Drawings_2020-07-15_reprint-1 of 3.pdf
PDF 9 MB Posted
- Attached to
- Y1DZ--Renovate Basement, Building 1 610A4-19-104
- Solicitation number
- 36C25021B0018
About this file
This federal contract opportunity is a solicitation for the renovation of the basement in Building 1 at the VA Northern Indiana Health Care System campus in Fort Wayne, Indiana. The scope of work includes renovating space for Environmental Management Services, Biomedical Services, Pharmacy, Mailroom, Engineering Services, Office of Information Technology, Graduate Medical Education, and Medical Imaging. The project will be conducted in three phases with work stoppages between each phase. Phase I is scheduled for 300 days, Phase II for 210 days, and Phase III for 270 days. All work will be completed at the VA campus located at 2121 Lake Ave, Fort Wayne, IN. The justification provided is that this project aims to modernize systems and focus resources more efficiently to provide world-class customer service to Veterans by streamlining workflows, optimizing storage space, providing electronic inventory tracking and medication verification to prevent dispensing errors.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
B
IM
/1
F t.
W a y n e
V A
M C
B a s e m e n t B ld g
/1
A rc h
C e n tr a l
.r v t
/1
/2
:5
:5
P
M
G001
COVER SHEET
AE Works
209 SANDUSKY STREET
PITTSBURGH, PA 15212
412-287-7333
AEW Project No. 18025
RENOVATE BASEMENT,
BUILDING 1
2121 LAKE AVE, FORT WAYNE, IN 46805
610A4-19-104
07/15/2020 DC TW
BID DOCUMENTS
RENOVATE BASEMENT, BUILDING 1
NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE VA MEDICAL CENTER
2121 LAKE AVENUE, FORT WAYNE, IN 46805
VICINITY MAP
LOCATION MAP
SITE
SHEET # SHEET NAME
HVAC
H001 HVAC SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
H002 AIR BALANCE PLAN
HD100W HVAC DEMOLITION PLAN - BASEMENT WEST
HD100E HVAC DEMOLITION PLAN - BASEMENT EAST
HD110W HVAC PIPING DEMOLITION PLAN - BASEMENT WEST
HD110E HVAC PIPING DEMOLITION PLAN - BASEMENT EAST
H100W HVAC PLAN - BASEMENT WEST
H100E HVAC PLAN - BASEMENT EAST
H110W HVAC PIPING PLAN - BASEMENT WEST
H110E HVAC PIPING PLAN - BASEMENT EAST
H301
H501 HVAC DETAILS
H502 HVAC DETAILS
H701 HVAC SCHEDULES
H801 HVAC CONTROL DIAGRAM AND SEQUENCE
H802 HVAC CONTROL DIAGRAM AND SEQUENCE
ELECTRICAL
E001 ELEC SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
ED101W ELECTRICAL DEMOLITION PLAN - BASEMENT WEST
ED102E ELECTRICAL DEMOLITION PLAN - BASEMENT EAST
E101W ELECTRICAL LIGHTING PLAN - BASEMENT WEST
E102E ELECTRICAL LIGHTING PLAN - BASEMENT EAST
E201W ELECTRICAL POWER PLAN - BASEMENT WEST
E202E ELECTRICAL POWER PLAN - BASEMENT EAST
E301 ELECTRICAL DETAILS AND ONE-LINE DIAGRAM
E401 ELECTRICAL SCHEDULES
TELECOM
ET001 TELECOM SYMBOLS, ABBREVIATIONS & GEN NOTES
ETD100W TELECOM DEMO PLANS - BASEMENT WEST
ETD100E TELECOM DEMO PLANS - BASEMENT EAST
ET100W TELECOM FLOOR PLANS - BASEMENT WEST
ET100E TELECOM FLOOR PLANS - BASEMENT EAST
ET110W TELECOM LV FLOOR PLANS - BASEMENT WEST
ET110E TELECOM LV FLOOR PLANS - BASEMENT EAST
ET601 TELECOM DETAILS
ET701 TELECOM SCHEDULES
FIRE ALARM
EF001 FIRE ALARM LEGENDS, SYMBOLS AND ABBREVIATIONS
EFD100W FIRE ALARM BASEMENT DEMO PLAN - WEST
EFD100E FIRE ALARM BASEMENT DEMO PLAN - EAST
EF100W FIRE ALARM BASEMENT PLAN - WEST
EF100E FIRE ALARM BASEMENT PLAN - EAST
EF601 FIRE ALARM PARTIAL RISER
SECURITY
ES001 SECURITY SYSTEM SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
ES100W SECURITY SYSTEM FLOOR PLANS - BASEMENT WEST
ES100E SECURITY SYSTEM FLOOR PLANS - BASEMENT EAST
ES601 SECURITY SYSTEM DETAILS
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
G002 LIFE SAFETY PLAN
G003 PHASING PLAN & DEDUCT ALTERNATES
G004 ICRA AND DUST CONTROL PLAN
HAZARDOUS MATERIAL ABATEMENT
ASB01 ASBESTOS ABATEMENT
STRUCTURAL
S000 GENERAL NOTES
S100 PLANS AND SECTIONS
ARCHITECTURAL
A001 ARCH SYMBOLS, ABBREVIATIONS & GENERAL NOTES
A002 PARTITION TYPES
AD100W DEMOLITION PLAN - BASEMENT WEST
AD100E DEMOLITION PLAN - BASEMENT EAST
A100 ARCHITECTURAL FLOOR PLAN - OVERALL
A100W FLOOR PLAN - BASEMENT WEST
A100E FLOOR PLAN - BASEMENT EAST
A110W BASEMENT REFLECTED CEILING PLAN (RCP) - BASEMENT WEST
A110E BASEMENT REFLECTED CEILING PLAN (RCP) - BASEMENT EAST
A120W FURNISHINGS, FIXTURES, & EQUIP (FFE) PLAN - B WEST
A120E FURNISHINGS, FIXTURES, & EQUIP (FFE) PLAN - B EAST
A130 FINISH SCHEDULE & DETAILS
A130W FINISH PLAN - BASEMENT WEST
A130E FINISH PLAN - BASEMENT EAST
A400 ENLARGED PLANS & ELEVATIONS
A401 ENLARGED PLANS & ELEVATIONS
A402 ENLARGED PLANS & ELEVATIONS
A501 DETAILS
A502 DETAILS
A503 DETAILS - CASEWORK
A601 DOOR SCHEDULE & DETAILS
A701W BASEMENT SIGNAGE PLAN WEST
A701E BASEMENT SIGNAGE PLAN EAST
FIRE PROTECTION
FP001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FPD100W FIRE PROTECTION DEMOLITION PLAN - BASEMENT WEST
FPD100E FIRE PROTECTION DEMOLITION PLAN - BASEMENT EAST
FP100W FIRE PROTECTION PLAN - BASEMENT WEST
FP100E FIRE PROTECTION PLAN - BASEMENT EAST
FP600 FIRE PROTECTION DETAILS AND SCHEDULE
PLUMBING
P001 PLUMBING SYMBOLS AND ABBREVIATIONS
PD100W PLUMBING DEMOLITION PLAN - BASEMENT WEST
PD100E PLUMBING DEMOLITION PLAN - BASEMENT EAST
P100W PLUMBING PLAN - BASEMENT WEST
P100E PLUMBING PLAN - BASEMENT EAST
P600 PLUMBING DETAILS
P700 PLUMBING SCHEDULES
PROJECT NUMBER: 610A4-19-104
SITE
BID DOCUMENTS SUBMISSION
DRAWING INDEX
# Revisions Date
HVAC SECTIONS AND ENLARGED PLANS
UP
UP UP
UP
UP
UP
NOTE: LIFE SAFETY REVIEW BASED ON NFPA 101, 2018 EDITION (AND IBC 2018 WHERE
APPLICABLE); WHEN CODES CONFLICT, THE MORE STRINGENT CODE WILL APPLY.
1. LOCATIONS OF LOOSE FURNITURE (TABLES, DESKS, CHAIRS, ETC.) ARE SHOWN FOR
REFERENCE ONLY AND TO DEMONSTRATE NUMBER OF LIKELY OCCUPANTS IN ASSEMBLY SPACES.
ALL LOOSE FFE ITEMS TO BE LOCATED BY VA UNLESS NOTED OTHERWISE.
LIFE SAFETY CODE REVIEW
GOVERNING CODES AND STANDARDS
- INTERNATIONAL BUILDING CODE - 2018 Edition
- INTERNATIONAL MECHANICAL CODE - 2018 Edition
- INTERNATIONAL PLUMBING CODE - 2018 Edition
- NFPA STANDARD 13, INSTALLATION OF SPRINKLER SYSTEMS - 2019 Edition
- NFPA STANDARD 45, STANDARD ON FIRE PROTECTION FOR LABORATORIES USING CHEMICALS - 2019 Edition
- NFPA STANDARD 70, NATIONAL ELECTRIC CODE - 2020 Edition
- NFPA STANDARD 72, NATIONAL FIRE ALARM AND SIGNALING CODE - 2019 Edition
- NFPA STNADARD 101, LIFE SAFETY CODE - 2018 Edition
- AMERICANS WITH DISABILITIES ACT AND ARCHITECTURAL BARRIERS ACT ACCESSIBILITY GUIDELINES - 2010
EXISTING CONDITIONS
OCCUPANCY TYPE
BUILDING REVIEW
REQUIREMENT PROJECT/PROPOSED CODE REFERENCE
BUSINESS (BASEMENT LEVEL) -- NO CHANGE NFPA 101 - 6.1.12 / 40.1.1.4
CONSTRUCTION TYPE 1A -- NO CHANGE IBC 2018 - TABLE 602
HIGHRISE NO -- NO CHANGE IBC 2018 - 403.1
SPRINKLERS YES -- NO CHANGE IBC 2018 - 903.2.2 & 903.3.1.1
ALARM SYSTEM YES -- NO CHANGE IBC 2018 - 907.2.2
BUILDING HEIGHT 5 STORIES UNLIMITED SINGLE FLOOR (BASEMENT) IBC 2018 - TABLE 504.4 & 504.3
FLOOR AREA (PROJECT) APPROXIMATELY 14,534 SF UNLIMITED NO CHANGE IBC 2018 - TABLE 506.2
EXTERIOR WALLS 3 HOURS 3 HOURS NO CHANGE IBC 2018 - TABLE 602
FIRE WALLS 3 HOURS 3 HOURS NO CHANGE IBC 2018 - TABLE 706.4
FIRE BARRIER ASSEMBLIES 2 HOURS 2 HOURS NO CHANGE IBC 2018 - TABLE 707.3.10
PRIMARY STRUCTURAL FRAME 3 HOURS 3 HOURS NO CHANGE IBC 2018 - TABLE 601
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
INTERIOR FINISHES
EXIT PASSAGEWAYS
CORRIDOR & ENCLOSURES
ENCLOSURED SPACES CLASS C
CLASS C
CLASS B
NOT APPLICABLE
2 HOURS (SLAB ON GRADE)
CLASS C
CLASS C
CLASS B
2 HOURS
2 HOURS
NOT APPLICABLE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE IBC 2018 - TABLE 601
IBC 2018 - TABLE 601
IBC 2018 - TABLE 803.13
IBC 2018 - TABLE 803.13
IBC 2018 - TABLE 803.13
MEANS OF EGRESS
OCCUPANCY LOAD
(SEE TABLE ON SHEET) UNKOWN
NFPA 101 TABLE 7.3.1.2 -
OCCUPANT LOAD FACTOR
FUNCTION OF SPACE FLOOR AREA IN SF PER OCCUPANT
500 GROSS
150 GROSS
30 GROSS
15 GROSS
ACCESSORY STORAGE AREAS
BUSINESS USE
COLLABORATION ROOMS / SPACES
- ≤ 450 SF
- > 450 SF
VARIES - SEE TABLE 90 NFPA 101 - TABLE 7.3.1.2
NUMBER OF EXITS PER STORY MULTIPLE 2 4 NFPA 101 - 40.2.4.1.2
EXISTING STAIR EGRESS (WIDTH)
EXIT PASSAGEWAY (WIDTH)
COMMON PATH OF TRAVEL
DEAD END CORRIDOR
EXISTING ACCEPTABLE
EXISTING ACCEPTABLE
EXISTING ACCEPTABLE
(0.3" / PERSON) MIN 36"
(0.2" / PERSON)
100' MAX (W/ SPRINKLERS)
50' MAX (W/ SPRINKLERS)
OCCUPANCY CALCULATION
ROOM OCCUPANTS
/30EMS SUITE
OCCUPANCY FACTORNUMBER AREA
014 408 14
/150EMS OFFICE 2 014A 140 1
/150EMS OFFICE 1 014B 147 1
/150EMS OFFICE 014C 154 2
/300CLEAN LINEN 014D 278 1
/300EMS STORAGE 015 225 1
/300EMS SUPPLY 016 209 1
/300PHARMACY CACHE 017 1156 4
/300TLT / CHANGING 021F 71 1
/300CLEAN LINEN 021G 73 1
/150X-RAY 021E 411 3
/150CT SCANNING 021D 490 4
/30RECEPTION / WORK 021A 194 7
/300SOILED HOLDING 021C 36 1
/300CLOSET 021B 34 1
/30WAITING 022 210 7
/300STORAGE 023 109 1
043A
046D
046C
046B
046A
/30GME LIBRARY 205 7
/150RES. SLEEPING ROOM 163 2
/150MENS 106 1
/150WOMENS 124 1
/300MECH 258 1
/150MECH OFFICE 492 4
/150MAILROOM 519 4
/300MECH ROOM 1 494 2
/300BIOMED STORAGE 195 1
/300STORAGE 197 1
/300WORKSHOP 408 2
/150OFFICE 111 1
/150BIOMED 458 3
/300STORAGE 55 1
/300OIT SERVER 534 2
/150OIT OFFICE 314 3
/300BATTERY ROOM 245 1
/300STOR / SOILED LINEN CART 247 1
TOTAL OCCUPANCY 90
NO CHANGE
68' - 8" (LONGEST)
NO CHANGE
NO CHANGE NFPA 101 - TABLE 7.3.3.1
NFPA 101 - TABLE 40.2.5.1
NFPA 101 - TABLE 40.2.5.1
NFPA 101 - TABLE 7.3.3.1
FIRE PROTECTION
SPRINKLER SYSTEMS
STANDPIPES
FIRE ALARM SYSTEM
YES
YES
YES
HEADS MODIFIED PER LAYOUT
NO CHANGE
MODIFIED PER LAYOUT
NFPA 101 - 9.7.1
NFPA 101 - 9.10.1
NFPA 101 - 9.6.1
043B /300ENGINEERING STORAGE 256 1
AREA (SF)
EXIT GENERATOR (OCCS / SF)
OCCUPANTS
EGRESS SYMBOL LEGEND
(135)
34"
DOOR(S)
EXIT
(REQUIRED OCCUPANTS)
EXIT WIDTH
EXIT COMPONENT
EXIT PATH
2-HR FIRE BARRIER
TRAVEL DISTANCE
COMMON PATH OF TRAVEL DISTANCE
NOT IN SCOPE (NIS)
NOT IN CONTRACT (NIC)
1-HR FIRE BARRIER
FEC
FIRE EXSTINGUISHER CABINET
FE
FIRE EXSTINGUISHER (EXISTING)
150 GSF
106 SF
MENS
B114
150 GSF
122 SF
WOMENS
B113
150 GSF
411 SF
X-RAY
B120E
150 GSF
71 SF
TLT / CHANGING
B120F
300 GSF
73 SF
CLEAN
B120G
150 GSF
487 SF
CT SCANNING
B120D
300 GSF
36 SF
SOILED HOLDING
B120C
30 NSF
208 SF
WAITING
B119
300 GSF
103 SF
STORAGE
B118
PHARMACY (NIC)
B117
30 NSF
238 SF
STOR / SOILED
LINEN CART
B306
CORRIDOR
C06
30 NSF
189 SF
RECEPTION /
WORK
B120A
CORRIDOR
C04
FIRE PUMP ROOM
(NIC)
B109
ENGINEERING (NIC)
B105
ENGINEERING (NIC)
B106
SOILED (NIC)
B107
HVAC (NIC)
B108
300 GSF
194 SF
STORAGE
B316D
300 GSF
1109 SF
PHARMACY CACHE
B111
OIT (NIC)
053A
HAVC (NIC)
B314
WET VAC (NIC)
B313
STAIR 4 (NIC)
S4
VESTIBULE (NIC)
TOILET ROOM
B315
STAIR 3 (NIC)
S3
ENGINEERING (NIC)
B304
ENGINEERING (NIC)
B305
159 SF
STAIR 2 (NIC)
S2
300 GSF
534 SF
OIT SERVER
B311
150 GSF
473 SF
MAILROOM
B300
HAC (NIC)
063A
ELEVATOR (NIC)
SERV ELEV
MORGUE (NIC)
JAN
B302 SOILED (NIC)
B303
150 GSF
481 SF
MECHANICAL
OFFICE
B101
30 NSF
195 SF
GME LIBRARY
B116
300 GSF
195 SF
BIOMED STORAGE
B310
FUTURE EMERGENCY ROOM ADDITION IN
THIS APPROXIMATE LOCATION (NIC)
RECENT SPS ADDITION IN THIS LOCATION
(NIC - SHOWN FOR REFERENCE ONLY)
100 GSF
125 SF
EMS OFFICE 1
B100B
300 GSF
214 SF
EMS SUPPLY
B104
100 GSF
135 SF
EMS OFFICE 2
B100A
100 GSF
266 SF
CLEAN LINEN
ROOM
B100C
2 300 GSF
152 SF
MENS DRESSING
B100E
30 NSF
362 SF
EMS SUITE
B100
ELEVATOR (NIC)
300 GSF
519 SF
WORKSHOP
B316C
150 GSF
318 SF
BIOMED
B316
150 GSF
99 SF
OFFICE
B316B
300 GSF
494 SF
MECH ROOM 1
B308
EXIT
72" Door(s)
EXIT
48" Door(s)
EXIT
36" Door(s)
EXIT
36" Door(s)
150 GSF
85 SF
RES. SLEEPING
ROOM
B115
150 GSF
305 SF
OIT OFFICE
B309
E X
IT
D o o r( s
300 GSF
249 SF
EMS STORAGE
B103
300 GSF
237 SF
BATTERY ROOM
B307
PUMP ROOM (NIC)
300 GSF
54 SF
STORAGE
B316A
CPT = 68' - 8" TD = 135' - 11"
300 GSF
33 SF
CLOSET
B120B
CPT = 65' - 0"
TD = 171' - 7" TD = 142' - 8" CPT = 66' - 5"
300 GSF
256 SF
ENGINEERING
STORAGE
B312
300 GSF
225 SF
MECH
B102B
300 GSF
115 SF
WOMENS
DRESSING
B100D
EXISTING AREAWAY BELOW GRADE
SWITCHGEAR AND
GENERATORS (NIC)
FE
FEC
FECFECFEC
WEST (BW) EAST (BE)
BASEMENT
GENERAL AREA
OF WORK
(REF PLAN FOR
DETAILS)
BASEMENT
AREA OF FUTURE
WORK (NOT IN
CONTRACT)
NOT IN CONTRACT
N O
T I
N C
O N
T R
A C
T M
A T
C H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
B
IM
/1
F t.
W a y n e
V A
M C
B a s e m e n t B ld g
/1
A rc h
C e n tr a l
.r v t
/1
/2
:5
:0
P
M
G002
LIFE SAFETY PLAN
AE Works
209 SANDUSKY STREET
PITTSBURGH, PA 15212
412-287-7333
AEW Project No. 18025
RENOVATE BASEMENT,
BUILDING 1
2121 LAKE AVE, FORT WAYNE, IN 46805
610A4-19-104
07/15/2020 DC TW
BID DOCUMENTS
0 16' 32'8' 1/16" = 1'-0"
PROPOSED BASEMENT FLOOR PLAN
UP
UP
UP
MENS
B114
WOMENS
B113
X-RAY
B120E
TLT / CHANGING
B120F
CLEAN
B120G
CT SCANNING
B120D
SOILED HOLDING
B120C
WAITING
B119
STORAGE
B118
PHARMACY (NIC)
B117
STOR / SOILED LINEN
CART
B306
CORRIDOR
C06
RECEPTION / WORK
B120A
CORRIDOR
C04
FIRE PUMP ROOM
(NIC)
B109
ENGINEERING (NIC)
B105
ENGINEERING (NIC)
B106
SOILED (NIC)
B107
HVAC (NIC)
B108 STORAGE
B316D
PHARMACY CACHE
B111
OIT (NIC)
053A
HAVC (NIC)
B314
WET VAC (NIC)
B313
STAIR 4 (NIC)
S4
VESTIBULE (NIC)
TOILET ROOM
B315
STAIR 3 (NIC)
S3
ENGINEERING (NIC)
B304
ENGINEERING (NIC)
B305
159 SF
STAIR 2 (NIC)
S2
OIT SERVER
B311
MAILROOM
B300
HAC (NIC)
063A
ELEVATOR (NIC)
SERV ELEV
MORGUE (NIC)
JAN
B302
SOILED (NIC)
B303
MECHANICAL OFFICE
B101
GME LIBRARY
B116
BIOMED STORAGE
B310
M A
T C
H L
IN
E
M A
T C
H L
IN
E
FUTURE EMERGENCY ROOM ADDITION IN
THIS APPROXIMATE LOCATION (NIC)
RECENT SPS ADDITION IN THIS LOCATION
(NIC - SHOWN FOR REFERENCE ONLY)
PHASING / ALTERNATES KEY
PHASE 1
PHASE 2
PHASE 3
NOT IN SCOPE (NIS)
NOT IN CONTRACT (NIC)
EMS OFFICE 1
B100B
EMS SUPPLY
B104
EMS OFFICE 2
B100A
CLEAN LINEN ROOM
B100C
MENS DRESSING
B100E
EMS SUITE
B100
ELEVATOR (NIC)
VA ALT 2
VA ALT 1 = PHASE 3
VA ALT 3
WORKSHOP
B316C
BIOMED
B316
OFFICE
B316B
RES. SLEEPING
ROOM
B115
RESIDENT TLT RM
B115A
OIT OFFICE
B309
MECH ROOM 1
B308EMS STORAGE
B103
BATTERY ROOM
B307
PACKAGE LOCKER
B301
STORAGE
B316A
BIOMED FILE ROOM
(NIC)
B110
LOCATION OR PROPOSED VA (ADD) ALTERNATE
CONSTRUCTION BARRIER
WOMENS DRESSING
B100D
MECH
B102B
ENGINEERING
STORAGE
B312
STORAGE
B100F
RADIOLOGY
B120
CLOSET
B120B
CORRIDOR
C05
CORRIDOR
C05
CORRIDOR
C02
CORRIDOR
C03
CORRIDOR
C01
CORRIDOR
C07
CORRIDOR
C07
FUTURE
CONNECTION TO ER
ELEVATOR LOBBY
EXISTING AREAWAY BELOW GRADE
SWITCHGEAR AND
GENERATORS (NIC)
WEST (BW) EAST (BE)
BASEMENT
GENERAL AREA
OF WORK
(REF PLAN FOR
DETAILS)
BASEMENT
AREA OF FUTURE
WORK (NOT IN
CONTRACT)
NOT IN CONTRACT
N O
T I
N C
O N
T R
A C
T M
A T
C H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
B
IM
/1
F t.
W a y n e
V A
M C
B a s e m e n t B ld g
/1
A rc h
C e n tr a l
.r v t
/1
/2
:5
:1
P
M
G003
PHASING PLAN & DEDUCT ALTERNATES
AE Works
209 SANDUSKY STREET
PITTSBURGH, PA 15212
412-287-7333
AEW Project No. 18025
RENOVATE BASEMENT,
BUILDING 1
2121 LAKE AVE, FORT WAYNE, IN 46805
610A4-19-104
07/15/2020 DC TW
BID DOCUMENTS
0 16' 32'8' 1/16" = 1'-0"
PROPOSED BASEMENT PHASING PLAN
UP
UP
UP
INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION
STEP #1: SELECT ACTIVITY TYPE BELOW:
CONSTRUCTION ACTIVITY TYPES:
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE PER 50 SQUARE FEET.
• PAINTING (BUT NOT SANDING)
• WALL COVERING
• ELECTRICAL TRIM WORK
• MINOR PLUMBING
• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING
OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL
INSPECTION
TYPE B
SMALL SCALE, SHORT DURATION (less than 1 day) ACTIVITIES WHICH
CREATE MINIMAL DUST
INCLUDES, BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING
• ACCESS TO CHASE SPACES
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
INCLUDES, BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING
• REMOVAL OF FLOOR COVERING, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT NOT LIMITED TO:
• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CABLING SYSTEM.
• NEW CONSTRUCTION
IS IT LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK
FOR INFECTION WITH TUBERCULOSIS? YES / NO
IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER
SYSTEM/LINES DURING ACTIVITY? YES / NO
STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF
COLUMN
A) INFECTION CONTROL RISK GROUPS
GROUP 1 - LOW: OFFICE AREAS:
GROUP 2 - MEDIUM: CARDIOLOGY, ECHOCARDIOGRAPHY,
ENDOSCOPY, NUCLEAR MEDICINE, PHYSICAL THERAPY,
RADIOLOGY/MRI, RESPIRATORY THERAPY
GROUP 3 - HIGH RISK: CCU, EMERGENCY ROOM, LABORATORIES,
OUTPATIENT SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT,
SURGICAL UNITS
GROUP 4 - HIGHEST RISK: ANY AREA CARING FOR
IMMUNOCOMPROMISED PATIENTS, CARDIAC CATH LAB, CENTRAL
SUPPLY, INTENSIVE CARE UNITS, MEDICAL UNITS, NEGATIVE
AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS
STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX
BELOW:
CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO
DETERMINE CLASS
** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES
THAT CLASS II, III, IV PRECAUTIONS ARE REQUIRED.
RISK LEVEL TYPE 'A' TYPE 'B' TYPE 'C' TYPE 'D'
GROUP 1 I II II III / IV
GROUP 2 I II III IV
GROUP 3 I II III / IV IV
GROUP 4 II III / IV III / IV IV
CONSTRUCTION
TYPE: D
RISK GROUP:
MEDIUM
RISK ASSESSMENT:
IV
ELECTRICAL
YES
POTABLE WATER
YES
HVAC
YES
MEDICAL VACUUM
YES
SEWER
YES
PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL
STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION
PERMIT:
1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING
INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO
SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
(CART WITH PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH
HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION
BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY
COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID IS USED.
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO
SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
(CART WITH PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH
HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION
BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE; OR THE CAN WEAR CLOTH OR PAPER COVERALLS
THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY
CLEANED BY ENVIRONMENTAL MANAGEMENT.
1. CLEAN WORK UPON COMPLETION OF TASK
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP &/OR VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING
PERFORMED.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY
CLEANED BY ENVIRONMENTAL MANAGEMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT &
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
4. WET MOP WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT &
DEBRIS ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
CLASS I - DURING CONSTRUCTION PROJECT
CLASS I - UPON COMPLETION OF PROJECTS
CLASS II - DURING CONSTRUCTION PROJECT
CLASS II - UPON COMPLETION OF PROJECTS
CLASS III - DURING CONSTRUCTION PROJECT
CLASS III - UPON COMPLETION OF PROJECTS
CLASS IV - DURING CONSTRUCTION PROJECT
CLASS IV - UPON COMPLETION OF PROJECTS
(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)
CONTRACTOR'S SIGNATURE AND DATE
INFECTION CONTROL NURSE'S SIGNATURE AND DATE
ICRA LEGEND
AREA NOT IN CONTRACT (NIC)
SHOWN FOR REFERENCE ONLY
**COORDINATE ICRA BARRIER LOCATIONS WITH VA
CONTRACTING OFFICERS REPRESENTATIVE (COR).
1 LAYER 5/8" TYPE-X G.W.B.
INSULATION - SEE SPECIFICATIONS
5/8" G.W.B.
METAL STUDS @16"
O.C.
BASE - SEE FINISH
SCHEDULE FOR TYPE
TRACK RUNNER
FLOOR SLAB
S E
E S
C H
E D
U
LE
P A
R T
IT
IO
N W
ID
T
H
SEALANT - SEE SPECIFICATIONS
MENS
B114
WOMENS
B113
X-RAY
B120E
TLT / CHANGING
B120F
CLEAN
B120G
CT SCANNING
B120D
SOILED HOLDING
B120C
WAITING
B119
STORAGE
B118
PHARMACY (NIC)
B117
STOR / SOILED LINEN
CART
B306
CORRIDOR
C06
RECEPTION / WORK
B120A
CORRIDOR
C04
FIRE PUMP ROOM
(NIC)
B109
ENGINEERING (NIC)
B105
ENGINEERING (NIC)
B106
SOILED (NIC)
B107
HVAC (NIC)
B108 STORAGE
B316D
PHARMACY CACHE
B111
OIT (NIC)
053A
HAVC (NIC)
B314
WET VAC (NIC)
B313
STAIR 4 (NIC)
S4
VESTIBULE (NIC)
TOILET ROOM
B315
STAIR 3 (NIC)
S3
ENGINEERING (NIC)
B304
ENGINEERING (NIC)
B305
159 SF
STAIR 2 (NIC)
S2
OIT SERVER
B311
MAILROOM
B300
HAC (NIC)
063A
ELEVATOR (NIC)
SERV ELEV
MORGUE (NIC)
JAN
B302
SOILED (NIC)
B303
MECHANICAL OFFICE
B101
GME LIBRARY
B116
BIOMED STORAGE
B310
M A
T C
H L
IN
E
M A
T C
H L
IN
E
FUTURE EMERGENCY ROOM ADDITION IN
THIS APPROXIMATE LOCATION (NIC)
RECENT SPS ADDITION IN THIS LOCATION
(NIC - SHOWN FOR REFERENCE ONLY)
EMS OFFICE 1
B100B
EMS SUPPLY
B104
EMS OFFICE 2
B100A
CLEAN LINEN ROOM
B100C
MENS DRESSING
B100E
EMS SUITE
B100
ELEVATOR (NIC)
WORKSHOP
B316C
BIOMED
B316
OFFICE
B316B
PROPOSED AEW DEDUCT ALTERNATE:
SHELL RADIOLOGY SUITE
RES. SLEEPING
ROOM
B115
RESIDENT TLT RM
B115A
OIT OFFICE
B309
MECH ROOM 1
B308EMS STORAGE
B103
BATTERY ROOM
B307
PACKAGE LOCKER
B301
STORAGE
B316A
BIOMED FILE ROOM
(NIC)
B110
WOMENS DRESSING
B100D
MECH
B102B
ENGINEERING
STORAGE
B312
STORAGE
B100F
RADIOLOGY
B120
CLOSET
B120B
CORRIDOR
C05
CORRIDOR
C05
CORRIDOR
C02
CORRIDOR
C03
CORRIDOR
C01
CORRIDOR
C07
CORRIDOR
C07
FUTURE
CONNECTION TO ER
ELEVATOR LOBBY
EXISTING AREAWAY BELOW GRADE
SWITCHGEAR AND
GENERATORS (NIC)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
B
IM
/1
F t.
W a y n e
V A
M C
B a s e m e n t B ld g
/1
A rc h
C e n tr a l
.r v t
/1
/2
:5
:1
P
M
G004
ICRA AND DUST CONTROL PLAN
AE Works
209 SANDUSKY STREET
PITTSBURGH, PA 15212
412-287-7333
AEW Project No. 18025
RENOVATE BASEMENT,
BUILDING 1
2121 LAKE AVE, FORT WAYNE, IN 46805
610A4-19-104
07/15/2020 TW CC
BID DOCUMENTS
NORTH
TRUE NORTH=
PROJECT
88.50°
# Revisions Date
NOT TO SCALEG004
ICRA PARTITION TYPES - 1 HOUR (U465)2
0 16' 32'8' 1/16" = 1'-0"
PROPOSED BASEMENT PLAN
ASBESTOS CONTAINING MATERIALS
ACM NOTES
# Revisions Date
209 SANDUSKY STREET
2121 LAKE AVE, FORT WAYNE, IN 46805
Project Director
ASB01
RCM BSR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
PITTSBURGH, PA 15212
412-287-7333
AEW PROJECT NO. 18031
AEW PROJECT NO. 18031
www.skellyloy.com
412-828-1412
PITTSBURGH, PA 15238
3280 WILLIAM PITT WAY
SKELLY AND LOY, INC.
07/15/2020
ASB01
ASBESTOS ABATEMENT
NOT TO SCALE
610A4-18-104
RENOVATE BASEMENT
BUILDING 1BASEMENT
ASBESTOS ABATEMENT
SUB-BASEMENT
R3 5
4 6 7 8 8A
F1
R2
R1
22A
18 19
2021 13
63A
B
60A
59A
42A
44A
45A 45 45B
46 47
STR #3
50A
575859C59B
52 52
STR #4
53B
STR #2
39 40
30A
30B
53A49A
R3
8B
25A
LEGEND
WORK AREA
HA 44 - 12"x12" WHITE WITH BLUE FLOOR TILE AND ASSOCIATED MASTIC
HA 34 - BLACK TAR PIPE COATING
HA 25/27/28/29 - 12"x12" GREEN, BLACK, AND BROWN FLOOR TILE AND ASSOCIATED MASTIC
HA 20 - 12"x12" CREAM FLOOR TILE AND ASSOCIATED MASTIC
HA 18/20 - 12"x12" GREY SPECKLED AND 12"x12" CREAM FLOOR TILE AND ASSOCIATED MASTIC
HA 10/36 - PIPE INSULATION AND FITTINGS
AREA OF WORK
SETUP AND PROJECT PHASING.
AREA WORK FOR PLAN ICRA THE AND PLANS AND DRAWINGS CONTROL
DUST APPLICABLE REFERENCE SHALL CONTRACTOR THE 12.
1926.500-503.
CFR 29 M SUBPART INCLUDING REGULATIONS APPLICABLE ALL TO
ADHERE SHALL CONTRACTOR THE AREA. ADJOINING THE ABOVE FEET
(6) SIX THAN GREATER SURFACES ON EDGES AND SIDES UNPROTECTED
WITH WORKING WHEN REQUIRED BE SHALL PROTECTION FALL 11.
(1910.146) DURING ABATEMENT ACTIVITIES. 29 CFR 1926
AND 1926.453, CFR 29 1926.450-454, CFR 29 L SUBPART INCLUDING SPACE
CONFINED AND LIFTS WORK AERIAL SCAFFOLDING, FOR REGULATIONS
APPLICABLE ALL TO ADHERE SHALL CONTRACTOR THE 10.
ENVIRONMENT.
THE AND PATIENTS, AND EMPLOYEES HOSPITAL WORKERS,
TO EXPOSURE LEAD MINIMIZE TO CONSTRUCTION IN LEAD 1926.62
CFR TO ADHERE SHALL AND DISTURBED, BE TO IS PAINT IF CONTROL
DUST USE MUST CONTRACTORS PAINT. BASED LEAD AS TESTED
44A AND 44 43, ROOM IN WALLS ON PAINT COLORED PEACH THAT
INDICATING RESULTS WITH SAMPLED, WAS PAINT BASED LEAD 9.
TO PROCEED IN THE PROJECT WORK AREA.
PROJECT RENOVATION THE FOR SAFE ENVIRONMENTALLY AREA WORK
THE MAKE AND ACM SPECIFIED REMOVE TO IS WORK ABATEMENT THE
OF INTENT THE WORK. THE BY GENERATED MATERIALS CONTAMINATED
OR CONTAINING ASBESTOS ANY OF DISPOSAL THE INCLUDES
ALSO WORK THE FIBERS. ASBESTOS AIRBORNE WITH CONTACT FROM
BOTH, OR ENVIRONMENT, THE WORKERS, PROTECT TO MATERIALS
CONTAINING ASBESTOS OF CONTROL AND HANDLING PROPER
THE INCLUDES COVERED WORK THE CONTAINMENT; UNDER WHILE 8.
BE REMOVED.
TO MASTIC ASSOCIATED AND TILE FLOOR ACM ACCESS TO ETC. UNITS,
HVAC CABINETS, WALLS, REMOVE WILL CONTRACTOR THE REMOVED.
BE TO COATING TAR INSULATION PIPE AND INSULATION PIPE/FITTING
ACM ACCESS TO WALLS AND CEILINGS CONTAINING NON-ASBESTOS ALL
REMOVE SHALL CONTRACTOR HE CONTAINMENT, UNDER WHILE 7.
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
WEEK, PER DAYS 7 DAY, PER HOURS 24 MANOMETER, RECORDABLE
A USING PRESSURE, THE RECORD AND PRESSURE NEGATIVE MAINTAIN
SHALL CONTRACTOR THE AREAS, WORK CONTAINMENT IN 6.
THE DESIGNATED VA REPRESENTATIVE.
WITH COORDINATED BE SHALL PANEL TEMPORARY THE OF CONNECTION
THE PANEL. POWER GFCI TEMPORARY THE CONNECT TO ELECTRICIAN
LICENSED A RETAIN SHALL CONTRACTOR THE CONDUCTED.
BE TO IS WORK WHERE FLOOR THE ON LOCATED PANELS DISTRIBUTION
POWER A TO CONNECTED AND INSTALLED BE SHALL PANELS
GFCI PANEL. GFCI THE INSTALL AND PROVIDE SHALL CONTRACTOR
THE PANEL. POWER GFCI A TO CONNECTED BE SHALL AREAS
WORK REGULATED THE WITHIN LIGHTS AND EQUIPMENT CONTRACTOR
OPERATE TO USED POWER ALL - POWER GFCI TEMPORARY 5.
AND WATER CONTAMINATION.
DUST FROM THEM PROTECT TO SHEETING PLASTIC WITH DETECTORS
SMOKE THE COVER SHALL AND SYSTEM FIRE MAIN THE FROM ISOLATED
AREA WORK THE IN DETECTORS SMOKE ANY HAVE TO ARRANGE
SHALL CONTRACTOR THE SHEETING. PLASTIC 6-MIL RETARDANT
FLAME OF TWO-LAYERS WITH SEALED BE SHALL AREA WORK
THE OF CEILING THE - DETECTORS SMOKE AND HEADS SPRINKLER 4.
REQUIRED.
IS AREA WORK THE WITHIN CHAMBERS DECONTAMINATION THE OF
PLACEMENT SPECIFICATIONS. THE OF 1.9 SECTION WITH ACCORDANCE
IN CHAMBERS DECONTAMINATION WASTE AND PERSONNEL
SEPARATE DESIGN AND CONSTRUCT SHALL CONTRACTOR THE
- LOCATION ENCLOSURE DECONTAMINATION PERSONAL/WASTE 3.
SHALL BE DISPOSED OF AS NON-FRIABLE ASBESTOS WASTE.
MASTIC ASSOCIATED AND TILE FLOOR INSULATION, PIPE ON COATING
TAR WASTE. ASBESTOS FRIABLE AS OF DISPOSED BE SHALL INSULATION
PIPE/FITTING ASBESTOS-CONTAINING ACCUMULATED THE B.
NEGATIVE AIR PRESSURE IN THE WORK AREA.
APPROPRIATE THE RE-ESTABLISH TO REPAIRS NECESSARY THE MAKE
AND WORK STOP SHALL CONTRACTOR THE COLUMN, WATER OF INCHES
-0.02” BELOW FALLS AREA WORK THE WITHIN PRESSURE AIR NEGATIVE
THE TIME ANY AT IF REMOVAL. DURING TIMES ALL AT MAINTAINED BE
SHALL AREA WORK THE IN PRESSURE AIR NEGATIVE ADEQUATE A.
PRESENT IN THE WORK AREA USING MANUAL WET METHODS.
MATERIALS ASBESTOS-CONTAINING ALL REMOVE SHALL CONTRACTOR
THE - METHOD REMOVAL MASTIC ASSOCIATED AND TILE FLOOR
AND INSULATION PIPE ON COATING INSULATION, PIPE/FITTING 2.
SECTIONS 2.2.4 AND 3.1.4 OF THE SPECIFICATIONS.
BY REQUIRED AS SHEETING POLYETHYLENE OF LAYERS 2 WITH
SURFACES WORK ALL PROTECT AND SEAL SHALL CONTRACTOR THE
AREA’S NEGATIVE AIR PRESSURE.
WORK THE MONITOR TO CONTINUALLY TO USED BE SHALL MANOMETER
DIGITAL A MINIMUM, A AT AREA. WORK THE OUTSIDE POSTED
MANOMETERS DIGITAL OF USE THE THROUGH CONTRACTOR THE BY
MONITORED CONTINUOUSLY BE SHALL AREA WORK THE IN PRESSURE
AIR NEGATIVE AREA. WORK THE INSIDE HOUR PER CHANGES AIR (4)
FOUR LEAST AT GENERATE TO USED BE WILL UNITS EXHAUST FILTERED
HEPA THESE BUILDING. THE OF EXTERIOR THE TO EXHAUSTED
HANDLERS AIR FILTERED HEPA USING AREA WORK THE IN CREATED
BE SHALL PRESSURE AIR NEGATIVE REMOVAL. ASBESTOS DURING
TIMES ALL AT PROVIDED BE SHALL LOCATION, PERIMETER AREA WORK
ANY AT MEASURED AS COLUMN, WATER OF INCHES -0.02 LEAST AT
OF PRESSURE AIR NEGATIVE A CONTAINMENTS. PRESSURE NEGATIVE
WITHIN CONDUCTED BE SHALL WORK REMOVAL ASBESTOS ALL
THE WORK AREA.
FROM MATERIALS NON-ASBESTOS AND ASBESTOS ALL OF REMOVAL THE
PERFORMING WHEN DUST OF RELEASE THE CONTROL TO CLEANERS
VACUUM FILTERED HEPA AND METHODS WET USE SHALL CONTRACTOR
THE MASTIC. ASSOCIATED AND TILE FLOOR AND COATING TAR
AND INSULATION PIPE/FITTING ACM ACCESS TO AREAS WORK ASBESTOS
DESIGNATED THE WITHIN FROM CREATED MATERIALS, CONTAINING
NON-ASBESTOS ALL OF DISPOSE AND REMOVE SHALL CONTRACTOR THE
BY THE RENOVATIONS, WHERE INDICATED ON THE DRAWINGS.
IMPACTED BE WILL WHICH AREAS WORK THE FROM MASTIC ASSOCIATED
AND TILE FLOOR AND COATING, TAR AND INSULATION PIPE/FITTING
CONTAINING ASBESTOS OF DISPOSE AND REMOVE SHALL CONTRACTOR
THE - REMOVAL MASTIC ASSOCIATED AND TILE FLOOR AND COATING TAR
INSULATION PIPE INSULATION, PIPE/FITTING ASBESTOS-CONTAINING 1.
FULLY SPRINKLERED
AREA OF WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
BID DOCUMENTS
ABBREVIATIONS
@ At A.B. Anchor Bolt ARCH. Architect or Architectural BLDG. Building B.O.F. Bottom of Footing B.O.S. Bottom of Steel BOTT. Bottom BRG. Bearing CLR. Clear CMU Concrete Masonry Unit COL. Column CONC. Concrete CONN. Connection CONST. Construction CONT. Continuous CONTR. Contractor COORD. Coordinate DET. Detail DIA. or ø Diameter DWG. Drawing DWL. Dowel EL. Elevation EMBED. Embedment EX. Existing EXT. Exterior FTG. Footing F.V. Field Verify
CODES AND STANDARDS
1. New construction has been designed to, and shall be constructed in accordance with the following building codes and standards:
A. Indiana Building Code 2014 B. 2012 International Building Code (IBC 2012) C. ASCE 7-05, Minimum Design Loads for Buildings and Other Structures
2. Unless explicitly modified in the Contract Drawings and Specifications, the Contractor shall comply with provisions of:
A. ACI 301-10, Specifications for Structural Concrete B. ACI 318-11, Building Code Requirements for Structural Concrete C. ACI 530-11, Building Code Requirements for Masonry Structures D. ACI 530.1-11, Specification for Masonry Structures E. AISC 360-10, Specification for Structural Steel Buildings F. AWS D1.1-10, Structural Welding Code - Steel
DESIGN LOADS (IBC 2015)
Floor live load (unless otherwise noted)
Slab on grade ----------------------------------------------------------------------- 100 psf
The blast load requirements utilized for the structural reinforcements indicated within these documents were provided by Woods Peacock dated February 21, 2020.
DESIGN STRESSES
Concrete minimum compressive strength in 28 days:
Footings ------------------------------------------------------------------------------ f'c = 3,000 psi Interior slabs on grade and topping slab ------------------------------------- f'c = 4,000 psi
Reinforcing bars (ASTM A615, Grade 60) ------------------------------------------- Fy = 60,000 psi Welded wire reinforcement (ASTM A1064) ----------------------------------------- Fy = 70,000 psi Structural steel W shapes (ASTM A992 or ASTM A572/50) -------------------- Fy = 50,000 psi Structural steel other shapes (ASTM A36) ------------------------------------------ Fy = 36,000 psi Anchor rods (ASTM F1554, Grade 55 weldable) ---------------------------------- Fy = 55,000 psi Hollow structural sections (ASTM A500, Grade C)
Rectangular ------------------------------------------------------------------------- Fy = 50,000 psi Masonry -------------------------------------------------------------------------------------- f'm = 2,000 psi
Load-bearing CMU (ASTM C55 or C90) Brick (ASTM C216 Grade SW) Mortar (ASTM C270) ------------------------------------------------------------- Type M or S Grout (ASTM C476) -------------------------------------------------------------- 3,000 psi
Soil bearing pressure for foundations Presumed allowable bearing pressure --------------------------------------- 3,000 psf
GENERAL
1. All new construction shall comply with the Contract Documents and the Building Code.
2. Typical details and general notes apply to all parts of the work except where specifically detailed or unless otherwise noted.
3. The structural drawings illustrate structural members. Refer to architectural, mechanical, and electrical drawings for non-structural items which require special provisions during the construction of the structural members.
4. Drawings are not to be scaled.
5. No pipes or ducts shall be embedded into structural members unless so shown on the plans or approved by the Engineer.
6. The Contractor shall verify and be responsible for all dimensions and conditions which impact the work. Field verify sizes, elevations, hole locations, etc., prior to fabrication.
7. The Contractor shall carefully review the drawings to identify the scope of work required, visit the site to relate the scope of work to existing conditions and determine the extent to which those conditions and physical surroundings will impact the work.
8. Existing conditions as shown on these plans are for reference only. The Contractor is required to field verify all existing conditions prior to construction.
9. Locate existing underground utilities in areas of construction. Coordinate with utility companies for any shut-off requirements of still active lines.
10. The Contractor shall resolve any conflicts on the drawings or in the specifications with the Architect/Engineer before proceeding with the work.
11. Any deviation, modification, or substitution from the approved set of structural drawings shall be submitted to the Owner, Architect, and Engineer for review/approval prior to its use or inclusion on the shop drawings.
12. The Contractor shall provide all necessary shores, braces, and guys required to support all loads to which the building structure and components, soils, other structures, and utilities may be subjected during construction. Shoring systems shall be designed, signed, and sealed by a professional engineer licensed in the jurisdiction where the project is located.
13. The Contractor shall provide means, method, techniques, sequence, and procedure of construction as required.
14. The Contractor shall protect all work, materials, and equipment from damage and shall provide proper storage facilities for materials and equipment during construction.
15. Site visits performed by the Architect do not constitute inspections of means and methods of construction performed by the Contractor.
16. Observations performed by the Architect during construction are not the continuous and special inspection services and do not waive the responsibility for the inspections required of the Building Department Inspector or the testing agency.
Observations also do not guarantee the Contractor's performance and shall not be considered as supervision of construction.
17. The Contractor shall review shop drawings for completeness and compliance with contract documents. The Contractor shall stamp shop drawings prior to submission to the Architect and Engineer.
18. Review of the shop drawings by the Architect's Engineers shall not be construed as an authorization to deviate from the Contract Documents.
19. Shop drawings will not be processed if they are incomplete, lack coordination with relevant portion of contract documents, lack calculations if required, or if deviations, modifications, and substitutions are indicated without prior written approval from the Architect/Engineer.
ROOF, FLOOR, OR WALL OPENINGS
1. The Contractor shall verify and coordinate the number, size, and location of all sleeves and openings required for mechanical or electrical items.
2. Sleeves and openings shall be located in a manner that will maintain the structural integrity of the roof, floor, or wall system.
3. No structural elements are to be cut unless specifically approved by the Engineer.
FOUNDATIONS AND SLABS ON GROUND
1. Foundations for this project are designed based on the allowable bearing pressure used for the construction of the existing building. Contractor shall hire a testing agency or geotechnical engineer to verify bearing capacity. Contractor shall submit report to the Architect/Engineer prior to placement of foundations.
2. All footings must be supported on undisturbed soil capable of achieving the design soil bearing pressure without appreciable settlement. Where additional excavation is required to attain the design bearing pressure, backfill the overexcavated area with lean concrete up to the design bearing elevation.
3. Unless otherwise noted in the geotechnical report or specifications, compact all fill under slabs on ground to 98% of optimum laboratory density in accordance with ASTM D698 Standard Proctor Method. Place fill in 6” to 8” layers and compact with vibratory tamping equipment.
4. Unless otherwise noted in the geotechnical report or specifications, compact all engineered fills under foundations to 95% of the maximum dry density per ASTM D1557 Modified Proctor Method.
5. In granular soils (sands and gravel) the soil shall be mechanically tamped to a hard surface immediately prior to placing footing.
6. When excavations approach the ground water level, the water level shall be lowered by an acceptable dewatering system so that the water level is maintained continuously a minimum of 2'-0" below the excavation.
7. Existing foundation shown on drawings are approximate. Exact conditions must be verified at time of construction.
CONCRETE CONSTRUCTION
1. All concrete construction shall be in accordance with the latest Building Code Requirements for Structural Concrete ACI 318 and ACI Detailing Manual, except that construction and removal of forms and reshoring shall be inspected by the Contractor's engineer.
2. Reinforcing steel shall have the following minimum coverage. Place bars as near to the concrete surface as these minima permit wherever possible, unless noted otherwise:
A. Concrete poured against earth: 3" B. Formed concrete in contact with earth: 2"
3. Welded wire reinforcement for slabs on ground shall have a minimum top coverage of 1" and a maximum top coverage of 1 1/2", unless otherwise noted.
Reinforcement shall be positively supported and maintained in this position during placement of concrete.
4. Furnish bar supports where necessary during construction.
5. At wall footing corners, innermost reinforcing shall have 1'-0" long hook at far face.
For outer reinforcing, provide corner bars with lap length of 36 bar diameters (2'-0" minimum).
6. All bars interrupted by structural steel shall extend to within 1" of structural steel flange or web and have a 90° hook unless otherwise shown.
7. Drawings show typical reinforcing conditions. Contractor shall prepare detailed placement drawings of all conditions showing quantity, spacing, sizes, clearances, laps, intersections, and coverage required by the structural details, applicable code, and trade standards. Contractor shall notify reinforcing inspector of any adjustments from typical conditions which are proposed in placement drawings to facilitate field placement of reinforcing steel and concrete.
8. Bar bends shall be made cold. Bars shall not be bent after any portion of the bar is encased in concrete.
MASONRY CONSTRUCTION
1. Masonry walls shown on structural drawings have been designed in accordance with ACI 530, Building Code Requirements for Masonry Structures.
2. Masonry walls shall be constructed in accordance with ACI 530.1, Specifications for Masonry Structures, and the project specifications.
3. Determine compressive strength of masonry (f'm) by the unit strength method (Section 1.4,B.2 of ACI 530.1).
A. Mortar shall meet the Property Specifications' requirements of ASTM C270, and shall be field tested according to ASTM C780.
B. The strength of grout shall be determined by tests in accordance with ASTM
C1019.
4. Corners of bearing walls shall be built in running bond.
5. Provide corner bars in bond beams at wall intersections and corners to match bond beam reinforcing.
6. Unless otherwise noted, provide galvanized ladder type joint reinforcement at 16" on center vertically per ASTM A82.
7. Welding of reinforcing bars (including tack welding) is not permitted without permission of Engineer in writing.
8. Provide shop drawings which indicate size, spacing, bending details, and type of all reinforcing bars placed in masonry walls.
9. Provide dowels from supporting member (footing, beam, or slab) for all reinforced walls same size, location, and spacing as wall reinforcing.
10. Wall reinforcing shall be held in position during grouting.
LOOSE LINTEL SCHEDULE
1. Interior lintels shall be shop painted.
2. Lintels shall have minimum bearing at each end of 1" per foot of opening (6" minimum) except as detailed.
3. Lintels shall have 8" minimum solid masonry below bearing points and shall extend beyond the full bearing area.
4. Lintel bearing plates shall be held back 1/2" minimum from face of masonry at opening. Provide flexible caulk between lintel and masonry at this location. Match mortar color.
5. The following schedules apply to all non-bearing masonry walls and to bearing walls where lintels are not indicated on the structural drawings. See drawings for other lintels in bearing walls.
A. For 4", 8" walls, provide one angle for each 4" of masonry wall thickness with 3
1/2" leg horizontal as follows:
Span Limits Angle Size 0'-0" to 4'-0" L3 x 3 1/2 x 1/4 4'-1" to 5'-6" L4 x 3 1/2 x 5/16 5'-7" to 7'-6" L5 x 3 1/2 x 5/16
B. For 6" walls provide:
Span Limits Lintel Size 0'-0" to 4'-0" WT5x6 4'-1" to 5'-6" WT5x8.5
STEEL CONSTRUCTION
1. Steel detailing, fabrication, and erection shall conform to the AISC Specification for Structural Steel Buildings and Code of Standard Practice, and the AWS Structural Welding Code.
2. Stresses occurring during fabrication, shipment, and erection shall be temporary and not excessive. Stresses at all times shall be less than design and allowable stresses.
The full design and load-carrying capacity of the steel work shall not be impaired due to fabrication, shipment, or erection procedures. Throughout the complete process, the stability of all individual members and assembles shall be maintained.
3. The Contractor shall be responsible for the control of all erection procedures and sequences with relation to temperature differentials and weld shrinkage.
4. All additional steel required for erection purposes shall be provided at no additional cost and shall be removed unless approved by the Owner in writing.
5. Connections - welded or high strength bolted:
A. Bolts shall be ASTM F3125 and shall be installed in accordance with
"Specifications for Structural Joints Using High-Strength Bolts".
B. Provide slip critical bolts for all moment connections, wind connections, hangers, and other connections as noted on drawings.
C. Provide bearing type connections with thread included in the shear plane for all connections other than slip critical connections.
D. Provide hardened washers under nuts at all high-strength bolts, except where plate washers are used per AISC Specifications.
E. Unless snug tight connections are noted on the drawings as being permitted, all bolts should be tightened to full pretensioning load.
F. Use standard holes with the following exceptions: oversize holes are permitted when bolts are loaded in tension; short slotted holes are permitted for shear loading perpendicular to the slot.
G. Where minimum AISC fillet weld thickness requirement exceeds welds shown on details, or weld size is not specified, provide minimum AISC weld.
H. The length of connection shall not be less than one-half of the T distance of the beam web.
I. Connections shall develop one-half of the total uniform load capacity of the beam.
6. Welding electrodes shall be E70XX except where other electrodes are required for compatibility with material being welded.
7. Shop drawings are required and shall note type of electrodes, size of all welds, and type and size of all bolts. Shop drawings shall be prepared under the supervision of a professional engineer licensed in the jurisdiction where the project is located.
8. See all contract drawings for miscellaneous steel requirements.
9. All shop and field welding shall be performed by a recently certified welder.
10. All welding and high strength bolting must be inspected by a qualified testing laboratory.
Laboratory shall be approved by the Architect and/or Engineer.
11. At column base plates, provide a minimum of 1" grout with (4) 3/4" diameter anchor bolts with 1'-0" embedment.
12. Provide fills at splices of parts differing by more than 1/8" in thickness.
13. Provide 1/4" closure plates at all open ends of HSS members.
POST-INSTALLED ANCHORS
1. Anchorage to hardened concrete or masonry shall include torque controlled expansion anchors and adhesive anchors of size, number and spacing as shown on the drawings.
2. All anchors shall be installed in accordance with the Manufacturer's Printed Installation Instructions (MPII).
3. Existing reinforcing bars in the concrete or masonry may conflict with specific anchor locations. Reinforcing bars shall not be cut unless specifically noted on the drawings or approved by the Engineer of Record. The contractor shall review the structural drawings and shall locate the position of reinforcing bars in the vicinity of the anchors, by ground penetrating radar (GPR), x-ray, or other means.
4. Anchors shall be installed in holes drilled with a rotary impact hammer drill. Core drilling of holes is not permitted. Holes and anchor shall be thoroughly cleaned per the MPII prior to installation of the anchor.
5. Remove and replace misplaced or malfunctioning anchors. Patch failed anchor locations with high-strength non-shrink, non-metallic grout.
6. Installed adhesive anchors shall be securely held in-place to prevent displacement while the adhesive cures.
7. All anchors supporting structural elements shall be enclosed with a fire-resistance-rated envelope or protected by approved fire-resistance rated materials.
8. Quality Control:
A. All anchors shall be periodically inspected to meet the requirements of MPII and the ICC-ES ESR report for the product.
B. All anchor installers shall be trained by the manufacturer or manufacturer's representative for each individual product being installed.
9. Submittals:
A. Technical product literature, highlighting each anchor and size to be used on the project.
B. Manufacturer's Printed Installation Instructions (MPII) for each anchor type.
C. Engineering Design Data: For each substitution request, provide calculations substantiating specified design requirements, sealed by a professional engineer licensed in the jurisdiction where project is located.
10. Where a specific type of anchorage is indicated on the drawings, substitution for a different type of anchorage shall meet the requirements of ACI 355.2 Category 1 or ACI 355.4 Category 1 for anchorage into concrete or shall have an ICC-ES ESR report for anchorage into masonry. Substitution shall not be permitted without prior written approval of the Engineer of Record.
11. Anchors to hardened concrete shall be supplied as an entire system and shall be as follows:
A. Torque Controlled Expansion Anchors (Expansion Anchors) in cracked and un-cracked concrete as indicated on the drawings shall be Hilti KWIK Bolt TZ Expansion Anchor (ICC-ES Evaluation Report: ESR# 1917).
B. Adhesive anchors in cracked and un-cracked concrete indicated on the drawings shall be Hilti HIT-HY 200 Safe Set Adhesive Anchoring System (ICC-ES Evaluation Report: ESR# 3187). The following anchor rods shall be used with the system:
1. Reinforcing bar meeting the requirements of ASTM A615/A706 Grade
60.
2. All-threaded rod shall be Hilti HIT-Z rods.
12. Requirements and design parameters of post-installed anchors into hardened concrete:
A. Concrete shall have a minimum compressive strength of 2,500 psi and a minimum age of 21-days at the time of installation for adhesive anchors and 7-days for expansion anchors.
B. Concrete temperature at the time of installation of adhesive anchors shall be a minimum of 50°F.
C. Concrete may be water saturated or dry; water filled holes shall not be allowed.
D. Embedment depth and anchor projection shall be as detailed on the drawings.
Unless otherwise noted, minimum embedment depths, spacing, and edge distance shall be by the table below.
13. Anchors into masonry shall be supplied as an entire system and shall be as follows:
A. Torque Controlled Expansion Anchors (Expansion Anchors) in solid or grout filled masonry as indicated on the drawings shall be Hilti KWIK Bolt 3 Expansion Anchor (ICC-ES Evaluation Report: ESR# 1385).
B. Adhesive anchors in hollow, solid or grout filled masonry as indicated on the drawings shall be Hilti HIT-HY 70 Hybrid for Masonry Construction (ICC-ES Evaluation Report: ESR# 3342). Screen tubes shall be used for all connections to hollow masonry. The following anchor rods shall be used with the system:
1. All-threaded rod shall be Hilti HAS-E rod.
2. Stainless steel anchor rods shall be AISI Type 304 or 316.
14. Requirements and design parameters of post-installed anchors into masonry:
A. Masonry grout shall have a minimum compressive strength of 2,000 psi and a minimum age of 21-days at the time of installation for adhesive anchors and 7-days for expansion anchors.
B. Masonry temperature at the time of installation of adhesive anchors shall be between 41°F, and 104°F.
C. Masonry may be water saturated or dry; water filled holes shall not be allowed.
D. Embedment depth…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .