34 AD121 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - 506-20-103.pdf

PDF 344 KB Posted

Attached to
Z1DA--Upgrade Primary Care Building 1E, 506-20-103
Solicitation number
36C25023B0057
Issued by

About this file

This pre-solicitation notice and related documents describe an upcoming federal construction contract opportunity with the Department of Veterans Affairs. The VA intends to issue an invitation for bid on or about May 27, 2023 for an internal demolition and reconstruction project to upgrade the primary care area at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The estimated value of the firm fixed price construction contract is between $5-10 million. The contract is set aside for qualified service-disabled veteran owned small businesses. Bids are due by the date specified in the forthcoming solicitation, which will provide additional details on the pre-bid site visit, statement of work, and other requirements. Interested parties should monitor the federal Contract Opportunities website for issuance of the solicitation and any subsequent amendments.

View the file

Other files

File Type Posted
Notice of Award Aug 22 - 506-20-103.pdf PDF
Wage Determination MI20230100 July 21 - 506-21-103.pdf PDF
36C25023B0057 0003.pdf PDF
Project Manual Volume 1 Updated through Addendum No 1 - 506-20-103.pdf PDF
AE Addendum 01 Write Up - 506-20-103.pdf PDF
36C25023B0057 0002.pdf PDF
01 GI000 Cover Sheet - 506-20-103.pdf PDF
Pre-Bid Site Visit Agenda signed - 506-20-103.pdf PDF
36C25023B0057 0001.pdf PDF
Pre Bid Site Visit Attendance Log signed - 506-20-103.pdf PDF
Drawings A2 - 506-20-103.pdf PDF
Drawings C - 506-20-103.pdf PDF
Wage Determination MI20230100 Apr 7 - 506-20-103.pdf PDF
Sole Source Justification Simplex KO signed - 506-20-103.pdf PDF
RFI Form - 506-20-103.pdf PDF
Specifications Volume 2 - 506-20-103.pdf PDF
Sole Source Justification Swisslog KO signed - 506-20-103.pdf PDF
Sole Source Justification Rauland R5 KO signed - 506-20-103.pdf PDF
Drawings B - 506-20-103.pdf PDF
Drawings D2 - 506-20-103.pdf PDF
Drawings D1 - 506-20-103.pdf PDF
36C25023B0057_1 cleared - 506-20-103.pdf PDF
EMR Certification Form - 506-20-103.pdf PDF
Specifications Volume 1 - 506-20-103.pdf PDF
Drawings A1 - 506-20-103.pdf PDF
Sole Source Justification Siemens Desigo KO signed - 506-20-103.pdf PDF
36C25023B0057.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1E-3 1E-3

1E-G

1E-3.3

1E-3.5

1E-3.6

1E-3.8

1E-E 1E-F 1E-H 1E-J 1E-K1E-E.1 1E-E.4 1E-F.3 1E-G.3

1E-3.4

1E-4

1E-5

1E-6

1E-7

1E-8

1E-8.1

1E-9

1E-10

1E-8.8

1E-9.7

C1-2

CORRIDOR

D196

OUTPATIENT PHARMACY

D196E

PHARMACY VAULT

STAIR #9

D195

EXAM 7

D195A

CLO.

D194

EXAM 6

D192

EXAM 5

D193

EXAM 1

D191

EXAM 2

D192A

EXAM 4

D190

EXAM 3

D127

CHECK-IN

CHECK-OUT

D196B

STAFF TOILET

D196A

PHARM. MGR.

D125D

D125C

EXAM

D125B

EXAM

D125A

EXAM

D196C

IV PREP

D188

WAITING

C1-18

CORRIDOR

D100

PHARM

CONSULT

D101

AMBULATORY CARE

D101

CLO.

C1-17A

CORRIDOR

C

-2

C O

R R

ID

O

R

C1-19

CORRIDOR

C1-22

CORRIDOR

C1-17B

CORRIDOR

C1-20

CORRIDOR

C1-17C

CORRIDOR

D186

OFFICE

D185

OFFICE

D184

OFFICE

D183

OFFICE

D181

OFFICE

D180

STAFF

LOUNGE

STAIR #6

D187

TOILET

D154

TOILET

D128

TREATMENT

D152

TREATMENT

D126

EXAM

D151

EXAM

D120

EXAM

D141

EXAM

D121

EXAM

D143

EXAM

D122

EXAM

D145

EXAM

D124

ICE

D123

SOLID UTILITY

D123

SUPPLIES

D182

TOILET

D174

HAC

D150

TREATMENT

D172

TREATMENT

D148

EXAM

D170

EXAM

D146

MENTOR RM

D162

EXAM

D144

EXAM

D160

NURSING

D142

NURSING

D159

NURSING

D140

STATION 6

D178

MECH. RM

D178A

IS STORAGE

D178B

ELEC

D179

ELEC RM

D177

TOILET

D173

EXAM

D175

EXAM

D171

EXAM

D169

EXAM

C1-21

PASSAGE

D165

EXAM

D163

EXAM

D161

EXAM

E157

TOILET

E156A

TOILET

E156

PHLEBOTOMY

AD110

REMOVE EXISTING CEILING SYSTEM THIS AREA AS

REQUIRED TO REMOVE EXISTING DECORATIVE

CANOPY STRUCTURE AND ITS SUPPORTS.

1 1 1 1 1 1

1 1

1 1

1 1

D148

TEAM 1 WORK

ROOM

D139

EXAM/

CONSULT. 25D140

EXAM/

CONSULT. 14

D138

EXAM/

CONSULT. 13

D100

WAITING AREA

AD110

EXIST GYP BD AND

SOFFIT TO REMAIN

EXIST LAY-IN ACCOUSTICAL CEILING

TILE AND GRID SYSTEM TO REMAIN

1 1

1 1

1 1

1 1 1

EXISTING LIGHT FIXTURE TO BE REMOVED AND RELOCATED;

REFER TO LIGHTING PLAN FOR NEW LOCATION

AD110

AD110

BEYOND BEYOND

BEYOND BEYOND

BEYOND BEYOND

222222

2 22

REMOVE

EXISTING HOOD

REMOVE EXISTING

TELEVISION AND

RETURN TO COR

• ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS

SHALL BE DONE AFTER HOURS AND COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE GOVERNMENT. REFER TO

SPECIFICATIONS FOR TYPICAL ACTIVITIES THAT DICTATE AFTER HOURS WORK TO BE

PERFORMED.

• ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON

THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS

REQUIRED TO FACILITATE NEW CONSTRUCTION.

• CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT REFLECT

WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE

CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND ARCHITECT IMMEDIATELY ON

DISCREPANCIES AND VERIFICATION ON HOW BEST TO PROCEED.

• THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION

DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING

WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.

• CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS

TO BE DETERMINED BY COR WITH CONTRACTORS INPUT.

• CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT

ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO

ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER.

ONSITE SALE OR BURNING OF REMOVED ITEMS IS NOT PERMITTED.

• THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF

THE PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY

PERSON ON, ABOUT OR ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY

WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND

THE PREVENTION OF ACCIDENTS.

• THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING,

EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE

TO REMAIN.

• THE VA RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO

COORDINATE WITH COR.

• DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD

CHANGE THEIR LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

GENERAL DEMOLITION NOTES

• OLD 'ABANDONED' DATA AND PHONE LINES, PIPING TO BE DEMOED AT NO COST

PREMIUM TO THE VA.

• PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION OR REWORK TO

PREPARE FOR NEW CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING

SHALL BE TOOTHED-IN TO MATCH EXISTING COURSING PATTERN.

• WHERE WALLS, PANELS, AND CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL

WITH THE WALLS &/OR CEILINGS ARE TO BE REMOVED OR REROUTED. REFER TO

MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL DEMOLITION

NOT SHOWN ON THIS SHEET. ALL EXISTING WALLS THAT ARE TO REMAIN WITH

ADJACENT ITEMS TO BE REMOVED MUST BE PATCHED AND FINISH PAINTED (PAINT 2

COATS MINIMUM TO MATCH EXISTING COLOR)

• CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS

WITH A ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TAKE

CARE THAT CONSTRUCTION DUST IS NOT TRANSMITTED TO OCCUPIED AREAS BY

MECHANICAL SYSTEM.

• CONTRACTOR TO COORDINATE ACCESS TO WORK AREAS WHICH ARE OCCUPIED

WITH COR; CONTRACTOR TO RELOCATE EQUIPMENT FROM WORK AREA AS

DESCRIBED PER THE EQUIPMENT SCHEDULE.

• IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR

SHALL NOTIFY THE COR AND ARCHITECT ON HOW TO PROCEED.

• WHERE WALLS OR ITEMS ATTACHED TO SPRAY APPLIED FIRE PROOFING ARE

REMOVED, THE CONTRACTOR SHALL PATCH THE FIRE RATED SYSTEM AS REQUIRED TO

MAINTAIN THE FIRE RATING OF THE SYSTEM.

• REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR

DAMAGED DURING DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO

DAMAGE EXISTING TO REMAIN FINISHED SURFACE.

• CLEAN ALL AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.

• INTERIOR WALLS TO BE REMOVED, SHALL BE REMOVED THE ENTIRE HEIGHT OF THE

WALL UNLESS REQUIRED OTHERWISE BY NEW OPENINGS IN EXISTING WALLS TO

REMAIN.

• ALL EXISTING FURNISHINGS AND EQUIPMENT ARE TO BE RELOCATED BY THE VA

PRIOR TO DEMOLITION. ANY REMAINING FURNISHINGS AND EQUIPMENT

ENCOUNTERED BY THE CONTRACTOR ARE TO BE DISPOSED OF BY THE CONTRACTOR.

REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID

SYSTEM COMPLETE INCLUDING ASSOCIATED HANGERS,

METAL TEE GRID, AND EDGE ANGLES, ALL ITEMS ATTACHED

TO THE EXISTING CEILING INCLUDING CEILING MOUNTED

LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS,

MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS,

WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS,

ETC. TO BE REMOVED. COORDINATE WITH FIRE

PROTECTION DEMO, LOW VOLTAGE DEMO, MECHANICAL

DEMO, AND ELECTRICAL DEMO PLANS.

REMOVE EXISTING GYPSUM BOARD CEILING AND SUPPORT

SYSTEM COMPLETE. ALL ITEMS ATTACHED TO THE EXISTING

CEILING INCLUDING CEILING MOUNTED LIGHT FIXTURES,

SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL

DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS

POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE

REMOVED. COORDINATE WITH FIRE PROTECTION DEMO,

LOW VOLTAGE DEMO, MECHANICAL DEMO, AND

ELECTRICAL DEMO PLANS. PATCH AND REPAIR EXPOSED

SURFACES TO REMAIN AS REQUIRED FOR NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING DECORATIVE CANOPY SUPPORT

STRUCTURE AND COLUMN COVERS IN ITS ENTIRETY

INCLUDING PERFORATED PANELS, SUPPORT RODS AND

BRACKETS, AND LIGHT FIXTURES. EXISTING STRUCTURAL

SUPPORT COLUMN TO REMAIN; PATCH AND REPAIR

SPAYED-ON FIREPROOFING TO ACHIEVE REQUIRED

RATING. REFER TO DEMO SECTIONS FOR FURTHER

INFORMATION.

REMOVE EXISTING CEILING MOUNTED PATIENT LIFT,

ELECTRICAL WIRING, HARDWARE, TRACK, WALL BRACKTS,

BRACING HANGERS AND ALL CONNECTIONS TO THE

STRUCTURE. PATCH AND REPAIR ANY FLOOR OPENINGS

REMAINING WITH MATERIALS TO MAINTAIN THE 2 HOUR

FLOOR RATING.

DEMOLITION KEY NOTES

REMOVE ALL EXISTING CEILINGS. THIS INCLUDES

CEILING TILE & GRID SYSTEMS, AS WELL AS GYP BD.

CEILING & SUPPORT SYSTEM. PATCH & REPAIR

EXPOSED SURFACES TO REMAIN AS REQUIRED FOR

NEW CONSTRUCTION AND/OR NEW FINISHES.

4 AD1

AD1

AREA - A

AREA - B

AREA - C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 145

7GAE PROJECT NO.: 219123

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

100% BID DOCUMENTS APRIL 6, 2023

ADDENDUM 01 JULY 11, 2023

FIRST FLOOR REFLECTED

CEILING DEMOLITION PLAN

UPGRADE PRIMARY CARE

ANN ARBOR VAMC

506-20-103

APRIL 6, 2023 Checker

100% BID DOCUMENTS

AD121

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN

Revisions: Date:

Sheets
AD121 - FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN

File details come from the government source that posted it. Updated .