RFI Received 3-18-21.pdf

PDF 92 KB Posted

Attached to
Y1DZ--Renovate Basement, Building 1 610A4-19-104
Solicitation number
36C25021B0018
Issued by

About this file

This document contains a Request for Information (RFI) and related federal contract opportunity solicitation for renovating the basement of Building 1 at the VA Northern Indiana Health Care System campus in Fort Wayne, Indiana. The RFI provides responses to questions from contractors regarding specifications, phasing of the project, and the ability to obtain submittals and long lead time materials in advance of construction start dates. The related solicitation provides additional details on the scope of work, which involves renovating spaces for various medical and administrative functions over three phases, with phase one to be completed within 300 days and all work to be finished within a total of 780 days while maintaining adjacent hospital services. Coordination and scheduling will be required to allow continued operations during construction. The opportunity is designated for the Department of Veterans Affairs.

View the file

Other files

File Type Posted
36C25021B0018 0010.docx DOCX document
36C25021B0018 0009.docx DOCX document
36C25021B0018 0008.docx DOCX document
36C25021B0018 0007.docx DOCX document
Fort Wayne_Interior Sign Spec r1.pdf PDF
RFI Responses 4-13-21.xlsx XLSX spreadsheet
RFI (PLUMBING) Response.pdf PDF
RFI - scan0001 - Amendment 0006.pdf PDF
36C25021B0018 0006.docx DOCX document
RFI 03 - Amendment 0006.pdf PDF
RFI 02 - Amendment 0006.pdf PDF
36C25021B0018 0005.docx DOCX document
Handout Sheet - scheduled work stoppage.docx DOCX document
Breez Lighting Specs 3-22-21.pdf PDF
Pre-Bid Sign-In Sheet.pdf PDF
36C25021B0018 0004.docx DOCX document
CO Pre-Bid Remarks.pdf PDF
Sole Source JA - Breez lighting-signed.pdf PDF
Drawings_2020-07-15_reprint-3 of 3.pdf PDF
36C25021B0018 0003.docx DOCX document
Drawings_2020-07-15_reprint-2 of 3.pdf PDF
Amendment 0002.docx DOCX document
36C25021B0018 0001.docx DOCX document
Drawings_2020-07-15_reprint-1 of 3.pdf PDF
RFI Form.pdf PDF
Contractor EMR Certification Form.pdf PDF
6-drawings-Renovate Basement.pdf PDF
36C25021B0018.docx DOCX document
5a-specs-Renovate Basement.pdf PDF
Wage Determination 02-26-2021.txt TXT text file
5b-specs-Renovate Basement.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C25021B0018

PROJECT NUMBER: 610A4-19-104 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarif ication submitted. No question or request for clarif ication will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE:

(Const) Renovate Basement Bldg. 1

PROJECT LOCATION:

Department of Veterans Affairs Northern Indiana Health Care System – Fort Wayne Campus 2121 Lake Ave., Fort Wayne, IN

TO:

Yvonne Demorest, Contract Specialist Department of Veterans Affairs NCO10 West Contracting Office 2780 Airport Dr., Suite 340 Columbus, OH 43219 Yvonne.demorest@va.gov

RFI NO.: DATE:

SPEC/DWG. REFERENCE(s):

REPLY NEEDED BY:

INFORMATION NEEDED:

REPLY:

RFIs will be answered by amendment(s).

REPLY FROM:

DATE:

ATTACHMENTS:

COPY TO:

SUBMITTED BY: CITY/STATE:

PHONE:

1) SUPERINTENDENT SHALL BE DEDICATED TO THIS PROJECT - NO EXCEPTIONS.

2) AS STATED IN THE IFB EACH PHASE WILL STOP FOR 30 DAYS THEN A NEW NOTICE TO

PROCEED FOR THE NEXT PHASE WILL BE ISSUED.

3) ADMINISTRATIVE NTP WILL NOT BE PROVIDED FOR SUBMITTALS. THERE ARE NO

MATERIALS EXPECTED TO NEED LONG LEAD TIMES.

Dale Typewritten Text

3/18/21

Dale Typewritten Text 01 00 00 & 01 45 01

Dale Typewritten Text

Dale Typewritten Text Can the superintendent supervise other projects on-site or does the superintendent need to be dedicated to the Bld 1 Basement project?

With 780 days allowed for total duration, will the contract time be stopped for the 30 days required for VA moves between the various phases? With only 300 days for phase 1 will a administrative NTP be provided once contract is awarded to allow submittals and long lead-time materials to be obtained prior to issuing the construction NTP?

Dale Typewritten Text

Dale Typewritten Text