This addendum and pre-solicitation notice provide details for an upcoming construction project at the VA Ann Arbor Medical Center. The Department of Veterans Affairs intends to issue an invitation for bids on May 27, 2023 for project 506-20-103 to upgrade the primary care area at the facility. Work includes internal demolition of the existing space and full reconstruction of a new primary care area. The project cost is estimated between $5-10 million and the contract will have a fixed price with a performance period of 550 days from bid opening. This procurement is set aside solely for verified Service-Disabled Veteran Owned Small Businesses. Offers are due in accordance with the solicitation to be issued through the System for Award Management.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project 506-20-103 Page 1 of 2
ALLIANCE | 7GAE JV
Addendum 01 Project: VA Ann Arbor Medical Center Project No: 506-20-103
Upgrade Primary Care
Date: July 11, 2023
Notice
This addendum is issued by the Architect to all known individuals, firms or corporations who have obtained or received bidding documents and contract documents for the above-listed project. This addendum is hereby made a portion of bidding documents or contract documents, as appropriate. It is issued for the purpose of amplifying, clarifying, or correcting originally issued bid documents. Bidders are required to acknowledge receipt of this addendum in the appropriate space on the bid form.
D E D U C T I V E A L T E R N A T E S
Item AD1-01 – Deductive Alternate 1
Refer to reissued sheet GI000 – COVER SHEET
Deductive Alternate #1 scope clarified to include removal of all plumbing devices, light fixtures, electrical devices, and new architectural finishes including flooring, wall gyp board, wall protection, ceiling, and casework within the following rooms:
BREAKROOM/LOUNGE D132, CORRIDOR D134, TOILET D163, PRIVATE WORK ROOM D162,
PASSAGE C1-21, OVERFLOW STAFF WORK ROOM D159, TOILET D158.
Note all demolition and subsequent new metal stud partition wall configuration of the listed rooms to be provided in addition to all HVAC work.
Item AD1-02 – Deductive Alternate 3
Refer to reissued sheet GI000 – COVER SHEET
Deductive Alternate #3 scope clarified to include Deductive Alternate #1, Deductive
Alternate #2, and removal of all plumbing devices, light fixtures, electrical devices, and new architectural finishes including flooring, wall gypsum board, wall protection, ceiling, and casework within the following rooms: CENTRAL RECEPTION D101, TEAM 2 WORK
ROOM D150, EXAM/CONSULT 25 D139, EXAM/CONSULT D141, EXAM/CONSULT D143,
EXAM/CONSULT D145, EXAM/CONSULT D149, MED ROOM D151, EXAM/CONSULT 20
D153, EXAM/CONSULT 10 D155.
VA Project 506-20-103 Page 2 of 2
ALLIANCE | 7GAE JV
Note all demolition and subsequent new metal stud partition wall configuration of the listed rooms to be provided in addition to all HVAC work.
D E M O L I T I O N
Item AD1-03 – Existing Patient Lift Removal
Refer to reissued sheet AD121 – FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN
Added removal and demolition of existing ceiling mounted patient lift, all associated track, and structural components with slab infill.
S P E C I F I C A T I O N S
Item AD1-04 – Table of Contents
Refer to reissued Volume 1 Specifications. Table of Contents has removed the following text:
- 05 58 13 Column Covers
- 05 70 00 Decorative Metals
- 08 34 59 Vault Doors and Day Gates
- 08 51 13 Aluminum Windows
- 12 31 00 Manufactured Metal Casework
- 26 13 13 Medium-Voltage Circuit Breaker Switchgear
Item AD1-05 – Added Schedules for Plastic Fabrications
Refer to inserted specification section 06 06 60 Schedules for Plastic Fabrications
Item AD1-06 – Added Tackboards
Refer to inserted specification section 10 11 23 Tackboards
END OF ADDENDUM No. 1