36C25018B0815-003.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25018B0815
About this file
36C25018B0815 Project Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0025-000.docx | DOCX document | |
| 36C25018B0815-0003000.docx | DOCX document | |
| 36C25018B0815-0002007.pdf | ||
| 36C25018B0815-0002004.pdf | ||
| 36C25018B0815-0002002.pdf | ||
| 36C25018B0815-0002006.pdf | ||
| 36C25018B0815-0002005.pdf | ||
| 36C25018B0815-0002003.pdf | ||
| 36C25018B0815-0002000.docx | DOCX document | |
| 36C25018B0815-0002008.pdf | ||
| 36C25018B0815-0002001.pdf | ||
| 36C25018B0815-0002010.pdf | ||
| 36C25018B0815-0002009.pdf | ||
| 36C25018B0815-0001000.docx | DOCX document | |
| 36C25018B0815-001.docx | DOCX document | |
| 36C25018B0815-004.txt | TXT text file | |
| 36C25018B0815-002.pdf | ||
| 36C25018B0815-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST
ATE OF OHIO
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
PROJECT SITE
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Department of Veterans Affairs Ambulatory Care Center
ARCHITECT
2727 TULLER PARKWAY, SUITE 200
DUBLIN, OHIO 43017
614.798.1515 P
COLLABORATIVE DESIGN
MEP ENGINEER
3073 N. HIGH STREET
COLUMBUS, OHIO 43202
614.267.4928 P
W.E. MONKS & CO.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
COVER SHEET
G-001
17029
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL PHARMACY IV PREP ROOM
420 NORTH JAMES ROAD, COLUMBUS, OHIO 43219-1834
DM DM MB
INDEX OF DRAWINGS
G-001 COVER SHEET 1
G-002 GENERAL INFORMATION 2
G-003 OVERALL FIRST FLOOR PLAN 3
G-004 OVERALL SECOND FLOOR PLAN 4
AS-100 ENLARGED PLANS - DEMOLITION & NEW CONSTRUCTION 5
AS-101 ENLARGED PLANS - EQUIPMENT & REFLECTED CEILING PLANS 6
AS-102 ROOF PLAN 7
AS-300 SCHEDULES & WALL TYPES & DETAILS 8
FP-001 FIRE PROTECTION GENERAL NOTES 9
FP-100 FIRE PROTECTION SECOND FLOOR PLAN 10
P-001 PLUMBING ABBREVIATIONS / SYMBOLS 11
P-100 PLUMBING FLOOR PLANS 12
P-200 TEMPORARY TRAILER PLUMBING PLAN 13
M-001 HVAC ABBREVIATIONS / SYMBOLS 14
M-100 HVAC SECOND FLOOR DEMOLITION PLAN 15
M-101 HVAC SECOND FLOOR PLAN 16
M-102 HVAC PIPING SECOND FLOOR PLAN 17
M-103 HVAC THIRD FLOOR / ROOF PLANS 18
M-500 HVAC DETAILS & DIAGRAMS 19
M-600 HVAC SCHEDULES 20
E-001 ELECTRICAL ABBREVIATIONS / SYMBOLS 21
E-100 ELECTRICAL SECOND FLOOR DEMOLITION PLAN 22
E-101 ELECTRICAL SECOND FLOOR LIGHTING & POWER PLANS 23
E-102 ELECTRICAL THIRD FLOOR / ROOF PLAN 24
E-200 TEMPORARY TRAILER ELECTRICAL PLAN 25
E-500 ELECTRICAL SCHEDULES AND DETAILS 26
N.T.S.Scale:
LOCATION MAP
Revisions Date
BID SET 5/18/18
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
CG-1
PP
CR
PBL
MD
HO
000'-0"
DATUM
CONCRETE
GYP. BD.
PLYWOOD
INSUL.
RIGID INSUL.
EARTH
GRAVEL
SAND
BLOCK
DATUM MARKER
DOOR NUMBER
COLUMN LINE BUBBLE
CODED NOTE (NUMBER)
DETAIL MARKER
ELEVATION MARKERS
SECTION CUT
SECTION TITLE
DETAIL TITLE
PLAN TITLE
NORTH ARROW
1. PERFORM WORK AS REQUIRED FOR PROPER COMPLETION OF THE WORK. DRAWINGS MAY NOT SHOW ALL EXISTING ITEMS OR CONDITIONS. CONTRACTOR SHALL NOT RECEIVE EXTRA PAYMENT FOR REQUIREMENTS WHICH CAN BE INFERRED THROUGH OBSERVATION OF EXISTING CONDITIONS AT THE SITE.
2. THE CONTRACTOR IS RECOMMENDED TO VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. SEE SOLICITATION FOR DATE AND TIME OF SITE
VISIT.
3. PROVIDE TEMPORARY DUST PARTITIONS AND PROVIDE TEMPORARY EXIT CORRIDORS AND ROUTING SAFETY DEVICES. COORDINATE WITH COR AND THE VA'S SAFETY PLAN.
4. COORDINATE BUILDING ACCESS AND CONSTRUCTION SCHEDULING WITH VA.
5. COMPLY WITH ALL VA RULES AND REGULATIONS, ALSO SEE SPECIFICATIONS FOR REFERENCE STANDARDS THAT GOVERN THIS PROJECT.
6. UNDER NO CIRCUMSTANCES SHALL CONSTRUCTION ACTIVITIES INTERFERE WITH SAFETY OF THE PUBLIC, OWNER'S EMPLOYEES, OR CONSTRUCTION PERSONNEL. ADHERE STRICTLY TO CONFINES OF AREAS OF WORK; DO NOT INTERRUPT HOSPITAL FUNCTIONS AT ANY TIME. REMAINING AREAS OF THE BUILDING OUTSIDE THE LIMITS OF CONSTRUCTION SHALL REMAIN
OPERATIONAL AND NOT BE DISRUPTED BY THE SCOPE OF THIS WORK.
7. DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE DRAWINGS REPRESENT THE INTENT OF THE PROJECT WORK. ALL FIELD CONDITIONS, OFFSETS, TRANSITIONS, ETC. ARE NOT REPRESENTED.
ALL EXISTING CONDITIONS AND DIMENSIONS ARE BASED ON EXISTING DRAWINGS. DUE TO THE POSSIBILITY OF DISCREPANCIES THE CONTRACTOR SHOULD VERIFY EXISTING CONDITIONS BEFORE BEGINNING CONSTRUCTION AND NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES. ALL BUILDING FLOOR LEVELS ARE ESTABLISHED FROM EXISTING DRAWINGS AND SHALL BE
FIELD VERIFIED.
8. WHERE WORK IS DONE IN EXISTING AREAS, THE EXISTING FINISHED CONDITIONS ARE TO BE REPAIRED OR REPLACED. THESE FINISHED CONDITIONS ARE TO MATCH EXISTING UNLESS OTHERWISE NOTED. WHERE NEW FINISHED CONDITIONS ARE TO BE INSTALLED, EXISTING FINISHED CONDITIONS ARE TO BE REMOVED BY THE CONTRACTOR.
9. WHERE DISCREPANCIES OCCUR BETWEEN FLOOR PLANS AND DETAILS AND LARGE SCALE DRAWINGS, CONSULT COR FOR CLARIFICATIONS. WHERE CONFLICTS OCCUR BETWEEN
ARCHITECTURAL DRAWINGS AND ENGINEERING DRAWINGS, CONSULT COR FOR INTERPRETATION.
10. ALL ROOM DIMENSIONS ARE FACE TO FACE OF PARTITION FOR METAL STUD PARTITIONS AND TO FACE OF MASONRY FOR ALL MASONRY PARTITIONS.
11. PROVIDE DOUBLE STUDS FOR AND BLOCKING AS REQUIRED TO SUPPORT EQUIPMENT, WALL GUARDS, ETC. AT DRYWALL PARTITIONS. PROVIDE FIRE RETARDANT WOOD OR METAL BLOCKING IN WALLS AS REQUIRED FOR WALL-MOUNTED EQUIPMENT AND HARDWARE, INCLUDING ITEMS IDENTIFIED AS BEING PROVIDED BY VA. VERIFY ALL MOUNTING REQUIREMENTS WITH COR, MANUFACTURER, OR EQUIPMENT SUPPLIER.
12. ALL INTERIOR FIRE-RATED PARTITIONS SHALL EXTEND ABOVE THE FINISHED CEILING AND SHALL TERMINATE AT ASSEMBLIES OF GREATER RATING. NON FIRE-RATED PARTITIONS SHALL NOT PENETRATE RATED PARTITIONS. ALL FULL-HEIGHT PARTITIONS TO HAVE ACOUSTIC SEALANT AT BOTTOM PLATE AND TOP PLATE.
13. CONTROL JOINTS IN GYPSUM BOARD PARTITIONS SHALL BE LOCATED WHERE:
A. A PARTITION OR FURRING ABUTS A STRUCTURAL ELEMENT OR DISSIMILAR WALL OR CEILING.
B. A CEILING ABUTS A STRUCTURAL ELEMENT, DISSIMILAR WALL OR PARTITION OR OTHER VERTICAL PENETRATION.
C. A PARTITION OR FURRING RUN EXCEEDING 30'-0". IF THERE IS A DOOR OPENING IN THE 30'-0" RUN, LOCATE THE CONTROL JOINT AT BOTH SIDES OF THE JAMB FROM
HEAD OF DOOR TO TOP OF PARTITION.
14. ELECTRICAL PANELS, FIRE EXTINGUISHER CABINETS, AND OTHER WALL RECESSED OBJECTS OVER 16 SQUARE INCHES, ARE TO BE WRAPPED IN GYPSUM BOARD TO MAINTAIN THE
APPROPRIATE WALL RATING, IF REQUIRED.
15. PROVIDE FIRE AND/OR SMOKE DAMPERS AT ALL LOCATIONS WHERE MECHANICAL DUCTS PENETRATE FIRE AND/OR SMOKE WALLS.
16. WHERE ITEMS ARE DEEPER THAN THE PARTITION WALLS ARE TO BE FURRED OUT TO CONCEAL PIPING, ELECTRICAL PANELS, FIRE EXTINGUISHER CABINETS, AND RECESSED OBJECTS.
NO FURRING SHALL OCCUR ON THE CORRIDOR SIDE OF THE PARTITION.
17. GYPSUM BOARD ABUTTING OTHER MATERIALS OR EXISTING FINISHES IS TO BE FINISHED WITH METAL CORNER BEAD.
18. GYPSUM BOARD AT METAL STUD FURR-OUTS IN AREAS WITH FINISH CEILING SHOULD EXTEND TO 6" ABOVE FINISH CEILING AND BE BRACED WITH VERTICAL MEMBERS SECURED AT A
45 DEGREE ANGLE TO STRUCTURE ABOVE AT 8'-0"O.C.
19. PROVIDE PROPER SUPPORT FOR NEW WORK. IF HANGERS, BACKERS, OR OTHER SUPPORTS ARE NOT DETAILED, NOTED, OR SPECIFIED, CONTRACTOR SHALL SUBMIT A VIABLE SUPPORT
DETAIL TO THE COR FOR APPROVAL.
20. ALL MATERIALS AND INFORMATION NOTED ON ANY OF THE WALL SECTIONS OR DETAILS ON DRAWINGS APPLY TO ALL OTHER SECTIONS AND DETAILS ON THOSE SHEETS WHERE SHOWN OR
WHERE SIMILAR CONDITIONS OCCUR WHETHER NOTED OR NOT.
21. PROVIDE ALL TRANSITION STRIPS AND TERMINATION STRIPS AS REQUIRED AT CHANGE IN FLOOR MATERIAL TO ASSURE SMOOTH TRANSITION OF FINISHES. PROVIDE FOR TRANSITION AT
CENTERLINE OF DOORS WHENEVER POSSIBLE.
22. REMOVE UTILITIES SERVING ITEMS/FIXTURES. DEVICES SHOWN TO BE DEMOLISHED. REMOVE UTILITIES BACK TO ACTIVE LINE OR BRANCH OR TO THE SOURCE.
23. MEDICAL EQUIPMENT SHOWN AS DASHED OR NOTED IN PLAN IS PROVIDED BY VA. SEE VA PROVIDED EQUIPMENT SCHEDULE OR DRAWINGS. CONTRACTOR TO COORDINATE INSTALLATION REQUIREMENTS WITH VA PROVIDED EQUIPMENT. CONTRACTOR TO PROVIDE BLOCKING FOR MISCELLANEOUS VA PROVIDED EQUIPMENT AND FURNISHINGS. CONTRACTOR TO REVIEW PRIOR TO INSTALLATION OF GYP BOARD ANY ADDITIONAL BLOCKING OR SERVICES REQUIRE BY VA NOT SHOWN ON DRAWINGS COORDINATE WITH COR.
24. PRODUCTS LISTED BY MANUFACTURER AND/OR MODEL NUMBER WERE USED AS A DESIGN BASIS, OTHER MANUFACTURERS MAY BE USED AS APPROVED BY VA AND/OR ARCHITECT.
25. BEFORE FABRICATION OR INSTALLATION OF ANY NEW WORK INSIDE THE BUILDING, CONTRACTOR SHALL PREPARE COORDINATION DRAWINGS AT 1/4" SCALE MINIMUM. COORDINATION DRAWINGS SHALL INCLUDE ALL NEW WORK SUCH AS FIRE PROTECTION PIPING AND HEADS, PLUMBING PIPING, MEDICAL GAS PIPING, HVAC DUCTWORK, HVAC PIPING, LIGHTS, CABLE TRAY, ELECTRICAL FEEDER CONDUITS, CEILING GRID, ETC. ALL WORK SHALL BE COORDINATED WITH NEW AND EXISTING STRUCTURE AND WALLS. CONTRACTOR SHALL INCLUDE MINOR RELOCATIONS OF NEW WORK AS REQUIRED TO FIT THE WORK INTO THE EXISTING BUILDING AND THE NEW ADDITION. ANY CONFLICTS CAUSED BY WORK INSTALLED BEFORE APPROVAL OF THE COORDINATION DRAWINGS BY THE COR SHALL BE REMOVED AND RE-INSTALLED IN ACCORDANCE WITH THE COORDINATION DRAWINGS.
26. ALL SHUT DOWNS SHALL BE PERFORMED DURING OFF HOURS, HOURS OF OPERATION ARE 7AM-5PM MON-FRI & 7AM-4:30PM SAT -SUN.
WPT
WD
WO
WM
WG
WIN
W/
WHB
WWF
WS
WP
WC
WH
WTW
VB
VCT
VIN
VERT
VRM
VB
LINTELLTL
CUBIC YARD
CUBIC FOOT
COURSE(S)
COUNTERSUNK SCREW
COUNTERSINK
COUNTERFLASHING
COUNTER
CORRUGATED
CORNER GUARD
CONTROL JOINT
CONTRACT(OR)
CY
CF
CRS
CTSK
CS
CONTR
CFL
CTR
CORR
CG
CJ
CLEANOUT
CENTER TO CENTER
CONTINUOUS
CONSTRUCTION
CONNECTION
CONCRETE
COMPARTMENT
COMBINATION
COLUMN
CLOSURE
CLEAR(ANCE)
CONST
C-C
CONT
CX
CMU
CONC
COMPT
COMB
CO
COL
CLS
CLR
FUTURE
FURRED(ING)
FURNISHED BY OTHERS
FULL SIZE
FIRE RETARDANT TREATED
FOUNDATION
FOOTING
FLUSH JOINT
FLUORESCENT
FLOOR PLATE
FUT
FUR
FBO
FS
FRT
FND
FLUR
FPL
FTG
FJT
PROPERTY LINE
PREFORMED
PREFINISHED
PREFABRICATE(D)
PRECAST CONCRETE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
POUNDS PER LINEAL FOOT
POUNDS PER CUBIC FOOT
POLYVINYL CHLORIDE
POINT
PLYWOOD
PLATE GLASS
PLATE
PLASTIC LAMINATE
LOUVER
LIVE LOAD
LVR
LL
PFB
PL
PRF
PFN
PVC
PCC
PSI
PSF
PLF
PCF
PT
PWD
PG
PL
PLAM
UNF
TYP
TOW TOP OF WALL
TYPICAL
FLATHEAD MACHINE SCREW
FIRE EXTINGUISHER CABINET
ANOD ANODIZED
CARP CARPET(ED)
CENTER LINE
CIRCUMFERENCE
CIRCLE
CHAMFER
CERAMIC TILE
CENTIMETER(S)
CEILING HEIGHT
CEILING
CATCH BASIN
CAST-IN-PLACE
CAST IRON
CL
CIRC
CIR
CHAM
CT
CM
CHT
CLG
CB
CIP
CI
BUILDING
BRONZE
BOTTOM
BOTH WAYS
BOTTOM AND TOP
BLDG
BRK
BOT
BW
B&T
FIRE EXTINGUISHERFE
FLOOR DRAIN
FLOOR CLEANOUT
FLOORING
FLEXIBLE
FLATHEAD WOOD SCREW
FLASHING
FIRE-RESISTANT COATING
FIREPROOF
FIRE HOSE STATION
FHMS
FHWS
FD
CO
FLR
FLX
FRC
FHS
FEC
FLG
FP
FOOT
FIRE ALARM
FINISHED FLOOR
FINISH(ED)
FIBERGLASS
FENCE
FASTEN, FASTENER
FACE OF STUDS
FACE OF MASONRY
FACE OF FINISH
FACE OF CONCRETE
FN
FGL
FT
FA
FF
FIN
FOS
FOM
FOF
FOC
FAS
BOTH SIDES
BLOCKING
BITUMINOUS
BEVELED
BETWEEN
BENCH MARK
BED JOINT
BEARING PLATE
BEARING
BS
BD
BLKG
BLK
BIT
BVL
BOARD
BLOCK
BTWN
BEL
BM
BJT
BPL
BRG
BELOW
BACK PLASTER(ED)
AUTOMATIC
ASPHALT
AREA DRAIN
ARCHITECT(URAL)
APPROXIMATE
BP
AUTO
ASPH
AD
ARCH
APX
EXTERIOR
EXPOSED
EXPANSION BOLT
EXPANSION JOINT
EXISTING
EXHAUST
EXCAVATE
EACHWAY
EXP
EXT
EXG
EXH
EXCA
EB
EJ
EW
EACH
EQUIPMENT
EQUAL
ENCLOSE(URE)
EMERGENCY
EMBANKMENT
ELEVATION
ELECTRIC WATER COOLER
ELECTRICAL PANELBOARD
ELECTRIC(AL)
EACH FACE
EQP
ENC
EMER
EMB
EQ
EL
EWC
ELEC
EA
EP
EF
ACP
ANCHOR BOLT
ANCHOR, ANCHORAGE
ALUMINUM
ALTERNATE
AIR CONDITIONING
AGGREGATE
ADJUSTABLE
ADJACENT
ADHESIVE
ADDENDUM
ACOUSTICAL TILE
AGG
AB
ANCH
ALUM
ALT
A/C
ADJT
ADJ
ADH
ADD
ACT
ACOUSTICAL
ACCESS PANEL
ACCESS
ABV ABOVE
ACOUS
AP
ACC
AFF
DIAMETERDIA
DRAWING
DRAWER
DRAIN TILE
DRAINBOARD
DRAIN
DOWNSPOUT
DOOR
DIVISION
DISPENSER
DIMENSION
D
DWG
DWR
DRB
DT
DPR
DS
DR
DIV
DIM
DIAGONAL
DETAIL
DEPRESSED
DEMOLISH
DEAD LOAD
DAMPERDPR
DIAG
DET
DEP
DEM
DL
RISERR
MISCELLANEOUSMISC
PERIMETER
PERFORATE(D)
PEDESTAL
PAVEMENT
PAVE(D), (ING)
PARTITION
PARTICLE BOARD
PARKING
PARALLEL
PAPER TOWEL RECEPTOR
PAPER TOWEL DISPENSER
PANIC BAR
PANEL
PAINT(ED)
OVERHEAD
OVERALL
OUTSIDE FACE
OUTSIDE DIAMETER
OPPOSITE SURFACE
OPPOSITE HAND
OPPOSITE
OPEN-WEBB JOIST
OPENING
OPAQUE
ON CENTER(S)
OBSCURE
NOT TO SCALE
NOT IN CONTRACT
NORTH
NEAR FACE
NONMETALLIC
NOMINAL
NOISE REDUCTION
NICKEL
NATURAL
MULLION
MOVABLE
MOUNT(ED), (ING)
MOLDING, MOULDING
MODULAR
OJ
LIGHTPROOF
LIGHT CONTROL
LIGHT
LENGTH
LAVATORY
LAMINATE(D)
LAG BOLT
LADDER
LABORATORY
LABEL
LAM
LP
LC
LT
L
LAV
LB
LAD
LAB
LBL
JOIST
KNOCKOUT
KICKPLATE
JOINT
JOINT FILLER
JOINT
JANITOR'S CLOSET
JST
KO
KPL
J
JF
JT
JC
PERI
PERF
PED
PVMT
PV
PTN
PBD
PK
PAR
PTR
PTD
PB
OA
PNL
PNT
OH
OF
OD
OPS
OPH
OPP
INCH
INSIDE FACE
INVERT
INTERMEDIATE
INTERLOCK
INTERIOR
INSULATION
INSIDE DIAMETER
INCLUDE(D), (ING)
INT
IN
IF
INV
INTM
ILK
INSUL
ID
INCL
HOT WATER HEATER
HOSE BIBB
HORIZONTAL
HOLLOW METAL
HOLLOW CORE
HEXAGONAL
HEIGHT
HEAVY DUTY
HEADER
HEAD JOINT
HWH
HB
HOR
HM
HC
HX
HT
HD
HVAC
HDR
HJT
OPG
OP
OC
OBS
NTS
NIC
NF
NMT
NOM
NR
NI
NAT
MULL
MOV
MT
MLD
MOD
SQUARESQ
T&B
TOM
TOC
TOS
TSL
TPD
TPTN
THR
THK
TEL
SD
SYS
SYN
SYM
SUSP
STRUCT
STOR
STL
STA
STD
SS
TOILET PAPER DISPENSER
TOP AND BOTTOM
TOP OF MASONRY
TOP OF CONCRETE
TOP OF STEEL
TOP OF SLAB
TOILET PARTITION
THRESHOLD
THICK(NESS)
TELEPHONE
STORM DRAIN
SYNTHETIC
SYMMETRY(ICAL)
SUSPENDED
STRUCTURAL
SYSTEM
STANDARD
STAINLESS STEEL
STORAGE
STEEL
STATION
SPA
SPEC
SPL
SPC
SP
SC
SL
SIM
SH
SG
SHT
SHTH
SSK
SEC
SNT
SCN
SCH
SFGL
RVT
SPECIFICATION(S)
SOUNDPROOF
SPACES
SPECIAL
SPACER
SOLID CORE
SHELF, SHELVING
SHEET GLASS
SLEEVE
SIMILAR
SHEET
SHEATHING
SERVICE SINK
SCHEDULE
SECTION
SEALANT
SCREEN
SAFETY GLASS
RIVET
MIRROR
MINIMUM
MILLIMETER(S)
METER(S)
METAL THRESHOLD
METAL ROOF DECKING
METAL FURRING
METAL FLOOR DECKING
METAL
MEMBER
MEDIUM
MECHANIC(AL)
MAXIMUM
MATERIAL(S)
MASONRY OPENING
MASONRY
MANUFACTURE(ER)
MANHOLE
GALVANIZED STEEL SHEET
GLASS, GLAZINGGL
HANDICAP
HARDWARE
GYPSUM
GROUT
GRAVEL
GRADE, GRADING
GRAB BAR
GLASS FIBER
GLASS BLOCK
GT
GYP
HDCP
HDW
GVL
GD
GB
GLF
GLBK
GASKET(ED)
GALVANIZED PIPE
GALVANIZED IRON
GALVANIZED
GAGE, GAUGEGA
GKT
GSS
GP
GI
GALV
MECH
MRD
MIR
MIN
MM
MTHR
MTFR
MFD
MET
MBR
MED
MH
MAX
MTL
MO
MAS
MFR
RCP
REV
ROW
RH
RO
RM
RFG
RVS
RA
RET
RES
REM
RAD
RE
FRL
REF
RWC
RL
REINFORCED CONCRETE PIPE
REVISION(S), REVISED
RIGHT OF WAY
RIGHT HAND
ROUGH OPENING
ROOM
ROOFING
REVERSE(SIDE)
RETURN AIR
RESILIENT
RETURN
REMOVE
REINFORCE(D), (ING)
REFLECT(ED), (IVE), (OR)
RAINWATER CONDUCTOR
RADIUS
REFERENCE
RAIL(ING)
WOOD
WITHOUT
WIRE MESH
WIRED GLASS
WHEEL BUMPER
WELDED WIRE FABRIC
WATERPROOFING
WATER CLOSET
WALL TO WALL
WATERSTOP
WINDOW
WITH
WALL HUNG
VAPOR BARRIER
VINYL BASE
VINYL
VERTICAL
VERMICULITE
UNFINISHED
M
N
WORKING
POINT
HEATING/VENTILATION/
AIR CONDITIONING
CONCRETE
MASONRY UNIT
ACOUSTICAL CEILING
PANEL
ABOVE FINISHED
FLOOR
VINYL COMPOSITION
TILE
ARCHITECTURAL SYMBOLS
ARCHITECTURAL HATCH GENERAL NOTES
ARCHITECTURAL ABBREVIATIONS
ROOM NUMBER & NAME
ENLARGED DETAILS OR PLANS
WALL TYPE
WINDOW INDICATOR (LETTER)
CARD READER
PUSH BUTTON COMBINATION LOCK
PUSH PLATE WALL SWITCH FOR AUTO DOORS
FERROMAGNETIC DETECTORS
CORNER GUARD (NUMBER INDICATES
DIFFERANT STYLES AND SIZES. SEE
DETAILS SHEET 3/AS501 AND
SPECIFICATIONS.
HOLD OPEN
VIEW NAME
SCALE
X
SCALE
VIEW NAME
X
SCALE
VIEW NAME
X
X
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
GENERAL INFORMATION
G-002
17029
Approver DM MB
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
UP
UP
UP
UP
UP
I
EXISTING
DUMPSTER
CEILING WORK FOR
PLUMBING LOCATION OF TEMPORARY
IV PREP CENTER
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
OVERALL FIRST FLOOR PLAN
G-003
17029
Approver DM MB
N Scale: 1" = 20'-0"
OVERALL FIRST FLOOR PLAN
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
O S
G F
C I
O S
J
JJ
M
J
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
OVERALL SECOND FLOOR PLAN
G-004
17029
? DM MB
N Scale: 1/16" = 1'-0"
OVERALL SECOND FLOOR PLAN
AREA OF WORK
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
I
EXISTING
DUMPSTER
EXIST.
ISO
HOOD
EXIST.
ISO
HOOD
EXIST. TABLE
30x60
EXIST.
STORAGE
CABINET
26x40
EXIST.
STORAGE
CABINET
26x40
EXIST.
CART
23x44
EXIST.
CART
23x44
EXIST.
2 UNIT
REF.
EXIST.
STORAGE
CABINET
26x40
EXIST.
GOWN
CABINET
26x40
EXIST.
CART
19x24
ISO IV PREP
2A213
ANTE PREP
2A212
CONTROL
SUBSTANCE
2A211
SATELITE
PHARMACY
2A210
D2
D1
D4
D1
D1
D5
D7
D6
D7
D6
D6
D6
D6
D6
D7
D7
D7
D9
D9
D9
D8
D8
D8
D8
D9
D7
D10
EXIST. 3 UNIT REF.
EXIST.
REF.
D7
D3
EXIST.
HOOD
D2
D12
D12
D13
D13
D14
D16 D15
D15
D10
D10
D10
IV PREP
2A211
ANTE ROOM
2A212
SATELITE
PHARMACY
2A210
ISO IV PREP
2A213
JANITOR
CLOSET
2A212A
DEMARCATION LINE
5' - 4 1/4"
/8 "5
/4
/8
AREA OF WORK
3' - 7 1/16"
4' - 11"
4' - 11"
2A211
2A212
2A212A
2B
2A213
/4
9' - 10"
8 5/8"
1' - 0"
1' - 6 5/8"
4' - 10 1/2"
5' - 4 1/4"
/2
/2
2A
6 3/4"
/8
/8
/4
15' - 0"
FOOD
SERVICE
1A075
KITCHEN
1A076
KITCHEN
STORAGE
1A077
HAC
1A020
KITCHEN
STORAGE
1A077A
D11
EXISTING WALL OR ITEM TO BE
DEMOLISHED
NEW WALL PER WALL TYPES
DEMO/NEW WORK PLAN LEGEND
S1
S2
S3
S4
S5
S6 S7
S8
S9
S10
S11
S11
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
ENLARGED PLANS - DEMOLITION
& NEW CONSTRUCTION
AS-100
17029
DM DM MB
N Scale: 1/4" = 1'-0"
SECOND FLOOR PLAN - DEMOLITION N
Scale: 1/4" = 1'-0"
SECOND FLOOR PLAN - NEW CONSTRUCTION
DEMO PLAN CODED NOTES
D1 EXISTING DOOR, FRAME, AND HARDWARE TO BE DEMOLISHED. DOOR HARDWARE TO
BE TURNED OVER TO OWNER.
D2 WALL TO BE DEMOLISHED FULL HEIGHT. ALL ITEMS MOUNTED IN/ON WALL SHALL BE
REMOVED OR DEMOLISHED BACK TO NEAREST SOURCE. SEE ALSO
MECHANICAL/ELECTRICAL/PLUMBING DRAWINGS.
D3 WALL TO BE DEMOLISHED AS NECESSARY FOR NEW OPENING. ALL ITEMS MOUNTED
IN/ON WALL IN THE AREA OF WORK SHALL BE REMOVED OR DEMOLISHED BACK TO
NEAREST SOURCE. SEE ALSO MECHANICAL/ELECTRICAL/PLUMBING DRAWINGS.
D4 WALL MOUNTED SINK TO BE REMOVED SEE PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION. REPAIR FLOOR PENETRATIONS. SET ASIDE SINK FOR
REINSTALLATION IN NEW LOCATION PER NEW WORK PLAN AND PLUMBING
DRAWINGS.
D5 EXISTING HOOD TO BE TEMPORARILY RELOCATED BY OWNER. EXISTING HOOD TO
BE REINSTALLED IN NEW LOCATION WHEN CONSTRUCTION IS COMPLETE BY OWNER.
SEE NEW WORK PLAN AND MECHANICAL DRAWINGS."
D6 EXISTING EQUIPMENT/FURINITURE TO BE TEMPORARILY RELOCATED BY OWNER.
EXISTING EQUIPMENT/FURNITURE TO REINSTALLED IN CURRENT LOCATION WHEN
CONSTRUCTION IS COMPLETE BY OWNER. SEE EQUIPMENT PLAN.
D7 EXISTING EQUIPMENT/FURINITURE TO BE TEMPORARILY RELOCATED BY OWNER.
OWNER TO REINSTALL EXISTING EQUIPMENT/FURNITURE IN NEW LOCATION WHEN
CONSTRUCTION IS COMPLETE BY OWNER. SEE EQUIPMENT PLAN.
D8 DEMOLISH EXISTING FLOORING AND WALL BASE IN THIS AREA.
D9 DEMOLISH EXISTING CEILING SYSTEM IN THIS AREA. ALL CEILING MOUNTED ITEMS
TO BE REMOVED/DEMOLISHED PER MECHANICAL/ELECTRICAL/PLUMBING DRAWINGS.
D10 REMOVE GYPSOM BOARD FROM ONE SIDE OF EXISTING STUD WALL, METAL STUDS
TO REMAIN
D11 REMOVE EXISTING LAY IN CEILING IN THIS AREA AS NECESSARY FOR ABOVE CEILING
WORK ASSOCIATED WITH MECH/ELEC/PLUM. REINSTALL LAY IN CEILING SYSTEM
AFTER MEP WORK IS COMPLETED.
D12 REMOVE EXISTING PAPER TOWEL DISPENSOR, FRAMED MIRROR AND SOAP
DISENSOR AND RETAIN FOR REINSTALLATION.
D13 REMOVE EXISTING HAND SANITIZER DISPENSOR AND RETAIN FOR REINSTALLATION.
D14 REMOVE AND RETAIN EXISTING ROOM SIGN FOR RELOCATION.
D15 INSTALL TEMPORARY ICRA/PCRA CLASS IV DUST BARRIER UNTIL PASS THROUGH
AND PERMINANT JANITOR CLOSET WALLS HAVE BEEN INSTALLED.
D16 EXISTING CASEWORK TO BE TEMPORARILY RELOCATED BY CONTRACTOR. EXISTING
CASEWORK TO REINSTALLED IN CURRENT LOCATION WHEN CONSTRUCTION IS
COMPLETE BY CONTRACTOR. SEE EQUIPMENT PLAN.
NEW CONSTRUCTION PLAN CODED NOTES
1 RELOCATED SINK, SEE PLUMBING DRAWINGS
2A NEW 18x18 HEPA FILTERED PASS THROUGH CHAMBER.
2B NEW 12x12 PASS THROUGH CHAMBER.
3 NEW MOP SINK PER PLUMBING DRAWINGS
4 TEMPORARY ICRA/PCRA CLASS IV DUST BARRIER STUD AND GYP BD WALL TO DECK
ABOVE DURING CONSTRUCTION.
5 ALIGN NEW WALL FINISHD FACE WITH EXISTING WALL FINISHED FACE.
6 NEW TAPE DEMARKATION LINE. TAPE TO BE "ULINE" HEAVY DUTY 8 MIL (2") ITEM
NUMBER S-383. TURN EXCESS TAPE OVER TO OWNER.
7 NEW DYSON AIRBLADE DB, MOUNTED PER DYSON GUIDELINES.
8 REINSTALL FRAMED MIRROR, BOTTOM EDGE AT MAX. 40" A.F.F.
9 REINSTALL SOAP DISPENSOR, CONTROLS AT 48" A.F.F.
10 REINSTALL HAND SANITIZER, CONTROLS AT 48" A.F.F.
11 REINSTALL ROOM SIGN, MATCH EXISTING HEIGHT.
12 SEAL AROUND ALL PENATRATIONS, I.E. JUNCTION BOXES, LIGHTS, DIFFUSERS, DUCTS,
DOORS, PASS THROUGH CHAMBERS, ETC. LOCATED IN GYPSUM BOARD WALLS AND
CEILINGS TO INSURE AN AIR-TIGHT SEAL.
13 COORDINATE DOOR OPERATOR SENSOR WITH ELECTRICAL DRAWINGS. TOP OF
SENSOR AT 48" A.F.F.
14 CORNER GUARD.
15 SEAL AROUND ALL OPENINGS, OUTLETS, SWITCHES, LIGHT FIXTURES, HVAC
DIFFUSERS, WALL OPENINGS, DOOR FRAMES, ETC. EVERYTHING MUST BE SEALED
TIGHT FOR AIR BALANCE.
16 PROVIDE NEW ROOM SIGN, MATCH EXISTING SIGN DESIGN & MOUNTING HEIGHT FROM
CODED NOTE 11.
N Scale: 1/4" = 1'-0"
FIRST FLOOR PLAN - DEMOLITION
N Scale: 1/16" = 1'-0"
TEMPORARY IV PREP TRAILER SITE PLAN
SITE PLAN CODED NOTES - TEMPORARY TRAILER
S1 EXISTING RAMP ENCLOSURE TO REMAIN FOR MOBILE IV PREP CENTER DURING
REMODEL PHARMACY IV PREP ROOM PROJECT. REMOVE RAMP ENCLOSURE
INCLUDING FOUNDATION AT END OF PROJECT AND RESTORE SITE TO GRASS
COVERED LAWN.
S2 EXISTING CONCRETE PAD FOR MOBILE IV PREP CENTER LOCATION. CONCRETE
PAD TO REMAIN AT END OF PROJECT.
S3 EXISTING ELECTRICAL PANELS FOR MOBILE IV PREP CENTER. ALL ELECTRICAL FOR
IV PREP CENTER TO REMOVED BACK TO A POINT INSIDE MAIN BUILDING AT END OF
PROJECT, SEE ELECTRICAL DRAWINGS.
S4 EXISTING FIRE, HOT & COLD WATER SOURCE FOR MOBILE IV PREP CENTER. ALL
FIRE, HOT & COLD WATER LINES FOR IV PREP CENTER TO BE REMOVED BACK TO A
POINT INSIDE MAIN BUILDING AT END OF PROJECT, SEE MEP DRAWINGS.
S5 EXISTING SANITARY CONNECTION FOR MOBILE IV PREP CENTER. SAW-CUT
EXISTING CONCRETE PAD AS NECESSARY FOR INSTALLATION OF SANITARY LINES
FOR IV PREP CENTER. ALL SANITARY LINES FOR IV PREP CENTER TO BE REMOVED
AT END OF PROJECT AND PATCH AND REPAIR CONCRETE PAD, SEE MEP
DRAWINGS.
S6 TERMINATE TEMPORARY UTILITIES JUST INSIDE MAIN BUILDING AT END OF
PROJECT. EXISTING WALL PANEL MODIFIED FOR IV PREP CENTER UTILITIES TO BE
REPAIRED TO ADD GALVANIZED WEATHER TIGHT ACCESS PANEL AT END OF
PROJECT, PAINT TO MATCH PANEL. PANEL MANUFACTURER IS "TESCO
ENTERPRISES", COLOR IS "ALLOY 110 SATIN COPPER & LACQUER"
S7 RENTAL OF TEMPORARY IV PREP CENTER BY CONTRACTOR. CONTRACTOR TO
KEEP MOBILE CENTER ON SITE UNTIL RENOVATED PHARMACY IS CERTIFIED. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION. TEMPORARY CENTER TO BE
RETURNED AT END OF PROJECT.
S8 INSTALL 4" THICK CONCRETE WALK TO ALIGN WITH IV PREP CENTER DOOR AND
ADJACET CONCRETE SLAB. CONCRETE WALK TO BE REMOVED AT END OF
PROJECT.
S9 INSTALL CANOPY FROM TEMPORARY IV PREP CENTER DOOR TO ENTRY FOR MAIN
BUILDING. CANOPY TO BE REMOVED AT END OF PROJECT.
S10 EXISTING ENTRY DOOR INTO MAIN BUILDING AND CARD READER TO REMAIN AT END
OF PROJECT.
S11 EXISTING SAFETY BARRIERS TO BE REMOVED AT END OF PROJECT AND DISPOSED
OF OFF SITE.
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
O S
G F
C I
O S
J
J J
M
J
EXIST.
ISO
HOOD
EXIST.
ISO
HOOD
EXIST. TABLE
30x60
EXIST.
STORAGE
CABINET
26x40
EXIST.
STORAGE
CABINET
26x40
EXIST.
CART
23x44
RELOCATED
CART
23x44
RELOCATED
2 UNIT
REFRIG.
RELOCATED
STORAGE
CABINET
26x40
RELOCATED
GOWN
CABINET
26x40
RELOCATED
CART
19x24
RELOCATED
HOOD
ISO IV PREP
2A213
ANTE ROOM
2A212
IV PREP
2A211
SATELITE
PHARMACY
2A210
RELOCATED
REFRIG.
RELOCATED
3 UNIT
REFRIG.
ISO IV PREP
2A213
ANTE ROOM
2A212
IV PREP
2A211
SATELITE
PHARMACY
2A210
C2
C2
C2
C1
C3
C3
C4
C4
C1
C1
C1
C1
C5
C5
C5
C5
C5
C6
C6
C6
C6
C6
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
ENLARGED PLANS - EQUIPMENT
& REFLECTED CEILING PLANS
AS-101
17029
Approver DM MB
N Scale: 1/4" = 1'-0"
ENLARGED PLAN - NEW EQUIPMENT LAYOUT N
Scale: 1/4" = 1'-0"
ENLARGED PLAN - REFLECTED CEILING
REFLECTED CEILING PLAN CODED NOTES
C1 EXISTING CEILING SYSTEM TO REMAIN
C2 NEW GYPSUM BOARD CEILING SYSTEM, PROVIDE ACCESS
PANEL AS REQUIRED FOR ABOVE CEILING MECHANICAL
EQUIPMENT, MINIMUM OF (1) PER ROOM.
C3 REWORK EXISTING CEILING SYSTEM AT NEW WALL
LOCATION.
C4 EXISTING GYPSUM BOARD SOFFIT TO REMAIN
C5 PROVIDE ICRA/PCRA CLASS IV DUST BARRRIER ABOVE AND
IN LINE WITH WALL BELOW DURING CONSTRUCTION.
C6 PROVIDE ACCESS PANEL IN CEILING FOR ACCESS TO
MECHANICAL EQUIPMENT. COORDINATE EXACT LOCATION
WITH MECHANICAL EQUIPMENT.
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
J
V A R I E S
3/4"=1'-0"
ANCHOR DETAIL
EXIST. ROOF
MEMBRANE
TPO
SEALANT
S.S.CLAMPING RING
RIGID INSULATION
EXIST.
CONCRETE DECK
TPO FLASHING PER
MANUFACTURERS
RECOMMENDATION
NOTE:
ASSEMBLY TO BE SHOP
FABRICATED AND HOT DIPPED
GALVANIZED
TPO SEALANT
3/8" PLATE
3/8" DIA.
GALV. STEEL
CABLE
3/16"
3/16"
3/16"
3" ∅ SCH 40
PIPE
3/8" x 3" x 3"
PLATE
WITH 4
1 1/2"=1'-0"
MECH. CURB DETAIL
EXIST. ROOF MEMBRANE
EXIST. CONCRETE DECK
RIGID INSUL.
WELDED SPLICE
TPO SEALANT
2x4 TREATED WOOD
BLOCKING
MECH. FASTENER
TPO FLASHING PER MANUFACTURERS
RECOMMENDATION
ROOFTOP MECHANICAL
EQUIPMENT BY HVAC CONTR.
V A R I E S
P E R
M A N U F A C T U R E R
R E C O M M M E N D A T I O N
1 1/2"=1'-0"
MECH. RAIL DETAIL
EXIST. ROOF MEMBRANE
EXIST. CONCRETE DECK
RIGID INSUL.
WELDED SPLICE
TPO SEALANT
2x4 TREATED WOOD
BLOCKING
TPO FLASHING PER MANUFACTURERS
RECOMMENDATION
ROOFTOP MECHANICAL
EQUIPMENT RAIL BY HVAC CONTR.
GALVANIZED STEEL
COUNTERFLASHING
R1
R2
R3
R4
R2
R4
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
ROOF PLAN
AS-102
17029
Approver Checker Designer
N Scale: 1/8" = 1'-0"
THIRD FLOOR / ROOF PLAN
ROOF PLAN CODED NOTES
R2 NEW ROOF TOP EQUIPMENT PER
MECHANICAL/ELECTRICAL DRAWINGS. NEW 14" x
14" ROOF OPENING IN EXISTING CONCRETE
COMPOSITE DECK, (6 1/2" THICK). "DO NOT" OVER
CUT 14" x 14" OPENING. COORDINATE OPENING
WITH LOCATION OF EXISTING STEEL FRAMING.
OPENING REINFORCING IS NOT REQUIRED FOR 14"
x 14" OPENING. IF OVERCUT, NOTIFY COR
IMMEDIATELY.
R3 PATCH AND REPAIR EXISTING TPO ROOFING AT
NEW ROOF TOP EQUIMENT. REPLACE INSULATION,
THICKNESS TO MATCH EXISTING & PROVIDE
POSITIVE SLOPE TOWARDS ROOF DRAIN.
R4 NEW GUY WIRE SUPPORT PER DETAILS 1 &
2/1A-AS-102
DELLOS
D
MORRISON
R E
G I S
T
ER ED A RC
H
I T E
C T
6"8" 2'-6"
A B
GLAZING
AS
SCHEDULED
2"SEE DOOR
S E
E D
O O
R S
C H
E D
2"
SCHED
S.S.
WELDED
FRAME
REFER TO
PLANS
REFER TO
PLANS
WALL THICKNESS NOTED
AS 5" [127 mm] ON
PLANS
3-5/8" [92 mm]
METAL STUDS @
16" [406 mm] O.C.
ROOF OR
FLOOR ABOVE
PROVIDE SLIP
CONNECTION WITH
DEEP LEG TRACK
5/8" [16 mm]
GYP. BD. EACH SIDE
FINISH CEILING -
SEE REFLECTED
CEILING PLAN FOR
LOCATION
WALL THICKNESS
NOTED ON PLANS
EXISTING METAL
STUD WALL TO
REMAIN
WALL THICKNESS
NOTED ON PLANS
3-5/8" METAL
STUDS @ 16"
O.C.
ROOF OR
FLOOR ABOVE
REMOVE GYP.
BOARD THIS SIDE
OF EXIST. WALL
5/8" GYP.
BD.
BRACE WALL @
4'-0" O.C.
MAX.
WALL THICKNESS NOTED
AS 5" [127 mm] ON
PLANS
3-5/8" [92 mm]
METAL STUDS @
16" [406 mm] O.C.
ROOF OR
FLOOR ABOVE
PROVIDE SLIP
CONNECTION WITH
DEEP LEG TRACK
5/8" [16 mm]
GYP. BD. EACH SIDE
BATT INSULATION
FINISH CEILING -
SEE REFLECTED
CEILING PLAN FOR
LOCATION
BRACE WALL @
4'-0" O.C.
MAX.
BATT INSULATION
BATT
INSULATION
FINISH CEILING -
SEE REFLECTED
CEILING PLAN FOR
LOCATION
EXISTING METAL
STUD WALL TO
REMAIN
6" METAL STUDS
@ 16" O.C.
ROOF OR
FLOOR ABOVE
REMOVE GYP.
BOARD THIS SIDE
OF EXIST. WALL
5/8" GYP.
BD.
BATT
INSULATION
FINISH CEILING -
SEE REFLECTED
CEILING PLAN FOR
LOCATION
EXISTING METAL
STUD WALL &
GYP. BOARD @
CORRIDOR TO
REMAIN
NOTE: ALL METAL STUDS ARE 20 GAUGE UNLESS NOTED OTHERWISE. SEE BELOW FOR TYPICAL CONTROL JOINT LOCATIONS AND INSTALLATION.
1A 41B 3
7_
7 _ 8
2"
NOTE 1:
OMIT BRACE WHEN "D" DIMENSION IS LESS THAN 2'-0"
FOR GYP. WALLBD. OR 16" FOR PLASTER PARTITION.
SECTION B
VERTICAL STUDS @ 2'-0" MAX. W/GYPSUM WALL BD.
1'-4" W/GYPSUM LATH & PLASTER DOUBLE STUDS
FOR SUPPORTING CONC. BACKER BOARD.
PROVIDE CONTINUOUS BRACING WHEN STUDS
EXCEED 10'-0" & ARE FINISHED BOTH SIDES
JAMB ANCHOR CLIPS 3 PER SIDE - COORDINATE
W/HINGE REINFORCEMENT.
DETAIL D
SEE NOTE
1/2"
CONST.
JOINT
RUNNER
BET.
STUDS
SEE
DOOR
SCHEDULE
SHIM AS
REQ'D.
SEC. B
ELEVATION AT DOOR FRAME
DETAIL D
PROVIDE
SOUND
DEADENING
WHERE
REQ'D.
SANITARY STOP
METAL DOOR FRAME
METAL
ANCHOR
CLIP
SHIM AS
REQ'D.
DETAIL C
JAMB ANCHOR
SECTION A
DOUBLE STUDS
DETAIL C
1/ 2"
JAMB ANCHORS
(FURNISHED WITH FRAME)
EQ
EQ
VA
RI
ES
VARIES
MET.
DOOR
FRAME
M A X
1/2"
A A
D
EQ
EQ
M
IN
WIDTH
STUD
MINUS 3/16"
[5mm]
JAMB DEPTH
M
IN
M
IN
. WIDTH
STUD
FR
AM
E
FA
CE
MI
NU
S 3/
MI
NU
S 3/
FR
AM
E
FA
CE
"M
IN.
5/ 8"
MA
X.
NOT TO SCALE
TYPICAL PARTITION FRAMING FOR DOORS
1-1/2"=1'-0"
DOOR HEAD DETAIL
1-1/2"=1'-0"
DOOR JAMB DETAIL
DOOR - SEE
SCHEDULE
3 5/8"
MTL. STUDS
5/8" GYPSUM
BOARD EACH SIDE
S.S. DOOR
FRAME
SEALANT
CONTINUOUS
EACH SIDE
INSULATION PER
WALL TYPES INSULATION PER
WALL TYPES
3 5/8"
MTL. STUDS
S.S. FRAME WITH 3
ANCHORS PER JAMB
SEALANT
CONTINUOUS EACH
SIDE
5/8" GYPSUM
BOARD
EACH SIDE
DOOR - SEE
SCHEDULE
SEE TYPICAL DOOR FRAMING DETAIL 3/AS-300
SEE TYPICAL DOOR FRAMING DETAIL 3/AS-300
CONTROL JOINT DETAIL
1/4"=1'-0"
CONTROL JOINT
ON HINGE SIDE
OF DOOR LINE OF CEILING
LINE OF ROOM BASE
CONTROL JOINT DETAIL
1/4"=1'-0"
CONTROL JOINT
ON HINGE SIDE
OF DOOR LINE OF CEILING
LINE OF ROOM BASE
GYPSUM BOARD CONSTRUCTION NOTES FOR CONTROL JOINT INSTALLATION
INSTALL CONTROL JOINTS CONSISTENT WITH LINES OF BUILDING SPACES IN LOCATIONS SUCH AS THE FOLLOWING:
1. WHERE EXPANSION OR CONTROL JOINTS OCCUR IN SUBSTRATE;
2. WHERE CEILING FRAMING OR FURRING CHANGES DIRECTION;
3. WHERE WINGS OF "L," "U," AND "T"-SHAPED CEILING AREAS ARE JOINED;
4. WHERE GYPSUM BOARD ABUTS STRUCTURAL ELEMENTS, SUCH AS COLUMNS, BEAMS AND LOAD BEARING WALL;
5. WHERE GYPSUM BOARD ABUTS DISSIMILAR WALL, CEILING OR SOFFIT FINISHES BY EDGE TRIM.
6. AT BOTH CORNERS OF DOOR JAMBS, EXTENDING FROM DOOR HEAD TO CEILING.
7. AT BOTH CORNERS OF WINDOW JAMBS, EXTENDING FROM WINDOW HEAD TO CEILING.
B. FULL HEIGHT DOOR FRAMES SHALL BE CONSIDERED EQUIVALENT TO A CONTROL JOINT.
C. PROVIDE CONTROL JOINTS IN FIRE-RESISTANT CONSTRUCTION ACCORDING TO GA 234.
8. LOCATE CONTROL JOINTS ACCORDING TO THE FOLLOWING CHART:
CONSTRUCTION AND LOCATION MAX. SINGLE DIMENSION MAX. SINGLE AREA
CEILING INTERIOR
WITH PERIMETER RELIEF 50-0" 2500 SQ. FT.
WITHOUT PERIMETER RELIEF 30'-0" 900 SQ. FT.
CEILING - EXTERIOR GYPSUM BOARD 30'-0" 900 SQ. FT.
PARTITION - INTERIOR 30-0"
NOT TO SCALE
TYPICAL CORNER GUARD DETAIL
CORNER
GUARD
FINISHED WALL
1 _ 2
T Y P
EXIST. CONCRETE DECK
SHEET VINYL FLOOR
4" INTEGRAL ROOM BASE
TERMINATION
STRIP
SEALANT
PARTITION WALL
J-BEAD
FRT WOOD BLOCKING
3/8 " GYP. BD.
PROVIDE CANOPY SIMILAR TO IMAGE
FROM TEMPORARY IV PREP CENTER TO MAIN BUILDING ENTRY.
PROVIDE CANOPY WITH CLEAR PLASTIC SIDES.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th in ch on e fo ot on e-qu ar te r in ch on e fo ot th re e-ei gh th s in ch on e fo ot on e-ha lf in ch on e fo ot th re e-qu ar te rs in ch on e fo ot on e in ch on e fo ot on e an d on e-ha lf in ch es on e fo ot th re e in ch es on e fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
CDL Project No.
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
757-19-201 REMODEL
PHARMACY IV PREP ROOM
05/18/18
SCHEDULES & WALL TYPES &
DETAILS
AS-300
17029
Approver Checker Designer
DOOR SCHEDULE
Mark Panel Width Panel Height Thickness Panel Type
Panel Material Glazing Frame Type
Frame Material Head Detail Jamb Detail Sill Detail Fire Rating
Hardware Set Remarks
2A212 3' - 8" 7' - 6" 1 3/4" B SS CLR/TEMP 1 SS 1/AS-3OO 2/AS-300 -- - 1F
2A212A 3' - 0" 7' - 0" 1 3/4" A SS - 1 SS 1/AS-3OO 2/AS-300 -- - 5D
2A211 3' - 8" 7' - 6" 1 3/4" B SS CLR/TEMP 1 SS 1/AS-3OO 2/AS-300 -- - 1
2A213 3' - 9" 7' - 6" 1 3/4" B SS CLR/TEMP 1 SS 1/AS-3OO 2/AS-300 X/AS-300 - 1
ROOM FINISH SCHEDULE
Number Name
WALL
BASE
FLOOR
FINISH
WALL
MATERIAL
WALL
FINISH
CEILING
MATERIAL
CEILING
FINISH
CEILING
HEIGHT REMARKS
2A211 IV PREP NOTE 2 RSF GYP BD EPOXY PAINT GYP BD EPOXY PAINT 8'-6"
2A212 ANTE ROOM NOTE 2 RSF GYP BD EPOXY PAINT GYP BD EPOXY PAINT 9'-0"
2A213 ISO IV PREP NOTE 2 RSF GYP BD EPOXY PAINT GYP BD EPOXY PAINT 9'-0"
2A210 SATELITE PHARMACY NOTE 2 RSF GYP BD EPOXY PAINT GYP BD EPOXY PAINT 9'-0" NOTE 1
2A212A JANITOR CLOSET NOTE 2 RSF GYP BD EPOXY PAINT GYP BD EPOXY PAINT 9'-0"
Scale: 1/4" = 1'-0"4
DOOR TYPES
Scale: 1/4" = 1'-0"5
FRAME TYPES
N.T.S.Scale:
WALL TYPES
REMARKS:
1. NEW FINISHES TO MATCH EXISTING FOR ROOM 2A210
2. INTEGRAL RSF COVED BASE.
N.T.S.Scale:
Temporary Canopy
Revisions Date
BID SET 5/18/18
Scale: 3" = 1'-0"7
INTEGRAL RSF COVED BASE DETAIL
FIRE PROTECTION GENERAL NOTES:
1. FIRE PROTECTION SYSTEM TO COMPLY WITH NFPA 13, 14, 20, 24
AND ALL APPLICABLE STATE CODES.
2. FINAL INSPECTION AND APPROVAL BY CONTRACTION OFFICER'S
REPRESENTATIVE (COR).
3. SPRINKLER SHOP DRAWINGS AND MATERIAL SUBMITTALS SHALL
BE SUBMITTED TO THE COR AND SHALL BE APPROVED PRIOR TO
ANY INSTALLATION.
4. PIPE ROUTING IS NOT SHOWN. IT IS THE RESPONSIBILITY OF THIS
CONTRACTOR TO PROVIDE PIPING MODIFICATIONS AND OFFSETS
REQUIRED FOR PROPER INSTALLATION AND COORDINATION WITH
OTHER TRADES.
5. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
CEILING DESCRIPTIONS AND HEIGHTS.
6. SPRINKLERS ARE TO BE COORDINATED WITH ALL DIFFUSERS,
SPEAKERS, LIGHTING FIXTURES AND CEILING SYSTEMS. SPACING
OF SPRINKLERS SHALL BE IN ACCORDANCE WITH NFPA 13 AND THE
LISTING OF THE SPRINKLER.
7. BEFORE FABRICATION OF INSTALLATION OF ANY NEW WORK INSIDE
THE BUILDING, CONTRACTOR SHALL PREPARE COORDINATION
DRAWINGS AT 1/4" SCALE MINIMUM. COORDINATION DRAWINGS
SHALL INCLUDE ALL NEW WORK SUCH AS FIRE PROTECTION PIPING
AND HEADS, PLUMBING PIPING, MEDICAL GAS PIPING, HVAC
DUCTWORK, HVAC PIPING, LIGHTS, CABLE TRAY, ELECTRICAL
FEEDER CONDUITS, CEILING GRID, ETC. ALL WORK SHALL BE
COORDINATED WITH NEW AND EXISTING STRUCTURE AND WALLS.
CONTRACTOR SHALL INCLUDE MINOR RELOCATIONS OF NEW
WORK AS REQUIRED TO FIT THE WORK INTO THE EXISTING
BUILDING AN THE NEW ADDITION. ANY CONFLICTS CAUSED BY
WORK INSTALLED BEFORE APPROVAL OF THE COORDINATION
DRAWINGS BY THE COR SHALL BE REMOVED AND RE-INSTALLED IN
ACCORDANCE WITH THE COORDINATION DRAWINGS.
8. SPRINKLER LOCATIONS SHALL BE CENTERED IN THE TILE. PROVIDE
ARM-OVER OR SWING JOINT AS REQUIRED. SUPPORT ANDY
ARM-OVER 18" OR LONGER.
9. SLEEVE AND FIRESTOP ALL PENETRATIONS THROUGH RATED
WALLS, CEILINGS, AND FLOORS WITH U/L LISTED ASSEMBLIES.
FIRESTOP ASSEMBLIES SHALL BE EQUAL OR EXCEED THE RATING
OF THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS
FOR FINAL FINISHES.
10. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE
NON-ACCESSIBLE CEILINGS AND CHASES.
11. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (PANELS,
TRANSFORMERS, ETC.) PRIOR TO ANY INSTALLATION. DO NOT
ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY
CIRCUMSTANCES. ANY PIPING RUN OVER ELECTRICAL SHALL BE
REROUTED AT NO ADDITIONAL COST.
12. THE FIRE PROTECTION SYSTEMS AND INFORMATION SHOWN
WITHIN THESE DRAWINGS AND THE SPECIFICATIONS, REPRESENT
THE DESIGN INTENT OF THE ENGINEER OF RECORD. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO SUBMIT LAYOUT
DRAWINGS TO THE AUTHORITY HAVING JURISDICTION FOR
PERMITTING AND REVIEW. THE LAYOUT DRAWINGS SHALL BE IN
COMPLIANCE WITH NFPA 13, 8-1, WORKING PLANS.
13. FINAL INSPECTION AND APPROVAL BY LOCAL FIRE MARSHAL AND
ARCHITECT/ENGINEER.
14. ROLL GROOVE AND CUT GROOVED COUPLINGS AND FITTINGS
SHALL BE PROVIDED BY A SINGLE MANUFACTURER, NO EXCEPTION.
15. WITHIN THE AREA OF WORK, PROVIDE TEMPORARY UPRIGHT
SPRINKLER HEADS FOR COMPLETE COVERAGE PER NFPA 13 IN ALL
AREAS WHERE EXISTING CEILINGS WILL BE REMOVED FOR MORE
THAN 10 HOURS. REMOVE TEMPORARY HEADS AND INSTALL
PERMANENT PENDANT HEADS WHEN CEILING IS RE-INSTALLED.
FIRE PROTECTION LEGEND
RESPONSETEMP MFG.PLATESTYLEMODELFINISHK-FACSYMBOL
FIRE SPRINKLER LEGEND
SYMBOL DESCRIPTION
1" DROP
SPRINKLER HEAD
1" 90° ELL 1" 90° ELL
1x\ REDUCER
BRANCH LINE
CEILING
RETURN BEND DETAIL
FIRE PROTECTION DESIGN DATA
QUICK RESPONSE175° 5.6 CHROME F1FR 56 INSTITUTIONAL CHROME RELIABLE
NOTES
NOTE:
SPECIFIED SPRINKLER IS BASIS OF DESIGN ONLY. CONTRACTOR SHALL MATCH EXISTING SPRINKLER HEAD TYPE, TEMPERATURE RATING, K-FACTOR, ETC. CONTRACTOR SHALL PROVIDE ADDITIONAL SPRINKLERS AS
REQUIRED TO BE INSTALLED IN SPARE SPRINKLER HEAD CABINET
F
F
F
SYMBOL DESCRIPTION
QUICK RESPONSE175° 5.6 CHROME F1FR 56 INSTITUTIONAL CHROME RELIABLE
- NEW UPRIGHT SPRINKLER
- NEW PENDENT SPRINKLER
- EXISTING PENDENT SPRINKLER
- DEMOLITION PENDENT SPRINKLER
- NEW SPRINKLER PIPING
- EXISTING SPRINKLER PIPING
- DEMOLITION SPRINKLER PIPING
W/FP
ESCUTCHEON
W/FP
ESCUTCHEON
DESIGN CRITERIA:
THE FOLLOWING PUBLICATIONS SHALL BE USED AS A REFERENCE FOR DESIGN OF
THE FIRE SUPPRESSION SYSTEM ON THIS PROJECT.
1. DEPT. OF VETERAN'S AFFAIRS FIRE PROTECTION DESIGN GUIDELINES
2. NFPA 1, UNIFORM FIRE CODE - 2007 EDITION
3. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS - 2010 EDITION
4. EXISTING FIRE PUMP CRITERIA: OBTAIN LATEST FLOW TEST DATA FROM COTR.
NOT TO SCALE
ENTIRE AREA OF CONSTRUCTION (EXCEPT AS NOTED):
OCCUPANCY CLASSIFICATION: LIGHT HAZARD
SYSTEM TYPE: WET PIPE
DESIGN DENSITY: .10 GPM/SQ. FT.
HYDRAULIC REMOTE AREA: 1,500 SQ. FT.
SPRINKLER ORIFICE SIZE: 1/2"
DURATION OF SUPPLY: 30 MINUTES
MAXIMUM COVERAGE/SPRINKLER HEAD: 225 SQ. FT.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne fo ot on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
REMODEL PHARMACY IV
PREP ROOM
1 BID SET 05/18/18 05/18/18
FIRE PROTECTION GENERAL
NOTES
FP-001
Approver TWM JCRevisions Date
J
K
K
L
L
4.9
4.9
3.83.8
J
J
K
K
L
L
4.9
4.9
3.83.8
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne fo ot on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
REMODEL PHARMACY IV
PREP ROOM
1 BID SET 05/18/18 05/18/18
FIRE PROTECTION SECOND
FLOOR PLAN
FP-100
Approver TWM JC
1/4" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN - NEW CONSTRUCTION
1/4" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN - DEMOLITION
DEMOLITION PLAN NOTES FOR AFFECTED ROOMS (BOXED AREA):
PREPARE FIRE SPRINKLER PIPING SYSTEM FOR DEMOLITION OF
WALLS AND CEILINGS BY REMOVING EXISTING FIRE SPRINKLER
HEADS IN THE AFFECTED AREAS, OR BY PROTECTIONG HEADS IN
PLACE.
REWORK EXISTING BRANCH ARM-OVERS FROM OLD LOCATIONS TO
NEW LOCATIONS OF NEW HEADS IN ACCORDANCE WITH THE NEW
ROOM WALL AND CEILING LAYOUTS.
PROVIDE NEW TEE CONNECTION IN EXISTING FIRE SPRINKLER PIPING
AND EXTEND BRANCH ARMOVER TO NEW SPRINKLER HEAD
LOCATION TO ACCOMMODATE NEW WALL AND CEILING LAYOUT
FOR ROOMS.
NEW CONSTRUCTION PLAN NOTES FOR AFFECTED ROOMS (BOXED AREA):
PROVIDE NEW FIRE SPRINKER HEADS FOR ALL REMOVED HEADS, AND FOR
ADDITIONAL HEAD LOCATIONS.
NORTH
NORTH2
1 2 3
EX SAN
SAN
PLUMBING PIPE LINE TYPES
EX VENT
PLUMBING AND FIRE PROTECTION SUPPRESSION GENERAL NOTES
(APPLY TO ALL PLUMBING DRAWINGS)
A. THE PIPING SYSTEMS SHOWN ARE SCHEMATIC. THE INSTALLING
CONTRACTOR SHALL COORDINATE PIPING INSTALLATIONS WITH
THE PIPING, AIR DUCT, AND CONDUIT INSTALLATIONS OF THE FIRE
PROTECTION, HVAC, AND ELECTRICAL CONTRACTORS. VERIFY ALL
PIPE CLEARANCES BEFORE INSTALLATION OF PIPING.
B. THE INSTALLING CONTRACTOR SHALL VERIFY ALL PIPE
CLEARANCES WITH THE BUILDING STRUCTURE BEFORE
INSTALLATION. ALL CONFLICTS SHALL BE REPORTED TO THE
OWNER BEFORE FABRICATION AND INSTALLATION.
C. ALL INTERIOR SANITARY DRAINS 2-1/2" AND SMALLER SHALL BE
SLOPED AT 1/4" PER FOOT MINIMUM. SANITARY AND STORM DRAINS
3" AND LARGER SHALL SLOPE AT 1/8" PER FOOT MINIMUM.
D. INSTALLING CONTRACTOR SHALL BEAR THE RESPONSIBILITY OF
CORRECTLY CONNECTING NEW SANITARY PIPING TO EXISTING
SANITARY PIPING, NEW DOMESTIC WATER PIPING TO EXISTING
DOMESTIC WATER PIPING, AND NEW STORM PIPING TO EXISTING
STORM PIPING.
E. REFER TO ARCHITECTURAL DRAWINGS FOR IDENTIFICATION AND
LOCATIONS OF NEW WALLS. COORDINATE EXACT DIMENSIONS OF
ROUGH-INS WITH CONTRACTOR INSTALLING NEW WALLS.
F. INSTALLING CONTRACTOR SHALL PROVIDE A CLEAN SET OF
AS-BUILT CONTRACT DRAWING PRINTS MARKED IN RED PENCIL,
SHOWING ALL DEVIATIONS FROM CONTRACT DRAWINGS. RECORD
DRAWINGS SHALL SHOW ALL UNDERGROUND PIPING BY DIMENSION
FROM BUILDING WALLS OR STUCTURAL COLUMNS, AND DEPTH
BELOW GRADE OR SLAB. KEEP PRINTS CURRENT WITH EVERYDAY
JOB PROGRESS.
G. PIPING WILL NOT BE ALLOWED TO BE INSTALLED ABOVE ANY
ELECTRICAL EQUIPMENT OR SWITCHGEAR, OR WITHIN THREE(3)
FEET IN FRONT OF SUCH SWITCHGEAR/EQUIPMENT.
H. ALL PLUMBING PIPING SHALL BE INSTALLED AS COORDINATED WITH
HVAC SHOP DRAWINGS THAT SHOW COORDINATION OF ALL PME
TRADES. INSTALL ALL PLUMBING SHUT-OFF VALVES IN AN
ACCESSIBLE LOCATION. COORDINATE WITH HVAC, ELECTRICAL,
AND F.P.C.
I. CONTRACTOR TO FOLLOW THE SPECIFICATIONS FOR ALL
NECESSARY PERMITS AND INSPECTIONS, AND COMPLY WITH ALL
CODE REQUIREMENTS.
PLUMBING ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AHJ AUTHORITY HAVING JURISDICTION
ASSE AMERICAN SOCIETY OF SANITARY ENGINEERS
CA COMPRESSED AIR
CISPI CAST IRON SOIL PIPE INSTITUTE
CO CLEANOUT
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
EA EACH
E.C. ELECTRICAL CONTRACTOR
EX. OR EXISTING
EXIST.
FT FEET OR FOOT
F.P. FIRE PROTECTION (CONTRACTOR)
G.C. GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
HVAC HEATING, VENTILATION, AIR CONDITIONING
OPC OHIO PLUMBING CODE
NFPA NATIONAL FIRE PROTECTION ASSOC.
NHCI NO-HUB CAST IRON
N.T.S. NOT TO SCALE
PDI PLUMBING AND DRAIN INSTITUTE
P.C. PLUMBING CONTRACTOR
PSI POUNDS PER SQUARE INCH
SANU SANITARY UNDERGROUND
SAN SANITARY
SK SINK
SS STAINLESS STEEL
TYP. TYPICAL
V VENT
PLUMBING SYMBOLS
CONNECT TO EXISTING
LIMIT OF DEMOLITION
FLOOR DRAIN
CLEAN OUT
BALL VALVE
PIPE DOWN
PIPE UP
TEE
90 ELBOW
PIPE DOWN
TRAP PRIMER
EXSAN
SAN
SAN VENTV
EXV
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne fo ot on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
REMODEL PHARMACY IV
PREP ROOM
1 BID SET 05/18/18 05/18/18
PLUMBING ABBREVIATIONS /
SYMBOLS
P-001 Approver TWM JCRevisions Date
K
K
L
L
4.9
4.9
3.83.8
J
J
K
K
L
L
4.9
4.9
3.83.8
J
J
K
K
L
L
4.9
4.9
3.83.8
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne fo ot on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
REMODEL PHARMACY IV
PREP ROOM
1 BID SET 05/18/18 05/18/18
PLUMBING FLOOR PLANS
P-100 Approver TWM JC
NORTH
DEMOLITION PLUMBING PLAN NOTES:
DISCONNECT DOMESTIC WATER AND DRAIN PIPING FROM EXISTING SCRUB SINK AND ASSOCIATED
EYEWASH DRENCH HOSE ASSEMBLY. REMOVE FIXTURE AND ACCESSORIES FOR FUTURE RE-
INSTALLATION AT LATER TIME IN PROJECT.
COORDINATE STORAGE OF FIXTURE UNITS WITH VAACC.
REMOVE SCRUB SINK CARRIER AND RE-INSTALL FOR NEW FIXTURE LOCATION. COORDINATE WITH
NEW WALL LAYOUTS AND OTHER TRADES.
NEW CONSTRUCTION PLUMBING PLAN NOTES:
EXTEND EXISTING DRAIN, DCW, AND DHW PIPING FROM EXISTING SCRUB SINK
LOCATION TO NEW SCRUB SINK LOCATION IN WALL CAVITY. PROVIDE REQUIRED
SUPPORTS FOR HORIZONTAL PIPING. INSULATE DOMESTIC WATER PIPING TO MATCH
EXISTING.
PROVIDE BACKING SUPPORT FOR PIPING, DEVICES, APPURTENANCES, AND FIXTURE
ACCESSORIES.
CONFIRM SCRUB SINK CARRIER IS SECURELY ANCHORED AND READY FOR SCRUB
SINK BRACKET SUPPORTS BEFORE WALL COVERING IS APPLIED.
INSTALL SCRUB SINK, INCLUDING EYEWASH DRENCH HOSE ASSEMBLY, AND MAKE
ALL FINAL CONNECTIONS.
CONNECT NEW 2" SANITARY VENT PIPING INTO EXISTING 2" VENT PIPING ABOVE
CEILING. PROVIDE CLEANOUT FITTING FOR TESTING NEW PIPING SYSTEM. SEE FIRST
FLOOR PLAN FOR CONTINUATION.
NEW 2" VENT SERVING NEW MOP SINK.
CONNECT NEW 3/4" DCW AND DHW BRANCH PIPING INTO EXISTING 3/4" DCW AND DHW
PIPING WITH ISOLATION VALVE. EXTEND TO NEW MOP SINK. PROVIDE WATER
HAMMER ARRESTORS AND NON-SLAM CHECK VALVES. PROVIDE PIPING INSULATION
AND PIPE IDENTIFICATION PER SPECIFICATIONS.
PROVIDE NEW MOP SINK BASE AND FAUCET WITH ACCESSORIES. MAKE ALL FINAL
CONNECTIONS.
CONNECT NEW 2" SANITARY BRANCH DRAIN (WITH TEST FITTING) INTO EXISTING 2"
SANITARY DRAIN ABOVE FIRST FLOOR CEILING. EXTEND 2" DRAIN TO NEW MOP SINK
LOCATION AND PROVIDE TRAP AND VENT PIPING TO ABOVE THE SECOND FLOOR.
SEE SECOND FLOOR PLAN FOR CONTINUATION.
NORTH
2 3
MOP SINK
EXISTING 2" SAN. ABOVE
1st FLOOR CEILING
NEW 2" VENT
EXISTING 2" VENT ABOVE
2nd FLOOR CEILING
NEW 2" SAN. ABOVE
1st FLOOR CEILING
STACK DIAGRAM
1AP100
A
N.T.S.
1 3
1 2
1/8" = 1'-0"
SECOND FLOOR PLUMBING PLAN - DEMOLITION
1/8" = 1'-0"
SECOND FLOOR PLUMBING PLAN - NEW CONSTRUCTION
1/8" = 1'-0"
FIRST FLOOR PLUMBING PLAN
NORTH
I
1"ø 1 1/4"ø
2"ø
HW
CW
FIRE
S A
N
4" EXISTING UNDERGROUND
SANITARY
1B012
L
L
M
M
B
B
1B012
1B103A
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
VA Project No.
Drawing Number
Dwg. of on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne fo ot on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT/ENGINEERS:CONSULTANTS:
Collaborative Design,Ltd.
2727 Tuller Parkway, Suite 200
Dublin, Ohio 43017
Tel 614.798.1515 Fax 614.798.5105
COLUMBUS, OH
757-19-201
1A
Chalmers P. Wylie Ambulatory Care Center
REMODEL PHARMACY IV
PREP ROOM
1 BID SET 05/18/18 05/18/18
TEMPORARY TRAILER PLUMBING
PLAN
P-200 Approver TWM PDC
1/4" = 1'-0"
TEMPORARY TRAILER PLUMBING PLAN
NORTH
1/8" = 1'-0"
TRAILER HOT WATER SHUT OFF RM 1A350
1/8" = 1'-0"
TRAILER COLD WATER REMOVAL CORRIDOR 1B012
PLAN NOTES NEW WORK:
EXTEND EXISTING 1" HOT WATER TO NEW TEMPORARY
PHARMACY AND MAKE FINAL CONNECTION WITH VALVE.
EXTEND EXISTING 1-1/4" COLD WATER TO NEW
TEMPORARY PHARMACY AND MAKE FINAL CONNECTION
WITH VALVE.
EXTEND EXISTING 4" SANITARY AND CONNECT TO NEW
TEMPORARY PHARMACY.
EXTEND EXISTING 2" FIRE PROTECTION TO NEW
TEMPORARY PHARMACY AND MAKE FINAL CONNECTION.
MAINTAIN EXISTING 140°F HOT WATER TEMPERATURE
CABLE ON HOT WATER LINE COMPLETE TO CONNECTION
TO TEMPORARY PHARMACY.
PROVIDE SELF-REGULATING UL LISTED COMMERCIAL
GRADE FREEZE PROTECTION CABLE TO PROTECT
EXPOSED SANITARY PIPING FROM FREEZING. SYSTEM
SHALL BE COMPLETE WITH POWER CONNECTIONS, END
CAPS, AND GROUNDING LUG. CABLES SHALL BE
PERFORMANCE BASED AT -21°F @ 6W/FT. INSULATE PER
MANUFACTURER'S REQUIREMENTS.
EXISTING 1" HOT WATER, 1 1/4" COLD
WATER, & 2" FIRE PROTECTION.
PLAN NOTES DEMOLITION WORK:
AFTER VA HAS MOVED OUT OF TEMPORARY
PHARMACY, REMOVE FIRE PROTECTION PIPING
FROM TEMPORARY PHARMACY BACK TO THIS
POINT AND CAP.
AFTER VA HAS MOVED OUT OF TEMPORARY
PHARMACY, REMOVE COLD WATER LINE BACK TO
MAIN IN CORRIDOR 1B012 (APPROXIMATELY 180')
AND CAP AT MAIN.
AFTER VA HAS MOVED OUT OF TEMPORARY
PHARMACY, SHUTOFF 1" DHW SERVING
TEMPORARY PHARMACY AT 2-1/2" MAIN. DRAIN
PIPING DOWN STREAM OF CLOSED VALVE.
AFTER VA HAS MOVED OUT OF TEMPORARY
PHARMACY, REMOVE…