34 AD121 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - 506-20-103.pdf
PDF 344 KB Posted
- Solicitation number
- 36C25023B0057
About this file
This pre-solicitation notice and related documents describe an upcoming federal construction contract opportunity with the Department of Veterans Affairs. The VA intends to issue an invitation for bid on or about May 27, 2023 for an internal demolition and reconstruction project to upgrade the primary care area at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The estimated value of the firm fixed price construction contract is between $5-10 million. The contract is set aside for qualified service-disabled veteran owned small businesses. Bids are due by the date specified in the forthcoming solicitation, which will provide additional details on the pre-bid site visit, statement of work, and other requirements. Interested parties should monitor the federal Contract Opportunities website for issuance of the solicitation and any subsequent amendments.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1E-3 1E-3
1E-G
1E-3.3
1E-3.5
1E-3.6
1E-3.8
1E-E 1E-F 1E-H 1E-J 1E-K1E-E.1 1E-E.4 1E-F.3 1E-G.3
1E-3.4
1E-4
1E-5
1E-6
1E-7
1E-8
1E-8.1
1E-9
1E-10
1E-8.8
1E-9.7
C1-2
CORRIDOR
D196
OUTPATIENT PHARMACY
D196E
PHARMACY VAULT
STAIR #9
D195
EXAM 7
D195A
CLO.
D194
EXAM 6
D192
EXAM 5
D193
EXAM 1
D191
EXAM 2
D192A
EXAM 4
D190
EXAM 3
D127
CHECK-IN
CHECK-OUT
D196B
STAFF TOILET
D196A
PHARM. MGR.
D125D
D125C
EXAM
D125B
EXAM
D125A
EXAM
D196C
IV PREP
D188
WAITING
C1-18
CORRIDOR
D100
PHARM
CONSULT
D101
AMBULATORY CARE
D101
CLO.
C1-17A
CORRIDOR
C
-2
C O
R R
ID
O
R
C1-19
CORRIDOR
C1-22
CORRIDOR
C1-17B
CORRIDOR
C1-20
CORRIDOR
C1-17C
CORRIDOR
D186
OFFICE
D185
OFFICE
D184
OFFICE
D183
OFFICE
D181
OFFICE
D180
STAFF
LOUNGE
STAIR #6
D187
TOILET
D154
TOILET
D128
TREATMENT
D152
TREATMENT
D126
EXAM
D151
EXAM
D120
EXAM
D141
EXAM
D121
EXAM
D143
EXAM
D122
EXAM
D145
EXAM
D124
ICE
D123
SOLID UTILITY
D123
SUPPLIES
D182
TOILET
D174
HAC
D150
TREATMENT
D172
TREATMENT
D148
EXAM
D170
EXAM
D146
MENTOR RM
D162
EXAM
D144
EXAM
D160
NURSING
D142
NURSING
D159
NURSING
D140
STATION 6
D178
MECH. RM
D178A
IS STORAGE
D178B
ELEC
D179
ELEC RM
D177
TOILET
D173
EXAM
D175
EXAM
D171
EXAM
D169
EXAM
C1-21
PASSAGE
D165
EXAM
D163
EXAM
D161
EXAM
E157
TOILET
E156A
TOILET
E156
PHLEBOTOMY
AD110
REMOVE EXISTING CEILING SYSTEM THIS AREA AS
REQUIRED TO REMOVE EXISTING DECORATIVE
CANOPY STRUCTURE AND ITS SUPPORTS.
1 1 1 1 1 1
1 1
1 1
1 1
D148
TEAM 1 WORK
ROOM
D139
EXAM/
CONSULT. 25D140
EXAM/
CONSULT. 14
D138
EXAM/
CONSULT. 13
D100
WAITING AREA
AD110
EXIST GYP BD AND
SOFFIT TO REMAIN
EXIST LAY-IN ACCOUSTICAL CEILING
TILE AND GRID SYSTEM TO REMAIN
1 1
1 1
1 1
1 1 1
EXISTING LIGHT FIXTURE TO BE REMOVED AND RELOCATED;
REFER TO LIGHTING PLAN FOR NEW LOCATION
AD110
AD110
BEYOND BEYOND
BEYOND BEYOND
BEYOND BEYOND
222222
2 22
REMOVE
EXISTING HOOD
REMOVE EXISTING
TELEVISION AND
RETURN TO COR
• ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS
SHALL BE DONE AFTER HOURS AND COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE GOVERNMENT. REFER TO
SPECIFICATIONS FOR TYPICAL ACTIVITIES THAT DICTATE AFTER HOURS WORK TO BE
PERFORMED.
• ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON
THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS
REQUIRED TO FACILITATE NEW CONSTRUCTION.
• CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT REFLECT
WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND ARCHITECT IMMEDIATELY ON
DISCREPANCIES AND VERIFICATION ON HOW BEST TO PROCEED.
• THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION
DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING
WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.
• CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS
TO BE DETERMINED BY COR WITH CONTRACTORS INPUT.
• CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT
ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO
ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER.
ONSITE SALE OR BURNING OF REMOVED ITEMS IS NOT PERMITTED.
• THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF
THE PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY
PERSON ON, ABOUT OR ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY
WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND
THE PREVENTION OF ACCIDENTS.
• THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING,
EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE
TO REMAIN.
• THE VA RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO
COORDINATE WITH COR.
• DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD
CHANGE THEIR LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.
GENERAL DEMOLITION NOTES
• OLD 'ABANDONED' DATA AND PHONE LINES, PIPING TO BE DEMOED AT NO COST
PREMIUM TO THE VA.
• PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION OR REWORK TO
PREPARE FOR NEW CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING
SHALL BE TOOTHED-IN TO MATCH EXISTING COURSING PATTERN.
• WHERE WALLS, PANELS, AND CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL
WITH THE WALLS &/OR CEILINGS ARE TO BE REMOVED OR REROUTED. REFER TO
MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL DEMOLITION
NOT SHOWN ON THIS SHEET. ALL EXISTING WALLS THAT ARE TO REMAIN WITH
ADJACENT ITEMS TO BE REMOVED MUST BE PATCHED AND FINISH PAINTED (PAINT 2
COATS MINIMUM TO MATCH EXISTING COLOR)
• CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS
WITH A ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TAKE
CARE THAT CONSTRUCTION DUST IS NOT TRANSMITTED TO OCCUPIED AREAS BY
MECHANICAL SYSTEM.
• CONTRACTOR TO COORDINATE ACCESS TO WORK AREAS WHICH ARE OCCUPIED
WITH COR; CONTRACTOR TO RELOCATE EQUIPMENT FROM WORK AREA AS
DESCRIBED PER THE EQUIPMENT SCHEDULE.
• IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR
SHALL NOTIFY THE COR AND ARCHITECT ON HOW TO PROCEED.
• WHERE WALLS OR ITEMS ATTACHED TO SPRAY APPLIED FIRE PROOFING ARE
REMOVED, THE CONTRACTOR SHALL PATCH THE FIRE RATED SYSTEM AS REQUIRED TO
MAINTAIN THE FIRE RATING OF THE SYSTEM.
• REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR
DAMAGED DURING DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO
DAMAGE EXISTING TO REMAIN FINISHED SURFACE.
• CLEAN ALL AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.
• INTERIOR WALLS TO BE REMOVED, SHALL BE REMOVED THE ENTIRE HEIGHT OF THE
WALL UNLESS REQUIRED OTHERWISE BY NEW OPENINGS IN EXISTING WALLS TO
REMAIN.
• ALL EXISTING FURNISHINGS AND EQUIPMENT ARE TO BE RELOCATED BY THE VA
PRIOR TO DEMOLITION. ANY REMAINING FURNISHINGS AND EQUIPMENT
ENCOUNTERED BY THE CONTRACTOR ARE TO BE DISPOSED OF BY THE CONTRACTOR.
REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID
SYSTEM COMPLETE INCLUDING ASSOCIATED HANGERS,
METAL TEE GRID, AND EDGE ANGLES, ALL ITEMS ATTACHED
TO THE EXISTING CEILING INCLUDING CEILING MOUNTED
LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS,
MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS,
WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS,
ETC. TO BE REMOVED. COORDINATE WITH FIRE
PROTECTION DEMO, LOW VOLTAGE DEMO, MECHANICAL
DEMO, AND ELECTRICAL DEMO PLANS.
REMOVE EXISTING GYPSUM BOARD CEILING AND SUPPORT
SYSTEM COMPLETE. ALL ITEMS ATTACHED TO THE EXISTING
CEILING INCLUDING CEILING MOUNTED LIGHT FIXTURES,
SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL
DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS
POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE
REMOVED. COORDINATE WITH FIRE PROTECTION DEMO,
LOW VOLTAGE DEMO, MECHANICAL DEMO, AND
ELECTRICAL DEMO PLANS. PATCH AND REPAIR EXPOSED
SURFACES TO REMAIN AS REQUIRED FOR NEW
CONSTRUCTION AND/OR NEW FINISHES.
REMOVE EXISTING DECORATIVE CANOPY SUPPORT
STRUCTURE AND COLUMN COVERS IN ITS ENTIRETY
INCLUDING PERFORATED PANELS, SUPPORT RODS AND
BRACKETS, AND LIGHT FIXTURES. EXISTING STRUCTURAL
SUPPORT COLUMN TO REMAIN; PATCH AND REPAIR
SPAYED-ON FIREPROOFING TO ACHIEVE REQUIRED
RATING. REFER TO DEMO SECTIONS FOR FURTHER
INFORMATION.
REMOVE EXISTING CEILING MOUNTED PATIENT LIFT,
ELECTRICAL WIRING, HARDWARE, TRACK, WALL BRACKTS,
BRACING HANGERS AND ALL CONNECTIONS TO THE
STRUCTURE. PATCH AND REPAIR ANY FLOOR OPENINGS
REMAINING WITH MATERIALS TO MAINTAIN THE 2 HOUR
FLOOR RATING.
DEMOLITION KEY NOTES
REMOVE ALL EXISTING CEILINGS. THIS INCLUDES
CEILING TILE & GRID SYSTEMS, AS WELL AS GYP BD.
CEILING & SUPPORT SYSTEM. PATCH & REPAIR
EXPOSED SURFACES TO REMAIN AS REQUIRED FOR
NEW CONSTRUCTION AND/OR NEW FINISHES.
4 AD1
AD1
AREA - A
AREA - B
AREA - C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 145
7GAE PROJECT NO.: 219123
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
100% BID DOCUMENTS APRIL 6, 2023
ADDENDUM 01 JULY 11, 2023
FIRST FLOOR REFLECTED
CEILING DEMOLITION PLAN
UPGRADE PRIMARY CARE
ANN ARBOR VAMC
506-20-103
APRIL 6, 2023 Checker
100% BID DOCUMENTS
AD121
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN
Revisions: Date:
| Sheets |
| AD121 - FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN |
File details come from the government source that posted it. Updated .