND ANY FRESH AIR INTAKE.
COORDINATE WITH HVAC CONTRACTOR.
9 FLOORS SHALL SLOPE TO DRAINS AT 1% MINIMUM SLOPE. SEE
ARCHITECTURAL PLANS FOR MORE INFORMATION.
10 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS, TRENCH DRAINS,
ETC. WITH TRAP GUARD DEVICES (ASSE 1072 COMPLIANT).
11 PROVIDE WALL CLEAN OUTS IN ALL VENT RISERS ON BRANCHES
LONGER THAN 5'-0" AND ON BRANCHES SERVING SINKS OR
URINALS.
12 SEE RISER DIAGRAMS FOR PIPE SIZING.
13 SHUT OFF VALVES SHALL BE ACCESSIBLE AND INSTALLED ON THE
SUPPLY TO EACH PLUMBING FIXTURE.
14 ALL ISOLATION VALVES ON DOMESTIC WATER SHALL BE 316L
STAINLESS STEEL BALL VALVES (TYP).
15 COORDINATE THE ROUTING OF ALL NEW SYSTEMS WITH
PNEUMATIC TUBE STATION AND PIPING.
SANITARY & VENT NOTES
1 ALL SANITARY DRAINAGE (SAN) PIPING IS LOCATED BELOW
SLAB, UNLESS OTHERWISE NOTED.
2 ROUTE ALL PIPING INTENDED FOR ABOVE CEILING LEVEL
INSTALLATION AS HIGH AS POSSIBLE. COORDINATE ROUTING
WITH OTHER TRADES. SLOPED PIPING ELEVATIONS TAKE PRIORITY
OVER ALL OTHER SYSTEMS AND TRADES.
3 PROVIDE SLEEVED AND WATERTIGHT PENETRATIONS AT ALL PIPE
PENETRATIONS THROUGH: LOWER LEVEL FLOOR SLAB, UPPER
LEVEL FLOOR SLAB, MECHANICAL PENTHOUSE FLOOR SLAB,
ROOF STRUCTURES AND, PERIMETER WALLS BELOW GRADE.
4 PROVIDE WATERTIGHT INSTALLATIONS OF ALL FLOOR EMBEDDED
DEVICES INCLUDING BUT NOT LIMITED TO: FLOOR DRAINS,
FLOOR SINKS, SHOWER DRAINS, HUB DRAINS, FLOOR RECESSED
CLEANOUTS AND, FLUSH TO FLOOR ACCESS HOUSINGS.
5 COORDINATE WITH ARCHITECT TO MAINTAIN THE WATERTIGHT
INTEGRITY OF THE BUILDING ENVELOPE AND FLOOR SLABS.
6 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS AND SHOWER
DRAINS WITH IN-LINE TRAP SEAL PROTECTION DEVICES, AS
MANUFACTURED BY "SURE SEAL MANUFACTURING", OR
APPROVED EQUAL. DEVICES TO MEET OR EXCEED ASSE -
1072AG-GW.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-5 1E-5
1E-4 1E-4
1E-3.8 1E-3.8
1E-3.6 1E-3.6
1E-3.5 1E-3.5
1E-3.4 1E-3.4
1E-3.3 1E-3.3
1E-3 1E-3
S
4" SS
3" SS
3" SS
4" SS4" SS
3" SS
3" SS
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
4" SS
3" SS
(E) 4" SS
(E) 4" SS
2" SS
2" SS
4" SS UP
2" V UP 1 1/2" V UP
4" SS
4" SS
3" SS 3" SS
3" SS
2" SS UP
4" SS UP
2" SS UP
2" SS UP
2" SS UP
3" WCO
(E) 4" SR CRP WP
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED SANITARY AND
VENT PLAN- AREA A
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PL120A
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED SANITARY AND VENT PLAN - AREA A
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-7 1E-7
1E-6 1E-6
1E-5 1E-5
S
4" SS
4" SS 4" SS
3" SS
4" SS
4" SS
4" SS
2" SS
3" SS
3" SS
3" SS
2" SS UP
4" SS
2" SS UP
2" SS UP
4" SS UP
2" SS UP
2" SS UP
4" SS UP
4" SS UP
2" SS UP
2" SS UP
2" V UP
2" SS UP
2" V UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
2" SS UP
3" SS
2" SS UP
2" SS UP
2" SS
2" SS UP
2" SS UP
2" SS UP
PLUG
4" SS UP
2" SS UP
2" SS UP
2" SS UP
(E) 4" SS
(E) 4" SS
(E) 4" SS
4" SS
4" SS
2" V UP
2" SS UP 2" SS UP
4" SS UP
2" SS UP
1 1/2" V UP
2" V UP
4" SS UP
2" SS UP
4" SS
4" SS
(E) 4" SS
2" SS UP
3" SS UP
2" SS
2" SS UP
2" SS UP
2" SS UP
4" SS
2" SS UP
2" SS UP
4" WCO
4" WCO
2" SS UP
4" SS UP
4" SS
4" WCO
2" SS
4" SS
2" SS
2" SS UP
2" SS
2" V UP
(E) 4" SR CRP WP
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED SANITARY AND
VENT PLAN- AREA B
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PL120B
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED SANITARY AND VENT PLAN - AREA B
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-11 1E-11
1E-10 1E-10
1E-9 1E-9
1E-8 1E-8
1E-7 1E-7
S
4" SS2" SS UP
2" V UP
4" SS UP
4" SS UP
2" SS UP
2" SS UP
4" SS
4" SS
2" V UP
4" SS UP
2" SS UP
(E) 4" SS
(E) 4" SS
(E) 4" SS
2" SS UP
(E) 4" SR CRP WP
(E) 4" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ENLARGED SANITARY AND
VENT PLAN- AREA C
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PL120C
FULLY SPRINKLERED
NORTH
SCALE: 1/4" = 1'-0"
ENLARGED SANITARY AND VENT PLAN - AREA C
NOTE
1 ALL EXISTING HORIZONTAL MAINS AND BRANCHES ARE ROUTED
THROUGH THE INTERSTITIAL SPACE ABOVE. PIPING SHOWN ON
FLOOR PLAN FOR CLARITY.
2 DEMOLISH ALL FLOOR DRAINS, CLEANOUTS AND ABANDONED
PIPING CONNECTIONS FOR DEMOLISHED FIXTURES AND
EQUIPMENT WHICH MAY NOT APPEAR ON EACH PLAN.
1E-J
1E-J
1E-H
1E-H
1E-G
1E-G
1E-F
1E-F
1E-E
1E-E
1E-10 1E-10
1E-9 1E-9
1E-8 1E-8
1E-7 1E-7
1E-6 1E-6
1E-5 1E-5
1E-4 1E-4
1E-3.8 1E-3.8
1E-3.6 1E-3.6
1E-3.5 1E-3.5
1E-3.4 1E-3.4 1E-3.3 1E-3.3
1E-3 1E-3
S
PROCEDURE 3
D129
PATIENT TOILET
D130
TOILET
D163
CORRIDOR
D134
CLEAN SUPPLY
D160
PASSAGE
C1-21
EXAM/ CONSULT
D128
EXAM/ CONSULT.
D126
PATIENT TOILET
D131
CORRIDOR
D122
PROCEDURE 2
D112
PATIENT TOILET
D113
PATIENT TOILET
D110
EXAM/ CONSULT.
D116
EXAM/ CONSULT.
D114
PROCEDURE 1
D109
EXAM/ CONSULT.
D104
CORRIDOR
D135A
INTAKE 1
D102
INTAKE 2
D103
TEAM 1 WORK
ROOM
D148
HEIGHT &
WEIGHT
D105
PRIVATE VIRTUAL
D147
EXAM/ CONSULT.
D106
EXAM/ CONSULT.
D107
EXAM/ CONSULT.
D115
EXAM/ CONSULT.
D117
EXAM/ CONSULT.
D119
MED ROOM
D121
EXAM/ CONSULT.
D123
EXAM/ CONSULT.
D125
SOILED UTILITY
D127 PROCEDURE 6
D156
EXAM/ CONSULT.
D154
EXAM/ CONSULT.
D152
OVERFLOW
STAFF WORK
ROOM
D159
TOILET
D158
HOUSEKEEPING
D157
CORRIDOR
D136
EXAM/ CONSULT.
D155
EXAM/ CONSULT.
D153
MED ROOM
D151
EXAM/ CONSULT.
D149
EXAM/ CONSULT.
D145
EXAM/ CONSULT.
D143
EXAM/ CONSULT.
D141
EXAM/ CONSULT.
D144
EXAM/ CONSULT.
D142
EXAM/ CONSULT.
D140
EXAM/ CONSULT.
D138
HEIGHT &
WEIGHT
D137
EXAM/ CONSULT.
D139
PATIENT TOILET
D146
TEAM 2 WORK
ROOM
D150
ELEC
D100A
CORRIDOR
D135
TEAM 2 WORK
ROOM
D150
CORRIDOR
D134
CORRIDOR
D135
PL121B
PL121CPL121C
PL121A
PL121BPL121B
PL121B
PL121CPL121C
PL121A
PL121BPL121B
(E) 4" SS
(E) 4" V
(E) 4" CRP WP
(E) 3" CRP V
(E) 4" SS
(E) 4" CRP WP
(E) 2" SR CRP WP
(E) 4" SS
(E) 4" CRP WP
(E) 2" SR CRP WP
PATIENT TOILET
D108
PT
D111A
(E) 2" SR CRP WP
B R A D E N
S .
C O X
6201070323
NO.
ENGINEER
S T
A
T E
O F M I C
H I
G A
N
R E
E N
I G
N
E L
ANOISSEFORP
D
E S
N E
C I
L
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
FIRST FLOOR SANITARY AND
VENT PLAN
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
1E
PROJECT DIRECTOR
APRIL 6, 2023 JDS SS
100% BID
DOCUMENTS
PL121
FULLY SPRINKLERED
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR SANTIARY AND VENT PLAN
PLUMBING NOTES
1 THIS PLAN IS DIAGRAMMATIC IN NATURE AND SHALL NOT BE
SCALED TO DETERMINE THE LOCATION OR DIMENSION OF THE
WORK. CONTRACTOR SHALL VERIFY EXACT LOCATION OF
PIPING AND PENETRATIONS.
2 CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE LOCATION
OF EXISTING BELOW GRADE WASTE PIPING AND REFLECT ANY
DEVIATION GREATER THAN 1'-0" FROM THIS PLAN ON THE
AS-BUILT DRAWINGS.
3 CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE
NEW AND EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY
WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE
APPROVAL THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
4 REPAIR WALL SURFACE AFTER INSTALLATION AND INSPECTION
OF EACH PLUMBING FIXTURE AND PIPING INSTALLED.
5 ALL WALL-MOUNTED ACCESS PANELS SHALL BE LOCKABLE TYPE.
6 ABOVE-GRADE WASTE PIPE SHALL BE RUN AT 2% GRADE.
BELOW-GRADE WASTE PIPE SHALL BE RUN AT 1% GRADE.
7 ALL CONDENSATE DRAIN PIPE SHALL BE RUN AT 1% GRADE.
8 MAINTAIN MINIMUM 10-0" SEPARATION BETWEEN FLUE AND
PLUMBING VENT OUTLETS AND ANY FRESH AIR INTAKE.
COORDINATE WITH HVAC CONTRACTOR.
9 FLOORS SHALL SLOPE TO DRAINS AT 1% MINIMUM SLOPE. SEE
ARCHITECTURAL PLANS FOR MORE INFORMATION.
10 PROVIDE ALL FLOOR DRAINS, FLOOR SINKS, TRENCH DRAINS,
ETC. WITH TRAP GUARD DEVICES (ASSE 1072 COMPLIANT).
11 PROVIDE WALL CLEAN OUTS IN ALL VENT RISERS ON BRANCHES
LONGER THAN 5'-0" AND ON BRANCHES SERVING SINKS OR
URINALS.
12 SEE RISER DIAGRAMS FOR PIPE SIZING.
13 SHUT OFF VALVES SHALL BE ACCESSIBLE AND INSTALLED ON THE
SUPPLY TO EACH PLUMBING FIXTURE.
14 ALL ISOLATION VALVES ON DOMESTIC WATER SHALL BE 316L
STAINLESS STEEL BALL VALVES (TYP).
15 COORDINATE THE ROUTING OF ALL NEW SYSTEMS WITH
PNEUMATIC TUBE STATION AND PIPING.
SANITARY & VENT NOTES
1 ALL SANITARY DRAINAGE (SAN) PIPING IS LOCATED BELOW
SLAB, UNLESS OTHERWISE NOTED.
2 ROUTE ALL PIPING INTENDED FOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .