Handout Sheet - scheduled work stoppage.docx
DOCX document 13 KB Posted
- Attached to
- Y1DZ--Renovate Basement, Building 1 610A4-19-104
- Solicitation number
- 36C25021B0018
About this file
This solicitation is for a renovation project at the Veterans Health Administration Northern Indiana Health Care System campus in Fort Wayne, Indiana. The contractor will provide all labor, equipment, materials and supervision necessary to renovate space in the basement of Building 1 for various medical, administrative and operational departments. The project is divided into three phases according to the architect/engineer's drawings, with each phase to be followed by a 30-day work stoppage to allow for internal moves between phases. Phase I is scheduled to take 300 days and involves rooms 15 through 26 and 45, 45A and 45B. Phase II is scheduled to take 210 days and involves rooms 49A through 59A and the east basement corridor. Phase III is scheduled to take 270 days and involves rooms 30 through 35 and 43, 44 and 44A and the west basement corridor. The goal of the project is to modernize the basement space and focus resources more efficiently to provide world-class service to veterans.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scheduled Work Stoppage Ft Wayne, IN VAMC Project number: 610A4-19-104 Project name: Renovate Basement, Building 1
There will be a scheduled thirty (30) calendar day work stoppage (at no cost to the VA) between each phase of the three phases. There will be no modifications issued to cover this cost at any time. These two scheduled work stoppages must be included/covered in your original bid. These two scheduled work stoppages will allow for VA departments to vacate the next scheduled phase and to move into the new completed phase.
The two scheduled work stoppages will be treated as if the project has been completed. The contractor will clean the area and perform a pre walk through inspection to annotate deficiencies and make corrections. The VA will perform a walk through to generate a punch list. The contractor will make all corrections to the punch list to the VA’s specifications. The contractor will clean the area in preparation to turn over the phase to the VA. The contractor shall remove all ICRA barriers and tools and equipment from the work site to allow the VA departments to relocate to the new area. The contractor may leave all items on the VA property, but securely contained in a contractor provided and contractor secure container. The thirty (30) calendar day work stoppage will begin when the VA takes possession of that completed phase.